Follow up Questions (7.12.2022).xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Small-Format B&W Printers IDIQ Federal contract opportunity
- Solicitation number
- SP7000-22-R-1004
- Issued by
- Defense Logistics Agency
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional Questions
| Document | Page # | Section/Requirement | Question/Comment | Government Response |
| Attachment 3 - CLIN Structure Lot 1 and Attachment 4 - CLIN Structure Lot 2 | N/A | General | For fair and open competition, will the Government add a CLIN for OS changes and security updates that are expected to occur during the term of the contract? Vendors have no way of projecting the exact number and magnitude of security vulnerabilities that may occur over time. Since we cannot predict these unknown variables, will the Government provide a price not to exceed (NTE)? | The Government cannot provide a specific numbers of patches or NTE as the number of required patches is determined by vendor vulnerabilites and severity level as to whether they are are urgent requirments or can be bundled with the regular quarterly updates as scheduled. Also, certain findings that are vulnerable CAT I require more immediate attention in regards to remediation. The Offeror should build cost within the maintenance agreement. |
| Questions Round 2 | N/A | General | Given the response to Round 2 Questions submitted on June 30 and released on July 11, will the Government extend the proposal due date for additional 10 days? | The Government cannot extend the proposal due date for an additional 10 days. However, we are able to extend the proposal due date to July 25th at 10AM EDT. |
| Questions Round 2 | N/A | General | Will the Government please confirm that the First Round Q&A released and the Second Round Q&A released by the Government include all questions from all vendors? | Yes, all questions from round 1 and round 2 were answered and posted. |
| Attachment 2 - Equipment Specifications (07.11.2022) | Line 47 | Lot 1 Usage Band 1 | The spiral die cut size is up to 44 inches. Will the Government please clarify which size die cut is required for each product in Lot 1 Usage Band 1 | The Government requires only the #2 (44-47 Hole GBC Color Coil Die cut) 4:1 Ratio oval for all machines. |
| Attachment 2 - Equipment Specifications (07.11.2022) | Line 47 | Lot 1 Usage Band 2 | The spiral die cut size is up to 44 inches. Will the Government please clarify which size die cut is required for each product in Lot 1 Usage Band 2 | The Government requires only the #2 (44-47 Hole GBC Color Coil Die cut) 4:1 Ratio oval for all machines. |
| Attachment 2 - Equipment Specifications (07.11.2022) | Line 44 | Lot 2 Usage Band 3 | The spiral die cut size is up to 44 inches. Will the Government please clarify which size die cut is required for each product in Lot 2 Usage Band 3? | The Government requires only the #2 (44-47 Hole GBC Color Coil Die cut) 4:1 Ratio oval for all machines. |
| Attachment 2 - Equipment Specifications (07.11.2022) | Line 44 | Lot 2 Usage Band 4 | The spiral die cut size is up to 44 inches. Will the Government please clarify which size die cut is required for each product in Lot 2 Usage Band 4? | The Government requires only the #2 (44-47 Hole GBC Color Coil Die cut) 4:1 Ratio oval for all machines. |
| Attachment 3 - CLIN Structure Lot 1 (7.11.2022), Months 1-12 Matrix tab | N/A | General | Based on the die cut requirement for each Usage Band, will the Government update Attachment 3 - CLIN Structure Lot 1 to enable vendors to provide accurate pricing? | The Government has updated Attachment 3. Please see the attachment dated 7.12.2022. |
| Attachment 4 - CLIN Structure Lot 2 (7.11.2022), Months 1-12 Matrix tab | N/A | General | Based on the die cut requirement for each Usage Band, will the Government update Attachment 4 - CLIN Structure Lot 2 to enable vendors to provide accurate pricing? | The Government has updated Attachment 4. Please see the attachment dated 7.12.2022. |
| Attachment 3 - CLIN Structure Lot 1 (7.11.2022), Months 1-12 Matrix tab | Line 36 | Lot 1: Usage Band 1 and Usage Band 2 | Based on the Government's response in Line 19 of Round 2 - Q&A, will the Government please remove the additional requirement for a Monitor, Keyboard, Mouse and Stand? | The Government will not lessen the requirements for Monitor, Keyboard, Mouse, and Stand as the operators at some locations utilize these for job processing and management. Also, troubleshooting can be performed easier with this option provided if needed. |
| Attachment 4 - CLIN Structure Lot 2 (7.11.2022), Months 1-12 Matrix tab | Line 42 | Lot 2: Usage Band 3 and Usage Band 4 | Based on the Government's response in Line 20 of Round 2 - Q&A, will the Government please remove the additional requirement for a Monitor, Keyboard, Mouse and Stand? | The Government will not lessen the requirements for Monitor, Keyboard, Mouse, and Stand as the operators at some locations utilize these for job processing and management. Also, troubleshooting can be performed easier with this option provided if needed. |
Solicitation No. SP7000-22-R-1004 Round 1 Questions: Due June 7, 2022 NLT 10 A.M. Page &P of &N
Solicitation No. SP7000-22-R01004 Round 1 Questions Due: June 7, 2022 NLT 10 A.M.
image1.png
File details come from the government source that posted it. Updated .