This document is a project cost estimate template for the Wisconsin Department of Transportation (WisDOT). The template appears to be designed for environmental or consulting services contracts, with provisions for report distribution to WisDOT's Environmental Support Services (ESS) unit and Regional Environmental Coordinators.
The template includes comprehensive cost structure elements including lump sum items, vendor labor costs with detailed breakdowns by task, title, hours, and rates, direct expenses, overhead, profit margins, and subcontractor costs. The document requires completion of project details such as site locations, city, county, highway termini, total estimated costs, and project timelines. It also mandates the inclusion of a Site Health and Safety Plan and project assumptions, indicating this template is likely used for environmental assessment or remediation projects requiring specialized safety protocols and regulatory compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3195_5.PDF | ||
| updated AECOM pricing.xlsx | XLSX spreadsheet | |
| 3195_3.DOCX | DOCX document | |
| 3195_0.PDF | ||
| 3195_2.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WisDOT Project ID:
Site(s):
City:
County:
Highway and Termini (when applicable):
Total Estimated Cost:
Report recipients and report format (electronic or paper):
| Recipient |
| Number of Copies |
| Preferred format |
| WisDOT ESS |
| 2 |
| 1 bound/stapled paper |
1 electronic (PDF)
| Region Environmental Coordinator |
| 1 |
Paper Electronic
Timetable for completion:
| Project Element |
| Completion date |
Scope of Services:
Include Site Health and Safety Plan:
Assumptions:
Estimated Cost:
Lump Sum Items: Total: $ List items
Vendor Labor: Total: $
| Task |
| Rate Title |
| Hours |
| Rate |
| Cost |
Direct Expenses: Total: $
| Item |
| Quantity |
| Unit |
| Unit Price |
| Total |
Overhead: $ Profit: $
Subcontractor costs: Total: $
| Subcontractor |
| Subcontracted Services |
| Cost basis /Unit Price |
| Cost |
File details come from the government source that posted it. Updated .