Village of North Aurora Crack Sealing Project Summary
This is a Local Public Agency Formal Contract Proposal document for the Village of North Aurora in Kane County, Illinois, for crack sealing work at various locations throughout the village. The project, designated as Section 27-00000-01-GM, involves routing, cleaning, and filling cracks in asphalt pavement in accordance with Section 451 of the Standard Specifications for Road and Bridge Construction. The work encompasses 47,000 pounds of crack filling material across approximately 28,601 linear feet of roadway spanning 80,385 square yards at multiple street locations within the corporate boundaries. Sealed proposals are due on July 15, 2026, at 10:00 AM at the Village of North Aurora office located at 25 East State Street, North Aurora, Illinois 60542, with public opening and reading of proposals occurring at the same time and location. The contractor must complete all work by September 30, 2026, and must provide 48 hours' notice prior to initial start of work. A preconstruction meeting is required, and the contractor shall attend and submit a progress schedule on Bureau of Construction form BC 255 or an approved alternate Gantt chart.
The project is funded through Motor Fuel Tax (MFT) funds and is designated as a Proposal Only contract, with plans being separate. Bidders must submit a Local Public Agency Formal Contract Proposal (BLR 12200), Schedule of Prices (BLR 12201), a Proposal Bid Bond (BLR 12230) equal to 5 percent of the total bid price, Apprenticeship or Training Program Certification (BLR 12325), and an Affidavit of Illinois Business Office (BLR 12326). The apparent low bidders must file an Affidavit of Availability (Form BC 57) within 24 hours after the letting. The successful bidder will be required to deposit a contract bond for the full contract amount and maintain general liability insurance with the Village of North Aurora named as additional insured. All costs associated with job site maintenance and cleanup, traffic control planning, and crack routing are considered incidental to the contract. Liquidated damages of $475 per day will accrue if work is not completed by the September 30, 2026, deadline. Prevailing wage rates for Kane County, effective May 21, 2026, apply to all workers performing work on this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| city of harvard rock salt.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Local Public Agency Formal Contract Proposal
Page 1 of 6 BLR 12200 (Rev. 01/19/23)Completed06/24/26
Proposal Submitted By:
Contractor's Name
Contractor's Address City State Zip Code
STATE OF ILLINOIS
Local Public Agency
Village of North Aurora County
Kane Section Number
27-00000-01-GM
Route(s) (Street/Road Name)
Various Type of Funds
MFT
Proposal Only Proposal and Plans Proposal only, plans are separate
Submitted/Approved For Local Public Agency:
Note: All proposal documents, including Proposal Guaranty Checks or Proposal Bid Bonds, should be stapled together to prevent loss when bids are processed.
COVER SHEET
For a County and Road District Project
Submitted/Approved
Submitted/Approved
Highway Commissioner Signature & Date
County Engineer/Superintendent of Highways Signature & Date
For a Municipal Project
Submitted/Approved/Passed
Official Title
Signature & Date
Department of Transportation
Released for bid based on limited review Regional Engineer Signature & Date
BLR 12200 (Rev. 01/19/23)Page 2 of 6Completed06/24/26
Route(s) (Street/Road Name)
Various Section Number
27-00000-01-GM
County
Kane Local Public Agency
Village of North Aurora
NOTICE TO BIDDERS
Sealed proposals for the project described below will be received at the office of Name of Office the Village of North Aurora
Address 25 East State Street, North Aurora, IL 60542 until
Time 10:00 AM on
Date 07/15/26 .
Sealed proposals will be opened and read publicly at the office of Name of Office the Village of North Aurora
Address 25 East State Street, North Aurora, IL 60542 at
Time 10:00 AM on
Date 07/15/26 .
DESCRIPTION OF WORK
Location
Various Project Length
Proposed Improvement Crack sealing at various locations throughout the Village of North Aurora.
1. Plans and proposal forms will be available in the office of the Village of North Aurora, 25 East State Street, North Aurora, IL 60542 and at http://northaurora.org/government/rfp-rfq-bidding.aspx
2. Prequalification If checked, the 2 apparent as read low bidders must file within 24 hours after the letting an "Affidavit of Availability" (Form BC 57) in triplicate, showing all uncompleted contracts awarded to them and all low bids pending award for Federal, State, County, Municipal and private work. One original shall be filed with the Awarding Authority and two originals with the IDOT District Office.
3. The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals.
4. The following BLR Forms shall be returned by the bidder to the Awarding Authority:
a. Local Public Agency Formal Contract Proposal (BLR 12200)
b. Schedule of Prices (BLR 12201)
c. Proposal Bid Bond (BLR 12230) (if applicable)
d. Apprenticeship or Training Program Certification (BLR 12325) (do not use for project with Federal funds.)
e. Affidavit of Illinois Business Office (BLR 12326) (do not use for project with Federal funds)
5. The quantities appearing in the bid schedule are approximate and are prepared for the comparison of bids. Payment to the Contractor will be made only for the actual quantities of work performed and accepted or materials furnished according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided.
6. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in depth examination. The Awarding Authority will, in no case, be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder.
7. The bidder shall take no advantage of any error or omission in the proposal and advertised contract.
8. If a special envelope is supplied by the Awarding Authority, each proposal should be submitted in that envelope furnished by the
Awarding Agency and the blank spaces on the envelope shall be filled in correctly to clearly indicate its contents. When an envelope other than the special one furnished by the Awarding Authority is used, it shall be marked to clearly indicate its contents. When sent by mail, the sealed proposal shall be addressed to the Awarding Authority at the address and in care of the official in whose office the bids are to be received. All proposals shall be filed prior to the time and at the place specified in the Notice to Bidders. Proposals received after the time specified will be returned to the bidder unopened.
9. Permission will be given to a bidder to withdraw a proposal if the bidder makes the request in writing or in person before the time for opening proposals.
BLR 12200 (Rev. 01/19/23)Page 3 of 6Completed06/24/26
Various Section Number
27-00000-01-GM
County
Kane Local Public Agency
Village of North Aurora
PROPOSAL
1. Proposal of Contractor's Name
Contractor's Address
2. The plans for the proposed work are those prepared by the Village of North Aurora and approved by the Department of Transportation on .
3. The specifications referred to herein are those prepared by the Department of Transportation and designated as "Standard Specifications for Road and Bridge Construction" and the " Supplemental Specifications and Recurring Special Provisions" thereto, adopted and in effect on the date of invitation for bids.
4. The undersigned agrees to accept, as part of the contract, the applicable Special Provisions indicated on the "Check Sheet for
Recurring Special Provisions" contained in this proposal.
5. The undersigned agrees to complete the work within working days or by 09/30/26 is granted in accordance with the specifications.
6. The successful bidder at the time of execution of the contract will be required to deposit a contract bond for the full amount of the award. When a contract bond is not required, the proposal guaranty check will be held in lieu thereof. If this proposal is accepted and the undersigned fails to execute a contract and contract bond as required, it is hereby agreed that the Bid Bond of check shall be forfeited to the Awarding Authority.
7. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the products of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price. A bid may be declared unacceptable if neither a unit price nor a total price is shown.
8. The undersigned submits herewith the schedule of prices on BLR 12201 covering the work to be performed under this contract.
9. The undersigned further agrees that if awarded the contract for the sections contained in the combinations on BLR 12201, the work shall be in accordance with the requirements of each individual proposal for the multiple bid specified in the Schedule for Multiple Bids below.
10. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and Conditions for unless additional time
Contract Proposals, will be required. Bid Bonds will be allowed as a proposal guaranty. Accompanying this proposal is either a bid bond, if allowed, on Department form BLR 12230 or a proposal guaranty check, complying with the specifications, made payable to: Village of North Aurora Treasurer of .
The amount of the check is ( ).
Attach Cashier's Check or Certified Check Here
In the event that one proposal guaranty check is intended to cover two or more bid proposals, the amount must be equal to the sum of the proposal guaranties which would be required for each individual bid proposal. If the proposal guaranty check is placed in another bid proposal, state below where it may be found.
The proposal guaranty check will be found in the bid proposal for: Section Number .
BLR 12200 (Rev. 01/19/23)Page 4 of 6Completed06/24/26
Various Section Number
27-00000-01-GM
County
Kane Local Public Agency
Village of North Aurora
CONTRACTOR CERTIFICATIONS
The certifications hereinafter made by the bidder are each a material representation of fact upon which reliance is placed should the Department enter into the contract with the bidder.
1. Debt Delinquency. The bidder or contractor or subcontractor, respectively, certifies that it is not delinquent in the payment of any tax administered by the Department of Revenue unless the individual or other entity is contesting, in accordance with the procedure established by the appropriate Revenue Act, its liability for the tax or the amount of the tax. Making a false statement voids the contract and allows the Department to recover all amounts paid to the individual or entity under the contract in a civil action.
2. Bid-Rigging or Bid Rotating. The bidder or contractor or subcontractor, respectively, certifies that it is not barred from contracting with the Department by reason of a violation of either 720 ILCS 5/33E-3 or 720 ILCS 5/33E-4.
A violation of section 33E-3 would be represented by a conviction of the crime of bid-rigging which, in addition to Class 3 felony sentencing, provides that any person convicted of this offense, or any similar offense of any state or the United States which contains the same elements as this offense shall be barred for 5 years from the date of conviction from contracting with any unit of State or local government. No corporation shall be barred from contracting with any unit of State or local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract that entity finds that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high managerial agent on behalf of the corporation.
A violation of Section 33E-4 would be represented by a conviction of the crime of bid-rotating which, in addition to Class 2 felony sentencing, provides that any person convicted of this offense or any similar offense of any state or the United States which contains the same elements as this offense shall be permanently barred from contracting with any unit of State of Local government. No corporation shall be barred from contracting with any unit of State or Local government as a result of a conviction under this Section of any employee or agent of such corporation if the employee so convicted is no longer employed by the corporation and: (1) it has been finally adjudicated not guilty or (2) if it demonstrates to the governmental entity with which it seeks to contract and that entity finds that the commission of the offense was neither authorized, requested, commanded, nor performed by a director, officer or a high managerial agent on behalf of the corporation.
3. Bribery. The bidder or contractor or subcontractor, respectively, certifies that, it has not been convicted of bribery or attempting to bribe an officer or employee of the State of Illinois or any unit of local government, nor has the firm made an admission of guilt of such conduct which is a matter or record, nor has an official, agent, or employee of the firm committed bribery or attempted bribery on behalf of the firm and pursuant to the direction or authorization of a responsible official of the firm.
4. Interim Suspension or Suspension. The bidder or contractor or subcontractor, respectively, certifies that it is not currently under a suspension as defined in Subpart I of Title 44 Subtitle A Chapter III Part 6 of the Illinois Administrative code. Furthermore, if suspended prior to completion of this work, the contract or contracts executed for the completion of this work may be canceled.
BLR 12200 (Rev. 01/19/23)Page 5 of 6Completed06/24/26
Various Section Number
27-00000-01-GM
County
Kane Local Public Agency
Village of North Aurora
SIGNATURES
(If an individual)
Business Address
City State Zip Code
(If a partnership) Firm Name
Title
Business Address
City State Zip Code
Insert the Names and Addresses of all Partners
(If a corporation) Corporate Name
Title
Business Address
City State Zip Code
Insert Names of Officers President
Bidder Signature & Date
Signature & Date
BLR 12200 (Rev. 01/19/23)Page 6 of 6Completed06/24/26
Secretary
Treasurer Attest:
Secretary
Schedule of Prices
Page 1 of 1 BLR 12201 (Rev. 05/07/21)Printed 06/24/26
Contractor's Name
Contractor's Address City State Zip Code
Local Public Agency
Village of North Aurora County
Kane Section Number
27-00000-01-GM
Route(s) (Street/Road Name)
Various
Schedule for Multiple Bids Combination Letter Section Included in Combinations Total
Schedule for Single Bid (For complete information covering these items, see plans and specifications.)
Item Number Items Unit Quantity Unit Price Total
1 Crack Filling Pound 47,000 Bidder's Total Proposal
1. Each pay item should have a unit price and a total price.
2. If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern.
3. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price.
4. A bid may be declared unacceptable if neither a unit price or total price is shown.
Proposal Bid Bond
Page 1 of 2 BLR 12230 (Rev. 01/19/23)Completed06/24/26
WE, as PRINCIPAL, and as SURETY, are held jointly, severally and firmly bound unto the above Local Public Agency (hereafter referred to as "LPA") in the penal sum of 5% of the total bid price, or for the amount specified in the proposal documents in effect on the date of invitation for bids, whichever is the lesser sum. We bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly pay to the LPA this sum under the conditions of this instrument.
WHEREAS THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH that, the said PRINCIPAL is submitting a written proposal to the LPA acting through its awarding authority for the construction of the work designated as the above section.
THEREFORE if the proposal is accepted and a contract awarded to the PRINCIPAL by the LPA for the above designated section and the PRINCIPAL shall within fifteen (15) days after award enter into a formal contract, furnish surety guaranteeing the faithful performance of the work, and furnish evidence of the required insurance coverage, all as provided in the "Standard Specifications for Road and Bridge Construction" and applicable Supplemental Specifications, then this obligation shall become void; otherwise it shall remain in full force and effect.
IN THE EVENT the LPA determines the PRINCIPAL has failed to enter into a formal contract in compliance with any requirements set forth in the preceding paragraph, then the LPA acting through its awarding authority shall immediately be entitled to recover the full penal sum set out above, together with all court costs, all attorney fees, and any other expense of recovery.
IN TESTIMONY WHEREOF, the said PRINCIPAL and the said SURETY have caused this instrument to be signed by their respective officers this
Day of
Month and Year Principal
Company Name
Signature & Date
Company Name
Signature & Date By: By:
Title Title
(If Principal is a joint venture of two or more contractors, the company names, and authorized signatures of each contractor must be affixed.)
Surety Name of Surety
COUNTY OF
I , a Notary Public in and for said county do hereby certify that
(Insert names of individuals signing on behalf of PRINCIPAL & SURETY) who are each personally known to me to be the same persons whose names are subscribed to the foregoing instrument on behalf of PRINCIPAL and SURETY, appeared before me this day in person and acknowledged respectively, that they signed and delivered said instruments as their free and voluntary act for the uses and purposes therein set forth.
Given under my hand and notarial seal this day of Month and Year
Date commission expires
(SEAL, if required by the LPA)
Local Public Agency Village of North Aurora
County Kane
Section Number
27-00000-01-GM
By:
Day
STATE OF IL
Signature of Attorney-in-Fact Signature & Date
Notary Public Signature & Date
Page 2 of 2 BLR 12230 (Rev. 01/19/23)
Village of North Aurora County
Kane Section Number
27-00000-01-GM
Completed06/24/26
ELECTRONIC BID BOND
Electronic bid bond is allowed (box must be checked by LPA if electronic bid bond is allowed) The Principal may submit an electronic bid bond, in lieu of completing the above section of the Proposal Bid Bond Form. By providing an electronic bid bond ID code and signing below, the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the LPA under the conditions of the bid bond as shown above. (If PRINCIPAL is a joint venture of two or more contractors, an electronic bid bond ID code, company/Bidder name title and date must be affixed for each contractor in the venture.)
Electronic Bid Bond ID Code Company/Bidder Name
Title
Affidavit of Availability
Page 1 of 10 BC 57 (Rev. 02/16/21)
For the Letting of
Printed 06/24/26
Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, IL 62764
Instructions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued unless both sides of this form are completed in detail. Use additional forms as needed to list all work.
Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected. In a joint venture, list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE.
1 2 3 4 Awards Pending
Accumulated Totals
Contract Number
Contract With
Estimated Completion Date
Total Contract Price
Uncompleted Dollar Value if Firm is the Prime Contractor Uncompleted Dollar Value if Firm is the Subcontractor
Total Value of All Work
Part II. Awards Pending and Uncompleted Work to be done with your own forces.
List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE.
Earthwork Portland Cement Concrete Paving HMA Plant Mix HMA Paving Clean & Seal Cracks/Joints Aggregate Bases, Surfaces Highway, R.R., Waterway Struc.
Drainage Electrical Cover and Seal Coats Concrete Construction Landscaping Fencing Guardrail Painting Signing Cold Milling, Planning, Rotomilling Demolition Pavement Markings (Paint) Other Construction (List)
Totals Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the “Illinois Procurement Code." Failure to comply will result in non-issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center.
Page 2 of 10 BC 57 (Rev. 02/16/21)Printed 06/24/26
Part III. Work Subcontracted to Others.
For each contract described in Part I, list all the work you have subcontracted to others.
1 2 3 4 Awards Pending Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Total Uncompleted
Notary
I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates.
Officer or Director
Title
Signature Date
Company
Address
City State Zip Code
(Signature of Notary Public)
Subscribed and sworn to before me this day of , My commission expires
(Notary Seal)
Add pages for additional contracts
Page 3 of 10 BC 57 (Rev. 02/16/21)
For the Letting of Affidavit of Availability
Printed 06/24/26
Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, IL 62764
Instructions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued unless both sides of this form are completed in detail. Use additional forms as needed to list all work.
Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected. In a joint venture, list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE.
1 2 3 4 Awards Pending
Accumulated Totals
Contract Number
Contract With
Estimated Completion Date
Total Contract Price
Uncompleted Dollar Value if Firm is the Prime Contractor Uncompleted Dollar Value if Firm is the Subcontractor
Total Value of All Work
Part II. Awards Pending and Uncompleted Work to be done with your own forces.
List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE.
Earthwork Portland Cement Concrete Paving HMA Plant Mix HMA Paving Clean & Seal Cracks/Joints Aggregate Bases, Surfaces Highway, R.R., Waterway Struc.
Drainage Electrical Cover and Seal Coats Concrete Construction Landscaping Fencing Guardrail Painting Signing Cold Milling, Planning, Rotomilling Demolition Pavement Markings (Paint) Other Construction (List)
Totals Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the “Illinois Procurement Code." Failure to comply will result in non-issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center.
Page 4 of 10 BC 57 (Rev. 02/16/21)Printed 06/24/26
For each contract described in Part I, list all the work you have subcontracted to others.
2 3 4 Awards Pending 1 Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Total Uncompleted
Notary
I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates.
Officer or Director
Title
Signature Date
Company
Address
City State Zip Code
(Signature of Notary Public)
Subscribed and sworn to before me this day of , My commission expires
Page 5 of 10 BC 57 (Rev. 02/16/21)
Affidavit of Availability
Printed 06/24/26
Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, IL 62764
Instructions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued unless both sides of this form are completed in detail. Use additional forms as needed to list all work.
Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected. In a joint venture, list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE.
1 2 3 4 Awards Pending
Accumulated Totals
Contract Number
Contract With
Estimated Completion Date
Total Contract Price
Uncompleted Dollar Value if Firm is the Prime Contractor Uncompleted Dollar Value if Firm is the Subcontractor
Total Value of All Work
Part II. Awards Pending and Uncompleted Work to be done with your own forces.
List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE.
Earthwork Portland Cement Concrete Paving HMA Plant Mix HMA Paving Clean & Seal Cracks/Joints Aggregate Bases, Surfaces Highway, R.R., Waterway Struc.
Drainage Electrical Cover and Seal Coats Concrete Construction Landscaping Fencing Guardrail Painting Signing Cold Milling, Planning, Rotomilling Demolition Pavement Markings (Paint) Other Construction (List)
Totals Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the “Illinois Procurement Code." Failure to comply will result in non-issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center.
Page 6 of 10 BC 57 (Rev. 02/16/21)Printed 06/24/26
For each contract described in Part I, list all the work you have subcontracted to others.
1 2 3 4 Awards Pending Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Total Uncompleted
Notary
I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates.
Officer or Director
Title
Signature Date
Company
Address
City State Zip Code
(Signature of Notary Public)
Subscribed and sworn to before me this day of , My commission expires
Page 7 of 10 BC 57 (Rev. 02/16/21)
Affidavit of Availability
Printed 06/24/26
Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, IL 62764
Instructions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued unless both sides of this form are completed in detail. Use additional forms as needed to list all work.
Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected. In a joint venture, list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE.
1 2 3 4 Awards Pending
Accumulated Totals
Contract Number
Contract With
Estimated Completion Date
Total Contract Price
Uncompleted Dollar Value if Firm is the Prime Contractor Uncompleted Dollar Value if Firm is the Subcontractor
Total Value of All Work
Part II. Awards Pending and Uncompleted Work to be done with your own forces.
List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE.
Earthwork Portland Cement Concrete Paving HMA Plant Mix HMA Paving Clean & Seal Cracks/Joints Aggregate Bases, Surfaces Highway, R.R., Waterway Struc.
Drainage Electrical Cover and Seal Coats Concrete Construction Landscaping Fencing Guardrail Painting Signing Cold Milling, Planning, Rotomilling Demolition Pavement Markings (Paint) Other Construction (List)
Totals Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the “Illinois Procurement Code." Failure to comply will result in non-issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center.
Page 8 of 10 BC 57 (Rev. 02/16/21)Printed 06/24/26
For each contract described in Part I, list all the work you have subcontracted to others.
1 2 3 4 Awards Pending Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Total Uncompleted
Notary
I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates.
Officer or Director
Title
Signature Date
Company
Address
City State Zip Code
(Signature of Notary Public)
Subscribed and sworn to before me this day of , My commission expires
Page 9 of 10 BC 57 (Rev. 02/16/21)
Affidavit of Availability
Printed 06/24/26
Bureau of Construction 2300 South Dirksen Parkway/Room 322 Springfield, IL 62764
Instructions: Complete this form by either typing or using black ink. "Authorization to Bid" will not be issued unless both sides of this form are completed in detail. Use additional forms as needed to list all work.
Part I. Work Under Contract List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or rejected. In a joint venture, list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most recent engineer's or owners estimate, and must include work subcontracted to others. If no work is contracted, show NONE.
1 2 3 4 Awards Pending
Accumulated Totals
Contract Number
Contract With
Estimated Completion Date
Total Contract Price
Uncompleted Dollar Value if Firm is the Prime Contractor Uncompleted Dollar Value if Firm is the Subcontractor
Total Value of All Work
Part II. Awards Pending and Uncompleted Work to be done with your own forces.
List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work subcontracted to others will be listed on the reverse of this form. In a joint venture, list only that portion of the work to be done by your company. If no work is contracted, show NONE.
Earthwork Portland Cement Concrete Paving HMA Plant Mix HMA Paving Clean & Seal Cracks/Joints Aggregate Bases, Surfaces Highway, R.R., Waterway Struc.
Drainage Electrical Cover and Seal Coats Concrete Construction Landscaping Fencing Guardrail Painting Signing Cold Milling, Planning, Rotomilling Demolition Pavement Markings (Paint) Other Construction (List)
Totals Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the “Illinois Procurement Code." Failure to comply will result in non-issuance of an "Authorization To Bid." This form has been approved by the State Forms Management Center.
Page 10 of 10 BC 57 (Rev. 02/16/21)Printed 06/24/26
For each contract described in Part I, list all the work you have subcontracted to others.
1 2 3 4 Awards Pending Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Subcontractor
Type of Work
Subcontract Price
Amount Uncompleted
Total Uncompleted
Notary
I, being duly sworn, do hereby declare this affidavit is a true and correct statement relating to ALL uncompleted contracts of the undersigned for Federal, State, County, City and private work, including ALL subcontract work, ALL pending low bids not yet awarded or rejected and ALL estimated completion dates.
Officer or Director
Title
Signature Date
Company
Address
City State Zip Code
(Signature of Notary Public)
Subscribed and sworn to before me this day of , My commission expires
Apprenticeship and Training Program Certification
Page 1 of 1 BLR 12325 (Rev. 01/19/23)Completed06/24/26
Local Public Agency
Village of North Aurora County
Kane Street Name/Road Name
Various Section Number
27-00000-01-GM
All contractors are required to complete the following certification
For this contract proposal or for all bidding groups in this deliver and install proposal.
For the following deliver and install bidding groups in this material proposal.
Illinois Department of Transportation policy, adopted in accordance with the provisions of the Illinois Highway Code, requires this contract to be awarded to the lowest responsive and responsible bidder. The award decision is subject to approval by the Department. In addition to all other responsibility factors, this contract or deliver and install proposal requires all bidders and all bidder's subcontractors to disclose participation in apprenticeship or training programs that are (1) approved by and registered with the United States Department of Labor's Bureau of Apprenticeship and Training, and (2) applicable to the work of the above indicated proposals or groups. Therefore, all bidders are required to complete the following certification:
1. Except as provided in paragraph 4 below, the undersigned bidder certifies that it is a participant, either as an individual or as part of a group program, in an approved apprenticeship or training program applicable to each type of work or craft that the bidder will perform with its own employees.
2. The undersigned bidder further certifies, for work to be performed by subcontract, that each of its subcontractors either (A) is, at the time of such bid, participating in an approved, applicable apprenticeship or training program; or (B) will, prior to commencement of performance of work pursuant to this contract, establish participation in an approved apprenticeship or training program applicable to the work of the subcontract.
3. The undersigned bidder, by inclusion in the list in the space below, certifies the official name of each program sponsor holding the Certificate of Registration for all of the types of work or crafts in which the bidder is a participant and that will be performed with the bidder's employees. Types of work or craft that will be subcontracted shall be included and listed as subcontract work. The list shall also indicate any type of work or craft job category for which there is no applicable apprenticeship or training program available.
4. Except for any work identified above, if any bidder or subcontractor shall perform all or part of the work of the contract or deliver and install proposal solely by individual owners, partners or members and not by employees to whom the payment of prevailing rates of wages would be required, check the following box, and identify the owner/operator workforces and positions of ownership.
The requirements of this certification and disclosure are a material part of the contract, and the contractor shall require this certification provision to be included in all approved subcontracts. The bidder is responsible for making a complete report and shall make certain that each type of work or craft job category that will be utilized on the project is accounted for and listed. The Department at any time before or afterward may require the production of a copy of each applicable Certificate of Registration issued by the United States Department of Labor evidencing such participation by the contractor and any or all of its subcontractors. In order to fulfill the participation requirement, it shall not be necessary that any applicable program sponsor be currently taking or that it will take applications for apprenticeship, training or employment during the performance of the work of this contract or deliver and install proposal.
Bidder
Title
Address City State Zip Code
Affidavit of Illinois Business Office
Page 1 of 1 BLR 12326 (Rev. 01/20/23)Completed06/24/26
Local Public Agency
Village of North Aurora County
Kane Street Name/Road Name
Various Section Number
27-00000-01-GM
I, Name of Affiant of City of Affiant
State of Affiant being first duly sworn upon oath, state as follows:
1. That I am the Officer or Position of Bidder
2. That I have personal knowledge of the facts herein stated.
3. That, if selected under the proposal described above, Bidder
, will maintain a business office in the
State of Illinois, which will be located in County
County, Illinois.
4. That this business office will serve as the primary place of employment for any persons employed in the construction contemplated by this proposal.
5. That this Affidavit is given as a requirement of state law as provided in Section 30-22(8) of the Illinois Procurement Code.
Print Name of Affiant
Notary Public
Signed (or subscribed or attested) before me on
(name/s of person/s)
County
(SEAL) My commission expires
, authorized agent(s) of
(date) by
Bidder
State of IL
Notary Public Signature & Date
Check Sheet for Recurring Special Provisions
BLR 11300 (Rev. 11/19/24)Page 1 of 2Printed 06/24/26
Local Public Agency
Village of North Aurora County
Kane Section Number
27-00000-01-GM
Check this box for lettings prior to 01/01/2025
The Following Recurring Special Provisions Indicated By An "X" Are Applicable To This Contract And Are Included By Reference:
Recurring Special Provisions Check Sheet # Page No.
1 Additional State Requirements for Federal-Aid Construction Contracts 79 2 Subletting of Contracts (Federal-Aid Contracts) 82
3 EEO 83
4 Specific EEO Responsibilities Non Federal-Aid Contracts 93 5 Required Provisions - State Contracts 98 6 Asbestos Bearing Pad Removal 104 7 Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 105 8 Temporary Stream Crossings and In-Stream Work Pads 106 9 Construction Layout Stakes 107 10 Use of Geotextile Fabric for Railroad Crossing 110 11 Subsealing of Concrete Pavements 112 12 Hot-Mix Asphalt Surface Correction 116 13 Pavement and Shoulder Resurfacing 118 14 Patching with Hot-Mix Asphalt Overlay Removal 119 15 Polymer Concrete 121 16 Reserved 123 17 Bicycle Racks 124 18 Temporary Portable Bridge Traffic Signals 126 19 Nighttime Inspection of Roadway Lighting 128 20 English Substitution of Metric Bolts 129 21 Calcium Chloride Accelerator for Portland Cement Concrete 130 22 Quality Control of Concrete Mixtures at the Plant 131 23 Quality Control/Quality Assurance of Concrete Mixtures 139 24 Reserved 155 25 Reserved 156 26 Temporary Raised Pavement Markers 157 27 Restoring Bridge Approach Pavements Using High-Density Foam 158 28 Portland Cement Concrete Inlay or Overlay 161 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 165 30 Longitudinal Joint and Crack Patching 168 31 Concrete Mix Design - Department Provided 170 32 Station Numbers in Pavements or Overlays 171
BLR 11300 (Rev. 11/19/24)Page 2 of 2Printed 06/24/26
Section Number
27-00000-01-GM
County
Kane Local Public Agency
Village of North Aurora The Following Local Roads And Streets Recurring Special Provisions Indicated By An "X" Are Applicable To This Contract And Are Included By Reference:
Local Roads And Streets Recurring Special Provisions
Check Sheet # Page No.
LRS 1 Reserved 173
LRS 2 Furnished Excavation 174
LRS 3 Work Zone Traffic Control Surveillance 175
LRS 4 Flaggers in Work Zones 176
LRS 5 Contract Claims 177
LRS 6 Bidding Requirements and Conditions for Contract Proposals 178
LRS 7 Bidding Requirements and Conditions for Material Proposals 184
LRS 8 Reserved 190
LRS 9 Bituminous Surface Treatments 191
LRS 10 Reserved 195
LRS 11 Employment Practices 196
LRS 12 Wages of Employees on Public Works 198
LRS 13 Selection of Labor 200
LRS 14 Paving Brick and Concrete Paver Pavements and Sidewalks 201
LRS 15 Partial Payments 204
LRS 16 Protests on Local Lettings 205
LRS 17 Substance Abuse Prevention Program 206
LRS 18 Multigrade Cold Mix Asphalt 207
LRS 19 Reflective Crack Control Treatment 208
Special Provisions
Page 1 of 2Printed 06/24/26 BLR 11310 (Rev. 10/04/17)
Local Public Agency
Village of North Aurora County
Kane Section Number
27-00000-01-GM
The following Special Provision supplement the "Standard Specifications for Road and Bridge Construction", adopted
January 1, 2022 , the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures of Materials" in effect on the date of invitation of bids, and the Supplemental Specification and Recurring Special Provisions indicated on the Check Sheet included here in which apply to and govern the construction of the above named section, and in case of conflict with any parts, or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
DESCRIPTION OF WORK
This proposed project consists of routing, cleaning, and filling cracks in asphalt pavement in accordance with section 451 of the Standard Specifications for Road and Bridge Construction at various locations within the corporate boundaries of the Village of North Aurora. Locations are identified in a list and exhibit contained within the contract documents. The project is completed when the planned quantity of crack filling material is exhausted or all streets have been crack filled.
PROSECUTION OF THE WORK
Work shall be completed in accordance with Section 108 Prosecution and Progress. Article 108.03 of this Section shall be modified to require the contractor to provide 48 hours notice prior to the initial start of work.
PROGRESS SCHEDULE
The progress schedule shall be prepared in accordance with Section 108 Prosecution and Progress.
Article 108.02 of this Section shall be modified to indicate the Progress Schedule shall be provided to the Engineer on the Bureau of Construction form BC 255 or approved alternate Gantt chart approved by the Engineer at the preconstruction meeting.
PRECONSTRUCTION MEETING
The contractor shall attend a preconstruction meeting.
PARTIAL PAYMENTS AND ACCEPTANCE AND FINAL PAYMENT
Partial and Final Payments shall be prepared in accordance with Section 109 Measurement and Payment.
Article 109.07 Partial Payments and Article 109.08 Acceptance and Final Payment shall be modified to indicate lien waivers must be submitted to the Village of North Aurora at the time a partial or final pay request is submitted.
JOB SITE MAINTENANCE AND CLEAN-UP
The work site must be kept clean and orderly. Debris shall be collected and disposed of as the slow moving operation progresses. All materials, hazardous or otherwise must be secured or removed from the job site at the end of each day. Crackfiller that has been tracked to adjacent streets must be cleaned of the pavement by the end of each work day.
The Contractor shall have the ability to sweep and vacuum all debris created by the operation within 48 hours after the street has been crack sealed. This includes the sweeping and vacuuming of the excess fine sand, Portland cement, mineral filler used to prevent tracking.
The removal of any excess debris blown or deposited onto parkways, sidewalks, or driveways shall be included.
All costs associated with JOB SITE MAINTENANCE AND CLEAN-UP shall be considered incidental to the Contract.
Page 2 of 2Printed 06/24/26 BLR 11310 (Rev. 10/04/17)
Section Number
27-00000-01-GM
County
Kane Local Public Agency
Village of North Aurora
CRACKFILLING
Crack sealing or crack filling shall be completed in accordance with Section 451 Crack Sealing Hot-Mix Asphalt Pavement.
Article 451.04 General. Paragraph 2 shall be modified to indicate cracks that have a width greater than 3/4" shall be routed along each edge of crack. In Paragraph 3, the minimum ambient air temperature shall be increased to 45 degrees Fahrenheit. In Paragraph 5, the dimension of the"band-aid" shall be changed from "approximately 2 in." to "between 2 and 3 inches in width centered over the crack with the over-band thickness of approximately 1/8 inch". This paragraph shall be modified to indicate that no over-banding of existing or recently placed crackfiller will be allowed. In Paragraph 6, the second sentence shall be modified to: "When conditions warrant and as directed by the Engineer, the sealant may be dusted with fine sand, Portland cement, or mineral filler to prevent tracking."
This work will be paid for at the contract unit price per POUND for CRACK FILLING, which shall include the crack routing.
TRAFFIC CONTROL PLAN
This work shall be completed in accordance with Sections 701 and 702 of the Standard Specifications and following traffic control standards: 701301-04, 701306-04, 701311-03, 701501-06, 701502-09, 701701-10, 701901-08 and LRS 3 and LRS 4 in the Local Roads and Streets Recurring Special Provisions.
All costs associated with the TRAFFIC CONTROL PLAN shall be considered incidental to the Contract.
INSURANCE
The Bureau of Local Roads and Streets Special Provisions for Insurance shall be modified to require a copy of the certificate of insurance to be provided to the Village of North Aurora.
COMPLETION DATE
The work shall be completed by September 30, 2026. In event that all work is not completed by this date, then the Contractor will be liable to pay the Village of North Aurora liquidated damages in the amount of $475 as set forth in the Standard Specifications Article 108.09 Failure to Complete Work on Time. The liquidated damages shall accrue and be assessed until all work is complete.
LR107-4
State of Illinois Department of Transportation
Bureau of Local Roads and Streets
SPECIAL PROVISION
FOR
INSURANCE
Effective: February 1, 2007 Revised: August 1, 2007
All references to Sections or Articles in this specification shall be construed to mean specific Section or Article of the Standard Specifications for Road and Bridge Construction, adopted by the Department of Transportation.
The Contractor shall name the following entities as additional insured under the Contractor’s general liability insurance policy in accordance with Article 107.27:
The entities listed above and their officers, employees, and agents shall be indemnified and held harmless in accordance with Article 107.26.
Village of North Aurora
LOCATION FROM TO Length Width SQ YD
Doral Ln Wingfoot Dr Wingfoot Dr (End) 1642 25 4561 Spyglass Ct Doral Ln End 130 25 361 Wingfoot Dr Oak Crest Dr Hart Rd 4114 25 11428 Columbia Cir Wingfoot Dr End 1575 25 4375 Woodlawn Dr Columbia Cir Hartfield Dr 304 25 844 Oak Crest Dr Banbury Rd Wingfoot Dr 2212 25 6144 Augusta Dr Oak Crest Dr Hartfield Dr 850 26 2456 Hartfield Dr Greenbrier Ct Hart Rd 2265 25 6292 Greenbrier Ct Hartfield Dr End 726 25 2017 Fairfield Way Greenbrier Ct Hartfield Dr 2094 26 6049 Derby Dr Fairfield Way Village Limit 133 25 369 Aster Ct Fairfield Way Meadow Ln 635 25 1764 Meadow Ln Fairfield Way Hartfield Dr 928 25 2578 Sussex Ln Banbury Rd Darwin St 1635 25 4542 Sussex Ct Darwin St End 680 25 1889 Ridley St Sussex Ln Fitzwilliam Way 1555 25 4319 Darwin St Sussex Ln Churchill Dr 830 25 2306 Churchill Dr N River St Durham St 1178 25 3272 Durham St Oak Crest Dr Fitzwilliam Way 2500 26 7222 Homerton Blvd Durham St Fitzwilliam Way 935 25 2597 Fitzwilliam Way Durham St Oak Crest Dr 585 25 1625 Selwyn Pkwy Durham St Durham St 665 25 1847 Westminster Ct Selwyn Pkwy End 230 25 639 Oak Crest Dr Durham St Banbury Rd 200 40 889 Total 28,601 80,385
VILLAGE OF NORTH AURORA
2026-2027
CRACKFILL STREETS
Section #: 27-00000-01-GM
CURBLINE AND MINOR CRACKING
ONE LANE
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
pavement for a period of less than 15 minutes.
the centerline and a line 24 (600) outside the edge of the
For any operation that encroaches in the area between edge of the pavement for a period of less than 60 minutes.
For any operation that is more than 24 (600) outside the than 60 minutes.
pavement for a period in excess of 15 minutes but less the centerline and a line 24 (600) outside the edge of the
For any operation that encroaches in the area between amber dome light operating.
Vehicle with dual flashers or flashing min.
100' (30 m) min.
100' (30 m) ( amber dome light operating.
Vehicle with dual flashers or flashing
W20-4(0)-48
1 1 min.
100' (30 m) min.
100' (30 m) 1 1
W20-4(0)-48
4 SIGN SPACING
Posted Speed Sign Spacing
50-45
<45
500' (150 m)
350' (100 m)
200' (60 m)
1 = table for distances.
Refer to SIGN SPACING
Cleaning up debris on pavement
Utility operations
String line
Field survey
Marking patches Work area
Sign on portable or permanent support
Flagger with traffic control sign unless otherwise shown.
All dimensions are in inches (millimeters)
W20-7(O)-48
W20-7(O)-48
SYMBOLSTYPICAL APPLICATIONS
Illinois Department of Transportation
APPROVED 2011
APPROVED 2011
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF SAFETY ENGINEERING 1-1-09
STANDARD 701301-04
SHORT TIME OPERATIONS
LANE CLOSURE, 2L, 2W,
DATE REVISIONS
Revised flagger sign.1-1-11
Switched units to English (metric).
PAINT
WET
PAINT
WET
(appropriate arrow)
G20-I101-2430
R4-7a-2430 min. *
200' (60 m)
(appropriate arrow)
G20-I101-2430 or crack sealant to wheel tracking.
and susceptibility of pavement marking
Distance varies depending on terrain*
Crack pouring
Debris cleanup
Roadometer measurements
Weed spraying
Pavement marking
Utility work
Landscaping work Arrow board (Hazard Mode only)
(visible from all directions) flashers and flashing amber light.
Truck with headlights, emergency
(use when guide wheel is used)
18 x 18 (450x450) min. orange flag
Truck mounted attenuator unless otherwise shown.