Amendment0004.docx.pdf

PDF 35 KB Posted

Attached to
Deep Freeze 2015
Solicitation number
SPE600-15-R-0716
Issued by

About this file

Deep Freeze 2015

View the file

Other files

File Type Posted
Summary_of_Awards.pdf PDF
Amendment_0005.pdf PDF
Amendment0003.docx.pdf PDF
Attachment_One.pdf PDF
Amendment0002SF30.pdf PDF
Amendment0001SF30.pdf PDF
Offer_Submission_Package_(15R0716)_8_18_2015.docx DOCX document
ATTACH_1_STANDARDIZED_TEST_REPORTS.doc DOC document
Solicitation_SPE60015R0716.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60015R0716

X

2015 AUG 19

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUED ON NEXT PAGE

This amendment is hereby issued to respond to a question submitted regarding clarification on base reference pricing.

The following question has been submitted:

1. DLA Energy's response to the question submitted on September 18, 2015 is as follows:

Question: Based on instructions given in the Solicitation Package with No SPE600-15-R-0716, SECTION B, Reference Clause B-0002/B19.34 (f) TABLE (including rounding instructions) calculations were made, however, they are different from the ones instructed in the Solicitation Package with No SPE600-15-R-071, SECTION B, Reference Clause B-0002/B19.34 (f) TABLE.

Answer: The numbers referenced in the Table on page 12 of the solicitation were pulled from the Platts Publication on the specific day of July 1, 2015 as indicated in the table. Clause B-0002/B19.34 ECONOMIC PRICE ADJUSTMENT (OVERSEAS BULK) (DLA ENERGY JAN 2012) provides instruction for calculation. For proper calculation divide the conversion of 42 by the full Low-High Average (with the four numbers after the decimal verses with just the two numbers behind the decimal). For reference product location Platts Jet-Kerosene FOB the proper calculation to obtain the Base Reference Price would be 74.0970/42 = 1.764214285, from there you would round to the sixth place after decimal to get $1.764214. The same goes for the other calculation. For Platts MOGAS 95 Unl. FOB the proper calculation would be 82.8190/42=1.971880952, from there round to the sixth place after decimal to get $1.97881.

2. All other terms and conditions remain unchanged.

Section B