A07_Summary_of_Changes_to_STT_Radome_SOW.pdf
PDF 19 KB Posted
- Attached to
- RADOME for Satellite Transportable Terminals Federal contract opportunity
- Solicitation number
- W25G1V18R0019
About this file
Summary of Changes to PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A07_Questions_and_Answers.pdf | ||
| A07_Summary_of_Changes_for_STT_RADOME_SOW_02.pdf | ||
| A07_Attachment_I_SOW_STT_Radome_AMENDMENT_02.pdf | ||
| A07_Solicitation_Amendment_0002.pdf | ||
| A07_Questions_and_Answers.pdf | ||
| A07_Attachment_1_SOW_STT_Radome_AMENDED.pdf | ||
| A07_Solicitation_Amendment_0001.pdf | ||
| A07_Attachment_I_SOW.pdf | ||
| A07_Solicitation_W25G1V18R0019.pdf | ||
| A07_Attachment_V_Past_Performance_questionnaire.pdf | ||
| A07_Attachment_III_KO's_determination_brand_name_connector_REDACTED.pdf | ||
| A07_Attachment_II_Wage_Rate_Requirements_(Construction).pdf | ||
| A07_Attachment_IV_Small_Business_Participation_Plan.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF CHANGES TO
Statement of Work Requirement and Specification for Installation of an Equipment Shelter
Housing Satellite Transportable Terminals at
Tobyhanna Army Depot Tobyhanna, PA Revision: Initial Release
Date: 12 March 2018
SOW Paragraph 2.6 Add:
J. UFC 3-260-01, AIRFIELD AND HELIPORT PLANNING AND DESIGN, 17 NOVEMBER 2008.
SOW Paragraph 3.1.2 Change:
A. Approximate Radial Azimuth from Radome and external pad to 100 FT Target Tower relative to True North: 283 DEG.
C. Approximate Coordinates – Longitude, Latitude: 75° 26’10.807”W 41° 11’ 57.176”N.
Add:
E. Approximate coordinates of existing 100 FT Target Tower is – SPC: 2,604,434E 384,879N FT.
F. Approximate coordinates of existing 100 FT Target Tower is – Longitude, Latitude: 75° 26’19.726”W 41° 11’ 59.021”N.
SOW Paragraph 3.1.3.
Change:
The Equipment Shelter Site configuration and layout shall be such that the axis formed by the line connecting the center point of the Radome and the center point of the external pad is aligned parallel to Perimeter Road at an approximate radial azimuth of 220 DEG relative to True North. Each pad (Radome and external) shall have a clear line of sight to the 100 FT Target Tower. The line of sight is critical to antenna targeting and alignment shall be clearly shown on all Contractor Site Plan DWGs. Design Site Plan DWGs showing the Radome rotational positioning and layout shall be provided to the Government at the 35% design review. The Equipment Shelter Site configuration shall be IAW UFC 3-260-01 referenced in Paragraph 2.6.J.
SOW Paragraph 3.3.8.
Change:
NOTE: These survey monuments (A and B above) are to be in-line with the 100 FT target tower center located approximately 715 FT from the Equipment Shelter Site. The Contractor shall provide the bearing from the each of the two (2) in-line center of pad monuments toward the direction of the 100 FT target tower at the tower’s center, after survey is complete. The survey results shall be determined and provided to the Government IAW Appendix A. The bearing and monument survey information shall be shown on all Contractor site plan DWGs.
SOW Paragraph 3.9 Change:
One access door shall be positioned such that the center of the opening is facing the 100 FT target tower.
File details come from the government source that posted it.