This solicitation seeks proposals for a firm fixed-price construction contract to replace boilers in three buildings at the Mississippi Air National Guard base. The contractor will remove existing boilers in Building 238 and have options to remove boilers in Buildings 236 and 237, replacing them with new, efficient boilers including related circulation pumps and components. A pre-bid conference will be held on August 18th and bids are due by September 8th, with award anticipated by September 30th if funds are available. The requirement is designated as a 100% small business set-aside for NAICS code 238220 with a size standard of $16.5 million in average annual revenue. The solicitation, plans and specifications are available through the SAM website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S7H22B0002 Solicitation Questions 8/23/2022
1. Can the Site Superintendent also fill the role of Quality Assurance and Safety Coordinator, or should each of these be separate individuals?
-Yes, the Site Superintendent may also fill the mentioned rolls.
2. If Quality Assurance is a separate individual(s), are periodic quality checks acceptable, or is a full time person expected?
-N/A-See response to question #1.
3. Can the mechanical and electrical plans, details, and schedules for each of the mechanical rooms be made available?
-As-Builts will be provided. Check SAM.gov
4. “Highly efficient” boiler as requested in the statement of work is being interpreted as a premium quality and efficiency, non-condensing boiler, but not necessarily a condensing-type boiler. Please confirm.
-The boiler should match the efficiency of the existing boilers/facility requirements.
5. Are portable sanitary toilets to be provided by contractor or will construction personnel have access to facilities on site?
-Because some boilers are located in secure areas, portable sanitary toilets will be required.
6. Statement of work says boilers are to be salvaged and placed on a trailer provide by the MSANG. Are pumps to be disposed of by contractors?
-Both boilers and pumps are to be placed on trailer provided by MSANG, but the contractor is responsible for removing any gases or fluids prior to loading. MSANG will be responsible for disposing.
7. Statement of work does not mention replacement of inline circulation pump in primary loops. Are these pumps considered a boiler appurtenance and to be replaced along with boilers?
-Yes, the inline circulation pump along with necessary components related to a new boiler will need to be replaced.
8. No asbestos or any other hazardous material is present at any of the worksites. Please confirm.
-Correct.