T2881 Final PS South 10.1.2026~4.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Contract RFP/PSBE/COOP NJ|26-GNSV2-145229
- Contract number
- 26-GNSV2-145229
- Issued by
- New Jersey
About this file
This is a state-supplied price sheet for Bid Solicitation #26DPP01192 (T2881) for water damage restoration services on a statewide basis. The document establishes pricing requirements for the South Region and is formatted to receive bidder unit costs across three contract years. Bidders are instructed to provide pricing only in designated yellow highlighted cells without altering the price schedule structure.
The contract encompasses comprehensive water damage restoration services organized into five pricing categories: labor, extraction/drying/air filtration equipment, power and distribution equipment, transportation equipment, and miscellaneous equipment. Labor pricing includes all-inclusive hourly rates for multiple personnel classifications (Project Manager, Supervisor, Water Restoration Technician, Laborer, Carpenter Foreman, Carpenter Journeyman, and Carpenter Apprentice) at both regular and overtime rates, plus a percentage markup for labor supplies and materials. Equipment pricing is structured as hourly rental rates for approximately 67 line items covering dehumidifiers, extraction units, generators ranging from portable to 1,000 KW capacity, air compressors, transportation vehicles, and specialized restoration equipment such as ozone generators, vacuum systems, and holding tanks. All pricing is requested for Year 1, Year 2, and Year 3, with bidders also required to provide a percentage markup for all rental equipment costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T2881 Att 3 Reim~1.xlsx | XLSX spreadsheet | |
| T2881 Final PS Central 10.1.2026~4.xlsx | XLSX spreadsheet | |
| T2881 - Method of Operation 10.1.2026~5.docx | DOCX document | |
| Green_Fleet_OA_Redacted_Signed.pdf | ||
| T2881 Att 1 Combined SSTC 6.3.2025.pdf | ||
| T2881 Bid Amendment 1_1.21.26~1.docx | DOCX document | |
| T2881 Final PS North 10.1.2026~4.xlsx | XLSX spreadsheet | |
| T2881 Att 4 Procedure for Background Checks.pdf | ||
| T2881 Final Bid Solicitation 10.1.2026~4.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 South Region - State Supplied Price Sheet Bid Solicitation #26DPP01192 - T2881 - Water Damage Restoration Services - Statewide
| Bidder Name: | ||||
| Refer to Bid Solicitation Section 3.23 for Bidder instructions. The Bidder shall provide pricing in the yellow highlighted cells below. The Bidder must not alter the price schedule in any manner. | ||||
| Line No. | Item Description | Unit of Measure | Year 1 | |
| Unit Cost | Year 2 | |||
| Unit Cost | Year 3 |
Unit Cost
| South Region Labor | ||
| 1 | South Region: Percentage Mark-Up for Labor Supplies and Materials | PCNT |
| 2 | South Region: Project Manager - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 3 | South Region: Project Manager - All- Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 4 | South Region: Supervisor -All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 5 | South Region: Supervisor - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 6 | South Region: Water Restoration Technician - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 7 | South Region: Water Restoration Technician - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 8 | South Region: Laborer - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 9 | South Region: Laborer - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 10 | South Region: Carpenter Foreman - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 11 | South Region: Carpenter Foreman - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 12 | South Region: Carpenter Journeyman -All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 13 | South Region: Carpenter Journeyman - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 14 | South Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 15 | South Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |||||
| $ 10.00 | . | |||||
| South Region Equipment | ||||||
| Extraction, Drying, Air Filtration & Cooling Equipment | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 16 | Air Mover/Carpert Blowers | HOURLY | ||||
| 17 | Dehumidifier (200 cfm refrigerant) | HOURLY | ||||
| 18 | Dehumidifier (3,500 cfm dessicant) | HOURLY | ||||
| 19 | Dehumidifier (4,500 - 5,000 cfm dessicant) | HOURLY | ||||
| 20 | Dehumidifier (9,000 - 10,000 cfm dessicant) | HOURLY | ||||
| 21 | Dehumidifier (15,000 cfm dessicant) | HOURLY | ||||
| 22 | Dehumidifier (DX Unit 20/30 ton) | HOURLY | ||||
| 23 | Dehumidifier (DX Unit 60 ton) | HOURLY | ||||
| 24 | Extraction Unit (Portable) | HOURLY | ||||
| 25 | Extraction Unit (Trailer) | HOURLY | ||||
| 26 | HEPA Filtration Unit (Air Scrubber) | HOURLY | ||||
| 27 | Inject-dry Unit | HOURLY | ||||
| Power and Distribution Equipment Rental | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 28 | Electrical Distribution Panel (120 AMPS) | HOURLY | ||||
| 29 | Generator (Portable) | HOURLY | ||||
| 30 | 60 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 31 | 75 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 32 | 125 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 33 | 200 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 34 | 500 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 35 | 1,000 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 36 | Air Compressor | HOURLY | ||||
| 37 | Carpet Cleaning Machine | HOURLY | ||||
| 38 | Carpet Tilt/Demolition | HOURLY | ||||
| 39 | Saw - Demo | HOURLY | ||||
| 40 | Saw - Power Miter | HOURLY | ||||
| Transportation Rental Fee | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 41 | Trailer, Enclosed (12-16 feet) | HOURLY | ||||
| 42 | Trailer, Flat Bed | HOURLY | ||||
| 43 | Trailer, Freezer | HOURLY | ||||
| 44 | Truck, Moving | HOURLY | ||||
| 45 | Truck, Pickup | HOURLY | ||||
| 46 | Van, Box (12 -16 feet) | HOURLY | ||||
| 47 | Van, Box (17-20 feet) | HOURLY | ||||
| 48 | Van, Passenger (up to 10 people) | HOURLY | ||||
| 49 | Vehicle Pickup, SUV or car | HOURLY | ||||
| 50 | Truck and Driver for water disposal | HOURLY | ||||
| Miscellaneous Equipment | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 51 | Bobcat, Small | HOURLY | ||||
| 52 | Floor Cleaning System (walk behind) | HOURLY | ||||
| 53 | Light, Tower Mobile (400 W diesel) | HOURLY | ||||
| 54 | Oven, Convection Convection Drying (ULT) | HOURLY | ||||
| 55 | Oven, Vacuum (large) | HOURLY | ||||
| 56 | Ozone Generator | HOURLY | ||||
| 57 | Pump, Sump/Flood | HOURLY | ||||
| 58 | Scaffolding Section | HOURLY | ||||
| 59 | Sprayer, Airless H.P. | HOURLY | ||||
| 60 | Steam Cleaner | HOURLY | ||||
| 61 | Vacuum, HEPA | HOURLY | ||||
| 62 | Vacuum, Upright | HOURLY | ||||
| 63 | Vacuum, Wet/Dry | HOURLY | ||||
| 64 | Washer, High Pressure (hot) | HOURLY | ||||
| 65 | Portable Holding Tank (550 gallon) | HOURLY | ||||
| 66 | Portable Holding Tank (1,000 gallon) | HOURLY | ||||
| 67 | South Region - Rental Equipment: All Inclusive Percentage Mark-Up for Rental Equipment | PCNT |
Sheet2
Sheet3
Sheet4
Sheet5
File details come from the government source that posted it. Updated .