This specification document outlines the requirements for asbestos-containing material (ACM) abatement services at a residential property in Verbank, New York, issued by Taconic DDSO. The project scope consists of removing two layers of ACM flooring surface and cleaning mastic residue from the subfloor. All work must be completed by a licensed abatement contractor in compliance with New York State Department of Labor Industrial Code Rule 56, 40 CFR Part 745, OSHA, and NESHAP regulations. The contractor must complete all work within 60 days of award unless otherwise modified. Taconic DDSO will provide a project monitor as required by Code Rule 56, while the vendor is responsible for supplying all labor and materials necessary to complete the work in a professional manner.

The contractor bears full responsibility for providing tools, equipment, and supplies, with the owner assuming no liability for theft or damage. The contractor must employ a licensed electrician to perform all electrical removals, power lock-outs, and restorations, while water and base electrical service are provided by the owner. Additional contractor responsibilities include conducting OSHA air monitoring for asbestos exposure, coordinating asbestos waste dumpster locations and transport routes with the owner's representative, maintaining a clean and safe work area, protecting adjacent surfaces, and immediately notifying the owner if unanticipated ACM is encountered. This is a New York State Public Works project requiring payment of prevailing wages.

View the file

Other files

File Type Posted
Verbank Floor Tile ACM Abatement RFQ.pdf PDF
Verbank- Abatement Scope.pdf PDF
IR_Pre-Reno_90_Verbank (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE

APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. ABATEMENT CONTRACTOR SHALL

FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO SUBMITTING A BID. IF

THERE ARE ANY DISCREPANCIES WITH WHAT EXISTS TO WHAT IS INDICATED ON THE

CONTRACT DOCUMENTS, THE CONTRACTOR SHALL REPORT SUCH SAID DISCREPANCIES TO

THE OWNER'S REPRESENTATIVE.

2. THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE WITH THE

CONTRACT SPECIFICATIONS, NEW YORK STATE DEPARTMENT OF LABOR INDUSTRIAL CODE

RULE 56, 40CFR PART 745, OSHA, NESHAPS, AND ALL OTHER APPLICABLE CODES AND

VARIANCES. REFER TO SPECIFICATIONS FOR FURTHER DETAIL.

3. THE CONTRACTOR SHALL COORDINATE THE SCHEDULED WORK WITH THE OWNER'S

REPRESENTATIVE.

4. ASBESTOS WASTE DUMPSTER LOCATIONS AND TRANSPORT ROUTE ARE TO BE

COORDINATED WITH THE OWNER'S REPRESENTATIVE AND INCLUDED ON THE WORKPLAN. ALL

WASTE SHALL BE TRANSPORTED IN COVERED CARTS. THE DUMPSTER SHALL BE AN

ENCLOSED TYPE AND LOCKABLE.

5. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. THE

OWNER OR OWNER'S REPRESENTATIVE WILL NOT BE LIABLE FOR THEFT OR DAMAGE.

6. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE

CONDITION AND TO ENSURE THAT UNCERTIFIED PERSONNEL OR UNAUTHORIZED VISITORS

DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

7. PROTECT FROM DAMAGE ALL ADJACENT FLOORS, WALLS, DOORS, CEILINGS, TRIM,

AND FINISH SURFACES TO REMAIN THROUGHOUT ENTIRE SCOPE OF ABATEMENT.

8. ELECTRIC TO BE PROVIDED BY THE OWNER. THE ABATEMENT CONTRACTOR IS TO

EMPLOY A LICENSED ELECTRICIAN TO PERFORM ALL REQUIRED ELECTRICAL REMOVALS AND

POWER LOCK-OUTS AND RESTORE UPON COMPLETION OF ABATEMENT ACTIVITIES.

COORDINATE SHUT DOWN AND LOCK OUT OF POWER WITH THE OWNER'S REPRESENTATIVE.

ALL TEMPORARY POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE

WORK AREA THROUGH A GROUND-FAULT CIRCUIT INTERRUPTER AT THE SOURCE.

9. WATER TO BE PROVIDED BY THE OWNER. COORDINATE HOOK-UP OF WATER SERVICE

FOR DECONTAMINATION PURPOSES WITH THE OWNER'S REPRESENTATIVE.

10. THE CONTRACTOR SHALL NOTIFY THE OWNER/OWNER'S REPRESENTATIVE

IMMEDIATELY IF ANY UNANTICIPATED ASBESTOS CONTAINING MATERIAL IS ENCOUNTERED

DURING DEMOLITION AND/OR ABATEMENT.

11. THE CONTRACTOR SHALL NOT DISTURB ANY ASBESTOS-CONTAINING MATERIALS (ACM)

DURING PRE-ABATEMENT DEMOLITION ACTIVITIES.

12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENCLOSE ANY EXTERIOR OPENING WITH

A SECURE AND WEATHER TIGHT BARRIER UPON REMOVAL OF ANY DOOR/WINDOW.

13. OSHA AIR MONITORING FOR ASBESTOS EXPOSURE IS THE RESPONSIBILITY OF THE

ASBESTOS ABATEMENT CONTRACTOR.

14. THE ABATEMENT CONTRACTOR MUST PROVIDE SUFFICIENT ELECTRIC SERVICE TO

THE AIR MONITORING FIRM