amendment_2.pdf
PDF 310 KB Posted
- Attached to
- Gaseous Nitrogen, Type I, Grade B
- Solicitation number
- SPE60113R0315
- Issued by
-
Defense Logistics Agency Energy
About this file
Industry Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_4.pdf | ||
| amendment_4.pdf | ||
| 13-R-0315 _Amendment_0003.pdf | ||
| SPE601-13-R-0315-0001.pdf | ||
| SPE601-13-R-0315.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE601 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60113R0315
X
2013 JUL 10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY AEROSPACE ENRGY-DLAE-M
BLDG 1621
1014 BILLY MITCHELL BLVD
SAN ANTONIO TX 78226
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
13. EFFECTIVE DATE
14 Aug 2013
Opening/Closing Date Changed to:
2013 JUL 10 / 2013 AUG 20
TIME 3:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
PAGE OF PAGES
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
SPE601-13-R-0315
Amendment 2
TO ALL OFFERORS: This amendment will answer questions posed by industry. In addition it revises the Schedule. Also a revised Proposal Format and Content Provision [L2.35] and revised Evaluation Provision [M2.14] is also incorporated into the solicitation via this amendment.
1. Industry Question: CLIN 16 – relates to the support staff being on site and since we have them work 12 hour shifts, we can calculate their hourly & overtime rates. I’m assuming the quantity of 8 is in anticipation of 8 events in the course of a year – correct? So we should multiply the rate times 8 to get an annual contract spend?
GOVERNMENT ANSWER: Yes, 8 is the estimated number of events. This is a requirements contract so the estimate of 8 is a best estimate but the number of actual events may be more or less than 8. The CLIN proposal is looking for offerors to insert their proposed per person per day cost for labor while on site, not an annual roll-up number.
2. Industry Question: CLIN 17 – refers to labor & per diem while in travel status – assume that’s the time on average each support staff travels to arrive at VAFB correct? That will vary depending on staff availability and distance traveled…any suggestions on how we should guesstimate it?
GOVERNMENT ANSWER: See the below listed revised schedule.
3. Industry Question: CLIN 18 – Shout this be “TBD”? We need to seek direct reimbursement for whatever travel arrangements are necessary based on staff availability. Not knowing which staff is coming from where on any given event to support the HFE makes it virtually impossible to guesstimate travel costs – some will be flying and some local staff will be driving…any suggestions or clarification as to how we should respond? Can we opt to quote “TBD” and expect direct reimbursement for actual cost?
GOVERNMENT RESPONSE: See the revised schedule listed below.
4. Industry Question: CLIN 19 – appears similar to CLIN 16. We typically bring the same support staff for any HFE as the task/duties are the same or am I overlooking something here?
GOVERNMENT RESPONSE: See the revised schedule listed below.
5. Industry Question: CLIN 20 – this appears to be similar to CLIN 17. Here again they are typically the same people or am I missing something? Please clarify.
GOVERNMENT RESPONSE: See the revised schedule listed below.
6. Industry Question: CLIN 21 – this one also appears to be similar to CLIN 18. We would prefer to use “TBD” rather than guesstimate high to be sure and cover our costs when we have to fly personnel to the site. Same questions as in CLIN 18. Please comment.
GOVERNMENT RESPONSE: See the revised schedule listed below.
7. Industry Question: CLIN 22 – Why is there differentiation between HFE, Environmental Check, WDR, Static Fire, Launch, etc. The same tasks/duties are performed each time for each HFE. The second line states “Check for HIGH FLOW EVENT” – what does that mean? Please clarify.
GOVERNMENT RESPONSE: See the revised schedule listed below.
8. Industry Question: CLIN 23 – for Mobilization of Distribution Equipment for HEAVY LIFT REQUIREMENTS – since we don’t always know where the resources will come from i.e. which of our air separation plants will have extra LIN available, it’s hard to predict what equipment will be required as it will depend on which plant has the product and how far it is to VAFB. Do you want us to calculate mileage from each plant and define the surcharge amount for each load of LIN, and then quote just the surcharge/additional cost per LIN load? Please advise.
GOVERNMENT RESPONSE: See the revised schedule listed below.
9. Industry Question: In the Statement of Objectives (SOO) under Section 4 HIGH FLOW EVENT, there’s a new stipulation that only allows offerors to bring support staff in less than 24 hours prior to start of a high-flow event
– the current contract provides 48 hours... There are times when a high-flow event that starts at 3AM and less than 24 hours prior for staff to arrive makes it impractical to catch flights and arrive at VAFB in time to go through the extensive checklist and prepare for startup. It could become a safety issue if the guys don’t get adequate rest prior to a strenuous high-flow event. Are you sure the DLA wants us to take additional risks by bringing in tired-sleep deprived staff to prepare for a launch or HFE? More safety incidents occur when employees are overworked or very tired…
GOVERNMENT RESPONSE: The time remains at 24 hours. Re-imbursement for all travel related expenses will be reimbursed under CLIN 0017 in the attached revised schedule.
10. Industry Question. Departing the site within 24 hours following a high-flow event is also a new stipulation. .
Is it safe to assume we will be reimbursed for airline change fees and late check-out/hotel room cancellation fees?
GOVERNMENT RESPONSE: The time remains at 24 hours. Re-imbursement for all travel related expenses will be reimbursed under CLIN 0017 in the attached revised schedule.
11. Industry Question. On page 12 of 17 where the Technical Proposal begins I’m trying to follow the item on page 13 of 17 where the statement (F) (ii) reads “Description of Contractor-furnished equipment at a location other than the Contractor’s facility such as storage tanks. Is the DLA wanting us to describe LIN tanks at VAFB or at our primary production plants located in California?
GOVERNMENT RESPONSE: The proposal is looking for a description of contractor provided equipment that will be placed by the contractor at VAFB in order to meet contract requirements.
12. Industry Question: Is (A) below (F) (ii) requesting Offeror to “Describe all Contractor provided existing equipment…” based current installation at VAFB or at primary production plants?
GOVERNMENT RESPONSE: The proposal is looking for a description of contractor provided equipment that will be placed by the contractor at VAFB in order to meet contract requirements.
B. The following schedule replaces the schedule in the original RFP.
ITEM SUPPLIES/SERVICES ESTIMATED UNIT PRICE TOTAL
QTY/UNIT AMOUNT
0001 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________
Gaseous Nitrogen, Type I, Grade B IAW MIL-PRF-27401F Dated 10 Jan 08
CONTRACT PERIOD ONE –
1 November 2013 through 31 October 2014
0002 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
CONTRACT PERIOD TWO –
1 November 2014 through 31 October 2015
0003 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
CONTRACT PERIOD THREE –
1 November 2015 through 31 October 2016
0004 9135-00935-5863 (PIPELINE) 384,000 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
CONTRACT PERIOD FOUR –
1 November 2016 through 31 October 2017
0005 9135-00935-5863 (PIPELINE) 352,000 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
CONTRACT PERIOD FIVE –
1 November 2017 through 30 September 2018
0006 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
0007 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
0008 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
0009 9135-00935-5863 (Tube Bank Trailers) 110 MC __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
0010 9135-00935-5863 (Tube Bank Trailers) 101M __________ __________
IAW MIL-PRF-27401F Dated 10 Jan 08
0011 Fixed Facility Fee V00007062 12 MOS __________ __________ For Contractor Furnished Equipment Necessary to Generate Gaseous Nitrogen
0012 Fixed Facility Fee V00007062 12 MOS __________ __________
Necessary to Generate Gaseous Nitrogen
0013 Fixed Facility Fee V00007062 12 MOS __________ __________
Necessary to Generate Gaseous Nitrogen
0014 Fixed Facility Fee V00007062 12 MOS __________ __________
Necessary to Generate Gaseous Nitrogen
0015 Fixed Facility Fee V00007062 11 MOS __________ __________
Necessary to Generate Gaseous Nitrogen
0016 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day
CONTRACT PERIOD
1 November 2013 through 31 Oct 2014
0017 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day
CONTRACT PERIOD
1 November 2014 through 31 Oct 2015
0018 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day
CONTRACT PERIOD
1 November 2015 through 31 Oct 2016
0019 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day
CONTRACT PERIOD
1 November 2016 through 31 Oct 2017
0020 Services – Labor while on site for 8 per person __________ __________ all High Flow Events per day
CONTRACT PERIOD
1 November 2017 through 30 Sep 2018
0021 Travel Charges for HIGH FLOW EVENT TBD Labor, Transportation, and Per Diem While in Travel Status
CONTRACT PERIOD
1 November 2013 through 30 Sep 2018
SEE NOTE 1
0022 Mobilization of Distribution Per Mile __________ __________ Equipment for HEAVY LIFT REQUIREMENTS in support of
HIGH FLOW EVENT
CONTRACT PERIOD
1 November 2013 through 30 Sep 2018
Note 1 – All travel must be in accordance with FAR Clause 31.205-46 and must be submitted to the Contracting Officer for review and approval prior to commencing travel.
C. The following Aerospace Clauses replace the clauses in the original RFP
L0003 L2.35 PROPOSAL FORMAT AND CONTENT (AEROSPACE ENERGY) (DLA ENERGY JAN 2012)
(a) All proposals shall consist of a Price Proposal. In addition, a Technical Proposal shall be submitted if indicated in paragraph (c) below.
(b) PRICE PROPOSAL.
(1) In the Schedule, Section B, Supplies or Services and Prices/Costs, offered prices shall be completed for each Contract Line Item Number (CLIN) unless the Schedule notes that multiple awards will be made. In that case, the offeror may select which CLINs or groups of CLINs, such as those applying to a specific customer location, against which to submit an offer;
(2) For each applicable box checked below, unit prices shall be formulated, as specified:
[ ] (i) Product with no Monthly Facility Fee (MFF). The offeror shall include all fixed, variable and incremental costs to produce and prepare product for Government inspection and acceptance. Include all transportation and shipping costs to deliver the product to the specified customer location if the product CLIN is designation as f.o.b. destination. For this solicitation, the applicable CLINs are
[ X ] (ii) Product with an MFF CLIN. The offeror shall include only the variable and incremental costs to produce and prepare the product for Government inspection and acceptance in the product CLIN. All fixed costs associated with the facility shall be included in the MFF, to include storage and distribution of Government-owned product, if required by the Statement of Objectives (SOO). For this solicitation, the applicable CLINs are CLINS 0001 – 0010 and 0011 – 0015.
[ ] (iii) Services CLIN(s), such as maintenance and repair of containers. The offeror shall include all variable and fixed costs associated with the service, as described in the SOO, unless otherwise noted herein that those costs should be included in another CLIN. For this solicitation, the applicable Services CLINS are _ .
[ ] (iv) Repair Parts Specifically Identified in the Schedule. Where the Government specifically identifies repair parts which will be reimbursed under the Contract, the offeror shall include in its offered price, on a per unit basis, all costs associated with that repair part, to include the applicable labor costs to install it. For this solicitation, the applicable CLINS are [Buyer fill in the CLIN(s)] _________________________________________.
[ ] (v) Contractor-Provided Tank(s) CLIN(s). The offeror shall include in each applicable CLIN all fixed and variable costs associated with leasing of a tank or multiple tanks to the Government under the contract. Separate CLINS have been established for the costs associated with the leasing of the tank(s) as compared to the costs associated with the tank(s) installation and removal. Where the incumbent is offering the same number and size of tanks previously provided under the previous contract, the incumbent need not propose a price for tank(s) installation. However, the incumbent shall propose a price for tank(s) removal. For this solicitation, the applicable CLINs are [Buyer fill in the CLIN(s)] _______________________________________________.
[ ] (vi) Contractor provided equipment CLIN(s). Where the SOO requires specific contractor-provided equipment for which a separate CLIN has been established for reimbursement under the resultant contract, the offeror shall include all fixed and variable costs associated with providing such equipment, to include but not limited to delivery, installation, calibration, maintenance and repair throughout the contract term, and removal at the expiration of the contract. For this solicitation, the applicable CLINS are .
[ ] (vii) Expedited/Emergency Delivery CLIN(s). Where the Schedule has a CLIN for Expedited and/or Emergency delivery, as defined in the SOO, the offeror shall include all costs associated with such delivery on a per shipment basis. This encompasses additional labor and transportation costs anticipated to be incurred over and above normal delivery costs. Any product ordered with an Expedited and/or Emergency delivery shall be paid at the unit price of the applicable product CLIN. For this solicitation, the applicable CLINS are [Buyer fill in the CLIN(s)] _________________________________________.
[ ] (viii) Hot Fill CLIN(s). If the solicitation includes a “Hot Fill” CLIN, the offeror shall propose a per Hot Fill Unit Price. Examples of costs that should be included in the offeror’s per Hot Fill Unit Price but not limited to these, are additional support personnel required to accomplish the Hot Fill or additional time required at the delivery location in support of the Hot Fill. The per Hot Fill Unit Price shall not include the cost of the product consumed during the Hot Fill since the Contractor will be paid for the amount of product consumed under the applicable product CLIN. For this solicitation, the applicable CLINs are [Buyer fill in the CLIN(s)]
[ X ] (ix) Additional CLIN(s) not described above to be priced by the offeror. For this solicitation, the applicable CLINs are CLINS 0016 – 0017.
[ ] (x) Not Separately Priced (NSP) CLIN(s). For CLINs shown as NSP, the offeror shall include the costs associated with that CLIN in the designated CLIN’s unit price. For this solicitation, the applicable Services CLINs are [Buyer fill in the CLIN(s)] _______________________________________.
[ ] (xi) To Be Negotiated (TBN) CLIN(s). For those CLINs designated as TBN, the Government will negotiate a unit price on a case-by-case basis, if and when requirements under the CLIN materialize. In order for the Government to add such a requirement to the contract under the TBN CLIN, the unit price must be determined fair and reasonable. For this solicitation, the applicable CLINs are [Buyer fill in the CLIN(s)]___________0017_
[ ] (xii) Exceptions to the above. _________________________________________________________.
(3) The Standard Form 1449 must be completed, as well as the MANUFACTURING AND FILLING POINTS and TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND DETENTION RATES (AEROSPACE ENERGY) contract provisions , if included, and all certifications and representations contained in Section K of the solicitation.
(c) TECHNICAL PROPOSAL.
(1) A Technical Proposal __IS___ required. If a Technical Proposal is required, the two non-cost factors will be Technical Capability and Past Performance.
(2) TECHNICAL CAPABILITY. The offeror shall provide a technical proposal by completing the required fill-in data only if the applicable box is checked. [buyer checks each applicable block] ). The offeror may submit continuation sheets with this fill-in provision to provide additional technical narrative, however, the complete technical proposal, exclusive of any résumés, drawings, or blueprints, shall not exceed 12 pages. The proposal will be evaluated strictly on technical merit and should describe and justify the offeror's technical approach to the requirements of the work to be performed and/or delivery of product under the contract. The technical proposal should be specific and provide concise, straight-forward descriptions of the offeror's capability to perform the requirements of the contract.
Proposals that are unrealistic in terms of the description of the offeror’s technical capability may be considered indicative of a lack of understanding of the solicitation’s requirements. :
[ X ] (i) General description of how the offeror will ensure a reliable supply of on-spec product and/or service to meet the Government’s requirements as stated in the solicitation.
[ X ] (A) Production capability per day of proposed fill plant.
[ ] (B) Plant storage capacity for product offered.
[ ] (C) If the offeror will be making deliveries to customers, describe type, number and size of containers that will be used for delivery of product to each customer location that the offeror proposes on.
[ ] (D) If the contract requires maintenance and repair of Government-owned equipment, such as repairs to cylinders or tube trailers, describe how such services will be performed to meet solicitation requirements.
[ X ] (E) Describe the in-process quality control procedures that will ensure the production and delivery of on-spec product.
[X ] (F) Describe offeror’s proposed quality sampling plan that will be implemented to assure individual shipments made under this solicitation meet the product quality requirements stated in the applicable specification or product described.
[ X ] (ii) Description of Contractor-furnished equipment at a location other than the Contractor’s facility (e.g., on Government property) such as storage tanks.
[ X ] (A) Describe all Contractor provided equipment to include a description of size, certifications, instrumentation (including alarms), design parameters, etc.
[ X ] (B) Include a timeline for the purchase, installation, testing and commissioning of the equipment.
[ ] (iii) Describe the method for securing delivery container(s) and/or cargo tank openings with tamper indicating devices (i.e., seals) to prevent tampering and/or pilferage from the time the cargo tank is loaded until it is delivered to its destination. (Refer to the CONTRACTOR SEAL REQUIREMENT contract provision.)
[ ] (iv) For solicitations containing product CLINs, if the offeror is not the manufacturer of the product to be delivered under the contract or is otherwise proposing to provide product from a fill plant or production facility other than one owned and operated by the offeror, the offeror shall provide a written supply commitment letter from the owner of the fill plant or production facility from where the product will be obtained in performance of any resultant contract. The written supply commitment shall clearly indicate:
[ ] (A) The owner of the fill plant or production facility is willing to provide the products and/or services required to be delivered/performed under any resultant contract for the duration of the delivery period shown in the Schedule; and
[ ] (B) Confirmation of the quantity and specification of the products to be delivered;
[ X ] (v) This paragraph describes additional information for the Technical Proposal not asked for in above paragraphs.
The offeror shall describe in detail how they intend to meet the projected delivery requirements of gaseous nitrogen as to the operating conditions stated in the SOO and provide a detailed description of all contractor furnished equipment to include a description of planned on-site storage capacities for liquid nitrogen. The narrative shall include but not be limited to the production capacity per day of gaseous nitrogen and how this flow capacity will be sustained in the event of high flow events at SLC 3 or SLC 6 as described in the SOO. The narrative should also describe how the offeror intends to supply a continuous source of commodity in the event that new equipment has to be utilized. Additionally the offeror shall describe in detail the steps to be taken to obtain the required permissions/permits/approvals required by the base, including but not limited to the Environmental Office for the placement of new and/or temporary structures.
(d) PAST PERFORMANCE. Past Performance information is required in response to all solicitations. For solicitations that require only a Price Proposal, past performance information will be used in the Contracting Officer’s responsibility determination of individual offerors, as required by FAR Part 9. For those solicitations that require a Technical Proposal, past performance information will be used to evaluate past performance as the second non-cost factor in addition to Technical Capability. The offeror shall submit information regarding its past performance on the form entitled Contractor Performance Data Report, as attached to the solicitation.
All contracts and subcontracts (completed or in progress) for the last three years awarded by DLA Energy as well as other (completed or in progress) Government agencies or the private sector that are related to the proposed contract shall be included on the form. Failure to submit a complete list may reflect adversely on the offeror. The number of relevant past performance efforts submitted in accordance with the attachment shall not exceed five for the prime offeror. The Government reserves the right to make telephone contact with offerors, proposed subcontractors and references in order to confirm and/or clarify the past performance information submitted. The Government has the option to consider information from these sources, and any others that may be available, that it deems necessary in order to make an accurate assessment of the offeror’s past performance. In addition, the offeror should provide additional information on any significant problems encountered and corrective actions taken under contract(s).
(e) ADDITIONAL INFORMATION. For solicitations containing product CLINs that do not otherwise require a Technical Proposal, if the offeror is not the manufacturer of the product to be delivered under the contract or is proposing to provide product from a fill point or production facility other than one owned and operated by the offeror, the offeror shall provide a written supply commitment letter from the owner of the fill plant or production facility from where the product will be obtained in performance of any resultant contract. This information will be used in the Contracting Officer’s responsibility determination as required by FAR Part 9. The written supply commitment letter must clearly indicate--
[ ] (A) The owner of the fill plant or production facility is willing to provide the products and/or services required to be delivered/performed under any resultant contract for the duration of the delivery period shown in the Schedule; and
[ ] (B) Confirmation of the quantity and specification of the products to be delivered;
(f) EXCEPTIONS. Exceptions (price or technical) taken to the terms and conditions of the solicitation and/or any of its formal attachments shall be identified. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Provide rationale in support of the exception and fully explain the impact, if any, on the performance, price, and specific requirements of the solicitation. Failure to agree to the terms and conditions of the solicitation may result in the offeror being removed from consideration for award.
M0001 M2.14 EVALUATION – COMMERCIAL ITEMS (AEROSPACE ENERGY) (DLA ENERGY AUG 2009)
(a) For solicitations that do not require submission of a Technical Proposal, award will be made on the basis of the total lowest evaluated price of proposals.
(b) For solicitations that require submission of a Technical Proposal, award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the specific evaluation criteria contained in the solicitation. Non-cost factors to be evaluated shall be technical capability and past performance. In accordance with FAR 15.101-2(b)(3), proposals will be evaluated for acceptability but not ranked using the non-cost/price factors.
(1) Technical capability will be measured against requirements specified in the solicitation. As such, technical capability is considered acceptable when the offeror’s proposal is in compliance with the requirements of the solicitation. Specific criteria used to judge acceptability are as follows and apply ONLY if the applicable box is checked:
[ X ] (i) Acceptability of the narrative describing how the offeror will ensure a reliable supply of on-spec product and/or services to meet the annual estimated quantities in the RFP’s Schedule.
[ X ] (ii) Acceptability of the narrative describing any Contractor-furnished equipment at a location other than the Contractor’s facility (e.g., on Government property).
[ X ] (iii) Acceptability of method for securing delivery container and/or cargo tank openings with indicating devices (i.e., seals) to prevent tampering and/or pilferage from the time the cargo tank is loaded until it is delivered to its destination.
[ X ] (iv) Acceptability of the offeror’s description of where the product(s) will be obtained and any written supply commitments if the offeror is not the producer of the product to be delivered under the contract.
[ X ] (v) This paragraph describes additional criteria used to evaluate technical capability not described in the above paragraphs, if applicable.
Acceptability of the narrative provided in L2.35(c)(2)(v).
(2) Past performance shall generally include verification of performance with the offeror’s past and current customers, to include Federal, State, and local governments as well as private entities. The form entitled Contractor Performance Data Sheet, located in Section J of the solicitation, may be used to provide relevant performance history pursuant to this solicitation. In accordance with FAR 15.305(a)(2)(iv), offerors without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance. Additionally, past performance data may be obtained through the Past Performance Information Retrieval System, similar systems or other Government departments and agencies, questionnaires tailored to the circumstances of this acquisition, Defense Contract Management Agency channels, interviews with program managers and contracting officers, and other sources known to the Government (including commercial sources). Offerors will be given the opportunity to address any negative performance information resulting from the past performance assessment inquiries.
(3) An offeror whose proposal is evaluated as acceptable from both a technical capability perspective as well as for past performance will be considered technically acceptable.
(c) Regardless of whether a Technical Proposal is required or not, the following price evaluation procedure(s) apply if the applicable box is checked:
[ X ] (1) For F.O.B. Origin product CLINs. For price evaluation purposes, the evaluated price of each CLIN for product (0001 through 0010 and 0011 through 0015) to be delivered on an f.o.b. origin basis will be calculated by multiplying the estimated quantity by the proposed unit price of the product. To each CLIN/subCLIN, the Government will add as an “other price-related factor,” the Government’s estimated costs for transporting the product from the offeror’s proposed fill plant, production facility, and/or storage facility, as stated in the offeror’s proposal, to the individual customer locations designated in an attachment to the solicitation. The estimated number of shipments shown in the attachment will also apply. The lowest laid down price is calculated by adding the sum of the evaluated prices for each CLIN/subCLIN to the Government’s total estimated cost for transportation and the total of all “other price related factors”, if any, as described in the paragraph below. Transportation rates are derived from--
[ X ] (i) For CONUS locations, the Surface Deployment and Distribution Command’s (SDDC’s) competitively awarded contracts will be used.
[ ] (ii) For OCONUS locations, the Government rates for both air and sea transportation will be taken from the DoD’s Single Mobility System (SMS) Air Cargo/PAX Cost Calculator.
[ ] (2) For F.O.B. Destination product CLINs. For price evaluation purposes, the evaluated price of each CLIN or subCLIN for product (AA through ____) [Buyer fill in the CLIN(s)] will be calculated by multiplying the estimated quantity by the proposed unit price of the product(s), which should include all costs associated with the offeror’s delivery of product to the location specified in the Schedule. F.o.b. destination CLINs are normally individual DLA Energy customer locations, unless otherwise specified.
[ ] (3) Non-product CLINs/subCLINs. For price evaluation purposes, the following non-product CLINS/subCLINs will be evaluated for award: N/A. Each non-product CLIN/subCLIN’s evaluated price will be calculated by multiplying the estimated quantity by the offered unit price. Offerors who do not propose on all non-product CLINs and subCLINs stated in the Schedule (where one award will be made), or where a group of CLINs/subCLINs will be evaluated for award, or where the Schedule contains specific customer locations to be evaluated and awarded, may not be considered for evaluation and award unless the offeror proposes prices on all applicable CLINs/subCLINs.
[ ] (4) This paragraph describes the evaluation process for product or non-product CLINs/subCLINs or additional “other price related factors” not otherwise described in any of the above paragraphs, if applicable. [Buyer fill in information or indicate N/A.]
[ X ] (5) The offered prices for the following CLINs/subCLINs will not be included in the evaluation for award, but will be evaluated for price reasonableness and included as a CLIN/subCLIN in each contract award: CLINS 0016-0022.
[ X ] (6) Lowest Total Evaluated Price for F.O.B. Origin Requirements. If Schedule B includes both f.o.b. origin product CLINs as well as non-product CLINs that are to be evaluated in accordance with this provision, the evaluated prices for all the non-product CLINs will be added to the lowest laid down price of all the product CLINs that are otherwise designated as one group, such as in a region, to determine the lowest total evaluated price. Otherwise, only the product CLINs (or those applicable to the designated group) will be added to determine the lowest total evaluated price. If no region or group is designated in the Schedule, all the evaluated prices of all the CLINs in the solicitation will be added together for determination of the lowest total evaluated price.
[ ] (7) Lowest Total Evaluated Price for F.O.B. Destination Requirements. If Schedule B includes both f.o.b.
destination product CLINs as well as non-product CLINs that are to be evaluated in accordance with this provision, the evaluated prices for all the non-product CLINs will be added to the evaluated price(s) of the applicable f.o.b. destination product CLINs to determine the lowest total evaluated price. Otherwise, only the product CLINs applicable to the group or designated customer location will be added to determine the lowest total evaluated price. Where more than one customer location is contained in the Schedule, the lowest total evaluated price shall be all product CLINs and non-product CLINS for a specific customer location, added together.
[ ] (8) If Schedule B is for services only and as such does not include any product CLINs, the total evaluated price will be the total of the evaluated prices for all the services CLINs, as designated in paragraph (e)(3) above.
(d) If options are included, the Government will evaluate offered prices by using the same price evaluation procedures as described above, except, as follows: [Buyer fill in or indicate N/A.] __________________________________________________
The Government may determine that an offered price under an option CLIN is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(e) BASIS FOR AWARD. For solicitations not requiring a Technical Proposal, the Contracting Officer will award to the responsible offeror with the lowest total evaluated price for the designated group of CLINs and/or customer locations, including options if contained in the solicitation. For solicitations requiring a Technical Proposal, the Contracting Officer will award to the responsible, technically acceptable offeror with the lowest total evaluated price for the designated group of CLINs and/or customer locations, including options, if contained in the solicitation. If group(s) of CLINs or individual customer locations are not otherwise designated in the Schedule, only one contract will be awarded for all the CLINs specified in the Schedule. Where the Government is soliciting for a group of CLINs, such as on a regional basis, as well as for individual customer locations on a f.o.b. destination basis, more than one contract award may be made as price evaluation and award will be made on a customer location by customer location basis.
(f) A written notice of award or acceptance of offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
D. The solicitation closing date is extended to August 20, 2013, 3:00 p.m. local time.
File details come from the government source that posted it. Updated .