Drawing E8.2.pdf
PDF 45 KB Posted
- Attached to
- ARC Flash Study
- Solicitation number
- TJ-2019-0005
About this file
Drawing Referenced in SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response_to_Questions_re_Arc_Flash_studies_at_NNMC.pdf | ||
| Answers_to_questions.pdf | ||
| Fee_Schedule.pdf | ||
| Drawing E8.3.pdf | ||
| Drawing E8.1.pdf | ||
| SOW_Analysis_Study.pdf | ||
| Drawing E8.4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SH
IP
R O C K C
O M P R
EH
EN
SI
VE
H
EA
LT
H C
A R E
FA
C
IL
IT
Y
N A
VA
JO
A
R
EA
I N D
IA
N H
EA
LT
H S
ER
VI
C E
SH
IP
R O C K
N
EW
M
EX
IC
O e B A
TO
L
R O
PA
N
IN
C.
A
RC
H
IT
EC
TU
RE
EN
GI
NE
ER
IN
G, NO
RT
H A
RC
AD
IA
AV
EN
UE
TU
CS
O N, A
RI
ZO
NA
AN
D
ER
O N D
S
Revisions Date
Checked By Drawn By Scale Project
0400.00
NONE
CONSTRUCTION DOCUMENTS
LMW/RLD
TAE
FEB. 1992
ONE LINE NORMAL POWER
RISER DIAGRAM
SOUTH PORTION
E8.2
PANEL
GCYLNA
GC502YGC502Y
GCYLNB
PANEL
GC502Y
GCYLDB
PANELPANEL
GCZLNB
GC501ZGC501Z
GCZLNA
PANEL
GD501Z
GDZLNA
PANEL PANEL
GDZLNB
GD501Z
PANEL
GDYLNA
GD502Y GD502Y
GDYLNE
PANEL
GD502Y
GDYHNA
PANELPANEL
GDZHNA
GD501Z
PANEL
GCZHNA
GC501Z
LD501Z
LDZHNA
PANEL
LD502Y
LDYHNA
PANEL
DISTRIBUTION PANEL DPLDZHNA SWITCHBOARD DSLDZLNA
LD501ZLD501Z
PANEL
LDYLNC
LD502YLD502Y
LDYLNB
PANELPANEL
LDYLNA
LD502Y
PANEL
LDXLNA
LD503X LD503X
LDXLNB
PANEL
PANEL
LCZLNA
LC501Z
PANEL
LCYLNB
LC502Y LC502Y
LCYLNA
PANEL
PENTHOUSE LEVEL
GROUND LEVEL
LOWER LEVEL
GC501Z
DPGCZLNA
LD501ZLD501Z
TDPGCZLNATDSLDZLNA
ONE LINE NORMAL POWER
NTSDIAGRAM-SOUTH PORTION
PANEL
LCZHNA
LC501Z
PANEL
LCZLNB
PANEL
LCZLDA
LC501Z LC501Z
TUAZLNA
UA501Z
CONTINUATION
E8.4 FOR
SEE SHEET
SWITCHES
TRANSFER
AUTOMATIC
LD501Z
SE
SL
DZ
HN
A
TV
SS
NEUTRAL
GROUND
IG
SECTION
PULL
NEUTRAL
GROUND
IG
SE
SL
DZ
HN
B
TV
SS
LD501ZLD501Z
DSLDZHNB
SESLDZHNA SESLDZHNB
GFI
M
GFI GFI
M
GFI GFI GFI
GFI
DSLDZHNA
LD501Z
PANEL
UAZLNA
UA501Z
100/3/1/70
4 #3/0, 1 #6 GRD.,
2" C.
DPGCZHNA
TVSS
DPGCZHNA
GC501Z
GC501Z
SECTION
FUTUREMCCGCZHN
GC161 GC165 GC169 GC208 GC210
150/3/1
FLUSH MOUNTED
CIRCUIT BREAKERS
ATS-14
NORMAL
ATS-11
LIFE SAFETY
ATS-12
CRITICAL
ATS-10
NORMAL
ATS-13
EQUIPMENT
MCCPSHN
PH104
PANEL
PDZLNA
PH104
4 #4, 1 #8 GRD.,
1-1/2" C.
1 #4 CU. GRD. IN
SCHEDULE 80 PVC
CONDUIT
TVSS
GCZLNA
CONDUIT
SCHEDULE 80 PVC
1 #4 CU. GRD. IN
5 #6, 1-1/4" C.
MANHOLE
E7.3
DISTRIBUTION PANEL
UNDERGROUND PRIMARY
CONDUIT,VIA PULL BOX SEE
SITE PLAN E1.2 FOR CONTINUATION
1-1/2" RIGID GALVANIZED
STEEL OR SCHEDULE 80 PVC
CONDUIT ENCASED 30" (MIN.)
BELOW GRADE. RUN CONDUIT
FROM TRANSFORMER SECONDARY
COMPARTMENT TO METER.
CONCRETE PAD AND GROUND
FURNISHED AND INSTALLED BY
ELECTRICAL CONTRACTOR PER
NTUA SERVICE REQUIREMENTS
13.8KV-480/277V
3PH, 4W, PAD MOUNTED
TRANSFORMER BY NTUA
METER SOCKET
SEE SHEET E3.10
1 #500 MCM CU. GRD.
TO COUNTERPOISE
NEUTRAL
GROUND
IG
1 #500 MCM CU. GRD.
TO COUNTERPOISE
1 1/4" TO NORTH 1500 KVA PADMOUNT
FOR SINGLE POINT METERING
8-4"C. W/ 4-600 MCM AND 1-600 MCM GND.
2-3 1/2"C. W/ 4-350 MCM & 1-1/0 GND.
3-4"C. W/4-500 MCM
& 2-3/0 GND.
3-4"C. W/4-500 MCM & 1-2/-0 GND.
2 1/2"C. W/ 4-4/0 & 1 #6 GND.
3-4"C. W/ 4-500 MCM & 1-3/0 GND.
2-3"C. W/ 3-350 MCM & 2-1/0 GND.
1-3"C. W/ 4-350 MCM & 2-1/0 GND.
1 1/2"C. W/ 3#2 & 1#6 GND.
2-2 1/2"C. W/ 3-4/0 & 1#2 GND.
2 1/2"C. W/ 3-3/0 & 1#6 GND.
1 1/4"C. W/ 4#6 & 2#6 GND.
2 1/2"C. W/ 3-3/0 & 2#6 GND.
1 1/2"C. W/ 4#2 & 1#8 GND.
4"C. W/ 4-500 MCM & 1#2 GND. 2-3 1/2"C. W/ 3-500MCM & 1-2/0 GND.
2 1/2"C. W/ 4-3/0 & 2#6 GND.
5-4"C. W/ 4-500 MCM
& 2-250 MCM GND.
1 1/2"C. W/3#2, 2#2 NEUT. &
2#8 GND.
2 1/2"C. W/4-4/0 & 1#6 GND.
2 1/2"C. W/ 4-4/0 &
2#6 GND.
2 1/2"C. W/4-4/0 & 1#6 GND.
2 1/2"C. W/4-4/0 &
1#6 GND.
2 1/2"C. W/ 3-3/0, 2-3/0 NEUT. & 2#6 GND.
2 1/2"C. W/ 4-3/0 &
2#6 GND.
GDZLNA
TVSS
GDZLNB1#4 GND. IN SCHEDULE
80 PVC
5#6, 1 1/4"C.
2-3 1/2"C. W/4-350 MCM & 2-1/0 GND.
3 1/2/"C. W/
3-500 MCM &
1#2 GND.
RECORD DRAWINGS
APRIL 14, 1995
Model
File details come from the government source that posted it.