VTTC Display SOW For RFP.docx
DOCX document 639 KB Posted
- Attached to
- Out of the Window Threat Display System
- Solicitation number
- N6833520R0421
About this file
This statement of work outlines requirements for a visual display system to support fast jet aircraft simulation at Nellis Air Force Base. The Navy requires procurement, installation, and setup of four dome display systems with spherical screens between 1.3 and 1.5 meters in radius and a field of view of 220 degrees horizontal by 90 degrees vertical. Options are included for an additional four display systems in 2022. The systems must provide a seamless visual image, meet resolution, luminance, contrast, and latency requirements, and include automatic alignment and calibration. Installation is to be completed within 12 weeks at the secure Navy facility, with training and documentation also required. The opportunity was solicited under Navy contract N6833520R0421 for visual display systems to support threat simulation training.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6833520R0421 Amendment 2.docx | DOCX document | |
| Second Q and A .docx | DOCX document | |
| N6833520R0241 Amendment 1.docx | DOCX document | |
| Q and A.docx | DOCX document | |
| CDRLA004 - 3D Model.pdf | ||
| Released RFP.docx | DOCX document | |
| CDRLA001 - EDR.pdf | ||
| CDRLA003 - Operator-Maint-ICD.pdf | ||
| CDRLA002 - CDR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications / Statement of Work F-35 JSE High Fidelity Visual Display System
1.0 INTRODUCTION
The Joint Simulation Environment (JSE) program is installing aircraft simulation stations in a recently constructed facility at Nellis Air Force Base, Nevada (Nellis). This contract is for the procurement, installation and set-up of four dome display systems at Nellis in mid-to-late 2021, with an option to procure four additional dome display systems in 2022.
These display systems are to be used for fast-jet aircraft simulations. The facility has floor space restrictions, Field of View (FOV) requirements, and a future use of a Helmet Mounted Display (HMD) requirement with a 60” (1.5 m) focal distance that requires a dome display system with a 1.3-1.5m screen radius with the pilot’s eye point at the screen center.
Use of this display system is for simulation of single-seat fixed wing aircraft operating in the simulated world in dawn, day, dusk and night time Out-The-Window (OTW) visual scene conditions. NVG compatibility is not required, as simulated NVG video is displayed through a helmet mounted display. The display system shall provide a seamless OTW visual image across the field of view and shall not have visible changes of brightness in areas where individual projected images overlap (blend zones).
A Heads-Up-Display (HUD) image is to be projected on the screen for situations where the HMD is not used.
This specification establishes performance requirements for a Visual Display System (VDS) required to support these Nellis simulation systems. For the purposes of this document, a VDS is defined as an OTW display screen, image projectors, auto alignment and calibration system, mechanical/optical edge blending solution, and support structures and interfaces.
| 2.0 | PROGRAM REQUIREMENTS (Entire Paragraph including Subparagraphs Applies to CLINs 0001 and 0002) |
| 2.1 | Meetings |
| 2.1.1 | Engineering Design Review (EDR). The contractor shall host an EDR at a mutually agreed upon date. The contractor shall demonstrate compliance with the technical performance requirements. The contractor shall review schedule, preliminary test plan, installation plan, and identify any risks. Preliminary drawings showing the general arrangement/installation of all equipment and defining mechanical and electrical interfaces shall be presented. The EDR may be held remotely (phone/video conferencing). At the contractor’s request, it may include or follow a site survey of the installation site. (CDRL A001) (Also applies to CLIN 0003) |
| 2.1.2 | Critical Design Review (CDR). Final design review shall include the installation plan presentation. The contractor shall host a CDR at a mutually agreed upon date. The design review may be held at the installation location, Patuxent River NAS, or via teleconference (CDRL A002). (Also applies to CLIN 0003) The contractor shall present: |
| 2.1.2.1 | Final general arrangement and interface drawings. |
| 2.1.2.2 | An installation plan demonstrating the feasibility of assembling and locating the display systems within the confinements of the available spaces. |
| 2.1.2.3 | A 3D CAD models of the major subassemblies and top level assembly (CDRL A004) (Also applies to CLIN 0003). The 3D CAD model may be limited to major exterior surfaces as required to document integration of the VDS into the facility and incorporation of other simulation systems. |
| 2.1.2.4 | Documentation detailing how all requirements of the system requirements will be met. This information may be provided in PowerPoint format. |
| 2.1.2.5 | A preliminary recommended spares list. |
| 2.1.2.6 | A test plan, including schedule and equipment requirements. |
| 2.1.2.7 | Power requirements, power connector part numbers (or commercial connector specification), and any cooling requirements. |
2.2 Installation and Setup
| 2.2.1 | The contractor shall install, setup, and calibrate the VDS in a secure government facility located at Nellis Air Force Base, Nevada. Installation will occur in a secure facility that will require government escorting of the contractor’s employees. Only U.S. Citizens will be able to access this facility.” |
| 2.2.2 | Access to the base for installation is time limited. On-site installation of VDS ordered at the same time shall be completed in 12 weeks or less. |
| 2.2.3 | The contractor shall be responsible for furnishing all equipment and tools required for installation and testing of the VDS. |
| 2.2.4 | The contractor shall be responsible for video connectivity to the image generator, located in an electronics rack next to each display system. |
| 2.3 | Acceptance Testing |
| 2.3.1 | The contractor shall perform VDS acceptance testing demonstrating compliance with the technical performance requirements. A complete set of testing shall be performed on the first installed VDS. Testing of the remaining VDSs may be waived where the customer can verify conformance with the performance of the first tested VDS. The acceptance testing shall, as a minimum, verify the following system performance characteristics: |
2.3.2 Field of View. The contractor shall verify image coverage of the required field of view and image geometry position accuracy to +/- 1 degree across the dome image.
2.3.3 Luminance Measurements. Acceptance testing shall include light meter measurements (in Foot-Lamberts) verifying the average luminance and contrast of the VDS using an ANSI 50% black and 50% white checkerboard test pattern with all projectors displaying the test pattern.
2.3.3 Resolution Measurements. Acceptance testing shall include resolution measurements using a set of ten white and black vertical and horizontal line pairs. Customer viewing of line pairs on the dome, as follows, to determine the point at which the line pairs are discernable as line pairs on the dome surface.
2.3.3.1 Perform resolution measurement at the center of each projected image.
2.3.3.2 Calculate the arc-minute/Optical Line Pair for each projected image.
2.3.3.3 Calculate the average for all of the arc-minutes/Optical Line Pair measurements.
2.3.4 Intensity Matching. Acceptance testing shall include customer subjective Pass/Fail white intensity matching evaluation across all projected images using full field 0%, 50% and 100% white level test patterns without distracting visible anomalies.
2.3.5 Color Matching. Acceptance testing shall include customer subjective Pass/Fail Color matching evaluation of dawn, day, dusk, and night across all projected images using 5 customer-selected visual database OTW scenes without distracting visible anomalies.
2.3.6 Blend Zone. Acceptance testing shall include customer subjective Pass/Fail of non-discernable blend zone evaluation of dawn, day, dusk, and night across all projected images using 5 customer-selected visual database OTW scenes without distracting visible anomalies.
2.4 Documentation
Documentation provided with the display systems shall include:
| 2.4.2 | (CDRL A003) (Also applies to CLIN 0003) Operator’s Manual(s) with operational procedures for subsystems provided with the display system shall be provided by the contractor. |
| 2.4.3 | (CDRL A003) (Also applies to CLIN 0003) Maintenance Manual(s) that describes all preventive and corrective maintenance procedures, including equipment overhauls, with recommended maintenance intervals shall be provided by the contractor. Maintenance manuals shall address operation of all auto-calibration procedures required to maintain an accurate and seamless image. The Maintenance Manual(s) shall provide detailed fault detection and diagnostic information. |
| 2.4.4 | A listing of recommended spares, consumables, tools and test equipment shall be provided by the contractor. |
| 2.4.5 | (CDRL A004) (Also applies to CLIN 0003) As delivered 3D STEP or IGES mechanical engineering modeling software file of the display system, or drawings sufficient to model basic structure for the purpose of laboratory design and maintenance shall be provided by the contractor. |
| 2.5 | Training |
The following training shall be provided with initial system delivery:
| 2.5.1 | One time on-site training in use of automatic alignment/calibration solution shall be provided by the contractor. Duration of training is anticipated to be 2 days or less and is to be provided to 1-4 Navy / Air Force employees. Training shall be provided after the successful completion of the acceptance tests for the first Visual Display System. |
| 2.6 | Delivery Schedule |
Delivery, installation, and acceptance testing schedules shall be finalized at the CDR meeting. A short or compressed installation, setup and testing schedule is desirable.
3 DISPLAY PERFORMANCE (Entire Paragraph including Subparagraphs Applies to CLINs 0001 and 0002)
3.1 Field of View (FOV)
The VDS FOV as seen from the Pilot’s Eye point at the geometric center of the dome display screen is detailed in the Table 1 below. Horizontal FOV shall be the same in both the left and right directions. The front of the crew-station is expected to protrude through the front of the dome, requiring a cut-out in the screen. Parts of the screen not visible to the pilot because of the crew-station are not a required part of the FOV. Minimum and maximum values are given where flexibility is available.
Table 1: FOV Requirements
| Target Value |
| Minimum Value |
| Maximum Value |
| Vertical FOV (Total) |
| 90° |
| 85° |
| 95° |
| Downward Vertical FOV |
| -30° |
| -25° |
| -35° |
| Upward Vertical FOV |
| 60° |
| 55° |
| 65° |
| Horizontal FOV. |
| 220° (+/- 110°) |
| 215° |
| 225° |
3.2 Display Screen
3.2.1 To minimize parallax errors between the display system and helmet mounted display, the display screen shall be spherical in shape with pilot eye point located at the spherical center.
3.2.2 The radius of the screen surface shall be between 1.3m and 1.5m, with the 1.5m radius being preferred.
3.2.3 As shown in Appendix A, Figure 1, the Pilot Eye Point (PEP) for the Crewstation is 47.63” above the floor.
3.3 Resolution
3.3.1 Average resolution over the FOV shall be 5.2 arc-minutes / optical line pair or better.
3.3.2 Minimum average resolution over the projected area for any single projector shall be 6 arc-minutes / optical line pair or better.
3.4 Luminance
3.4.1 The minimum average white square luminance shall be 10 foot-Lamberts measured using the ANSI 50/50 white/black checkerboard test pattern.
3.4.2 Luminance at each point in the display shall not vary by more than 50 percent between any two matching (white and white, or black and black) squares within a viewing zone.
3.5 Contrast
3.5.1 The minimum average contrast ratio shall be 10:1.
3.5.2 The contrast ratio measurement shall be made using the ANSI 50/50 white/black checkerboard test pattern with all displays simultaneously illuminated with the test pattern. The pattern shall provide at least 8 squares per display channel with 50 percent of the squares at the specified minimum acceptable luminance.
3.6 Color
Minimum per color bit depth of 10 bits per primary color is required.
3.7 Display System Latency.
The latency of rendering of a full scene, which is measured from the projector first pixel input data of a frame to the light of that pixel on the display surface, shall be 27 milliseconds or less.
3.8 Distortion Correction / Image Blending
A solution shall be provided for projected image distortion correction, blending, color matching as required for seamless projected image across the FOV. Distortion correction and blending functions may be performed by a system provided by the contractor or through software installed on the government supplied image generation system. Up to 6U of space in government supplied 19” electronics racks that will be located next to each display system – and also house the image generator - can be made available for the contractor’s equipment. An Aechelon Nucleus image generation system will be used with these display systems.
3.9 Non-discernable Edge Blending
The blending area between the projectors shall not be discernable to the human eye. The blending areas shall not be discernable for Dawn, Day, Dusk, and Night scenes. Night Vision Goggle support is not required. It is expected that mechanical/optical edge blending may be required for seamless night-time imagery.
3.10 Automatic Alignment System
The display system shall incorporate automatic alignment and calibration functionality allowing the user to correct geometric distortion and blending to maintain a seamless image after installation. Distortion and blending maintenance corrections shall take less than an hour to perform.
3.11 Projector Control / Communication
There shall be a method for communicating with the projectors for the purpose of controlling on/off/standby status of all projectors from a government supplied host computer.
3.12 Projectors
The projectors supplied with the system shall use solid-state technology to minimize cost of ownership (lamp life). Video connection to the projectors shall use Display Port cables.
3.13 HUD Projector
A HUD projector shall be provided to project heads-up-display graphics on the screen in front of the crew-station covering a 30° x 30° degree area as viewed from the PEP. The HUD projector shall have sufficient contrast so that the background is not visible during day-time simulation. Geometric image correction for the HUD image shall be provided with the system. Security Requirements Network equipment (such as could be required for projector communication) will require prior approval. Wireless electro-magnetic communications (such as Wi-Fi and Blue-Tooth) are prohibited in the installation space.
4 PHYSICAL SPECIFICATIONS REQUIREMENTS (Entire Paragraph including Subparagraphs Applies to CLINs 0001 and 0002)
4.1 Facility Installation
4.1.1 The display system shall fit into a 130” wide x 130” deep x 120” high volume. The preferred footprint is 120” x 120” due to facility space constraints. Equipment and structures more than 7 feet above the ground (above head height) can protrude an additional 12” outside of this volume on aft side of the VDS. Subsequent to an inspection of the installation site, some additional height may be available.
4.1.2 A raised flooring system is installed in the installation room with smooth surfaced tiles. Display systems may be secured to the flooring system if required. It is not believe that the flooring system can support heavy machinery such as a fork-lift.
4.1.3 The room the display system are to be installed in is approximately 41’ x 65’ (12.5m x 19.8m). See Appendix A, Figure 2.
4.1.4 Display system equipment and structures shall enter the installation room through a 14’ x 14’ (4.2m x 4.2m) exterior door going directly into the room.
4.1.5 The government will provide a single electrical power connector for the VDS per the contractor’s requirement, up to a maximum of a 220 VAC x 30A connection. Separate power at the station will be provided for the government’s electronics rack and crew-station.
4.2 Crew-Station
4.2.1 Basic dimensions (in inches) for the crew-station to be used inside of the display system are shown in Appendix A, Figure 1. A 3D model of the crew-station can be provided by the government in STEP or IGES format on request.
4.2.2 Based on the size of the screen and required FOV, a rectangular cutout in the front of the display screen will be required to accommodate the Crewstation.
4.2.3 Pilots access the crew-station from the side of the cockpit. A clear walking path from the back of the display system to the side of the crew-station is required for ingress/egress.
Appendix A Figure 1: Crew-Station Dimensions
Appendix A Figure 2: Preliminary Room Layout image1.tif image2.png