P03 SS-Item 6 Material Finishes.pdf

PDF 202 KB Posted

Attached to
695-324, Parking Structure Lot 4 Federal contract opportunity
Solicitation number
VA69D15B0310
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to 695-324, Parking Structure Lot 4, newest first.
File Type Posted
VA69D-15-B-0310-A00002009.pdf PDF
VA69D-15-B-0310-A00002001.pdf PDF
VA69D-15-B-0310-A00002007.pdf PDF
VA69D-15-B-0310-A00002003.pdf PDF
VA69D-15-B-0310-A00002004.pdf PDF
VA69D-15-B-0310-A00002002.pdf PDF
VA69D-15-B-0310-A00002010.pdf PDF
VA69D-15-B-0310-A00002006.pdf PDF
VA69D-15-B-0310-A00002008.pdf PDF
VA69D-15-B-0310-A00002000.docx DOCX document
VA69D-15-B-0310-A00002005.pdf PDF
VA69D-15-B-0310-A00001000.docx DOCX document
VA69D-15-B-0310-A00001001.pdf PDF
P07 D-B WAGES JAN 2015.docx DOCX document
VA69D-15-B-0310.docx DOCX document
14.1020_MIL-VA_BidSet_2015_0115 100 Design Submission Specs_Vol2.pdf PDF
P03 SS-Item 2 Security System.pdf PDF
Pages 88-94 from 14.1020_MIL-VA_BidSet_2015_0115 100 Design Submission Drawings.pdf PDF
Pages 1-80 from 14.1020_MIL-VA_BidSet_2015_0115 100 Design Submission Drawings.pdf PDF
14.1020_MIL-VA_BidSet_2015_0115 100 Design Submission Specs_Vol1 rev 3-2-15.pdf PDF
Sole source items-Parking Structure Lot 4.docx DOCX document
P03 SS-Item 3 Locksets.pdf PDF
Pages 81-87 from 14.1020_MIL-VA_BidSet_2015_0115 100 Design Submission Drawings.pdf PDF
P03 SS-Item 4 Automation and HVAC.pdf PDF
P01 Statement Of Work Parking Structure-Lot 4.docx DOCX document
14.1020_MIL-VA_BidSet_2015_0115 100 Design Submission Specs_Vol1.pdf PDF
P03 SS-Item 5 Firestop System.pdf PDF
P03 SS-Item 1 Fire Alarm System.pdf PDF
VA69D-15-B-0310-000.docx DOCX document
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR SINGLE SOURCE AWARDS IAW FAR 13.106-1

(OVER MICRO-PURCHASE THRESHOLD($3K) BUT NOT EXCEEDING THE SAT ($150K))

IAW FAR13.104, COs must promote competition to the maximum extent practicable to obtain supplies and services from the source whose offer is the most advantageous to the Government, considering the administrative cost of the purchase. When competition is not practicable, IAW FAR13.106-1(b), COs solicit from a single source for purchases not exceeding the simplified acquisition threshold. COs may solicit from one source if the CO determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization). IAW FAR13.106-3(b)(3),COs are required to include additional statements explaining the absence of competition (see 13.106-1 for brand name purchases) if only one source is solicited and the acquisition does not exceed the simplified acquisition threshold (does not apply to an acquisition of utility services available from only one source) or supporting the award decision if other than price-related factors were considered in selecting the supplier. This template when completed can be used to document single source awards IAW FAR13.106-3(b)(3). Note: Statements such as "only known source" or "only source which can meet the required delivery date" are inadequate to support a sole source purchase.

1. PURCHASE REQUEST OR REQUISITION NUMBER:

695-15-2-555-0001

1A. PROJECT/TASK

NUMBER

695-324

1B. ESTIMATED AMOUNT:

$8,650,000.00

2. BRIEF DESCRIPTION OF SUPPLIES OR SERVICES REQUIRED AND THE INTENDED USE: This product, the Material and Room Finish Schedule, is an integration of colors, textures, finishes, and components meeting requirements of the VAMC long-range interior design plan.

a. Many factors within interior spaces affect the health, both mental and physical, of occupants. It is the responsibility of the proper interior design to positively affect health and healthy behaviors, as well as help reduce negative behaviors, eliminate harmful substances in the environment, and prevent the spread of disease.

b. Changing of one component of this integrated design results in a domino effect invalidating the contrasting color requirements for visual impairments and patient safety.

c. The room finish design manufacturers indicated below comply with all VA regulations, standards, green environmental management standards, and energy requirements for hospital and medical center environments.

d. The room finish design components have been integrated with other design elements of the project such as lighting fixtures, bathroom fixtures, beds, head end equipment, furnishings, blinds, window treatments, hardware, medical equipment, audio visual equipment, and signage. Changing of one component of this integrated design results in an adverse domino effect eradicating the above mentioned items of the contract.

3. UNIQUE CHARACTERISTICS THAT LIMIT AVAILABILITY TO ONLY ONE SOURCE, WITH THE REASON NO OTHER

SUPPLIES OR SERVICES CAN BE USED: My conclusion is that this product is the only product that has the features or capabilities identified in Item #1 above and is based on the following research: Need to match existing system to ensure there are no interface problems with the addition of the new Parking Structure Lot 4 and that system operation and maintenance is maintained to ensure patient and worker safety.

4. REASON THAT SUGGESTED SOURCE IS THE ONLY SOURCE, WHICH CAN PROVIDE THE SUPPLIES OR SERVICES:

The only reasonable and practicable way that the VA can accomplish the things identified in Item #3 above is by using products that have the features identified in Item #1 above and comply with interior finish schedule attached. The VA needs to be able to do the following: ensure the interior finishes installed throughout the campus buildings positively affect health and healthy behaviors of patients, patient safety and comply with all VA and green management standards.

5. DESCRIPTION OF MARKET RESEARCH CONDUCTED AND RESULTS OR STATEMENT WHY IT WAS NOT

CONDUCTED: My conclusion is Item #4 above is based on the following research: The only other way to ensure a physically and psychologically safe patient environment.

https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125454 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125503 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125467 https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125503

6. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

________________________________________ Date: ________________

Typed/Printed Name and Signature of Technical Representative

Signature: ______________________________ Date:____________________

Contract Specialist

Approved By:

Signature: ______________________________

Ricky Bond

Contracting Team Supervisor

NCO-12, Great Lakes Acquisition Center

Facility: Clement J. Zablocki VAMC, Milwaukee, WI.

https://acquisition.gov/far/current/html/Subpart%2013_1.html#wp1125466

2015-01-28T14:53:47-0600
james J Beier 890481
I am the author of this document
2015-01-29T08:03:21-0600
Leon A Jutrzonka 326667
2015-01-29T11:52:33-0600
Ricky Bond 321819

File details come from the government source that posted it. Updated .