Attachment J.7 CDRL A003 - Electrostatic Discharge (ESD) Control Program - 6.20.23 - Conformed via Amendment 0001.pdf

PDF 245 KB Posted

Attached to
DLA Distribution Guam Marianas Distribution and Warehousing Services
Solicitation number
SP330023R5001
Issued by

View the file

Other files

File Type Posted
SF33 SP330023R5001 conformed via Amendment 0003.pdf PDF
SP330023R5001 Attachment J.5 TE 4.1 Contractor Training.docx DOCX document
SP330023R5001 Amendment 0003.pdf PDF
SP3300-23-R-5001 Sections B - M conformed via Amendment 0003.docx DOCX document
SP3300-23-R-5001 Sections B - M conformed via Amendment 0002.docx DOCX document
SF33 SP330023R5001 conformed via Amendment 0002.pdf PDF
SP330023R5001 Amendment 0002.pdf PDF
Attachment J.7 CDRL A023 - Storage and Warehousing Plan - 6.20.23 - Conformed via Amendment 0001.pdf PDF
QA Document-Amendment 0001 - FINAL.pdf PDF
SP330023R5001 Amendment 0001.pdf PDF
Attachment J.5 TE 5.0 APLs - 6.20.23 - Conformed via Amendment 0001.docx DOCX document
DDGM - J.1 - 6.20.23 - Conformed via Amendment 0001.docx DOCX document
SP3300-23-R-5001 Sections B - M conformed via Amendment 0001.docx DOCX document
DDGM Pre-Proposal Conf Agenda - 5.23.23 - Final.doc DOC document
SP330023R5001 Attachment J.6 - Past Performance Questionnaire.docx DOCX document
SP330023R5001 FINAL for posting 5-22-2023.pdf PDF
SP330023R5001 Attachment J.8 Staffing Matrix.xls XLS spreadsheet
SP330023R5001 Attachment J.10 - Accounting System Self-Certification.docx DOCX document
SP330023R5001 Attachment J.9 Proposed Training Hours.xlsx XLSX spreadsheet
SP330023R5001 Attachment J.5 TEs.ZIP ZIP file
SP330023R5001 Attachment J.3 - DDGM CBA 2020-2025.pdf PDF
SP330023R5001 Attachment J.12 - DD254.pdf PDF
SP330023R5001 Attachment J.7 CDRLs.ZIP ZIP file
SP330023R5001 Attachment J.2.docx DOCX document
SP330023R5001 Attachment J.11 - CUI Marking Guidance.pptx PPTX presentation
SP330023R5001 Attachment J.1.docx DOCX document
SP330023R5001 Attachment J.4, CLIN X006 Labor Rate Table.xlsx XLSX spreadsheet
SP330023R5001 Attachment J.3 - Wage Determination.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A003
2_TITLE_OF_DATA_ITEM: Electrostatic Discharge (ESD) Control Program
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: J.1 Paragraph C-1.7
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J7 Contract Spec
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit contractor's format. Submit electronically

Submit NLT 30 days prior to the start of full performance, an ESD Control Program document that details the Contractor's process to ensure all regulatory requirements are followed; ensure all personnel who handle and process ESDS material are fully trained; and coordination of any audits that may be performed by other government agencies, manufacturers and users of ESDS material.

The ESD Program shall address the Contractor’s approach to conform to MIL-STD 1686, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) and requirements addressed in C-1.7.

Updates or revisions to the contractors plan that address the process for ensuring all regulatory requirements are followed shall be submitted within 30 calendar days of the change.

Block 7 - Inspection and acceptance requirements:

The KO will review and accept the ESD Program and updates after coordination with J-4 Policy & Procedures and J-3 Depot Operations review and comments.

Block 14 - Distribution - Contractor to submit original to Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X007
B_EXHIBIT: Attachment J.7
TDP:
TM:
OTHER:
DSYSTEMITEM: DDGM
E_CONTRACTPR_NO: SP3300-23-R-5001
FCONTRACTOR:
of_pages: 1
Reset:
2018-10-29T15:47:11-0400
CRUSEY.SHANE.M.1287981151
2019-02-13T13:52:00-0500
POWERS.CULLEN.MARTIN.1093893227

File details come from the government source that posted it. Updated .