UD-25-246 GIS Utility Network Migration RFP_Addendum 1.pdf
PDF 244 KB Posted
- Attached to
- GIS Utility Network Migration
- Solicitation number
- UD-25-246
- Issued by
- Los Angeles County, California
About this file
This is an Addendum No. 1 to a Request for Proposal (RFP) issued by Long Beach Utilities for Geographic Information Systems (GIS) Utility Network Migration Specifications. The addendum modifies the submittal instructions and response requirements for the original RFP. Key dates include a deadline for submitting questions on April 9, 2025 at 11:00 AM Pacific Time, with answers to all submitted questions available on April 15, 2025 at 3:00 PM Pacific Time. The final deadline for submission of proposals is May 7, 2025 at 11:00 AM Pacific Time. The addendum was prepared by Esme Houtepen on April 10, 2025, and proposers are required to acknowledge receipt of the addendum by signing and returning it with their proposal.
Proposals must use a 10-point minimum font size and are limited to a maximum of 120 pages, including the transmittal or offer letter and resumes of key personnel, but excluding the index, table of contents, tables, charts, and graphic exhibits. This restriction is intended to minimize proposal preparation costs and ensure that responses are fully relevant to the project. No pricing terms, set-asides, funding amounts, or other financial details are specified in this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UD-25-246 GIS Migration RFP.pdf | ||
| ReservoirDataSchemaReport.xlsx | XLSX spreadsheet | |
| UD-25-246 GIS Migration RFP - Notice of Intent to Award.pdf | ||
| RecycledWaterDataSchemaReport.xlsx | XLSX spreadsheet | |
| SewerDataSchemaReport.xlsx | XLSX spreadsheet | |
| GasDataSchemaReport.xlsx | XLSX spreadsheet | |
| UD-25-246 GIS Utility Network Migration RFP_Addendum 2.pdf | ||
| PotableDataSchemaReport.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 10, 2025
NOTICE TO PROPOSERS
ADDENDUM NO. 1
The following changes and/or additions shall be made to the original Request for Proposal (RFP) for Geographic Information Systems (GIS) Utility Network Migration Specifications. Please acknowledge receipt of this addendum by signing and returning with your proposal.
As of April 10, 2025:
The following sections shall be modified:
3. SUBMITTAL INSTRUCTIONS
3.1 RFP Timeline (times indicated are Pacific Time)
TASK DATE/TIME
Deadline for submitting questions April 9, 2025 @ 11:00 AM
Answers to all questions submitted available April 15, 2025 @ 3:00 PM
Deadline for submission of proposals May 7, 2025 @ 11:00 AM
4. RESPONSE REQUIREMENTS
Proposals shall use a 10‐point minimum font size, (maximum of 120 pages) including transmittal/offer letter and resumes of key people, but excluding Index/Table of Contents, tables, charts, and graphic exhibits. The purpose of these restrictions is to minimize the costs of proposal preparation and to ensure that the response to the RFP is fully relevant to the project.
Prepared By: Esme Houtepen Date: April 10, 2025
Acknowledged By: Date:
Firm of:
File details come from the government source that posted it. Updated .