A008_-_MSE_(AIE-SIE).pdf

PDF 679 KB Posted

Attached to
M1061 60mm He Mortar Cartridge
Solicitation number
W15QKN-17-R-0041
Issued by

About this file

CDRL MSE

View the file

Other files

File Type Posted
Attachment_0001_Price_Matrix_M1061_W15QKN-17-0041.xlsx XLSX spreadsheet
W15QKN17R0041-0006.pdf PDF
Round_6_Questions_and_Answers_M1061_Solicitation_W15QKN-17-R-0041.docx DOCX document
Round_5_Questions_&_Answers_M1061_Solicitation_W15QKN-17-R-0041.docx DOCX document
Round_4_Questions_and_Answers_M1061_W15QKN17R0041.docx DOCX document
Questions_and_Answers_Round_3_M1061_W15QKN-17-R-0041.docx DOCX document
Amendment_0005_W15QKN-17-R-0041.pdf PDF
Round_2_Questions_and_Answers_M1061_W15QKN-17-R-0041.docx DOCX document
W15QKN-17-R-0041_Amendment_0004.pdf PDF
Question_and_Answers_Round_1_M1061_Final_Approved.docx DOCX document
W15QKN17-R-0041-Amendment_0003.pdf PDF
Clarification___2__to_Solicitation_W15QKN-17-R-0041.docx DOCX document
Clarification_1_for_Solicitation_W15QKN-17-R-0041.docx DOCX document
W15QKN-17-R-0041-Amendment_0002.pdf PDF
A003_-_RFV.pdf PDF
Attachment_0002_DD_2345_Military_Critical_Technical_Data_Agreement.pdf PDF
Attachment_0007_-_FORM_3002_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
A016_-_Delay.pdf PDF
A012_-_CCCP_and_CPOA.pdf PDF
A002_-_NOR.pdf PDF
Attachment_0009_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
A011_-_Audit_Report.pdf PDF
A023_-_OPSEC.pdf PDF
Attachment_0001_Price_Matrix_M1061_W15QKN-17-0041.xlsx XLSX spreadsheet
A001_-_ECP.pdf PDF
Attachment_0008-Past_Questionnaire__M1061.docx DOCX document
A005_-_Test_Plan.pdf PDF
A009_-_FACAR.pdf PDF
A004_-_QPP.pdf PDF
W15QKN-17-R-0041-Amendment_0001.pdf PDF
A022_-_PA_and_IPR.pdf PDF
A019_-_POP.pdf PDF
A007_-_Material_Cert.pdf PDF
Attachment_0005_Technical_Data_Request_Questionnaire_-_AMSTA-AR_1350.pdf PDF
A015_-_ADC.pdf PDF
A020_-_IMS.pdf PDF
A006_-_FAT_and_LAT.pdf PDF
A013_-_CSI_and_CCDR.pdf PDF
Attachment_0004_-_Data_Item_Descriptions_(DID)_Index.docx DOCX document
A017_-_QQM.pdf PDF
Attachment_0011-_Scheduled_Government_Property_Spreedsheet_M1061.pdf PDF
A021_-_GFM_QDR.pdf PDF
Attachment_0006_-_Disclosure_Lobbying_Activities.pdf PDF
A014_-_SPC.pdf PDF
Attachment_0010_-_Technical_Data_Package_Info.docx DOCX document
A018_-_Accident_Report.pdf PDF
Attachment_0003_Non-Disclosure_Agreement_(NDA)__W15QKN-17-R-0041.docx DOCX document
W15QKN-17-R-0041_Final_Solicitation.pdf PDF
A010_-_QMS_Audits.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED Page____of____

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP _______ TM _______ OTHER ____________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9. DIST STATEMENT REQ’D 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13.13. DATE OF SUBSEQUENT SUBMISSION

Draft Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1 DATA ITEM NO:
2 TITLE OF DATA ITEM: MEASUREMENT SYSTEM EVALUATION (MSE)
3 SUBTITLE: Acceptance Inspection Equipment (AIE)
5 CONTRACT REFERENCE:
6 REQUIRING OFFICE: RDAR-EIQ-MC
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: A
10 FREQUENCY: As Required
12 DATE OF FIRST SUBMISSION: See Block 16
11 AS OF DATE: As Required
13 DATE OF SUBSEQUENT SUBMISSION: See Block 16
a ADDRESSEERow1: ACC-NJ-CA
DraftRow1: 1
RegRow1: 1
ReproRow1:
a ADDRESSEERow2: RDAR-MEM-M
DraftRow2: 1
RegRow2: 1
ReproRow2:
a ADDRESSEERow3: RDAR-EIQ-PE
DraftRow3: 1
RegRow3: 1
ReproRow3:
a ADDRESSEERow4: Government QAR
DraftRow4: 1
RegRow4: 1
ReproRow4:
a ADDRESSEERow5: SFAE-AMO-CAS
DraftRow5: 1
RegRow5: 1
ReproRow5:
a ADDRESSEERow6: RDAR-EIQ-MC
DraftRow6: 1
RegRow6: 1
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL: 6
Reg15 TOTAL: 6
Repro15 TOTAL:
H DATE: 8 Nov 2016
J DATE: 8 Nov 2016
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: 60mm M1061 HE Mortar Cartridge W/Fuze M734A1
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
Remarks: The Measurement and Inspection Equipment System Design documentation for Acceptance of Product describes the Acceptance Inspection Equipment (AIE), Automated AIE (AAIE), and various measurement systems, used to meet the inspection and test requirements to deliver units and other end products that conform to contract, specification, QAP and drawing requirements. This documentation is used to evaluate the acceptability of these designs to meet contract requirements.

Submit at least 180 days prior to FAT, or production if FAT is waived. The government will respond within 60 days of receipt. Revisions are to be submitted within 10 days of government response. If documentation was approved on prior contract and no changes were made, submit only evidence of prior approval.

Note: Incomplete submission is considered delinquent

BLOCK 5: Applicable to all AIE designs that are used to perform examination and test in accordance with the item specifications. All AIE designs shall be approved prior to the First Article submission. All AIE shall be available for use at FAT.

BLOCK 14: Submit electronically. E-mail addresses for the listed offices will be provided at Contract/Post award.

2017-02-23T14:20:55-0500
CHAMBERS.DARRIN.S.1367772740
2016-11-08T12:08:21-0500
CHAMBERS.DARRIN.S.1367772740
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-QCIC-81960

File details come from the government source that posted it. Updated .