updated AECOM pricing.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Environmental Consulting Services
- Contract number
- 407415
- Issued by
- Wisconsin
About this file
This document is a pricing attachment (Attachment K - Contract Cost Package) for AECOM, providing hourly rates and cost structures for a state contract vehicle. The document appears to be related to a Wisconsin state contract, as evidenced by references to Wisconsin-specific locations including Milwaukee, the Hoan Bridge, and Milwaukee, Racine and Kenosha counties for lodging rates.
The contract covers comprehensive asbestos-related services including inspections, abatement, and project management across five Wisconsin regions (Northeast, North Central, Northwest, Southeast, and Southwest). Asbestos bridge inspections are priced on a tiered structure ranging from $925 per structure for single inspections down to $675 for 10 or more structures, with consistent pricing across all regions. The contract includes hourly rates for various professional staff positions ranging from $19.50 for administrative support to $65.67 for contract managers, plus specialized asbestos inspection services at $31.22 per hour. Additional cost components include a 148% overhead rate on direct labor, 9% profit margin, and reimbursement rates aligned with current state standards for mileage ($0.51/mile), meals ($8-$20), and lodging ($70-$80 per night depending on location). Equipment, supplies, and subcontractor costs are billed at actual cost with no markup, and special pricing negotiations are specified for complex structures like the Hoan Bridge.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3195_5.PDF | ||
| 3195_4.DOCX | DOCX document | |
| 3195_0.PDF | ||
| 3195_2.PDF | ||
| 3195_3.DOCX | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hourly Rates and Costs
| ATTACHMENT K Contract Cost Package | ||||
| Fill in only those cells highlighted in blue. Cells in green are calculated. | ||||
| FIRM NAME: | AECOM | |||
| Asbestos Inspections - Bridges | Terms: Lump Sum | |||
| 1 Structure | 2-4 Structures | 5-9 Structures | 10 or more stuctures | |
| Asbestos inspection, per bridge structure, Northeast region | $ 925.00 | $ 725.00 | $ 700.00 | $ 675.00 |
| Asbestos inspection, per bridge structure, North Central region | $ 925.00 | $ 725.00 | $ 700.00 | $ 675.00 |
| Asbestos inspection, per bridge structure, Northwest region | $ 925.00 | $ 725.00 | $ 700.00 | $ 675.00 |
| Asbestos inspection, per bridge structure, Southeast region | $ 925.00 | $ 725.00 | $ 700.00 | $ 675.00 |
| Asbestos inspection, per bridge structure, Southwest region | $ 925.00 | $ 725.00 | $ 700.00 | $ 675.00 |
| NOTE: Prices for long, multiple-section structures such as the Hoan Bridge in Milwaukee will be negotiated separately at the time of request. | ||||
| Asbestos inspection, buildings, bridge tender houses, other structures | Terms: direct hourly rate | |||
| Asbestos Inspector | $ 31.22 | Average Hourly Rate | ||
| Asbestos Inspector | $25.00 - $38.00 | Hourly Wage Range | ||
| Asbestos abatement | Terms: direct hourly rate | |||
| Exterior Abatement Worker | Average Hourly Rate | |||
| Exterior Asbestos Supervisor | Average Hourly Rate | |||
| Asbestos Worker | Average Hourly Rate | |||
| Asbestos Supervisor | Average Hourly Rate | |||
| Asbestos Project Designer | Average Hourly Rate | |||
| Asbestos Management Planner | Average Hourly Rate | |||
| Equipment and supplies | Terms: direct expense, no markup | |||
| Subcontractor Costs | Terms: actual cost, no markup | |||
| Overhead rate | 148% | Percentage of Direct Labor | ||
| Mileage | Terms: current state reimbursement rate | |||
| Per mile, personal vehicle rate | $0.51/mile | |||
| Meals | Terms: current state reimbursement rate | |||
| Breakfast | $ 8.00 | |||
| Lunch | $ 10.00 | |||
| Dinner | $ 20.00 | |||
| Lodging | Terms: current state reimbursement rate, excluding taxes | |||
| Per night | $70.00 | |||
| Per night, Milwaukee, Racine and Kenosha counties | $80.00 | |||
| Project Staff | Terms: direct hourly rate | |||
| Contract Manager | $ 65.67 | Average Hourly Rate | ||
| Project Supervisor | $ 54.38 | Average Hourly Rate | ||
| Engineer | $ 43.10 | Average Hourly Rate | ||
| Hydrogeologist | $ 36.93 | Average Hourly Rate | ||
| Scientist | $ 29.76 | Average Hourly Rate | ||
| Field Technician | $ 23.60 | Average Hourly Rate | ||
| CADD, GIS | $ 26.67 | Average Hourly Rate | ||
| Accounting | $ 28.73 | Average Hourly Rate | ||
| Administrative Support | $ 19.50 | Average Hourly Rate | ||
| Profit | Terms: percentage of labor and overhead | |||
| Rate | 9% | Percentage of Direct Labor + Labor Overhead |