T2881 Final PS North 10.1.2026~4.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Contract RFP/PSBE/COOP NJ|26-GNSV2-145229
- Contract number
- 26-GNSV2-145229
- Issued by
- New Jersey
About this file
Contract Summary
This document is a pricing schedule for a state and local contract award designated T2881, effective October 1, 2026, through April 30, 2026. The contract involves pricing and product information maintained in spreadsheet format, likely supporting a broader procurement agreement between one or more state or local government entities and a contracted vendor or suppliers.
The spreadsheet contains detailed pricing structures, product line items, and associated costs for goods or services to be delivered under the contract terms. The document serves as the authoritative reference for pricing validation, cost allocation, and financial reconciliation throughout the contract performance period. Without access to the complete spreadsheet contents, specific commodity descriptions, unit pricing, total contract values, option periods, and set-aside provisions cannot be definitively identified; however, this pricing schedule functions as a critical component of the overall contract administration and vendor payment process for the procuring state or local jurisdiction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Green_Fleet_OA_Redacted_Signed.pdf | ||
| T2881 Att 1 Combined SSTC 6.3.2025.pdf | ||
| T2881 Bid Amendment 1_1.21.26~1.docx | DOCX document | |
| T2881 Att 4 Procedure for Background Checks.pdf | ||
| T2881 Final Bid Solicitation 10.1.2026~4.docx | DOCX document | |
| T2881 Att 3 Reim~1.xlsx | XLSX spreadsheet | |
| T2881 Final PS Central 10.1.2026~4.xlsx | XLSX spreadsheet | |
| T2881 Final PS South 10.1.2026~4.xlsx | XLSX spreadsheet | |
| T2881 - Method of Operation 10.1.2026~5.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 North Region - State Supplied Price Sheet Bid Solicitation #26DPP01192 - T2881 - Water Damage Restoration Services - Statewide
| Bidder Name: | ||||
| Refer to Bid Solicitation Section 3.23 for Bidder instructions. The Bidder shall provide pricing in the yellow highlighted cells below. The Bidder must not alter the price schedule in any manner. | ||||
| Line No. | Item Description | Unit of Measure | Year 1 | |
| Unit Cost | Year 2 | |||
| Unit Cost | Year 3 |
Unit Cost
| North Region Labor | ||
| 1 | North Region: Percentage Mark-Up for Labor Supplies and Materials | PCNT |
| 2 | North Region: Project Manager - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 3 | North Region: Project Manager - All- Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 4 | North Region: Supervisor -All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 5 | North Region: Supervisor - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 6 | North Region: Water Restoration Technician - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 7 | North Region: Water Restoration Technician - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 8 | North Region: Laborer - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 9 | North Region: Laborer - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 10 | North Region: Carpenter Foreman - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 11 | North Region: Carpenter Foreman - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 12 | North Region: Carpenter Journeyman -All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 13 | North Region: Carpenter Journeyman - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 14 | North Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Regular Time |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |
| 15 | North Region: Carpenter Apprentice - All-Inclusive Hourly Rate - Overtime |
| As per Bid Solicitation Section 4.6 Personnel Categories and Section 3.23 State-Supplied Price Sheet Instructions | HOURLY | |||||
| $ 10.00 | . | |||||
| North Region Equipment | ||||||
| Extraction, Drying, Air Filtration & Cooling Equipment | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 16 | Air Mover/Carpert Blowers | HOURLY | ||||
| 17 | Dehumidifier (200 cfm refrigerant) | HOURLY | ||||
| 18 | Dehumidifier (3,500 cfm dessicant) | HOURLY | ||||
| 19 | Dehumidifier (4,500 - 5,000 cfm dessicant) | HOURLY | ||||
| 20 | Dehumidifier (9,000 - 10,000 cfm dessicant) | HOURLY | ||||
| 21 | Dehumidifier (15,000 cfm dessicant) | HOURLY | ||||
| 22 | Dehumidifier (DX Unit 20/30 ton) | HOURLY | ||||
| 23 | Dehumidifier (DX Unit 60 ton) | HOURLY | ||||
| 24 | Extraction Unit (Portable) | HOURLY | ||||
| 25 | Extraction Unit (Trailer) | HOURLY | ||||
| 26 | HEPA Filtration Unit (Air Scrubber) | HOURLY | ||||
| 27 | Inject-dry Unit | HOURLY | ||||
| Power and Distribution Equipment Rental | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 28 | Electrical Distribution Panel (120 AMPS) | HOURLY | ||||
| 29 | Generator (Portable) | HOURLY | ||||
| 30 | 60 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 31 | 75 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 32 | 125 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 33 | 200 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 34 | 500 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 35 | 1,000 KW Generator (with enviro fuel tank) | HOURLY | ||||
| 36 | Air Compressor | HOURLY | ||||
| 37 | Carpet Cleaning Machine | HOURLY | ||||
| 38 | Carpet Tilt/Demolition | HOURLY | ||||
| 39 | Saw - Demo | HOURLY | ||||
| 40 | Saw - Power Miter | HOURLY | ||||
| Transportation Rental Fee | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 41 | Trailer, Enclosed (12-16 feet) | HOURLY | ||||
| 42 | Trailer, Flat Bed | HOURLY | ||||
| 43 | Trailer, Freezer | HOURLY | ||||
| 44 | Truck, Moving | HOURLY | ||||
| 45 | Truck, Pickup | HOURLY | ||||
| 46 | Van, Box (12 -16 feet) | HOURLY | ||||
| 47 | Van, Box (17-20 feet) | HOURLY | ||||
| 48 | Van, Passenger (up to 10 people) | HOURLY | ||||
| 49 | Vehicle Pickup, SUV or car | HOURLY | ||||
| 50 | Truck and Driver for water disposal | HOURLY | ||||
| Miscellaneous Equipment | Unit of Measure | Year 1 Unit Cost | Year 2 Unit Cost | Year 3 Unit Cost | ||
| 51 | Bobcat, Small | HOURLY | ||||
| 52 | Floor Cleaning System (walk behind) | HOURLY | ||||
| 53 | Light, Tower Mobile (400 W diesel) | HOURLY | ||||
| 54 | Oven, Convection Convection Drying (ULT) | HOURLY | ||||
| 55 | Oven, Vacuum (large) | HOURLY | ||||
| 56 | Ozone Generator | HOURLY | ||||
| 57 | Pump, Sump/Flood | HOURLY | ||||
| 58 | Scaffolding Section | HOURLY | ||||
| 59 | Sprayer, Airless H.P. | HOURLY | ||||
| 60 | Steam Cleaner | HOURLY | ||||
| 61 | Vacuum, HEPA | HOURLY | ||||
| 62 | Vacuum, Upright | HOURLY | ||||
| 63 | Vacuum, Wet/Dry | HOURLY | ||||
| 64 | Washer, High Pressure (hot) | HOURLY | ||||
| 65 | Portable Holding Tank (550 gallon) | HOURLY | ||||
| 66 | Portable Holding Tank (1,000 gallon) | HOURLY | ||||
| 67 | North Region - Rental Equipment: All Inclusive Percentage Mark-Up for Rental Equipment | PCNT |