Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Fueling Infrastructure Equipment Replacement and Improvements
Solicitation number
2026-IFB-LM-0335
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for a fueling infrastructure equipment replacement and improvements project managed by the City of Pasadena Department of Public Works, Building Systems and Fleet Management Division in California. The form requires contractors to identify and list all subcontractors performing work on the project, with specific sections dedicated to general subcontractors and shoring design engineers. The document provides spaces for up to seven subcontractors and up to six shoring design engineers, requiring documentation of each entity's name, address, and description of work to be performed. If shoring is not required for the project, contractors must indicate "NONE" in the shoring design section.

The subcontractor listing serves as a compliance and transparency requirement for the bid submission process, ensuring that the City of Pasadena has visibility into all parties involved in executing the fueling infrastructure project. This includes the replacement of eight liquid fuel dispensers across three city locations and the installation of two CNG dispensers with eleven dual-hose time-fill posts. The form does not specify pricing information, set-asides, or other contract terms, as it functions solely as a documentation and disclosure tool for identifying the supply chain and specialized personnel, such as civil or structural engineers responsible for shoring design, that will be engaged in the project delivery.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .