AUSTIN TE-2.pdf
PDF 27 KB Posted
- Attached to
- Operations and Maintenance Services
- Solicitation number
- TIRMS10R00005
About this file
Technical Exhibit 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AUSTIN PWS 7-14-10.rtf | RTF text file | |
| Vendor Questions AUSTIN.rtf | RTF text file | |
| Austin Site Visit Sign In.pdf | ||
| RMS10R00005-A0002 1 .rtf | RTF text file | |
| TIRMS10R00005 7-14-10.rtf | RTF text file | |
| HSPD_12_PIV Procedures Manual.pdf | ||
| TIRMS10R00005-A0001 1 .pdf | ||
| TIRMS10R00005 Amendment 1.pdf | ||
| Wage Determination 6-22-10 Austin.pdf | ||
| TIRMS10R00005.pdf | ||
| AUSTIN PWS FINAL.pdf | ||
| AUSTIN TE-9.pdf | ||
| Key personnel CMMS Administrator attachment.rtf | RTF text file | |
| QUALITY ASSURANCE SURVEILLANCE PLAN.pdf | ||
| AUSTIN TE-8.pdf | ||
| AUSTIN TE-4.pdf | ||
| AUSTIN TE-6.pdf | ||
| AUSTIN TE-3.xls | XLS spreadsheet | |
| AUSTIN TE-12.pdf | ||
| Key personnel Supervisory attachment.rtf | RTF text file | |
| AUSTIN TE-11.pdf | ||
| AUSTIN TE-5.xls | XLS spreadsheet | |
| AUSTIN TE-1.pdf | ||
| NOTICE TO CONTRACTORS OM Austin.pdf | ||
| AUSTIN TE-7 REV 5-4-2010 AB.pdf | ||
| Cover Letter.pdf | ||
| Key personnel Program Manager attachment.rtf | RTF text file | |
| Wage Determination.pdf | ||
| AUSTIN TE-10.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Austin TIRMS-10-R-00005
TECHNICAL EXHIBIT TE-2
FACILITY COMPONENTS AND EQUIPMENT
The Service Provider shall be fully responsible for all operations, maintenance, repairs, service calls, etc. for all building equipment and systems installed in the building (s) at time of the contract award including but not limited to the following:
Exterior of Structure All structural components including, but not limited to, exterior walls, roofing, flashing, skylights, chimneys, ventilators (and other items that pierce the roof), gutters, downspouts, splash blocks, overhangs, , windows, swing doors, overhead doors, sliding doors, revolving doors, hardware closures, hinges, locking devices, lightning protection systems, and exterior stairways.
Interior of Structure All structural components including, but not limited to, interior walls, soundproofing, floor coverings (such as repair of hardwood flooring, carpeting, ceramic tile) window blinds, window draperies, screening, insulation, drywall/plaster, interior signage, , , interior stairways, ceilings and ceiling tiles, carpentry finishes such as door, wall, and cove base trim (etc,,,) doors, door hardware, raised flooring, mechanical/electrical door mag lock devices, windows, glass, restroom hardware, and mirrors.
Parking Lots and Appurtenances. Structural components including, but not limited to, sidewalks, driveways, roads, curbing, parking areas, signage, patios, canopies, covered walkways, Metal fences and fence hardware and gates (including electrical gate controllers), ,barriers, barrier control arms, entrances, flagpoles, and retaining walls.
Storm Drainage Systems. Complete including, but not limited to, manholes, roof drains, sump pumps, and exterior grates Chilled Water Systems. Complete chilled water systems including, but not limited to, all computer room A/C units, central chilled water units, and all associated insulation and piping, water treatment, valves, gauges, thermometers, pumps, switches, and controls. Associated water and glycol condenser systems including: exterior cooling towers, piping loops, exterior air cooled condensing units, piping hangers, valves, pumps, expansion tanks, controls, switches, structural system platforms, makeup valves, and back-flow preventers.
HVAC Controls. All HVAC controls including, but not limited to, BAS software and IT equipment, digital and pneumatic controls and compressed control air systems including air compressors.
Electrical Power Systems. Complete including, but not limited to: all electrical power components, interior and exterior related lighting systems, Rotary Uninterruptible Power Supply (RUPS) units, UPS systems, lighting controls, batteries, transfer switches, diesel/motor generators, switchboards, switchgear, breaker panels, buss duct systems, conduits, hangers, receptacles, lighting switches, and circuit breakers. Also, all buildings electrical distribution equipment including, but not limited to, motors, motor control centers and breakers, high- voltage transformers and switchgear, individual circuits, valves, heaters, heat pumps, electric gate operators, central clock system, public address system and the Television cabling and hangers Emergency Light Systems. Emergency lighting systems complete including, but not limited to, individual units w/battery backup, wiring, breaker panels, special dock spotlights, controls, and emergency lighting generators.
Fire Alarm/Suppression Systems. The fire alarm system complete including but not limited to: control panels, alarms, horns, pull stations, smoke detectors, heat detectors, fire doors, all supervisory signaling devices on equipment as alarm check valves, dry pipe deluge and preaction valves, and flame detectors. Also fire suppression systems including wet pipe and dry pipe sprinkler systems and dry chemical fire extinguishers.
Fire Pumps. Fire sprinkler pump system complete and all associated equipment.
Heating Systems. Complete heating systems including, but not limited to: boilers, heating elements, controls, electrical heating systems, circulating pumps, steam/hot water heaters and coils, unit heaters, HVAC unit coils, control valves, and Building Automation Systems (BAS) control systems.
HVAC Systems. HVAC system complete including, but not limited to, air handlers, return air fans, controls, heat pumps, Energy Management Systems, cooling towers, glycol dry coolers, VAV and mixing boxes, Building Automation Systems (BAS) control systems, chillers, motors, filters, duct work, insulation, balancing dampers, fire dampers and air curtains, thermostats, gauges, thermometers, balancing valves, control valves, cutoff valves, under floor leak detection systems, compressed air control systems and strainers, etc Elevators, Escalators, Dumbwaiters, Hoists, and Loading Dock Levelers. All lifting equipment systems including but not limited to the following: all elevator associated equipment in machine rooms and pits, all motors; all hoist motors, motor generators and regulators, geared machines, brakes, interior and exterior of elevator cabs, all automatic controls and lighting or safety devices, all software and IT equipment, car gates, lighting:, hydraulics, emergency items, loading dock levelers, escalator devices, and cranes, or other lifting devices.
Overhead Doors. Overhead doors include, but not limited to, automatic motorized overhead doors, PVC transparent overlapping door panels, dock bumper/plates, platforms, and air curtains.
Plumbing. Building Plumbing system complete including, but not limited to: all piping, insulation, valves, meters, gauges, check valves, back-flow preventers, sump pumps, steam regulating valves, manual valves, check valves, hot water regulating valves, unit heaters, valcumm/condensate steam traps, radiators, hot water pumps, domestic hot water heaters, strainers, condensation drains, water fountains, sinks, sensor controlled restroom fixtures and related batteries, sink faucets, urinals, commodes, all standard rest room fixtures, and rest room partitions Sanitary Sewage System Complete building(s) to city connection including but not limited to: ejectors, controls, valves, piping, floor drains, fixture seals, and grease traps.
Kitchen Equipment. Kitchen equipment includes but not limited to installed icemakers, ranges, grills, refrigeration units, freezer units, kettles, drink dispensers, coffee pots, and vented exhaust hoods.
Child Care Play Equipment. Play Ground Equipment includes, but is not limited to, swings, bars, slides, other wood/plastic structures, and padded exterior play areas.
Lawn Irrigation Systems. The complete lawn sprinkler system, including but not limited to lawn sprinkler heads, electronic controls, piping, and valves.
Tanks. Tanks include but not limited to water and fuel tanks that may be above or under ground and all associated monitoring systems.
The Contractor shall be fully responsible for all operations, maintenance, repairs, service calls, etc. for all building equipment and systems installed in the building (s) at time of the contract award except for the specific building elements and structures, equipment, and systems depicted in the matrix below.
The Offeror should carefully review the equipment lists in Technical Exhibits TE-5-for details on equipment for which preventive maintenance shall be performed.
SYSTEMS EXCLUDED From THE SCOPE OF WORK
The Service Provider is not responsible for operation, maintenance or repair of any of the equipment named below in any building(s) in this contract.
• Computers
• Office furniture
• Office machines
• Furniture lighting
• Paper shredders
• Personally owned appliances
• Mail handling equipment
• Special purpose incinerators
• Printing plant equipment
• Laboratory equipment
File details come from the government source that posted it. Updated .