Amendment adding revised specification

View the file

Other files

File Type Posted
amendment_4.pdf PDF
13-R-0315 _Amendment_0003.pdf PDF
amendment_2.pdf PDF
SPE601-13-R-0315-0001.pdf PDF
SPE601-13-R-0315.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE601 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60113R0315

X

2013 JUL 10

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY AEROSPACE ENRGY-DLAE-M

BLDG 1621

1014 BILLY MITCHELL BLVD

SAN ANTONIO TX 78226

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

13. EFFECTIVE DATE

16 Sep 2013

This amendment is issued to replace the specification in the original solicitation with the attached revised specification, MIL-PRF-27401G dated 07 August 2013.

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

FXS0159

Typewritten Text

FXS0159

Typewritten Text x

MIL-PRF-27401G

07 August 2013

SUPERSEDING

MIL-PRF-27401F

10 January 2008

PERFORMANCE SPECIFICATION

PROPELLANT PRESSURIZING AGENT, NITROGEN

AMSC N/A FSC 9135

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

METRIC

Comments, suggestions, or questions on this document should be addressed to AFPA/PTPT, 2430 C Street, Bldg 70, Area B, Wright-Patterson AFB OH 45433-7632 or e-mailed to AFPA.PTPS@wpafb.af.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at https://assist.dla.mil.

SPE601-13-R-0315

Amendment No. 0004 mailto:AFPA.PTPS@wpafb.af.mil https://assist.dla.mil/

This specification is approved for use by all Departments and Agencies of the Department of Defense.

1. SCOPE

1.1 Scope. This specification covers the requirements for three grades and two types of nitrogen.

1.2 Classification. The nitrogen will be of the following types and grades as specified (see 6.2).

1.2.1 Types. The types of nitrogen are as follows:

Type I - Gaseous

Type II - Liquid

1.2.2 Grades. The grades of nitrogen are as follows:

Grade A - 99.5 percent pure, aerospace practices

Grade B - 99.99 percent pure, space vehicle and cabin environment

Grade C - 99.995 percent pure, special applications

1.3 Part or identifying number (PIN). The PINs to be used for nitrogen acquired to this specification are created as follows:

M 27401 - X X Example of PIN: M27401-2B

Grade (see 1.2.2).

Type (see 1.2.1). Use 1 for Type I, 2 for Type II.

Specification number.

Prefix for military specification.

2. APPLICABLE DOCUMENTS

2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification, whether or not they are listed.

2.2 Government documents.

2.2.1 Specifications, standards, and handbooks. The following specification forms a part of this document to the extent specified herein. Unless otherwise specified, the issue of this document is the

SPE601-13-R-0315

Amendment No. 0004 one cited in the solicitation or contract (see 6.2).

DEPARTMENT OF DEFENSE STANDARDS

MIL-STD-101 Color Code for Pipelines and for Compressed Gas Cylinders

MIL-STD-1411 Inspection and Maintenance of Compressed Gas Cylinders

COMMERCIAL ITEM DESCRIPTIONS

A-A-58092 Tape, Antiseize, Polytetrafluorethylene

A-A-59860 Valves, Cylinder, Gas (For Compressed or Liquefied Gases)

(Copies of these documents are available online at https://assist.dla.mil or from the Standardization Document Order Desk, 700 Robbins Avenue, Bldg 4D, Philadelphia PA 19111-5094.)

2.3 Non-government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.

ASTM INTERNATIONAL

ASTM E 29 Standard Practice for Using Significant Digits in Test Data to Determine Conformance with Specifications (DoD Adopted)

ASTM F 307 Standard Practice for Sampling Pressurized Gas for Gas Analysis (DoD Adopted)

ASTM F 310 Standard Practice for Sampling Cryogenic Aerospace Fluids (DoD Adopted)

(Copies of these documents are available online at http://www.astm.org or by mail at ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken PA 19428-2959)

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-10.1 Commodity Specification for Nitrogen

CGA P-15 Filling of Industrial and Medical Nonflammable Compressed Gas Cylinders

(Copies of these documents are available online at http://www.cganet.com or by mail from the Compressed Gas Association, Inc., 14501 George Carter Way, Suite 103, Chantilly, VA 20151)

2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 Grade requirements. The nitrogen purity and the impurity concentrations as applicable to each grade of nitrogen shall conform to the limits of Table I when tested in accordance with the applicable test method also specified in Table I. Other limits and tests may be specified by the procuring activity (see 6.2).

3.2 Limiting values. The following applies to all specified limits in this specification: For purposes of determining conformance with these requirements, an observed value or a calculated value

SPE601-13-R-0315

Amendment No. 0004 https://assist.dla.mil/ http://www.astm.org/ http://www.cganet.com/ shall be rounded off in the last right-hand digit used in expressing the specification limit, using the Rounding Method of ASTM E29.

3.3 Filter.

3.3.1 Containers. A filter with a rating of at least 10-micrometer nominal and 40-micrometer absolute rating shall be installed between the manufacturer's plant system and the manifold used to fill the gas or liquid containers for delivery.

3.3.2 Pipelines. A filter with a rating of at least 3.5-micrometer nominal and 12-micrometer absolute rating shall be installed downstream of compressors and/or converters and as close to the user's interface as possible for delivery into pipelines. The filter shall remove all particles greater than 100 micrometers in any dimension.

TABLE I. Grade limits for nitrogen.

Grade Test Method

A B C

Purity a, b, % by vol, min

99.5

99.99

99.995

4.4.1

Impurities, ppm by volume, max

Water

Total hydrocarbons as methane

Oxygen

Hydrogen

Argon e

Carbon dioxide e

Carbon monoxide e

5000 c

26.3

58.3

-- d

100 c

11.5

5.0

50 c

5.7

5.0

0.5

4.4.2

Particulate f, mg/L, max 1.0 1.0 1.0 4.4.3

Notes.

a. Percent nitrogen includes trace quantities of argon (Grade A), neon, and helium.

b. If direct method is required, use the alternate method found in 6.3.

c. Sum, in parts per million (ppm), of water, hydrocarbons, oxygen, and if applicable, argon, hydrogen, carbon monoxide, and carbon dioxide.

d. No limit for this grade.

e. If required by contract (see 6.2).

f. Applies only to Type II (Liquid) nitrogen. The particulate limit may be removed by the procuring activity (see 6.2).

3.4 Filled containers (Type I only).

3.4.1 Pressure. The container filling pressure (see 6.2) shall not differ from that required by the contract by more than 1.0% at 21°C (70°F) when tested as specified in 4.5.1. In no case shall the filling pressure exceed the rated service pressure of the container.

3.4.2 Leakage. Containers shall not leak when tested according to 4.5.2.

3.4.3 Inspection and maintenance. Compressed gas cylinders shall be inspected, maintained, and charged according to 4.5.3.

4. VERIFICATION

4.1 Points of inspection (see 6.2).

4.1.1 Containers. Unless otherwise specified, acceptance tests shall be conducted at the site of filling prior to shipment or departure.

4.1.2 Pipeline. When Type I nitrogen is delivered in pipeline, acceptance tests shall be conducted immediately prior to entering the user's system.

4.2 Conformance inspection. Quality conformance tests shall consist of the following:

a. Individual tests (Type I only) ................................ 4.2.1

b. Sampling tests .................................................... 4.2.2

4.2.1 Individual tests (Type I only). Each container shall be subjected to the following tests as described under 4.5:

a. Filling pressure .................................................... 4.5.1

b. Leakage .............................................................. 4.5.2

4.2.2 Sampling test. The number of nitrogen containers shall be selected in accordance with Table II and subjected to the tests required by Table I.

TABLE II. Sampling for test.

Number of containers in lot Number of containers to be sampled

1 1

2 – 40 2

41 – 70 3

71 – over 4

4.2.3 Lot definitions.

4.2.3.1 Type I. A lot is defined as all of the nitrogen supplied in one or more container(s) filled from a single manifold at the same time.

4.2.3.2 Type II. Each filled container shall constitute a lot.

4.2.3.3 Container Assemblies. A shipping conveyance consisting of multiple cylinders or tubes that are interconnected by a single manifold that equalizes the pressure across all cylinders/tubes to form a single unit is considered a single container for the purpose of this specification.

4.2.4 Sample. Each sample shall be of sufficient size to conduct all the quality conformance tests as specified herein. Unless otherwise specified, the quality conformance tests shall be performed on each required sample (see 6.2). When required, an equivalent sample shall be forwarded to a laboratory designated by the procuring activity for testing.

4.2.4.1 Sampling methods. Each sample taken for analysis shall be representative of the entire contents of the container being sampled. All equipment used shall be made of suitable materials. Unless otherwise specified in the acquisition requirements (see 6.2), sampling shall be accomplished by one of the following methods.

a. Type I, gaseous nitrogen may be sampled in accordance with ASTM F 307 and Type II, liquid nitrogen may be sampled in accordance with ASTM F 310. It is critical that the outlet of the sampling port be clean and free of contaminants.

b. Connect the shipping container being sampled directly to the analytical equipment using suitable pressure regulation as required to prevent over-pressurization of the equipment.

4.2.5 Non-Bulk Containers. Non-bulk containers are defined as containers of 400 liters or less water capacity. The number of containers filled with Type I (gaseous) nitrogen selected for sampling from each lot shall be in accordance with Table II. The first and last containers to be filled within a given lot are typically sampled. Other samples may be selected at random. Every container filled with Type II (liquid) nitrogen shall constitute a lot and will be sampled.

4.2.6 Bulk transports. Bulk containers are defined as containers of more than 400 liters water capacity. Each bulk container filled with Type I (gaseous) or Type II (liquid) nitrogen constitute a lot and shall be sampled.

4.2.6.1 Continuous service. Unless otherwise specified by the procuring activity, the following sample option for nitrogen shall be used for storage and transport tanks engaged in continuous nitrogen service (see 6.2). Contractor shall sample the contents of each transport tank engaged in continuous nitrogen service at least once every seven days at uniform intervals of time. Samples shall be taken from the filled transport tanks. Contractor shall sample the contents of each transport tank when entering continuous service and when the transport tank has remained empty for a period greater than 24 hours.

When empty, all ports and vents shall remain closed to the atmosphere. While in continuous service, compliance with quality conformance tests specified herein shall be determined by sampling the filling point storage tank after each addition or, in case of continuous production, at established intervals not less frequent than once every 24 hours. When a storage tank is being filled during a change of duty shift, sampling shall be performed after filling. (see 6.5.1)

4.2.7 Pipelines. Unless otherwise specified in the contract, the following sampling plan shall be used for pipelines: Sampling to determine specification compliance shall be accomplished by drawing liquid phase samples from each filled container transporting liquid for conversion to gas and by drawing samples from the gas supplied into the user's system (see 6.2).

4.2.7.1 Liquid phase samples. Liquid phase samples shall be tested for each parameter in applicable grade of Type II nitrogen. Sampling under the "continuous service" provisions can be applied.

4.2.7.2 Gas phase samples.

a. Samples shall be tested for each parameter in the applicable grade of Type I nitrogen.

Samples shall be drawn in accordance with 4.2.4 from a point immediately prior to entering the user's system. The frequency of sampling shall not be less than once every seven days at regular intervals.

b. When specified in contract, in-line samples shall be drawn and tested with continuous monitors for each parameter specified in contract for the applicable grade of Type I nitrogen. Each analyzer shall be equipped with a permanent recording device. When specified in contract, an alarm system to indicate contaminant contents in excess of specified maximum shall be provided (see 6.2).

c. After internal exposure of the pipeline to the atmosphere or other foreign materials, a sample of gas shall be taken from the pipeline prior to delivery into the user's system at a point between the final filter and the interface with the Government system. The sample shall be tested for each parameter in applicable grade of Type I nitrogen. After cleaning operation, the sample shall also be tested for contamination by vapors from the cleaning materials.

4.3 Rejection. When any sample tested in accordance with 4.4 fails to conform to the requirements specified herein, the entire lot represented by the sample shall be rejected.

4.4 Analytical procedures. Unless otherwise specified, samples shall be analyzed according to the procedures described in 4.4.2 (see 6.2). Calibration gas standards may be required to calibrate (zero and span) analytical instruments used to determine the purity and impurity contents of the nitrogen. The accuracy of the calibration gas standards is to be traceable to the National Institute of Standards and Technology.

4.4.1 Nitrogen content. The nitrogen content in percent shall be found by determining the aggregate impurities by the methods described in 4.4.2. The nitrogen purity is the value obtained when the aggregate impurities, expressed as volume percent, is subtracted from 100 percent.

4.4.2 Impurities. Methods shall be selected from those of CGA G-10.1.

4.4.3 Particulate content. A filter holder assembly, (Pall Life Sciences part number 2220), or equivalent modified as shown on Figure 1 shall be attached to the withdrawal line of the vessel to be utilized to fill the tanks. A preweighed filter paper (47 mm glass fiber paper, type A/E or equivalent) shall be placed on top of another filter of the same kind. The filters shall then be placed on the porous filter support, which, in turn, shall be placed in the filter holder as shown on Figure 1. The male threads of the filter holder shall be wrapped with thin, nonadhesive-backed polytetrafluorethylene tape A-A-58092 or equivalent to prevent galling of the threads. The holder shall be tightened by hand as tight as possible to prevent bypassing of the filter element. The discharge liquid from the filter housing shall be collected in a clean, uninsulated, ambient temperature vessel marked to indicate when 5 liters of liquid have been collected. The liquid flow shall be terminated when 5 liters of liquid have been collected. The filter holder shall be removed from the line and permitted to reach ambient temperature. The warmup to ambient temperature may be expedited by use of an oven or other heat source. Care shall be exercised to ensure that any airflow which enters the unit will be directed through the inlet of the assembly to prevent displacing any particles from the surface of the filter. Upon warmup, the other side of the holder shall be wiped with a clean cloth and the holder then disassembled. The filter paper shall be closely inspected.

The test shall be repeated if evidence of either (a) the filter not being securely clamped by uniform depression of its edge; (b) the filter having been cut by the holder; or (c) when dirt particles are detected in the clamped area indicating bypassing had been encountered. The test shall also be repeated when either the bottom filter shows any discoloration or when leakage of liquid from the filter holder is detected.

Upon completion of a valid test the filter shall be removed from the housing and weighed to the nearest

0.1 mg.

4.5 Containers of Type I nitrogen.

4.5.1 Filling pressure. Containers shall be stabilized to 21°C (70°F). Containers shall be tested for proper filling pressure by attaching a calibrated Bourdon-tube gauge or calibrated electronic equivalent gauge to the valve outlet. The gauge shall have scale divisions not greater than 100 kPa (15 psi). Then the valve shall be opened and the internal pressure observed on the gauge. If the internal pressure differs from the applicable filling pressure value by more than 100 kPa (15 psi), the container, and all other containers filled from the same manifold at the same time, shall be rejected.

4.5.2 Leakage. Each Type I nitrogen container shall be tested for leaks at the neck threads, stem packing, and safety device of the valve with leak detection fluid. Valve seat leakage shall be tested after filling has been completed by connecting a hose to the valve outlet and placing the other end of the hose under the surface of a liquid. Methods of leak detection and/or the leak check guidance in CGA P- 15 may also be used.

4.5.3 Inspection and Maintenance. Compressed gas cylinders shall be inspected, maintained, and charged according to MIL-STD-1411.

4.5.3.1 Valves. Valves shall conform to A-A-59860.

4.5.3.2 Color Coding. Government-owned cylinders shall be color coded according to MIL-STD-

101.

FIGURE 1. Filter, Cryogenic Liquids

5. PACKAGING

5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract or order (see 6.2). When packaging of materiel is to be performed by DoD or in-house contractor personnel, these personnel need to contact the responsible packaging activity to ascertain packaging requirements. Packaging requirements are maintained by the Inventory Control Point’s packaging activities within the Military Service or Defense Agency, or within the military service’s system commands. Packaging data retrieval is available from the managing Military Department’s or Defense Agency’s automated packaging files, CD-ROM products, or by contacting the responsible packaging activity.

6. NOTES

(This section contains information of a general or explanatory nature that may be helpful, but is not mandatory.)

6.1 Intended use. The nitrogen covered by this specification is intended as a purging and pressurizing medium for rocket propellant systems, space vehicles and support equipment and for preparing oxygen-nitrogen mixtures for breathing purposes on board space vehicles (see 1.2.2).

6.2 Acquisition requirements. Acquisition documents should specify the following:

a. Title, number, and date of this specification.

b. Type and grade of nitrogen required (see 1.2).

c. If required, the specific issue of individual documents referenced (see 2.2.1).

d. When other limits or tests are required (see 3.1).

e. When testing for argon, carbon dioxide, or carbon monoxide is required (see Table I, Note e).

f. When the particulate test is not required (see Table I, Note f).

g. When a variation in the points of inspection is required (see 4.1).

h. When a variation of the quality conformance tests to be performed on a sample is required (see 4.2.4).

i. When a variation to the sampling method is required (see 4.2.4.1).

j. When a variation to the continuous service option is required (see 4.2.6.1).

k. When a variation to the sampling plan for pipelines is required (see 4.2.7).

l. When an alarm system to warn of contaminants in pipelines is required (see 4.2.7.2.b).

m. When a variation of the analytical procedures is required (see 4.4).

n. Cylinder size, capacity, and fill pressure (as determined by cylinder size and capacity).

o. Packaging requirements (see 5.1).

p. When color coding of pipeline is required (see 4.5.3.2).

6.3 Direct nitrogen method. When required, one of the following methods should be used to determine the nitrogen content directly. (1) A gas chromatography method which uses a 5Å molecular sieve column and measures the peak height versus retention time. (2) The mass spectrometric method which measures nitrogen at an atomic mass unit (amu) of 28. Carbon monoxide also has an amu of 28 but it can be determined by other methods, and corrected for in the nitrogen value.

6.4 Packaging requirements. Guidance for cylinders may be found in the following documents:

a. RR-C-901 Cylinders, Compressed Gas: Seamless Shatterproof, High Pressure DOT 3AA Steel, and 3AL Aluminum

b. 49 CFR 171 – 199 Code of Federal Regulations

6.5 Definition.

6.5.1 Continuous service. Continuous service applies to continuous deliveries under Government contract of nitrogen complying with the quality conformance tests specified herein.

6.6 Subject term (key word) listing.

Aerospace Cryogenic Cylinders Pipeline Space vehicle

6.7 Changes from previous issue. Marginal notations are not used in this revision to identify changes with respect to the previous issue due to the extent of the changes.

CONCLUDING MATERIAL

Custodians: Preparing activity:

Army – MI Air Force – 68 Navy – AS (Project 9135-2013-003) Air Force – 68

DLA – PS

Review activities:

Air Force – 19 Air Force – 11

Civil Agency:

NASA – NA

Note: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information using the ASSIST Online database at https://assist.dla.mil.

SPE601-13-R-0315

https://assist.dla.mil/

Amendment 2

TO ALL OFFERORS: This amendment will answer questions posed by industry. In addition it revises the Schedule. Also a revised Proposal Format and Content Provision [L2.35] and revised Evaluation Provision [M2.14] is also incorporated into the solicitation via this amendment.

1. Industry Question: CLIN 16 – relates to the support staff being on site and since we have them work 12 hour shifts, we can calculate their hourly & overtime rates. I’m assuming the quantity of 8 is in anticipation of 8 events in the course of a year – correct? So we should multiply the rate times 8 to get an annual contract spend?

GOVERNMENT ANSWER: Yes, 8 is the estimated number of events. This is a requirements contract so the estimate of 8 is a best estimate but the number of actual events may be more or less than 8. The CLIN proposal is looking for offerors to insert their proposed per person per day cost for labor while on site, not an annual roll-up number.

2. Industry Question: CLIN 17 – refers to labor & per diem while in travel status – assume that’s the time on average each support staff travels to arrive at VAFB correct? That will vary depending on staff availability and distance traveled…any suggestions on how we should guesstimate it?

GOVERNMENT ANSWER: See the below listed revised schedule.

3. Industry Question: CLIN 18 – Shout this be “TBD”? We need to seek direct reimbursement for whatever travel arrangements are necessary based on staff availability. Not knowing which staff is coming from where on any given event to support the HFE makes it virtually impossible to guesstimate travel costs – some will be flying and some local staff will be driving…any suggestions or clarification as to how we should respond? Can we opt to quote “TBD” and expect direct reimbursement for actual cost?

GOVERNMENT RESPONSE: See the revised schedule listed below.

4. Industry Question: CLIN 19 – appears similar to CLIN 16. We typically bring the same support staff for any HFE as the task/duties are the same or am I overlooking something here?

GOVERNMENT RESPONSE: See the revised schedule listed below.

5. Industry Question: CLIN 20 – this appears to be similar to CLIN 17. Here again they are typically the same people or am I missing something? Please clarify.

GOVERNMENT RESPONSE: See the revised schedule listed below.

6. Industry Question: CLIN 21 – this one also appears to be similar to CLIN 18. We would prefer to use “TBD” rather than guesstimate high to be sure and cover our costs when we have to fly personnel to the site. Same questions as in CLIN 18. Please comment.

GOVERNMENT RESPONSE: See the revised schedule listed below.

7. Industry Question: CLIN 22 – Why is there differentiation between HFE, Environmental Check, WDR, Static Fire, Launch, etc. The same tasks/duties are performed each time for each HFE. The second line states “Check for HIGH FLOW EVENT” – what does that mean? Please clarify.

GOVERNMENT RESPONSE: See the revised schedule listed below.

8. Industry Question: CLIN 23 – for Mobilization of Distribution Equipment for HEAVY LIFT REQUIREMENTS – since we don’t always know where the resources will come from i.e. which of our air separation plants will have extra LIN available, it’s hard to predict what equipment will be required as it will depend on which plant has the product and how far it is to VAFB. Do you want us to calculate mileage from each plant and define the surcharge amount for each load of LIN, and then quote just the surcharge/additional cost per LIN load? Please advise.

GOVERNMENT RESPONSE: See the revised schedule listed below.

9. Industry Question: In the Statement of Objectives (SOO) under Section 4 HIGH FLOW EVENT, there’s a new stipulation that only allows offerors to bring support staff in less than 24 hours prior to start of a high-flow event

– the current contract provides 48 hours... There are times when a high-flow event that starts at 3AM and less than 24 hours prior for staff to arrive makes it impractical to catch flights and arrive at VAFB in time to go through the extensive checklist and prepare for startup. It could become a safety issue if the guys don’t get adequate rest prior to a strenuous high-flow event. Are you sure the DLA wants us to take additional risks by bringing in tired-sleep deprived staff to prepare for a launch or HFE? More safety incidents occur when employees are overworked or very tired…

GOVERNMENT RESPONSE: The time remains at 24 hours. Re-imbursement for all travel related expenses will be reimbursed under CLIN 0017 in the attached revised schedule.

10. Industry Question. Departing the site within 24 hours following a high-flow event is also a new stipulation. .

Is it safe to assume we will be reimbursed for airline change fees and late check-out/hotel room cancellation fees?

GOVERNMENT RESPONSE: The time remains at 24 hours. Re-imbursement for all travel related expenses will be reimbursed under CLIN 0017 in the attached revised schedule.

11. Industry Question. On page 12 of 17 where the Technical Proposal begins I’m trying to follow the item on page 13 of 17 where the statement (F) (ii) reads “Description of Contractor-furnished equipment at a location other than the Contractor’s facility such as storage tanks. Is the DLA wanting us to describe LIN tanks at VAFB or at our primary production plants located in California?

GOVERNMENT RESPONSE: The proposal is looking for a description of contractor provided equipment that will be placed by the contractor at VAFB in order to meet contract requirements.

12. Industry Question: Is (A) below (F) (ii) requesting Offeror to “Describe all Contractor provided existing equipment…” based current installation at VAFB or at primary production plants?

GOVERNMENT RESPONSE: The proposal is looking for a description of contractor provided equipment that will be placed by the contractor at VAFB in order to meet contract requirements.

B. The following schedule replaces the schedule in the original RFP.

ITEM SUPPLIES/SERVICES ESTIMATED UNIT PRICE TOTAL

QTY/UNIT AMOUNT

0001 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________

Gaseous Nitrogen, Type I, Grade B IAW MIL-PRF-27401F Dated 10 Jan 08

CONTRACT PERIOD ONE –

1 November 2013 through 31 October 2014

0002 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

CONTRACT PERIOD TWO –

1 November 2014 through 31 October 2015

0003 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

CONTRACT PERIOD THREE –

1 November 2015 through 31 October 2016

0004 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

CONTRACT PERIOD FOUR –

1 November 2016 through 31 October 2017

0005 9135-00935-5863 (PIPELINE) 352,000 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

CONTRACT PERIOD FIVE –

1 November 2017 through 30 September 2018

0006 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

0007 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

0008 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

0009 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

0010 9135-00935-5863 (Tube Bank Trailers) 101M __________ __________

IAW MIL-PRF-27401F Dated 10 Jan 08

0011 Fixed Facility Fee V00007062 12 MOS __________ __________ For Contractor Furnished Equipment Necessary to Generate Gaseous Nitrogen

0012 Fixed Facility Fee V00007062 12 MOS __________ __________

Necessary to Generate Gaseous Nitrogen

0013 Fixed Facility Fee V00007062 12 MOS __________ __________

Necessary to Generate Gaseous Nitrogen

0014 Fixed Facility Fee V00007062 12 MOS __________ __________

Necessary to Generate Gaseous Nitrogen

0015 Fixed Facility Fee V00007062 11 MOS __________ __________

Necessary to Generate Gaseous Nitrogen

0016 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day

CONTRACT PERIOD

1 November 2013 through 31 Oct 2014

0017 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day

CONTRACT PERIOD

1 November 2014 through 31 Oct 2015

0018 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day

CONTRACT PERIOD

1 November 2015 through 31 Oct 2016

0019 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day

CONTRACT PERIOD

1 November 2016 through 31 Oct 2017

0020 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day

CONTRACT PERIOD

1 November 2017 through 30 Sep 2018

0021 Travel Charges for HIGH FLOW EVENT TBD Labor, Transportation, and Per Diem While in Travel Status

CONTRACT PERIOD

1 November 2013 through 30 Sep 2018

SEE NOTE 1

0022 Mobilization of Distribution Per Mile __________ __________ Equipment for HEAVY LIFT REQUIREMENTS in support of

HIGH FLOW EVENT

CONTRACT PERIOD

1 November 2013 through 30 Sep 2018

Note 1 – All travel must be in accordance with FAR Clause 31.205-46 and must be submitted to the Contracting Officer for review and approval prior to commencing travel.

C. The following Aerospace Clauses replace the clauses in the original RFP

L0003 L2.35 PROPOSAL FORMAT AND CONTENT (AEROSPACE ENERGY) (DLA ENERGY JAN 2012)

(a) All proposals shall consist of a Price Proposal. In addition, a Technical Proposal shall be submitted if indicated in paragraph (c) below.

(b) PRICE PROPOSAL.

(1) In the Schedule, Section B, Supplies or Services and Prices/Costs, offered prices shall be completed for each Contract Line Item Number (CLIN) unless the Schedule notes that multiple awards will be made. In that case, the offeror may select which CLINs or groups of CLINs, such as those applying to a specific customer location, against which to submit an offer;

(2) For each applicable box checked below, unit prices shall be formulated, as specified:

[ ] (i) Product with no Monthly Facility Fee (MFF). The offeror shall include all fixed, variable and incremental costs to produce and prepare product for Government inspection and acceptance. Include all transportation and shipping costs to deliver the product to the specified customer location if the product CLIN is designation as f.o.b. destination. For this solicitation, the applicable CLINs are

[ X ] (ii) Product with an MFF CLIN. The offeror shall include only the variable and incremental costs to produce and prepare the product for Government inspection and acceptance in the product CLIN. All fixed costs associated with the facility shall be included in the MFF, to include storage and distribution of Government-owned product, if required by the Statement of Objectives (SOO). For this solicitation, the applicable CLINs are CLINS 0001 – 0010 and 0011 – 0015.

[ ] (iii) Services CLIN(s), such as maintenance and repair of containers. The offeror shall include all variable and fixed costs associated with the service, as described in the SOO, unless otherwise noted herein that those costs should be included in another CLIN. For this solicitation, the applicable Services CLINS are _ .

[ ] (iv) Repair Parts Specifically Identified in the Schedule. Where the Government specifically identifies repair parts which will be reimbursed under the Contract, the offeror shall include in its offered price, on a per unit basis, all costs associated with that repair part, to include the applicable labor costs to install it. For this solicitation, the applicable CLINS are [Buyer fill in the CLIN(s)] _________________________________________.

[ ] (v) Contractor-Provided Tank(s) CLIN(s). The offeror shall include in each applicable CLIN all fixed and variable costs associated with leasing of a tank or multiple tanks to the Government under the contract. Separate CLINS have been established for the costs associated with the leasing of the tank(s) as compared to the costs associated with the tank(s) installation and removal. Where the incumbent is offering the same number and size of tanks previously provided under the previous contract, the incumbent need not propose a price for tank(s) installation. However, the incumbent shall propose a price for tank(s) removal. For this solicitation, the applicable CLINs are [Buyer fill in the CLIN(s)] _______________________________________________.

[ ] (vi) Contractor provided equipment CLIN(s). Where the SOO requires specific contractor-provided equipment for which a separate CLIN has been established for reimbursement under the resultant contract, the offeror shall include all fixed and variable costs associated with providing such equipment, to include but not limited to delivery, installation, calibration, maintenance and repair throughout the contract term, and removal at the expiration of the contract. For this solicitation, the applicable CLINS are .

[ ] (vii) Expedited/Emergency Delivery CLIN(s). Where the Schedule has a CLIN for Expedited and/or Emergency delivery, as defined in the SOO, the offeror shall include all costs associated with such delivery on a per shipment basis. This encompasses additional labor and transportation costs anticipated to be incurred over and above normal delivery costs. Any product ordered with an Expedited and/or Emergency delivery shall be paid at the unit price of the applicable product CLIN. For this solicitation, the applicable CLINS are [Buyer fill in the CLIN(s)] _________________________________________.

[ ] (viii) Hot Fill CLIN(s). If the solicitation includes a “Hot Fill” CLIN, the offeror shall propose a per Hot Fill Unit Price. Examples of costs that should be included in the offeror’s per Hot Fill Unit Price but not limited to these, are additional support personnel required to accomplish the Hot Fill or additional time required at the delivery location in support of the Hot Fill. The per Hot Fill Unit Price shall not include the cost of the product consumed during the Hot Fill since the Contractor will be paid for the amount of product consumed under the applicable product CLIN. For this solicitation, the applicable CLINs are [Buyer fill in the CLIN(s)]

[ X ] (ix) Additional CLIN(s) not described above to be priced by the offeror. For this solicitation, the applicable CLINs are CLINS 0016 – 0017.

[ ] (x) Not Separately Priced (NSP) CLIN(s). For CLINs shown as NSP, the offeror shall include the costs associated with that CLIN in the designated CLIN’s unit price. For this solicitation, the applicable Services CLINs are [Buyer fill in the CLIN(s)] _______________________________________.

[ ] (xi) To Be Negotiated (TBN) CLIN(s). For those CLINs designated as TBN, the Government will negotiate a unit price on a case-by-case basis, if and when requirements under the CLIN materialize. In order for the Government to add such a requirement to the contract under the TBN CLIN, the unit price must be determined fair and reasonable. For this solicitation, the applicable CLINs are [Buyer fill in the CLIN(s)]___________0017_

[ ] (xii) Exceptions to the above. _________________________________________________________.

(3) The Standard Form 1449 must be completed, as well as the MANUFACTURING AND FILLING POINTS and TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (AEROSPACE ENERGY) contract provisions , if included, and all certifications and representations contained in Section K of the solicitation.

(c) TECHNICAL PROPOSAL.

(1) A Technical Proposal __IS___ required. If a Technical Proposal is required, the two non-cost factors will be Technical Capability and Past Performance.

(2) TECHNICAL CAPABILITY. The offeror shall provide a technical proposal by completing the required fill-in data only if the applicable box is checked. [buyer checks each applicable block] ). The offeror may submit continuation sheets with this fill-in provision to provide additional technical narrative, however, the complete technical proposal, exclusive of any résumés, drawings, or blueprints, shall not exceed 12 pages. The proposal will be evaluated strictly on technical merit and should describe and justify the offeror's technical approach to the requirements of the work to be performed and/or delivery of product under the contract. The technical proposal should be specific and provide concise, straight-forward descriptions of the offeror's capability to perform the requirements of the contract.

Proposals that are unrealistic in terms of the description of the offeror’s technical capability may be considered indicative of a lack of understanding of the solicitation’s requirements. :

[ X ] (i) General description of how the offeror will ensure a reliable supply of on-spec product and/or service to meet the Government’s requirements as stated in the solicitation.

[ X ] (A) Production capability per day of proposed fill plant.

[ ] (B) Plant storage capacity for product offered.

[ ] (C) If the offeror will be making deliveries to customers, describe type, number and size of containers that will be used for delivery of product to each customer location that the offeror proposes on.

[ ] (D) If the contract requires maintenance and repair of Government-owned equipment, such as repairs to cylinders or tube trailers, describe how such services will be performed to meet solicitation requirements.

[ X ] (E) Describe the in-process quality control procedures that will ensure the production and delivery of on-spec product.

[X ] (F) Describe offeror’s proposed quality sampling plan that will be implemented to assure individual shipments made under this solicitation meet the product quality requirements stated in the applicable specification or product described.

[ X ] (ii) Description of Contractor-furnished equipment at a location other than the Contractor’s facility (e.g., on Government property) such as storage tanks.

[ X ] (A) Describe all Contractor provided equipment to include a description of size, certifications, instrumentation (including alarms), design parameters, etc.

[ X ] (B) Include a timeline for the purchase, installation, testing and commissioning of the equipment.

[ ] (iii) Describe the method for securing delivery container(s) and/or cargo tank openings with tamper indicating devices (i.e., seals) to prevent tampering and/or pilferage from the time the cargo tank is loaded until it is delivered to its destination. (Refer to the CONTRACTOR SEAL REQUIREMENT contract provision.)

[ ] (iv) For solicitations containing product CLINs, if the offeror is not the manufacturer of the product to be delivered under the contract or is otherwise proposing to provide product from a fill plant or production facility other than one owned and operated by the offeror, the offeror shall provide a written supply commitment letter from the owner of the fill plant or production facility from where the product will be obtained in performance of any resultant contract. The written supply commitment shall clearly indicate:

[ ] (A) The owner of the fill plant or production facility is willing to provide the products and/or services required to be delivered/performed under any resultant contract for the duration of the delivery period shown in the Schedule; and

[ ] (B) Confirmation of the quantity and specification of the products to be delivered;

[ X ] (v) This paragraph describes additional information for the Technical Proposal not asked for in above paragraphs.

The offeror shall describe in detail how they intend to meet the projected delivery requirements of gaseous nitrogen as to the operating conditions stated in the SOO and provide a detailed description of all contractor furnished equipment to include a description of planned on-site storage capacities for liquid nitrogen. The narrative shall include but not be limited to the production capacity per day of gaseous nitrogen and how this flow capacity will be sustained in the event of high flow events at SLC 3 or SLC 6 as described in the SOO. The narrative should also describe how the offeror intends to supply a continuous source of commodity in the event that new equipment has to be utilized. Additionally the offeror shall describe in detail the steps to be taken to obtain the required permissions/permits/approvals required by the base, including but not limited to the Environmental Office for the placement of new and/or temporary structures.

(d) PAST PERFORMANCE. Past Performance information is required in response to all solicitations. For solicitations that require only a Price Proposal, past performance information will be used in the Contracting Officer’s responsibility determination of individual offerors, as required by FAR Part 9. For those solicitations that require a Technical Proposal, past performance information will be used to evaluate past performance as the second non-cost factor in addition to Technical Capability. The offeror shall submit information regarding its past performance on the form entitled Contractor Performance Data Report, as attached to the solicitation.

All contracts and subcontracts (completed or in progress) for the last three years awarded by DLA Energy as well as other (completed or in progress) Government agencies or the private sector that are related to the proposed contract shall be included on the form. Failure to submit a complete list may reflect adversely on the offeror. The number of relevant past performance efforts submitted in accordance with the attachment shall not exceed five for the prime offeror. The Government reserves the right to make telephone contact with offerors, proposed subcontractors and references in order to confirm and/or clarify the past performance information submitted. The Government has the option to consider information from these sources, and any others that may be available, that it deems necessary in order to make an accurate assessment of the offeror’s past performance. In addition, the offeror should provide additional information on any significant problems encountered and corrective actions taken under contract(s).

(e) ADDITIONAL INFORMATION. For solicitations containing product CLINs that do not otherwise require a Technical Proposal, if the offeror is not the manufacturer of the product to be delivered under the contract or is proposing to provide product from a fill point or production facility other than one owned and operated by the offeror, the offeror shall provide a written supply commitment letter from the owner of the fill plant or production facility from where the product will be obtained in performance of any resultant contract. This information will be used in the Contracting Officer’s responsibility determination as required by FAR Part 9. The written supply commitment letter must clearly indicate--

[ ] (A) The owner of the fill plant or production facility is willing to provide the products and/or services required to be delivered/performed under any resultant contract for the duration of the delivery period shown in the Schedule; and

[ ] (B) Confirmation of the quantity and specification of the products to be delivered;

(f) EXCEPTIONS. Exceptions (price or technical) taken to the terms and conditions of the solicitation and/or any of its formal attachments shall be identified. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain the impact, if any, on the performance, price, and specific requirements of the solicitation. Failure to agree to the terms and conditions of the solicitation may result in the offeror being removed from consideration for award.

M0001 M2.14 EVALUATION – COMMERCIAL ITEMS (AEROSPACE ENERGY) (DLA ENERGY AUG 2009)

(a) For solicitations that do not require submission of a Technical Proposal, award will be made on the basis of the total lowest evaluated price of proposals.

(b) For solicitations that require submission of a Technical Proposal, award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the specific evaluation criteria contained in the solicitation. Non-cost factors to be evaluated shall be technical capability and past performance. In accordance with FAR 15.101-2(b)(3), proposals will be evaluated for acceptability but not ranked using the non-cost/price factors.

(1) Technical capability will be measured against requirements specified in the solicitation. As such, technical capability is considered acceptable when the offeror’s proposal is in compliance with the requirements of the solicitation. Specific criteria used to judge acceptability are as follows and apply ONLY if the applicable box is checked:

[ X ] (i) Acceptability of the narrative describing how the offeror will ensure a reliable supply of on-spec product and/or services to meet the annual estimated quantities in the RFP’s Schedule.

[ X ] (ii) Acceptability of the narrative describing any Contractor-furnished equipment at a location other than the Contractor’s facility (e.g., on Government property).

[ X ] (iii) Acceptability of method for securing delivery container and/or cargo tank openings…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .