This is a solicitation for an Interconnection Equipment Contract to provide broad support across the Federal Government for interconnection equipment and supply needs. Multiple awards are anticipated for contracts with a one year base period and five one-year option periods. The combined contract maximum is $808 million with a $10,000 minimum guarantee per awardee. The estimated award date is 31 October 2019 under Full and Open Competition with a small business reservation. Awardees must provide a Small Business Commitment Document targeting a minimum 40% of dollars to small businesses. The Government reserves the right to set aside orders under $250,000 solely for small business awardee(s). Required support includes production status, first article testing, and obsolescence reporting for interconnection equipment, wiring harnesses, cables, connectors and accessories. The Defense Logistics Agency Land and Maritime will issue the solicitation on or about 7 August 2019.

Amendment 0005 to the solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Interconnection Equipment Contract, newest first.
File Type Posted
SPRBL119R0042-0007.pdf PDF
Q&A_SPRBL119R0042_10_September_2019.pdf PDF
SPRBL119R0042-0006.pdf PDF
Q&A_SPRBL119R0042_9_September_2019.pdf PDF
Enclosure_1_Multiple_TDP_Questions.xlsx XLSX spreadsheet
Exhibit_A_IEC_Statement_of_Work_and_CDRLs_Dated_September_6,_2019.pdf PDF
Attachment_0001_Price_Evaluation_List_SPRBL1-19-R-0042_6_September_2019.xlsx XLSX spreadsheet
Q&A_SPRBL119R0042_6_September_2019.pdf PDF
SPRBL119R0042-0004.pdf PDF
Attachment_0006_Q&A_SPRBL119R0042_4_September_2019.pdf PDF
SPRBL119R0042-0003.pdf PDF
Exhibit_B_ILSC-1A_Supplemental_SOW_for_Omnibus_Contract_for_IEC_Aug_28_2019.pdf PDF
Attachment_0006_Q&A_SPRBL119R0042_29_August_2019.pdf PDF
Attachment_0001_Price_Evaluation_List_SPRBL1-19-R-0042_28_August_2019.xlsx XLSX spreadsheet
Attachment_0005_PEL_Supplemental_Requirements_August_28_2019.xlsx XLSX spreadsheet
Interconnection_Equipment_Contract_-_Pre-Proposal_Conference.pdf PDF
SPRBL119R0042-0002.pdf PDF
Attachment_0006_Q&A_SPRBL119R0042_23_August_2019.pdf PDF
Attachment_0001_Price_Evaluation_List_SPRBL1-19-R-0042_23_August_2019.xlsx XLSX spreadsheet
Exhibit_A_IEC_Statement_of_Work_and_CDRLS_Aug_20.pdf PDF
A0006_Q&A_SPRBL119R0042_21_August_2019.pdf PDF
SPRBL119R0042-0001.pdf PDF
Q&A_SPRBL119R0042_20_August_2019.pdf PDF
Exhibit_B_ILSC-1A_Supplemental_SOW_for_Omnibus_Contract_for_IEC.pdf PDF
SPRBL119R0042.pdf PDF
Attachment_0002__Use_and_Non-Disclosure_Agreement_for_SPRBL1-19-R-0042.pdf PDF
Attachment_0005_PEL_Supplemental_Requirements_July_25_2019.xlsx XLSX spreadsheet
Attachment_0001_Price_Evaluation_List_SPRBL1-19-R-0042.xlsx XLSX spreadsheet
Attachment_0003_List_of_Current_Items_within_Scope_of_the_IEC.xlsx XLSX spreadsheet
Attachment_0004_Projected_First_Order_RFP.xlsx XLSX spreadsheet
Exhibit_A_IEC_Statement_of_Work_and_CDRLS_Aug_16.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0005 2019SEP06

SPRBL1

DLA LAND AT ABERDEEN

6565 SURVEILLANCE LOOP, ROOM C1301

APG, MD 21005-1846

LINDSEY D. SCHUMAN

EMAIL: LINDSEY.SCHUMAN@DLA.MIL

SPRBL1-19-R-0042

2019AUG16

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 14

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: LINDSEY D. SCHUMAN

Buyer Office Symbol/Telephone Number: DLA-ZLAB/(443)861-4526

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost Plus Fixed Fee

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0005 for Solicitation SPRBL1-19-R-0042 is as follows:

1. Narrative A0001: The below paragraphs in Narrative A001 have been changed to read as follows: ________________

PRICING OVERVIEW: The Price Evaluation List contains a total of 127 supply items as provided in Attachment 0001 labeled Attachment ________________

0001 Price Evaluation List SPRBL1-19-R-0042.xlsx. The offeror shall provide ceiling prices on a minimum of 85% of the supply items (or

108 items) on the Price Evaluation List, for either the exact item specified or an acceptable alternate. Offerors cannot provide two prices for an item. You must either propose to the actual item or the alternate. Alternate items to those found on the Price Evaluation

List can be offered at the time of Price Proposal. However, the offeror must provide a complete technical data package for the Alternate item being offered as well as the item on the Price Evaluation List. If an item is deemed equal in form, fit, and function to the item on the Price Evaluation List, it may be added to the IEC contract award. Alternate items determined not acceptable will not count towards the 85% minimum Price Evaluation List requirement, and will not be evaluated. It is anticipated that the IEC contract awardees will pursue aggressive pricing, maximize the alternate offers, and find technical solutions/efficiencies, as needed.

2. Sections L&M: Sections L&M have been updated as reflected within this amendment. The following paragraphs were updated: ____________

L.6.

M.5.

3. Section J: To update the following Attachments: _________

Exhibit A: Exhibit A, Statement of Work and CDRLs, to update paragraphs 3.1.2 and 3.2.9. __________

Attachment 0001: Attachment 0001, Price Evaluation List has been updated as of 6 September 2019 to add the unit of measure per _______________ item.

Attachment 0006: Attachment 0006, Questions and Answers, has been updated as of 6 September 2019. Note that Enclosure 1 was added _______________ to the attachment.

*** END OF NARRATIVE A0006 ***

2 14

SPRBL1-19-R-0042

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Exhibit A STATEMENT OF WORK AND CDRLS 06-SEP-2019 028

Attachment 0001 PRICE EVALUATION LIST 06-SEP-2019

Attachment 0006 QUESTIONS AND ANSWERS 06-SEP-2019 028

3 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

DLAD PROC NOTES IMPLEMENTED BY REFERENCE

DLAD Proc Lot L04 Offers for Part Numbered Items (SEP 2016).

DLAD Proc Note L06 Agency Protests (DEC 2016).

DLAD Proc Note L08 Use of Past Performance Information Retrieval System Statistical Reporting in Past Performance Evaluations (JUN

2018).

DLAD Proc Note L09 Reverse Auction (OCT 2016)

DLAD Proc Note L11 Small Business Program Representation (AUG 2017).

DLAD Proc Note L22 Restriction of Alternate Offers for Source Controlled Items (SEP 2017).

INSTRUCTIONS TO OFFERORS - PROPOSAL INSTRUCTIONS

L.1. PROPOSAL SUBMISSION:_________________________

L.1.1. Introduction: This section contains general proposal submission instructions as well as specific proposal requirements for the

IEC. The Government intends to award multiple contracts from this solicitation.

L.1.2. General: The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the Request for Proposal (RFP). The Government will not assume the offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2. PROPOSAL INSTRUCTIONS:__________________________

L.2.1. General

L.2.1.1. The offeror shall provide information by addressing each Factor/Sub-Factor/Sub-Sub Factor in the format and sequence identified below. The offeror shall provide information in sufficient detail to allow the Government to make a best value assessment of the offerors capability to support the evaluation criteria. The offeror is responsible for providing adequate documentation to enable a thorough evaluation of the proposal. The offeror should thoroughly read and understand the terms and conditions contained in the solicitation. The offeror shall submit a proposal that clearly and concisely describes and defines the offerors response to the objectives/requirements contained in the RFP. In order to receive full consideration, the offeror is encouraged to ensure that the information provided within its proposal is factual, accurate and complete.

L.2.1.2. The offeror shall assume that the Government has no prior knowledge of its facilities and experience, and that the Government will base its evaluation exclusively on the merits and content of the information presented in the offerors proposal. The proposal shall not simply restate or rephrase the Governments requirements, but rather provide a convincing rationale explaining how the offeror intends to meet these requirements.

L.2.1.3. Each large business offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR

52.219-9. This plan shall be incorporated into any resultant contract in reference to the RFP.

L.2.1.4. If the offeror does not understand the instructions contained herein, written notification should be provided to the

Contracting Officer for clarification ten (10) days prior to the deadline for the receipt of proposals to get an answer in time to meet the deadline. The Government will publish the questions asked and the answers given, and distribute them to all prospective offerors.

L.2.1.5. If the offeror takes exception to any of the solicitation terms, the offeror shall include a list setting out the exceptions.

Exceptions to any terms and conditions of the RFP may make the proposal unacceptable.

L.2.1.6. In order to be considered for an award, proposals must be submitted in four (4) volumes in accordance with the instructions of the solicitation. Volume 1 shall consist of the Technical Proposal, which must be devoid of all reference to cost or price. Volume 2 shall consist of the Past Performance Proposal. Volume 3 shall consist of the Small Business Participation Proposal, and shall consist of the Sub-Contracting Plan (for Other-than-small-businesses only). Volume 4 shall consist of the Price Proposal.

L.2.1.7. The offeror shall include a completed and signed copy of the RFP, and all amendments. The offeror shall also include a cover letter on company letterhead as part of the proposal submission. The cover letter must contain a statement committing the offerors firm to the proposal, stating its validity for a period of at least one hundred eighty (180) days, and providing any exceptions to the RFP that are addressed throughout the proposal. The letter should also include the name, title, phone number, and e-mail address for the person(s) authorized to negotiate with the Government in connection with the proposal. The letter must be signed by a responsible officer or partner/principal of the firm that is authorized to bind the organization contractually. The letter must also contain a statement that the proposal meets the specifications of each section and sub-section of the RFP.

4 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.2.1.8. All proposal volumes, with the exception of Volume 4, shall be in delivered in PDF files. Volume 4 shall be delivered through the provided excel file. PDF pages should not exceed 8-1/2 inches in width by 11 inches in length with at least one inch margins on all sides, using a font with a 12 point size type or larger for all body text. Text used in the proposal is at the discretion of the offeror but should maintain a legible font and size. Graphics must be able to be printed and copied in pure black and white (no color). Pages shall be consecutively numbered. Each page of the proposal should be affixed with the following legend: Source Selection Information

(See FAR 2.101 and 3.104). The offeror shall not submit information in its proposals that is considered Classified. Proprietary markings are permitted.

L.2.1.9. Offers submitted must be valid for one hundred eighty (180) days after the final closing date of the solicitation. The

Government intends to make more than one contract award. The Government will process late submissions of proposals in accordance with

FAR 15.208.

L.2.1.10. The offeror shall submit its proposal electronically through the link on FedBizOpps associated with the solicitation number.

The offeror shall email a confirmation upload to Lindsey.Schuman@dla.mil and Michelle.Bontempo@dla.mil. The offeror may e-mail

Lindsey.Schuman@dla.mil and Michelle.Bontempo@dla.mil if it is experiencing technical difficulties with the FedBizOpps website. Email submissions through a secured site may be accepted as an alternative if approved in advance by the Contracting Officer.

L.3. TECHNICAL PROPOSAL (VOLUME 1)___________________________________

L.3.1. The technical proposal shall not exceed fifty (50) pages. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will not be evaluated. Each paragraph shall be separated by at least one blank line. Any and all annexes, documentation and attachments that are submitted by the offeror will count against the page limitations. The following will not count against page limitations: table of contents pages, cross-referencing pages, acronym lists, and page dividers.

L.3.2. The Technical Proposal shall consist of separate sub-sections outlining each technical sub-factor and sub-sub factor.

Information provided by the offeror should enable the Government to determine whether the offeror can meet the minimum requirements of the solicitation. The offeror is responsible for including sufficient details to permit a complete and accurate evaluation strictly from a technical standpoint. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarification.

L.3.3. Factor: Technical

L.3.3.1. Sub-Factor: Management Approach: The offerors shall provide a management approach that demonstrates its ability to effectively and efficiently manage the scope of the acquisition and that the organization has the current or planned capabilities for assuring performance of the requirements. The offeror shall provide insight into its organizational and administrative structure. The offeror shall clearly define how this structure will enable effective performance under the contract. The proposal should detail the processes the offeror has in place to ensure that applicable clauses, including terms and conditions required by the prime contract, flow down to subcontractors.

L.3.3.1.1. Program Management Plan: The offeror shall provide a detailed plan on how it will manage the program to include the oversight of the supply chain. The offeror shall align its plan in accordance with the required program management support within the SOW. The plan should detail the key personnel, internal management reviews, training, and policy implementation that will ensure integrity throughout the program. The plan shall also include the offerors ability to support surge and sustainment in contingency operations.

L.3.3.2. Sub-Factor: Technical Evaluation Approach: To meet the minimum requirements of the solicitation, the offeror must clearly show within its submitted proposal how it plans to meet the Governments product requirements as identified in the SOW in Section J (Exhibit

A) of this solicitation. The offeror shall demonstrate its technical capability by discussing in its technical proposal the plans, methods, and procedures for fulfilling the technical requirements described in the specification and the SOW. The offeror shall provide evidence demonstrating a clear understanding of the requirements, to include the scope and complexity of the work. The proposed approach shall be well-defined and logical, and include the methodologies and processes that can successfully meet the objectives. As required in the SOW, a Small Business or an Other-than-small-business offeror is required to quote on a minimum percentage of RFQ/RFPs. This percentage will be referred to as the quote metric. A Small Business offeror shall describe its plan to propose to the seventy percent

(70%) quote metric, and an Other-than-small-business offeror shall describe its plan to propose to the eighty-five percent (85%) quote metric.

L.3.3.2.1. Sub-Sub-Factor: Supply Chain Management: The offeror shall provide its established methods and processes in terms of supply chain management. The offeror shall provide detail into its supply chain management structure, and describe how that structure will meet the requirement of the SOW. The offeror shall list the current business alliances and contractual relationships with manufacturers, vendors, distribution centers, consolidation centers, warehousing resources, etc., that will enable the offeror to provide, consolidate, and distribute supplies covered under the IEC. The offeror shall also describe how these business alliances and contractual relationships will enable it to provide, consolidate, and distribute the types of supplies covered under the IEC. The offeror shall explain the processes in place to ensure that applicable quality requirements are flowed to subcontractors. The offeror shall also provide a detailed plan on how it will maintain the on-time delivery metric stated within the SOW, including its established processes

5 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

for tracking deliveries through the supply chain.

L.3.3.2.2. Sub-Sub-Factor: Production Management: The offeror shall provide detail on its production management processes, and demonstrate how the methods and processes meet the solicitation requirements. The plan should demonstrate the offerors understanding of the technically complex challenges that may arise under the acquisition.

L.3.3.2.2.1. Production Quality Verification: The offeror shall describe in detail its quality management processes, and the methodology by which the high level of quality will be maintained through their supply chain and throughout deliverables.

L.3.3.2.2.2 FAT Process: The offeror shall describe in detail its ability to supply items that require FAT. The offeror shall provide processes utilized for FAT execution, including the process flow through its supply chain.

L.3.3.2.2.3. Technical Data Package Verification: The offeror shall describe in detail the processes utilized to review, analyze and verify the TDPs prior to proposal submission.

L.3.3.2.2.4. Configuration Management: The offeror shall describe in detail their configuration management processes to include their process for Engineering Change Proposals and Request for Variance.

L.3.3.2.2.5. Obsolescence Reporting: The offeror shall describe the processes in place for tracking diminishing sources/part obsolescence as identified in the forecasted quarterly requirement within the SOW.

L.4. PAST PERFORMANCE (VOLUME 2)_________________________________

L.4.1. To assist the Government in evaluating past performance, the offeror shall provide a list of relevant completed contracts/orders, commercial or government, performed within the past three (3) years. Up to three (3) total, government OR commercial contracts for the same or similar items shall be submitted. Companies proposing as a joint venture can provide up to three (3) examples from either the companies that make up the joint venture or the joint venture. The Government will not consider any contracts that were completed or performed by subcontractors for the requirements listed in the past performance volume. For the purposes of this evaluation, similar items will be defined as products in the same federal supply class (FSC). Relevancy includes contracts/orders for similar items that are similar in complexity, dollar value, contract type, and/or degree of subcontracting.

L.4.2. For each contract/order requested, the offeror shall provide the following information:

- Name and address of the contracting government activity or the name and address of the commercial customer;

- For government contracts, the name, email address, and phone number of the Procuring Contracting Officer (PCO), and for commercial customers, the name and phone number of the commercial customer purchasing official;

- The contract/order number or other means of document identification if no contract/order number was assigned along with period of performance;

- The contract type (i.e. fixed price, fixed price with EPA, etc.) or commercial agreement type;

- Total dollar value of the contract;

- A description of the item(s) provided under the contract and the item or service, if applicable;

- For Government contracts, the name, email address, and phone number of the Administering Contracting Officer (ACO), and for commercial supply contracts, the name and phone number of the officer, official agent or employee administering the contract; and

- A listing of any problems or discrepancies (includes shortages, overages, damages, defects, or misshipments, etc.) experienced with the contracts or customers, including a brief description of how these problems were addressed and remedied.

- The Government reserves the right to limit the number of references it decides to contact.

Sources of Past Performance Information for Evaluation are as follows:

- Past performance information shall be provided by the offeror, as solicited;

- Past performance information shall be obtained from questionnaires tailored to the circumstances of the acquisition, if applicable; or

- Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the

Supplier Performance Risk System (SPRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract

Reporting System (eSRS), Dunn & Bradstreet (D&B), or other databases; interviews with Program Managers, Contracting Officers, and Fee

6 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Determining Officials; and the Defense Contract Management Agency.

L.5. SMALL BUSINESS PARTICIPATION (VOLUME 3)_____________________________________________

An offeror (either Other-than-small-businesses and small businesses) shall provide a Small Business Participation Commitment Document

(SBPCD) substantiating how it will meet the small business participation requirements. The extent of participation of small businesses and other socio-economically disadvantaged small businesses or entities will be measured as a percentage of the total anticipated effort regardless of whether the small business or socio-economically disadvantaged small business is a prime contractor, subcontractor, or joint venture partner.

To receive consideration for award, the offeror shall provide a SBPCD that explains its plan to maintain a minimum of forty percent

(40%) of the total awarded order dollar value throughout the life of the contract to small business. Small business participation is the collective small business participation from any type of small business or subcategory small business. Work self-performed by a small business prime will be credited towards the required forty percent (40%) small business participation.

The plans shall include the name of the company and type of services or supplies they will provide, their small business and socio-economic size standard, the current commitment the organization have with the offeror, and the percentage of work that will be performed when using the small businesses to ensure the required forty percent (40%) small business participation will be met. The plan shall include the organizations commitment to ensuring that the forty percent (40%) is maintained through bi-annual size standards checks with its vendors.

Other-than-small-business offerors shall provide substantiating documentation on your organizations performance in regards to meeting previous small business participation goals. The documentation should incorporate any small business performance within the last three

(3) years from date of solicitation. An Other-than-small-business offerors shall advise the Government within their proposal if they did not have any small business participation goals on any contract within the last three (3) years.

Other-than-small-business offerors shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR

52.219-9. This plan shall be incorporated into any resultant contract. The following are non-mandatory goals for socio-economic contracting programs that should be considered in the offerors plan:

Women-Owned Small Business (WOSB) - five percent (5%) of total contract dollars

Service-Disabled Veteran-Owned Small Business (SDVOSB) - three percent (3%) of total control dollars

Historically Underutilized Business Zone (HUBZone) - three (3%) of total control dollars

Veteran Owned Small Business - two percent (2%) of total control dollars

L.6. PRICE (VOLUME 4)_____________________

L.6.1. The offeror shall propose on a minimum of eighty-five (85%) of the Price Evaluation List (PEL) for the base period and each option period. Alternative items determined not to be acceptable will not count towards the eighty-five (85%) minimum of the PEL items required to be priced. (If the offeror proposes on an item or an alternative item for the base period, it must also propose on the same item or the alternative for all option periods.) The offeror that does not meet the eighty-five (85%) minimum of acceptable quoted PEL items will have its proposal rejected.

L.6.2. The offeror shall fill out Tab 1 of the provided spreadsheet: Attachment 0001 Price Evaluation Spreadsheet. The offeror shall refer to the instructions within the spreadsheet to ensure a complete understanding as to what requirements apply per NIIN.

L.6.2.1. TAB 1 The offerors shall submit firm-fixed ceiling prices for a minimum of eighty-five (85%) of the items on the PEL for the base period and all option periods. Pricing shall be for a new/unused product. Prices offered must be unit prices, which are clearly stated and which require no further interpretation by the Government in order to determine the actual offered price. Unit prices offered must include costs of compliance with all solicitation requirements. Prices are to be F.O.B destination and shall include all applicable costs, including commercial packaging. The ceiling prices on the PEL must include shipping to customers worldwide and as stated in SOW paragraph 3.4.4. Failure to submit proposed prices in accordance with these instructions may result in rejection of the offer.

L.6.2.1.1. The PEL is a representative sample of the types of items purchased by DLA Land Aberdeens customers. The prices for the PEL and acceptable alternatives will be ceiling prices after contract award. It is the maximum unit price the Government will pay during the base period and applicable option periods. During the post-award competition of orders, the contractor may not submit a quote for a PEL item or acceptable alternative with a price that exceeds the applicable contractual ceiling price. DLA Land Aberdeen will verify that the prices do not exceed the ceiling prices.

L.6.2.1.2. The offeror should take into consideration that there will be no minimum order quantity on the PEL items.

7 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.6.2.1.3. If an item on the PEL is superseded during the contract term, the contractor shall advise the Contracting Officer as soon as practical. If there is not a change to the form, fit, and function, configuration, application, or physical nature and is therefore an exact item of replacement, PEL pricing shall remain applicable. If there is a change such that it is not an exact item replacement, the contractor shall include complete information from the manufacturer concerning the replacement item as it relates to form, fit, and function, configuration, application, or physical nature of the superseded item. If the determination by the Contracting Officer is that the superseded item is not an exact replacement then PEL Pricing will not be applicable.

L.6.2.1.4. If an item on the PEL has been classified as end of life by the manufacturer, then the contractor shall provide supporting documentation to the Contracting Officer. PEL pricing will not be applicable after the last production date.

L.6.2.1.5. The Government is providing the estimated demand represented by the most current data available. The offeror should note these numbers are based on historical data and should account for any business risk associated with these numbers.

L.6.2.1.6. Items on the PEL have been identified by NSN, part number and material descriptions. If any of the following occur, the

Contracting Officer shall be contacted in writing: the part number does not match, equal or represent the item description; the part number has been discontinued; or the part number / product is no longer available.

L.6.2.1.7. The offeror may offer alternates for items on the PEL. (If the offeror proposed an alternative item for the base period, it must also propose on the same item for all option periods.) To be considered for evaluation, the alternate item must be equal to the item on the PEL, have the same form, fit, and function, and be compliant with applicable sourcing restrictions. The offeror shall provide the alternate items manufacturer, part number, and material description. In addition, the offeror shall fill in the unit price.

The offeror shall furnish with its offer legible copies of all drawings, specifications, or other data necessary to clearly describe the characteristics and features of the alternate product being offered, as well as a link to the manufacturers website (if applicable) to locate and identify the item being requested. Data submitted shall cover design, materials, performance, function, interchangeability, inspection, and/or testing criteria, and other characteristics of the offered product. In addition the offeror shall furnish drawings and other data covering the design, material and other information of the exact product cited in the PEL sufficient to enable the

Government to determine whether the offerors product is equal to the product cited in the PEL. The substantiation is to be part of the price proposal copy and must clearly identify the PEL item for which an alternate is being offered. The Contracting Officer will evaluate equal products on the basis of information furnished by the offeror or identified in the offer, and reasonably available to the

Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.

The offeror may only offer one alternate item per line item in the PEL. The offeror must identify the alternate offer in the price proposal spreadsheet in the space provided. All substantiating documentation must be annotated to clearly show the line item of the PEL for which an alternate is being offered. Alternate items determined not to be acceptable will not count towards the eighty-five (85%) minimum of the PEL items required to be priced. It is the Government that determines if the documentation or other evidence furnished by an offeror is adequate to satisfy the requirements in this provision. The Contracting Officer may at any time request evidence of the technical acceptability of the supplies offered in response to this solicitation. The Contracting Officer determines the acceptability and sufficiency of other documentation or other evidence at his or her sole discretion. If the Contracting Officer requests evidence from the offeror and the Contracting Officer subsequently finds the evidence to be unacceptable, or if the offeror fails to provide the requested evidence, the alternate item will not be accepted. As ordering requirements arise for the PEL items, the Government reserves the right to re-evaluate the acceptability of alternatives for any particular customer requirement. Acceptable alternate items will be added to the contractors awarded PEL as firm-fixed-price ceiling prices for the applicable base and all option periods. Failure to adhere to this paragraphs requirements will result in the proposal being considered unacceptable.

L.6.2.1.8. The offeror's ceiling prices should not include FAT. The ceiling prices shall include all other requirements in the solicitation and SOW to include testing and shipping.

L.6.3. Any clarifications or questions regarding an item on the PEL must be addressed to the Contracting Officer in writing during the solicitation period. The questions must be in order by the PEL line item numbering and forwarded to the Contracting Officer in a

Microsoft Word Document format.

L.6.4. Prices offered shall be clearly stated and require no further interpretation by the Government to determine the actual offered price. Prices shall not be stated as part of a pricing formula or as charges per lot. Unit prices offered shall include costs of compliance with all solicitation requirements. Failure to submit proposed prices in accordance with these instructions may result in rejection of the offer.

L.6.5. The offerors pricing on the PEL shall be carried out to a maximum of two decimal places.

L.6.6. The pre-formatted spreadsheet is the only acceptable method of returning the price proposal. Submitted files shall be renamed to include the volume number, the offerors name and the solicitation number, for example Volume 4_XYZ Company_SPRBL119R0042. The offeror shall not change the format in the spreadsheet, as any change to the spreadsheet may adversely impact the evaluation of the price proposal.

L.6.7. The offeror may be required to submit other than certified cost or pricing data in accordance with FAR 15.403-3.

8 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE L0001 ***

9 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION M - EVALUATION FACTORS FOR AWARD

DLAD PROCT NOTES IMPLEMENTED BY REFERENCE:

DLAD Proc Note M06 Evaluation of Offers for Part Numbered Items (SEP 2016).

PROPOSAL EVALUTION__________________

M.1. Proposals will be evaluated using Best Value Tradeoff source selection procedures, with the Government giving appropriate consideration to the four (4) evaluation factors: Technical, Past Performance, Small Business Participation, and Price. The Government will weigh the relative benefits of each proposal and awards will be made based on an assessment of the results of the evaluation. In making this assessment, the Government shall give due consideration to all of the factors, sub-factors, and sub-sub factors and their relative order of importance. The Government intends to make multiple awards.

All evaluation factors other than price, when combined, are significantly more important than price. The Government will evaluate Small

Business Offerors and Other-than-Small-Business Offerors separately and alike, as defined throughout the evaluation criteria. The

Government reserves the right to make an award to other than the lowest priced offerors, or to other than the offerors with the highest technical rating if the Government determines that do so would result in the best value to the Government. Offerors that receive a final rating of Red/Unacceptable on any factor/sub factor/sub-sub Factor level are ineligible for award. Non-cost evaluation factors for tradeoff are listed below in descending order of importance. The evaluation sub-factors /sub-subfactors listed below are equal in importance.

Non-Cost Evaluation Factors, Sub-Factors, and Sub-Sub Factors:

1. Technical

a. Management Approach

b. Technical Evaluation Approach

i. Supply Chain Management

ii. Production Management

2. Past Performance

3. Small Business Participation

Cost Evaluation Factor:

1. Price

M.2. TECHNICAL:______________

M.2.1. Management Approach: The offerors management approach will be evaluated to determine the extent to which the offeror has developed a strategy for the effective and efficient management of contract activities needed to successfully fulfill the SOW requirements, and demonstrated that the organization has the current or planned capabilities for assuring performance of the requirements. The offeror shall provide insight into its organizational and administrative structure that ensures efficient and effective procurement of requirement supply.

M.2.1.1. Program Management Plan: The offerors program management plan will be evaluated to determine if the offeror has clearly demonstrated its ability to effectively manage the overall program requirements, including its supply chain network.

M.2.2. Technical Evaluation Approach: The offerors technical approach will be evaluated to determine the extent to which the technical requirements have been considered. The Government shall evaluate how well the proposal meets the Governments requirements of the solicitation identified in the SOW found in Section J (Exhibit A) of the solicitation. As required in the SOW, a Small Business offeror will be evaluated on its ability to provide seventy percent (70%) of the request for quotes/proposals, including those that are set-aside for small business. An Other-than-small-business offeror will be evaluated on its ability to provide proposals on eighty-five percent (85%) of the unrestricted request for proposals.

M.2.2.1. Supply Chain Management: The proposal will be evaluated to determine whether the offerors methods and processes meet the solicitation requirements in terms of production and supply chain management.

M.2.2.2. Production Management: The proposal will be evaluated to determine if whether the offeror has effective production verification management processes in place, and whether the offerors methods and processes meet the solicitation requirements. The proposal will be evaluated to determine if there are clear processes in place to handle the technically complex challenges that may arise under the acquisition.

10 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.2.2.2.1. Product Quality Verification: The proposal will be evaluated to determine if the offeror has an effective quality management process.

M.2.2.2.2. FAT Process: The proposal will be evaluated to determine whether the offeror has a clear understanding of the FAT requirements, and whether the offeror has the resources required to manage and execute FAT items as applicable.

M.2.2.2.3. Technical Data Package (TDP) Verification: The proposal will be evaluated to determine if the offeror can manage TDPs.

M.2.2.2.4. Configuration Management: The proposal will be evaluated to determine if the offeror can manage configuration management.

M.2.2.2.5. Obsolescence Reporting: The proposal will be evaluated to determine if the offeror can manage obsolescence reporting.

M.2.3 TECHNICAL RATING:

M.2.3.1. The evaluation will consider the degree to which the offerors proposal meets the requirements, indicates an adequate approach and understanding of those requirements and minimizes the risk of unsuccessful performance. A proposal meets requirements and demonstrates a thorough or exceptional approach and understanding as evidenced by most of the following characteristics, which will generally receive favorable ratings: current processes in place in order to execute to the SOW requirements, an established supply chain and program management approach, and overall strengths.

M.2.3.2. A color and an adjectival rating will be assigned to each factor, sub-factor, and sub-sub factor to depict the degree to which each offerors proposal exceeds, meets, or does not meet the minimum performance or capability requirements of each of the technical factors, sub-factors, and sub-sub factors through an assessment of the strengths, weaknesses, or deficiencies of each proposal. The technical rating evaluates the quality of the offerors technical solution for meeting the Governments requirement. As referenced in the below rating table, the quote metric for Small Business is seventy percent (70%), and the quote metric for Other-than-small business is eighty-five percent (85%):

Color: Blue Rating: Outstanding_____ ______ Description: Proposal indicates an exceptional approach and understanding of the___________ requirements and contains multiple strengths.

Color: Purple Rating: Good_____ _______ Description: Proposal indicates a thorough approach and understanding of the requirements___________ and contains at least one strength.

Color: Green Rating: Acceptable_____ _______ Description: Proposal indicates an adequate approach and understanding of the___________ requirements.

Color: Yellow Rating: Marginal Description: Proposal has not demonstrated an adequate approach and understanding of the_____ _______ ___________ requirements.

Color: Red Rating: Unacceptable_____ _______ Description: Proposal does not meet requirements of the solicitation, and thus,___________ contains one or more deficiencies and is unawardable.

M.2.3.3. Definitions used in evaluating factors, sub-factors, and sub-sub factors responses to determine the overall factor, sub-factor or sub-sub factor rating as defined in FAR 15.001 and Defense Procurement and Acquisition Policy memorandum dated March 31, 2016, DoD

Source Selection Procedures :

Deficiency- A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a __________ proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

Strength- An aspect of the proposal that has merit or exceeds specified performance or capability requirements in a way that will ________ be advantageous to the Government during contract performance.

Significant Weakness- A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. ____________________

Weakness A flaw in the proposal that increases the risk of unsuccessful contract performance. ________

M.2.3.4. Within the Technical Factor, each sub-factor and sub-sub-factor will be rated separately using the color/adjectival ratings.

Each sub-factor and sub-sub-factor will be assessed for strengths, significant weaknesses, weaknesses, deficiencies, and uncertainties.

Each sub-factor and sub-sub-factor will be assigned a color/adjectival rating based upon these collective findings. The compilation of these sub-factors/sub-sub factor color/adjectival ratings will form the basis of the Factor rating. An offeror that receives a final rating of Red/Unacceptable at any factor/sub-factor/sub-sub factor level is ineligible for award.

11 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

M.3. PAST PERFORMANCE_____________________

M.3.1. The past performance evaluation will assess the offerors probability of meeting the solicitation requirements. The past performance evaluation considers each offeror's demonstrated recent and relevant record of performance in supplying products and services that meet the contracts requirements. In the case of a joint venture, the Government intends to evaluate each joint member's past performance for work done individually, as well as any work done by the joint venture itself. The Government will not evaluate the past performance of any proposed subcontractor.

M.3.2. There are two aspects to the past performance evaluation. The first is to evaluate the offerors past performance to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection. The second aspect of the past performance evaluation is the performance confidence assessment. The performance confidence assessment rating is based on the offerors overall record of recency, relevancy, and quality of performance. The past performance evaluation performed in support of a current source selection does not establish, create, or change the existing record and history of the offerors past performance on past contracts; rather, the past performance evaluation process gathers information from customers on how well the offeror performed those past contracts.

M.3.2.1. Past Performance Relevency

Relevancy will be defined as how relevant a recent effort accomplished by the offeror is to the solicited requirement. Relevancy includes contracts/orders of similar products. The Contracting Officer will assess whether prior efforts are relevant based on whether prior awards were, for example, in the federal supply class (FSC) (i.e., similar items), and of similar complexity, dollar value, contract type, and degree of subcontracting. The Contracting Officer will consider efforts completed within the three (3) previous years from solicitation release date.

M.3.2.1.1. The offeror should provide a list, as instructed in section L of this solicitation, of up to three (3) recently completed contracts/orders, either for commercial or government customers, performed within the past three (3) years.

M.3.2.1.2. The Government reserves the right to limit the number of references it decides to contact.

M.3.2.1.3. Small businesses and Other-than-small-businesses will be rated the same. Contracts/orders identified by the offeror as recent/relevant will receive one of the following ratings for Past Performance Relevancy:

Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. Past Performance includes long-term-contracts of five years or more, with a ceiling of at least $25M.

Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities as this solicitation requires.

Past Performance includes long-term-contracts of at least three years or more, with a ceiling of at least $10M.

Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities as this solicitation requires. Past Performance includes contracts of one (1) year or more, with a ceiling of $1M or more

Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities as this solicitation requires. Past Performance may not include contract actions with more than one (1) year, the dollar value is below $1M.

Neutral: The offeror has no relevant record of past performance. Offeror will not be rated favorably or unfavorably for the particular contract submitted.

M.3.2.2. Small Businesses and Other-than-small-businesses will be rated the same. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.

M.3.2.3 Performance confidence will be defined as how well the offeror performed on past contracts. Product quality, delivery, and customer satisfaction will be considered in evaluating quality of performance. The performance confidence assessment rating is based on the offerors overall record of recency, relevancy, and quality of performance. Proposals will receive one of the following ratings for

Past Performance Confidence Assessment:

Substantial Confidence: Based on the offerors recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence: Based on the offerors recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence: Based on the offerors recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

12 14

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

No Confidence: Based on the offerors recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

Unknown Confidence (Neutral): No recent/relevant performance record is available or the offerors performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Therefore, the offeror will not be evaluated favorably or unfavorably on past performance.

M.4. SMALL BUSINESS PARTICIPATION__________________________________

M.4.1 The Government will evaluate the SBPCD document to ensure that the offeror provides the minimum requirements of small business participation. A Small Business offerors may meet the requirement using work performed itself.

M.4.1.1. The offeror shall provide a SBPCD that maintains a minimum of forty percent (40%) of the total contract value for each IDIQ year to small business. The Government will evaluate the document to ensure that the offeror provides the minimum requirements of small business participation.

M.4.1.2. Other-than-small-business offerors shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR 52.219-9. This plan shall be incorporated into any resultant contract in reference to the RFP.

M.4.1.2.1. The following are non-mandatory goals for socio-economic contracting programs:

M.4.1.2.1.1. Women-Owned Small Business (WOSB) five percent (5%) of total contract dollars

M.4.1.2.1.2. Service-Disabled Veteran-Owned Small Business (SDVOSB) three percent (3%) of total control dollars

M.4.1.2.1.3. Historically Underutilized Business Zone (HUBZone) - three percent (3%) of total control dollars

M.4.1.2.1.4. Veteran Owned Small Business two percent (2%) of total control dollars

M.4.1.3. The Government will evaluate: the extent to which such firms, as defined in FAR Part 19, are specifically identified in the proposals; the extent of commitment to use such firms (existing and enforceable commitments will be considered more favorably than business relationships that are simply planned or theoretical); the identification of the complexity and variety of the work specific small firms are to perform, and the offerors commitment to maintain the required forty percent (40%) of total contract…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .