Base_Engineering_Service_Memo_(ESM)_.pdf
PDF 58 KB Posted
- Attached to
- Advanced Subscale Aerial Platform (ASAP)
- Solicitation number
- W31P4Q-17-R-0024
About this file
BASE ESM
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W31P4Q17R0024-0002.pdf | ||
| W31P4Q17R0024-0001.pdf | ||
| Preaward_Survey_-_Accounting_System_Checklist.pdf | ||
| Encl_5_-_CLIN_Structure.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| Small_Business_Participation_Proposal.docx | DOCX document | |
| ASAP_Performance_Specs.pdf | ||
| DD254.pdf | ||
| ASAP_SOW_30Nov2016.pdf | ||
| ASAP_CDRLs.pdf | ||
| W31P4Q17R0024.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING SERVICES MEMORANDUM (ESM)
FOR
ADV AN CED SlBSCALE AERIAL PLATF'ORM (ASAP) SYSTEM
1. ESM NUMBER: Base_··--- (contract year)
2. DATE: ____ (day, month, year)
3. SYSTEM AND EQUIPMENT: Advanced Subscale Aerial Platform System, Control Systems, Ground Support Equipment and Associated Mission Payload Equipment
4. PROJECT TITLE: Engineering Assistance, Derivative System Design, Prototype Fabrication, Prototype Demonstration, Field Support, Low Rate Production, and Failure Analysis and Correction.
5. MAJOR ITEM: Advanced Subscale Aerial Platform System and Subsystems, Control Systems, Ground Support Equipment and Mission Payload Equipment
6. CONTRACTOR AND CAGE NO:
7. CONTRACT NO:
8. NEED FOR PROPOSED WORK AND OBJECTIVES
The contractor shall research, analyze, develop, test and evaluate ASAP target systems, mission payload equipment, control systems, and ground support equipment to resolve deficiencies identified during field operations, upgrade the ASAP target system to incorporate additional DoD requirements and establish derivative aerial targets to meet adjustments in the test missions. Thi~; engineering support includes research, design, analysis, development, prototypes, associated hardware integration, software development, testing, and integration, proof of principle test planning, data evaluation, documentation, and reporting. This support also includes field flight engineering support as well as logistical services that will be required. The engineering support shall be defined by Sub-ESMs and this ESM.
9. DESCRIPTION OF PROPOSED WORK:
The engineering support covered by this base ESM applies to aerial target systems and related equipment including controls systems and ground support equipment. Sub-ESM or task orders will be generated that define the specific tasks to be conducted in order to improve.
correct, expand, and modify the capahilitie~. of existing or new aerial target systems to meet training and test support requirements. This base ESM and approval of subsequent Sub-ES Ms shall obligate the contractor to provide the engineering support for aerial targets and related equipment used by TMO and its customers. No effort shall be expended unless it is covered under a Sub-ESM authorized by the Government. Field support covered by this Base ESM applies to operations conducted at Redstone Arsenal, AL; Orogrande Range Camp, NM;
McGregor Range, Fort Bliss, TX; and other worldwide locations where the aerial target systems may be located. Sub-ESMs will be issued that will define where on-site engineering field support is to be conducted. On-site engineering assistance will be used to support flight operations, training, and weapon system certifications that make use of the aerial target systems.
The specifics of the technical support will be directed by the Government through Sub-ESMs.
Engineering tasks anticipated to be covered by Sub-ESMs include the following:
9.1 Assistance shall be provided in research, development, and evaluation of the ASAP target systems, derivative equipment. control systems, derivative control systems, mission payload equipment, ground support equipment, and system and support system software.
9 .2 Proof of pri.nciple evaluation tests shall be conducted that include environmental testing and other testing to determine the performance of the ASAP targets under certain specific conditions and to improve the design of the system components.
9.3 Engineering support shall be provided for various Government agencies involving target operations.
9.4 Detailed engineering support shall be provided to continuously improve the capabilities of the ASAP target systems to include design changes that are necessitated by obsolescence of comporn~nts and subsystems or changes necessary to meet future operational requirements.
9.5 Prototype equipment shall be developed and tested to implement design changes required to improve the operational capabilities of the aerial systems.
9.6 Low rate production quantities of derivative air vehicles and support equipment shall be fabricated to validate production plans, system performance, and establish initial minimum Government stock:~ of derivative systems.
9. 7 Documentation shall be prepared that fully describes the hardware and software design changes resulting from the Sub-ESMs generated under this. Base ESM.
9.8 Design reviews shall be supported as well as periodic conferences called to assess the status of work under each of the Sub-ESMs.
9.9 Reports sha.ll be generated on a monthly basis to document the engineering accomplishments, costs incurred, and progress achieved.
10. ESTIMATED HOURS:
11. GOVERNMENT FURNISHED EQUIPMENT (GFE):
GFE, if required, will be defined in individual Sub-ESMs.
12. ESTIMATED COMPLETION DATE:
The completion dates shall be in accordance with each individual Sub-ESM. The Government will establish priorities by Sub-ESM for work within a Sub-ESM as required.
13. SUBMITTED BY:
Project Manager for Instrumentation, Targets, and Threat Simulators Targets Management Office
ATTN: SFAE-STRI-PM ITTS-QE
Redstone Arsenal, AL 35898-7458
File details come from the government source that posted it. Updated .