Amendment 0009

View the file

Other files for this federal contract opportunity

Other files attached to SPE600-15-R-0409, newest first.
File Type Posted
Navy_PJM_NDW_SPE600-15-R-0409_Amd_0009.pdf PDF
Attachment_2_Production_and_Pricing_Worksheet-AMD_0006_-_Rev_3.xlsx XLSX spreadsheet
Amendment_0006---0409_Final.pdf PDF
PJM_Navy_RFI_Group_4.pdf PDF
Navy_PJM_NDW_SPE600-15-R-0409_Amd_0005_updated.pdf PDF
Attachment_8_Historical_Demand.xls XLS spreadsheet
Amendment_0005---0409_Final.pdf PDF
Attachment_2_Production_and_Pricing_Worksheet-AMD_0005_-_Rev_2.xlsx XLSX spreadsheet
PJM_Navy_RFI_Group_3.pdf PDF
Amendment_0004_SPE600-15-R-0409.pdf PDF
Navy_PJM_NDW_SPE600-15-R-0409_Amd_0004.pdf PDF
Amendment_0003---0409.pdf PDF
Navy_PJM_RFI_Group_2.pdf PDF
Navy_PJM_NDW_SPE600-15-R-0409_Amd_0003.pdf PDF
Navy_PJM_NDW_SPE600-15-R-0409_Amd_0002.pdf PDF
Amendment_0002---0409.pdf PDF
Navy_PJM_RFI_Group_1_SPE600-15-R-0409.pdf PDF
Navy_PJM_NDW_SPE600-15-R-0409_Amd_0001.pdf PDF
Industry_Day_Attendees.pdf PDF
Amendment_0001.pdf PDF
0001-Attachment_2_Production_and_Pricing_Worksheet-Rev1.xlsx XLSX spreadsheet
Navy_PJM_Industry_Day_-12_Jan_2015.pptx PPTX presentation
REPO_PJM_Industry_Day_Brief_Final.pptx PPTX presentation
Attachment_3_Attestation_Forms.pdf PDF
Attachment_1_Installation_Data_Sheet.xlsx XLSX spreadsheet
Attachment_5_Past_Performance_Information_Questionnaire.pdf PDF
Navy_PJM_NDW_SPE600-15-R-0409.pdf PDF
Attachment_2_Production_and_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_6_-_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_4_Early_Termination_Fees_Schedule-Navy_NDW.pdf PDF
Attachment_7_Industry_Day_Location_and_Directions_(DLA_HQ_Visitor_Information).pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Navy PJM NDW RESA Amendment 0009 RFP SPE600-15-R-0409 Page 2 of 4

1. The changes set forth herein are incorporated into Solicitation SPE600-15-R-0409.

Summary of requirements

2. Page 3, requirement, has hereby been updated as follows:

Minimum Annual Production by Contractor shall be:

• 187,000,000 kWh in total to Bases in PEPCO service territory, and

• 51,000,000 kWh in total to the Base located in BGE service territory

Contractor shall be expected to annually supply renewable energy in the amount of 249,333,334 kWh in total to Bases in PEPCO service territory and 68,000,000 kWh in total to the Base located in BGE service territory.

Such quantities will result in meeting offsite renewable facility annual supply requirements of at least 187,000,000 kWh within PEPCO and 51,000,000 kWh BGE service territories (reference C.8). NOTE: where the annual supply requirements are equal to 75% of the Expected Annual Production (reference C.4.1).

Definitions

3. Page 8, definitions, “New Renewable Generation” has been hereby updated as follows:

“New Renewable Generation” means a renewable generation resource must not be or ever have been previously placed in service at the time that the Notice of Intent to Award is issued from which the Department of Navy is the first off-taker of electrons upon project Commercial Operation Date. In the case where the proposed facility is part of a larger facility, only the new capacity generation would qualify and the proposed facility must be sub-metered such that the energy produced and delivered to the Government can be verified.

Section B

4. Page 12, B.1.2 CLIN Description, Firm Fixed Price Transaction Fee has been hereby updated as follows:

Offeror’s shall propose a transaction fee per kWh for all energy generated, supplied, and delivered through PJM. The price offered for these CLINs shall be the same for the entire term. For any conventionally generated electricity, offeror shall comply with C.17.

Section C

5. Page 17, C.4.1 Minimum Annual Production has been hereby updated as follows:

Minimum Annual Production is equal to the lesser of 75% of the Contractor’s Expected Annual Production or the Minimum Purchase Guarantee by the Government and the Contractor shall comply with this requirement at all times.

Navy PJM NDW RESA Amendment 0009 RFP SPE600-15-R-0409 Page 3 of 4

6. Page 18 and 19, C.8 Offsite Renewable Facility has been hereby updated as follows:

The Contractor shall secure a facility outside of the Installations to construct, operate, and maintain a REGS for the purpose of generating renewable energy capable of annual renewable energy production of at least 187,000,000 kWh distributed to Installations within Pepco and 51,000,000kWh distributed to the Installation served by BGE. To be eligible for consideration, the proposed facility must not be or ever have been previously placed in service at the time that the Notice of Intent to Award is issued must allow for the Department of Navy to be the first off-taker of electrons upon project Commercial Operation Date. In the case where the proposed facility is part of a larger facility, the proposed facility must be sub-metered such that the energy produced and delivered to the Government can be verified.

Section G

7. Page 27, G.2 Funding has been hereby removed and “Reserved” for future.

8. Page 29, G.6 Annual Reconciliation has been hereby updated as follows:

In the event the Contractor does not produce from the REGS the lesser of 75% of the Contractor’s Expected Annual Production or the Minimum Purchase Guarantee by the Government, or the Contractor fails to deliver the necessary conventionally generated energy, then the Contractor will be subject to cure processes under C.4.6. in default. Any renewable energy in excess of the Navy’s total requirement can be sold into the marketplace.

Section I

9. Page 51, I1.20-1 Clauses and Provisions Incorporated by Reference, FAR 52.232-18 Availability of

Funds has hereby been removed.

Section L

10. Page 79, L.4.1.6 has been hereby added as follows:

Assumptions will be considered by the Government solely for evaluation purposes. Unless identified as an exception in accordance with the Solicitation Section L.4.2.10, and accepted as such by the Contracting Officer, assumptions will not be deemed to be a part of any resultant contract and will not form the basis for any pricing adjustments.

Navy PJM NDW RESA Amendment 0009 RFP SPE600-15-R-0409 Page 4 of 4

Section M

11. Page 89, M.1.4.1 has been hereby updated as follows:

The Government will rate each subfactor independently and on a UDC basis. Each subfactor will be rated independently, and Only those offerors with Acceptable ratings or higher within a UDC offering for each subfactor, will be considered for award for that UDC. The offeror’s technical solution will be rated separately from the risk associated with its technical approach. The technical rating evaluates the quality of the offeror’s technical solution for meeting the Government’s requirement. The risk rating considers the risk associated with the technical approach in meeting the requirement and assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance.

Amendment 0008---0409.pdf
Amendment 0001 SPE600-15-R-0409 Updated.pdf
“Blended Contract Unit Price” means the total price in any given year of CLIN 0001/0005 Renewable Energy (with RECS), CLIN 0002/0006 Firm Fixed Price Transaction Fee, and CLIN 0003/0007, the estimated sum of Other Market Charges. The blended price ref...
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0009
Code[0]: SPE600
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Lawrence T. Fratis
Description[0]:

SEE CONTINUATION PAGES

FacilityCode[0]:
Code[2]:
IssuedBy[0]: DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

PURCHASE PROGRAM 8.1

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: SPE600-15-R-0409
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 4
EffectiveDate[0]: Aug 24,2015
Dated9B[0]: 12/19/2014
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .