Amendment_0003_attachments.pdf
PDF 5 MB Posted
- Attached to
- Site-Wide Replacement of Utility Poles Federal contract opportunity
- Solicitation number
- SP3300-17-B-0006
- Issued by
- Defense Logistics Agency Distribution
About this file
Amendment 0003 Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Revised_Dwg_ES-101_&_ES-108-_Amendment_0001.pdf | ||
| Site_Visit_Notes.pdf | ||
| (12)_Attachment_L_Drawings.pdf | ||
| (10)_Attachment_J_Wage_Determinations.pdf | ||
| (2)_Attachment_B_Short_Form_Badge_Request.pdf | ||
| (6)_Attachment_F_DLA_SP_Camera_Pass_Request_Form.pdf | ||
| (5)_Attachment_E_Deliv_Notification_Form.docm | DOCM document | |
| (7)_Attachment_G_SF24_-_Bid_Bond.pdf | ||
| (8)_Attachment_H_SF25_(Performance_Bond).pdf | ||
| SP3300-17-B-0006.pdf | ||
| (3)_Attachment_C_Long_Form_Badge_Request.pdf | ||
| (4)_Attachment_D_Badge_Renewal.doc | DOC document | |
| (1)_Attachment_A_New_Personnel_Notification_Form.docm | DOCM document | |
| (9)_Attachment_I_SF25A_(Payment_Bond).pdf | ||
| (11)_Attachment_K_Project_Specifications_and_Submittals.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ONeillJ1 JAO Stamp 5-31-2016
Site-Wide Replacement of Utility Poles Amendment #3 Defense Distribution Center, Susquehanna, New Cumberland, PA July 26, 2017
SECTION 26 00 00
BASIC ELECTRICAL MATERIALS AND METHODS
07/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE C2 (2017) National Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA 250 (2014) Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017) National Electrical Code
1.2 RELATED REQUIREMENTS
This section applies to certain sections of Division 02, EXISTING CONDITIONS.
This section applies to all sections of Division 26 and 33, ELECTRICAL and UTILITIES, of this project specification unless specified otherwise in the individual sections. This section has been incorporated into, and thus, does not apply to, and is not referenced in the following section:
Section 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
1.3 DEFINITIONS
a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in IEEE 100.
b. The technical sections referred to herein are those specification sections that describe products, installation procedures, and equipment operations and that refer to this section for detailed description of submittal types.
c. The technical paragraphs referred to herein are those paragraphs in PART 2 - PRODUCTS and PART 3 - EXECUTION of the technical sections that describe products, systems, installation procedures, equipment, and test methods.
1.4 ELECTRICAL CHARACTERISTICS
Electrical characteristics for this project shall be 12,470 Y/ 7200 V
SECTION 26 00 00 Page 1 primary, three phase, four wire, 60 Hz, 240/120 V 1-phase and 208/120 V 3-phase. Refer to "New Poles and Equipment" schedule on drawing E-401.
Final connections to the power distribution system at the existing Overhead Power Poles shall be made by the Contractor as directed by the Contracting Officer .
1.5 ADDITIONAL SUBMITTALS INFORMATION
Submittals required in other sections that refer to this section must conform to the following additional requirements as applicable.
1.5.1 Shop Drawings (SD-02)
1.6 QUALITY ASSURANCE
1.6.1 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.6.2 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in the technical section.
1.6.2.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.6.2.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.
1.7 WARRANTY
The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
SECTION 26 00 00 Page 2 svobodam Underline
1.8 MANUFACTURER'S NAMEPLATE
Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.9 ELECTRICAL REQUIREMENTS
Electrical installations shall conform to IEEE C2, NFPA 70, and requirements specified herein.
PART 2 PRODUCTS
2.1 FACTORY APPLIED FINISH
Electrical equipment shall have factory-applied painting systems which shall, as a minimum, meet the requirements of NEMA 250 corrosion-resistance test and the additional requirements specified in the technical sections.
PART 3 EXECUTION
3.1 FIELD FABRICATED NAMEPLATE MOUNTING
Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.
-- End of Section --
SECTION 26 00 00 Page 3
SECTION 33 71 01
OVERHEAD TRANSMISSION AND DISTRIBUTION
07/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALLIANCE FOR TELECOMMUNICATIONS INDUSTRY SOLUTIONS (ATIS)
ATIS ANSI O5.1 (2008) Wood Poles -- Specifications & Dimensions
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI C135.14 (1979) Staples with Rolled or Slash Points for Overhead Line Construction
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA C1 (2003) All Timber Products - Preservative Treatment by Pressure Processes
AWPA C4 (2003) Poles - Preservative Treatment by Pressure Processes
ASME INTERNATIONAL (ASME)
ASME B16.11 (2011) Forged Fittings, Socket-Welding and Threaded
ASTM INTERNATIONAL (ASTM)
ASTM A475 (2003; R 2014) Standard Specification for Zinc-Coated Steel Wire Strand
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A575 (1996; E 2013; R 2013) Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
ASTM A576 (1990b; R 2012) Standard Specification for Steel Bars, Carbon, Hot-Wrought, Special Quality
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B3 (2013) Standard Specification for Soft or Annealed Copper Wire
SECTION 33 71 01 Page 1
ASTM D117 (2010) Standard Guide for Sampling, Test Methods, Specifications and Guide for Electrical Insulating Oils of Petroleum Origin
ASTM D1654 (2008; R 2016) Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM D3487 (2016) Standard Specification for Mineral Insulating Oil Used in Electrical Apparatus
ASTM D709 (2016) Standard Specification for Laminated Thermosetting Materials
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
IEEE 404 (2012) Standard for Extruded and Laminated Dielectric Shielded Cable Joints Rated 2500 V to 500,000 V
IEEE C135.1 (1999) Standard for Zinc-Coated Steel Bolts and Nuts for Overhead Line Construction
IEEE C135.2 (1999) Threaded Zinc-Coated Ferrous Strand-Eye Anchor Rods and Nuts for Overhead Line Construction
IEEE C135.22 (1988) Standard for Zinc-Coated Ferrous Pole-Top Insulator Pins with Lead Threads for Overhead Line Construction
IEEE C2 (2017) National Electrical Safety Code
IEEE C37.42 (2009) Standard Specifications for High-Voltage (> 1000 V) Expulsion-Type Distribution-Class Fuses, Fuse and Disconnecting Cutouts, Fuse Disconnecting Switches, and Fuse Links, and Accessories Used with These Devices
IEEE C57.12.00 (2015) General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.20 (2011) Standard for Overhead Type Distribution Transformers, 500 KVA and Smaller: High Voltage 34 500 Volts and Below: Low Voltage, 7970/13,800 Y Volts and Below
IEEE C57.12.90 (2015) Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
SECTION 33 71 01 Page 2
IEEE C62.11 (2012) Standard for Metal-Oxide Surge Arresters for Alternating Current Power Circuits (>1kV)
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2013) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C29.3 (1986; R 2012) American National Standard for Wet Process Porcelain Insulators - Spool Type
ANSI C29.4 (1989; R 2012) Standard for Wet-Process Porcelain Insulators - Strain Type
ANSI C29.5 (1984; R 2002) Wet-Process Porcelain Insulators (Low and Medium Voltage Pin Type)
ANSI/NEMA WC 71/ICEA S-96-659 (2014) Standard for Nonshielded Cables Rated 2001-5000 Volts for use in the Distribution of Electric Energy
NEMA C135.4 (1987) Zinc-Coated Ferrous Eyebolts and Nuts for Overhead Line Construction
NEMA WC 70 (2009) Power Cable Rated 2000 V or Less for the Distribution of Electrical Energy--S95-658
NEMA WC 74/ICEA S-93-639 (2012) 5-46 kV Shielded Power Cable for Use in the Transmission and Distribution of Electric Energy
NEMA/ANSI C29.7 (1996; 2002) American National Standard for Wet Process Porcelain Insulators - High-Voltage Line Post Type
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 467 (2013) Grounding and Bonding Equipment
UL 486A-486B (2013; Reprint Jan 2016) Wire Connectors
UL 510 (2005; Reprint Jul 2013) Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape
UL 6 (2007; Reprint Nov 2014) Electrical Rigid Metal Conduit-Steel
SECTION 33 71 01 Page 3
1.2 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in
IEEE 100.
1.2.1 Pre-Installation Meetings
Within 30 calendar days after the date of receipt by him of notice of award, submit for the approval of the Contracting Officer six (6) copies of specified drawings of all equipment to be furnished under this contract, together with weights and overall dimensions. Submit the following data and drawings:
a. Connection Diagrams.
b. Fabrication Drawings.
c. Installation Drawings.
Submit certification from the manufacturer indicating conformance with the specified poles and transformer losses.
a. Wood Poles.
b. Transformer Losses.
Submit Operation and Maintenance data in accordance with standard Government requirements.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
a. A certification, from the manufacturer, that the technical requirements of this specification shall be met.
b. Routine and other tests (paragraph entitled "Routine and Other Tests, shall be conducted by the manufacturer and may be witnessed by the Government (paragraph entitled "Source Quality Control"). Provide certified copies of the tests.
c. Provide field test reports (paragraph entitled "Field Quality Control").
SD-03 Product Data
Conductors; G
Insulators; G
Wood Poles; G
Pole Labeling; G
Cutouts; G
Transformer; G
SECTION 33 71 01 Page 4
Surge arresters; G
Guy strand; G
Anchors; G
SD-05 Design Data
SD-06 Test Reports
Field Test Plan; G
Field Quality Control; G
Ground resistance test reports; G
Submit report of the acceptance test results as specified by paragraph entitled "Field Quality Control"
SD-07 Certificates
Wood poles; G
Transformer Losses; G
Submit certification from the manufacturer indicating conformance with the paragraph entitled "Specified Transformer Losses."
SD-09 Manufacturer's Field Reports
Overhead-type distribution transformer routine and other tests; G
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals, Data Package 5; G
Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein.
SD-11 Closeout Submittals
Transformer test schedule; G
1.4 QUALITY ASSURANCE
1.4.1 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 and IEEE C2 unless more stringent requirements are specified or indicated.
1.4.2 Standard Products
Provide materials and equipment that are products of manufacturers
SECTION 33 71 01 Page 5 regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.4.2.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.4.2.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site shall not be used, unless specified otherwise.
1.4.3 Ground Resistance Test Reports
Submit the measured ground resistance of grounding system. When testing grounding electrodes and grounding systems, identify each grounding electrode and each grounding system for testing. Include the test method and test setup (i.e. pin location) used to determine ground resistance and soil conditions at the time the measurements were made.
1.4.4 Field Test Plan
Provide a proposed field test plan 30 days prior to testing the installed system. No field test shall be performed until the test plan is approved.
The test plan shall consist of complete field test procedures including tests to be performed, test equipment required, and tolerance limits.
1.5 MAINTENANCE
1.5.1 Additions to Operations and Maintenance Data
In addition to requirements of Data Package 5, include the following in the operation and maintenance manuals provided:
a. Assembly and installation drawings
b. Prices for spare parts and supply list
c. Date of purchase
1.6 DELIVERY, STORAGE, AND HANDLING
Devices and equipment shall be visually inspected by the Contractor when received and prior to acceptance from conveyance. Stored items shall be protected from the environment in accordance with the manufacturer's published instructions. Damaged items shall be replaced. Oil filled transformers shall be stored in accordance with the manufacturer's requirements. Wood poles held in storage for more than 2 weeks shall be stored in accordance with ATIS ANSI O5.1. Handling of wood poles shall be
SECTION 33 71 01 Page 6 in accordance with ATIS ANSI O5.1, except that pointed tools capable of producing indentations more than inch in depth shall not be used. Nails and holes are not permitted in top of poles.
1.7 WARRANTY
The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
Consider materials specified herein or shown on contract drawings which are identical to materials listed in RUS 202-1 as conforming to requirements.
Equipment and component items, not hot-dip galvanized or porcelain enamel finished, shall be provided with corrosion-resistant finishes which shall withstand 120 hours of exposure to the salt spray test specified in ASTM B117 without loss of paint or release of adhesion of the paint primer coat to the metal surface in excess of 1/16 inch from the test mark. The described test mark and test evaluation shall be in accordance with ASTM D1654 with a rating of not less than 7 in accordance with TABLE 1, (procedure A). Cut edges or otherwise damaged surfaces of hot-dip galvanized sheet steel or mill galvanized sheet steel shall be coated with a zinc rich paint conforming to the manufacturer's standard.
2.2 POLES
Poles shall be of lengths and classes indicated.
2.2.1 Wood Poles
Wood poles machine trimmed by turning, Douglas Fir or Southern Yellow Pine conforming to ATIS ANSI O5.1 and RUS Bull 345-67. Gain, bore and roof poles before treatment. Should additional gains be required subsequent to treatment, metal gain plates shall be provided. Pressure treat poles with pentachlorophenol, or chromated copper arsenate (CCA), except that Douglas Fir shall not be treated with CCA in accordance with AWPA C1 and AWPA C4 as referenced in RUS Bull 345-67. The quality of each pole shall be ensured with "WQC" (wood quality control) brand on each piece, or by an approved inspection agency report.
2.3 HARDWARE
Zinc-coated hardware shall comply with IEEE C135.1, IEEE C135.2, NEMA C135.4, ANSI C135.14 IEEE C135.22. Steel hardware shall comply with ASTM A575 and ASTM A576. Pole-line hardware shall be hot-dip galvanized steel, except anchor rods of the copper-molten welded-to-steel type with nonferrous corrosion-resistant fittings shall be used. Washers shall be installed under boltheads and nuts on wood surfaces and elsewhere as required.
Washers used on through-bolts and double-arming bolts shall be approximately 2-1/4 inches square and 3/16 inch thick. The diameter of holes in washers shall be the correct standard size for the bolt on which a washer is used.
Washers for use under heads of carriage-bolts shall be of the proper size to fit over square shanks of bolts. Eye bolts, bolt eyes, eyenuts, strain-load plates, lag screws, guy clamps, fasteners, hooks, shims, and clevises shall be used wherever required to support and to protect poles, SECTION 33 71 01 Page 7 brackets, crossarms, guy wires, and insulators.
2.4 INSULATORS
Provide wet-process porcelain or poly-epoxy insulators which are radio interference free.
a. Line post type insulators: NEMA/ANSI C29.7, Class 57-1.
b. Spool insulators: ANSI C29.3, Class 53-2.
c. Guy strain insulators: ANSI C29.4, Class 54-4, except provide fiberglass type when used with underground terminal or when other interference problems exist.
d. Pin insulators: ANSI C29.5, Class 55-5.
2.5 OVERHEAD CONDUCTORS, CONNECTORS AND SPLICES
2.5.1 Spacer System
Currently installed on Base is a Hendrix insulated aerial spacer system that is being modified under this project. Existing cabling that will be altered, spliced, and replaced with new will be required to be compatible and able to be installed within the existing cable spacer support system.
Therefore, Hendrix cables complying with the following shall be provided as outlined and described on the site plan drawings.
2.5.2 Aluminum (AAC) Round or Compacted
15 KV Type TP insulated hard drawn stranded aluminum round or compacted type by cable rating/size. Cables shall be constructed with a semiconducting polyethylene layer, low density polyethylene insulation, and black track resistant high density polyethylene jacket. Four sizes are included on the drawings: 477.5 kcmil, 397.5 kcmil, 2/0 AWG, and #2 AWG.
2.5.3 Connectors and Splices
Connectors and splices shall be of aluminum alloys for aluminum-composition conductors, and a type designed to minimize galvanic corrosion for copper to aluminum-composition conductors. Aluminum-composition shall comply with
UL 486A-486B.
2.6 NEUTRAL-SUPPORTED SECONDARY AND SERVICE DROP CABLES
Service and streetlight cables shall be aluminum, two conductor triplex or quadruplex with cross-linked polyethylene insulation on the phase conductors, as noted on the plans. Secondary neutral shall be insulated, the same as the phase conductors, and shall be the same size as the phase conductors unless otherwise indicated. Cables shall conform to NEMA WC 70 and ANSI/NEMA WC 71/ICEA S-96-659 for EPR insulation.
2.7 GUY STRAND
ASTM A475, extra high-strength, Class 30 high-strength. Guy strand shall be 3/8 inch in diameter with a minimum breaking strength of 10,000 pounds.
Provide guy terminations designed for use with the particular strand and developing at least the ultimate breaking strength of the strand.
SECTION 33 71 01 Page 8
2.8 ROUND GUY MARKERS
Vinyl or PVC material, yellow colored, 8 feet long and shatter resistant at sub-zero temperatures.
2.8.1 Guy Attachment
Thimble eye guy attachment.
2.9 ANCHORS AND ANCHOR RODS
Anchors shall present holding area indicated on drawings as a minimum.
Anchor rods shall be triple thimble-eye, 3/4 inch diameter by 8 feet long.
Anchors and anchor rods shall be hot dip galvanized.
2.9.1 Screw Anchors
Screw type anchors having a manufacturer's rating of not less than 10,000 pounds in loose to medium sand/clay soil, Class 6 and extra heavy pipe rods conforming to ASTM A53/A53M, Schedule 80, and couplings conforming to ASME B16.11, fitting Class 6000.
2.10 GROUNDING AND BONDING
2.10.1 Driven Ground Rods
Provide copper-clad steel ground rods conforming to UL 467 not less than 3/4 inch in diameter by 10 feet in length. Sectional type rods may be used for rods 20 feet or longer.
2.10.2 Grounding Conductors
ASTM B3. Provide soft drawn copper wire ground conductors a minimum No. 4 AWG. Ground wire protectors shall be PVC.
2.10.3 Grounding Connections
UL 467. Exothermic weld or compression connector.
2.11 SURGE ARRESTERS
IEEE C62.11, metal oxide, polymeric-housed, surge arresters arranged for equipment mounting. RMS voltage rating shall be 9 kV. Arresters shall be Distribution class.
2.12 FUSED CUTOUTS
Open type fused cutouts rated 200 amperes and 14,000 amperes symmetrical interrupting current at 8.3/15 kV gnd Y , conforming to IEEE C37.42. Type K fuses conforming to IEEE C37.42 with ampere ratings equal to 150 percent of the transformer full load rating. Open link type fuse cutouts are not acceptable. Provide load-break duty open drop-out type, rated 15 kV, 200 Amp, 7,100 Amp I.C. (Sym.) with shield.`
2.13 CONDUIT RISERS AND CONDUCTORS
The riser shield shall be PVC containing a PVC back plate and PVC extension shield or a rigid galvanized steel conduit, as indicated, and conforming to
UL 6.
SECTION 33 71 01 Page 9
2.14 TRANSFORMER (OVERHEAD-TYPE DISTRIBUTION)
a. IEEE C57.12.20.
b. Single phase, self-cooled, 65 degrees C. continuous temperature rise, two winding, 60 Hertz.
c. Insulating liquid:
Mineral oil: ASTM D3487, Type II, tested in accordance with ASTM D117.
Provide identification of transformer as "non-PCB" and "Type II mineral oil" on the nameplate.
d. Ratings:
(1) kVA: As noted on plans.
(2) BIL: 95 kV.
(3) Primary voltage: 12.47 kV or 7200 V as noted on plans kV.
(4) Secondary voltage: 240/120 or 208/120 V as noted on plans volts.
e. Single-phase connections:
(1) Connect primary: Phase-to-phase or Phase-to-ground as noted on plans.
(2) Provide transformer with 1 or 2 high voltage bushing(s) as noted on plans.
f. Three-phase connections:
(1) Connect primary: Grounded wye .
(2) Connect secondary: Grounded wye , for 208/120 volt, three phase, 4 wire service.
(3) Provide transformer with a single high voltage bushing.
g. Taps:
(1) Provide four 2 1/2 percent full capacity taps, 2 above and 2 below rated primary voltage. Tap changer shall have external handle.
h. Corrosion Protection:
Paint coating system shall comply with IEEE C57.12.28 regardless of tank and cover material. Finish coat shall be light gray, ANSI color No. 70.
i. Show transformer kVA capacity using 2 1/2 inch Arabic numerals placed near the low-voltage bushings.
SECTION 33 71 01 Page 10
2.15 UTILITY POLE MARKING TAGS
2.15.1 Pole Labeling
All wood poles that are existing to remain and new shall be relabeled.
The site plan drawings have indicated the labels at each pole that are to be installed. Standard poly holders with 2" high lettering of UV resistant polyethylene flexible material shall be installed at 60" above grade facing the roadside. Lettering shall be permanently engraved, tamperproof, black on yellow. This product is available from LEM Products Inc., E-Z Tag, or an approved equal substitute vender
2.16 ELECTRICAL TAPES
Tapes shall be UL listed for electrical insulation and other purposes in wire and cable splices. Terminations, repairs and miscellaneous purposes, electrical tapes shall comply with UL 510.
2.17 CAULKING COMPOUND
Compound for sealing of conduit risers shall be of a puttylike consistency workable with hands at temperatures as low as 35 degrees F, shall not slump at a temperature of 300 degrees F, and shall not harden materially when exposed to air. Compound shall readily caulking or adhere to clean surfaces of the materials with which it is designed to be used. Compound shall have no injurious effects upon the workmen or upon the materials.
2.18 NAMEPLATES
2.18.1 Manufacturer's Nameplate
Each item of equipment shall have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable. Equipment containing liquid-dielectrics shall have the type of dielectric on the nameplate.
2.18.2 Field Fabricated Nameplates
ASTM D709. Provide laminated plastic nameplates for each equipment enclosure, relay, switch, and device; as specified or as indicated on the drawings. Each nameplate inscription shall identify the function and, when applicable, the position. Nameplates shall be melamine plastic, 0.125 inch thick, white with black center core. Surface shall be matte finish.
Corners shall be square. Accurately align lettering and engrave into the core. Minimum size of nameplates shall be one by 2.5 inches. Lettering shall be a minimum of 0.25 inch high normal block style.
2.19 SOURCE QUALITY CONTROL
2.19.1 Transformer Test Schedule
The Government reserves the right to witness tests. Provide transformer test schedule for tests to be performed at the manufacturer's test facility. Submit required test schedule and location, and notify the Contracting Officer 30 calendar days before scheduled test date. Notify Contracting Officer 15 calendar days in advance of changes to scheduled date.
SECTION 33 71 01 Page 11 svobodam Underline
Test Instrument Calibration
a. The manufacturer shall have a calibration program which assures that all applicable test instruments are maintained within rated accuracy.
b. The accuracy shall be directly traceable to the National Institute of Standards and Technology.
c. Instrument calibration frequency schedule shall not exceed 12 months for both test floor instruments and leased specialty equipment.
d. Dated calibration labels shall be visible on all test equipment.
e. Calibrating standard shall be of higher accuracy than that of the instrument tested.
f. Keep up-to-date records that indicate dates and test results of instruments calibrated or tested. For instruments calibrated by the manufacturer on a routine basis, in lieu of third party calibration, include the following:
(1) Maintain up-to-date instrument calibration instructions and procedures for each test instrument.
(2) Identify the third party/laboratory calibrated instrument to verify that calibrating standard is met.
2.19.2 Routine and Other Tests
IEEE C57.12.00 and IEEE C57.12.90. Routine and other tests shall be performed by the manufacturer on the actual transformer(s) prepared for this project to ensure that the design performance is maintained in production. Submit test reports, by serial number and receive approval before delivery of equipment to the project site. Required tests shall be as follows:
a. Polarity
b. Ratio
c. No-load losses (NLL) and excitation current
d. Load losses (LL) and impedance voltage
e. Dielectric
(1) Impulse
(2) Applied voltage
(3) Induced voltage
f. Leak
PART 3 EXECUTION
3.1 INSTALLATION
Provide overhead pole line installation conforming to requirements of
SECTION 33 71 01 Page 12
IEEE C2 for Grade B construction of overhead lines in medium loading districts and NFPA 70 for overhead services. Provide material required to make connections into existing system and perform excavating, backfilling, and other incidental labor. Consider street, alleys, roads and drives "public." Pole configuration shall be as indicated.
3.1.1 Overhead Service
Terminate overhead service conductors into buildings at existing service entrance fittings or weatherhead outside building. Installation and connection of new secondary cable to existing shall be spliced using rated materials. Nearby support bracket for overhead wires shall be not less than six feet above finished grade at building. Drip loops shall be formed on conductors at entrances to buildings or conduits.
3.1.2 Tree Trimming
Where lines pass through trees, trees shall be trimmed at least 15 feet clear on both sides horizontally and below for medium-voltage lines, and clear on both sides horizontally and below for other lines. No branch shall overhang horizontal clearances. G.
3.1.3 Wood Pole Installation
Provide pole holes at least as large at the top as at the bottom and large enough to provide 4 inch clearance between the pole and side of the hole.
3.1.3.1 Setting Depth of Pole
Pole setting depths shall be as follows:
Length of Pole (feet)
Setting in Soil (feet)
20 5.0
25 5.5
30 5.5
35 6.0
40 6.0
45 6.5
3.1.3.2 Setting in Soil, Sand, and Gravel
"Setting in Soil" depths, as specified in paragraph entitled "Setting Depth of Pole," apply where the following occurs:
a. Where pole holes are in soil, sand, or gravel or any combination of these;
SECTION 33 71 01 Page 13
b. Where soil layer over solid rock is more than 2 feet deep;
c. Where hole in solid rock is not substantially vertical; or
3.1.3.3 Setting in Solid Rock
"Setting in Solid Rock," as specified in paragraph entitled "Setting Depth of Pole," applies where poles are to be set in solid rock and where hole is substantially vertical, approximately uniform in diameter and large enough to permit use of tamping bars the full depth of hole.
3.1.3.4 Setting With Soil Over Solid Rock
Where a layer of soil 2 feet or less in depth over solid rock exists, depth of hole shall be depth of soil in addition to depth specified under "Setting in Solid Rock" in paragraph entitled "Setting Depth of Pole," provided, however, that such depth shall not exceed depth specified under "Setting in Soil."
3.1.3.5 Setting on Sloping Ground
On sloping ground, always measure hole depth from low side of hole.
3.1.3.6 Backfill
Thoroughly tamp pole backfill for full depth of the hole and mound excess fill around the pole.
3.1.3.7 Setting Poles
Set poles so that alternate crossarm gains face in opposite directions, except at terminals and dead ends where gains of last two poles shall be on side facing terminal or dead end. On unusually long spans, set poles so that crossarm comes on side of pole away from long span. Where pole top pins are used, they shall be on opposite side of pole from gain, with flat side against pole.
3.1.3.8 Alignment of Poles
Set poles in alignment and plumb except at corners, terminals, angles, junctions, or other points of strain, where they shall be set and raked against the strain. Set not less than 2 inches for each 10 feet of pole length above grade, nor more than 4 inches for each 10 feet of pole length after conductors are installed at required tension. When average ground run is level, consecutive poles shall not vary more than 5 feet in height.
When ground is uneven, poles differing in length shall be kept to a minimum by locating poles to avoid the highest and lowest ground points. If it becomes necessary to shorten a pole, a piece shall be sawed off the top.
Holes shall be dug large enough to permit the proper use of tampers to full depth of hole.
3.1.3.9 Pole Caps
Provide plastic pole caps with 1/4 inch sealing rings and four nailing tabs. Fill sealing area with either a bituminous, elastigum roof cement or an acceptable preservative paste to level of sealing ring to eliminate possibility of condensation. Place on pole top and nail each tab down with a 1 1/4 inch nail.
SECTION 33 71 01 Page 14
3.1.4 Anchors and Guys
Place anchors in line with strain. The length of the guy lead (distance from base of pole to the top of the anchor rod) shall be as indicated.
3.1.4.1 Setting Anchors
Set anchors in place with anchor rod aligned with, and pointing directly at, guy attachment on the pole with the anchor rod projecting 6 to 9 inches out of ground to prevent burial of rod eye.
3.1.4.2 Screw Anchors
Install screw anchors by torquing with boring machine.
3.1.4.3 Guy Installation
Provide guys where indicated, with loads and strengths as indicated, and wherever conductor tensions are not balanced, such as at angles, corners and dead-ends. Where single guy will not provide the required strength, two or more guys shall be provided. Where guys are wrapped around poles, at least two guy hooks shall be provided. Provide pole shims where guy tension exceeds 6000 pounds. Guy clamps 6 inches in length with three 5/8 inch bolts, or offset-type guy clamps, or approved guy grips shall be provided at each guy terminal. Securely clamp plastic guy marker to the guy or anchor at the bottom and top of marker.Complete anchor and guy installation, dead end to dead end, and tighten guy before wire stringing and sagging is begun on that line section. Provide strain insulators at a point on guy strand 8 feet minimum from the ground and 6 feet minimum from the surface of pole. Effectively ground and bond guys to the system neutral.
3.1.5 Hardware
Provide hardware with washer against wood and with nuts and lock nuts applied wrench tight. Provide locknuts on threaded hardware connections.
Locknuts shall be M-F style and not palnut style.
3.1.6 Grounding
Unless otherwise indicated, grounding shall conform to IEEE C2 and NFPA 70.
Pole grounding electrodes shall have a resistance to ground not exceeding 25 ohms. When work in addition to that indicated or specified is directed in order to obtain specified ground resistance, provisions of the contract covering changes shall apply.
3.1.6.1 Grounding Electrode Installation
Grounding electrodes shall be installed as follows:
a. Driven rod electrodes - Unless otherwise indicated, ground rods shall be located approximately 18 inches out from base of the pole and shall be driven into the earth until the tops of the rods are approximately 1 foot below finished grade. Multiple rods shall be evenly spaced at least 10 feet apart and connected together 2 feet below grade with a minimum No. 6 bare copper conductor.
SECTION 33 71 01 Page 15
b. Ground resistance - The maximum resistance of a driven ground rod shall not exceed 25 ohms under normally dry conditions. Whenever the required ground resistance is not met, provide additional electrodes interconnected with grounding conductors, to achieve the specified ground resistance. The additional electrodes will be up to three, 10 feet rods spaced a minimum of 10 feetapart. cIf the resultant resistance exceeds 25 ohms measured not less than 48 hours after rainfall, notify the Contracting Officer immediately.
3.1.6.2 Grounding Electrode Conductors
On multi-grounded circuits, as defined in IEEE C2, provide a single continuous vertical grounding electrode conductor. Neutrals, surge arresters, and equipment grounding conductors shall be bonded to this conductor. Grounding electrode conductors shall be stapled to wood poles at intervals not exceeding 2 feet. Grounding electrode conductors shall be sized as indicated. Secondary system neutral conductors shall be connected directly to the transformer neutral bushings, then connected with a neutral bonding jumper between the transformer neutral bushing and the vertical grounding electrode conductor as indicated. Bends greater than 45 degrees in grounding electrode conductor are not permitted.
3.1.6.3 Grounding Electrode Connections
Make above grade grounding connections on pole lines by exothermic weld or by using a compression connector. Make below grade grounding connections by exothermic weld. Make exothermic welds strictly in accordance with manufacturer's written recommendations. Welds which have puffed up or which show convex surfaces indicating improper cleaning, are not acceptable. No mechanical connectors are required at exothermic weldments. Compression connectors shall be type that uses a hydraulic compression tool to provide correct pressure. Provide tools and dies recommended by compression connector manufacturer. An embossing die code or similar method shall provide visible indication that a connector has been fully compressed on ground wire.
3.1.6.4 Grounding and Grounded Connections
a. When a primary or common neutral exists, connect all grounding and grounded conductors to a common grounding electrode.
3.1.6.5 Protective Molding
Protect grounding conductors which are run on surface of wood poles by PVC molding extending from ground line throughout communication and transformer spaces.
3.1.7 CONDUCTOR INSTALLATION
3.1.7.1 Line Conductors
Unless otherwise indicated, conductors shall be installed in accordance with manufacturer's approved tables of sags and tensions. Conductors shall be handled with care necessary to prevent nicking, kinking, gouging, abrasions, sharp bends, cuts, flattening, or otherwise deforming or weakening conductor or any damage to insulation or impairing its conductivity. Remove damaged sections of conductor and splice conductor.
Conductors shall be paid out with the free end of conductors fixed and
SECTION 33 71 01 Page 16 cable reels portable, except where terrain or obstructions make this method unfeasible. Bend radius for any insulated conductor shall not be less than the applicable NEMA specification recommendation. Conductors shall not be drawn over rough or rocky ground, nor around sharp bends. When installed by machine power, conductors shall be drawn from a mounted reel through stringing sheaves in straight lines clear of obstructions. Initial sag and tension shall be checked by the Contractor, in accordance with the manufacturer's approved sag and tension charts, within an elapsed time after installation as recommended by the manufacturer.
3.1.7.2 Connectors and Splices
Conductor splices, as installed, shall exceed ultimate rated strength of conductor and shall be of type recommended by conductor manufacturer. No splice shall be permitted within 10 feet of a support. Connectors and splices shall be mechanically and electrically secure under tension and shall be of the nonbolted compression type. The tensile strength of any splice shall be not less than the rated breaking strength of the conductor. Splice materials, sleeves, fittings, and connectors shall be noncorrosive and shall not adversely affect conductors.
Aluminum-composition conductors shall be wire brushed and an oxide inhibitor applied before making a compression connection. Connectors which are factory-filled with an inhibitor are acceptable. Inhibitors and compression tools shall be of types recommended by the connector manufacturer. Primary line apparatus taps shall be by means of hot line clamps attached to compression type bail clamps (stirrups). Low-voltage connectors for copper conductors shall be of the solderless pressure type.
Noninsulated connectors shall be smoothly taped to provide a waterproof insulation equivalent to the original insulation, when installed on insulated conductors. On overhead connections of aluminum and copper, the aluminum shall be installed above the copper.
3.1.7.3 Conductor-To-Insulator Attachments
Conductors shall be attached to insulators by means of clamps, shoes or tie wires, in accordance with the type of insulator. For insulators requiring conductor tie-wire attachments, tie-wire sizes shall be as specified in
TABLE I.
TABLE I - TIE-WIRE REQUIREMENTS
CONDUCTOR
Aluminum (AWG)
TIE WIRE
Aluminum (AWG)
6 8
4 and 2 6
1 through 3/0 4
4/0 and larger 2
AAC, AAAC, or ACSR (AWG) AAAC or AAC (AWG)
Any size 6 or 4
3.1.7.4 Armor Rods
Armor rods shall be provided for AAC, AAAC, and ACSR conductors. Armor
SECTION 33 71 01 Page 17 rods shall be installed at supports, except armor rods will not be required at primary dead-end assemblies if aluminum or aluminum-lined zinc-coated steel clamps are used. Lengths and methods of fastening armor rods shall be in accordance with the manufacturer's recommendations. For span lengths of less than 200 feet, flat aluminum armor rods may be used. Flat armor rods, not less than 0.03 by 0.25 inch shall be used on No. 1 AWG AAC and AAAC and smaller conductors and on No. 5 AWG ACSR and smaller conductors.
On larger sizes, flat armor rods shall be not less than 0.05 by 0.30 inches.
For span lengths of 200 feet or more, preformed round armor rods shall be used.
3.1.7.5 Ties
Provide ties on pin insulators tight against conductor and insulator and ends turned down flat against conductor so that no wire ends project.
3.1.7.6 Low-Voltage Insulated Cables
Low-voltage cables shall be supported on clevis fittings using spool insulators. Dead-end clevis fittings and suspensions insulators shall be provided where required for adequate strength. Dead-end construction shall provide a strength exceeding the rated breaking strength of the neutral messenger. Clevis attachments shall be provided with not less than 5/8 inch through-bolts. Secondary racks may be used when installed on wood poles and where the span length does not exceed 200 feet. Secondary racks shall be two-, three-, or four-wire, complete with spool insulators. Racks shall meet strength and deflection requirements for heavy-duty steel racks, and shall be rounded and smooth to avoid damage to conductor insulation. Each insulator shall be held in place with a 5/8 inch button-head bolt equipped with a nonferrous cotter pin, or equivalent, at the bottom. Racks for dead-ending four No. 4/0 AWG or four larger conductors shall be attached to poles with three 5/8 inch through-bolts. Other secondary racks shall be attached to poles with at least two 5/8 inch through-bolts. Minimum vertical spacing between conductors shall not be less than 8 inches.
3.1.7.7 Reinstalling Conductors
Existing conductors to be reinstalled or resagged shall be strung to "final" sag table values indicated for the particular conductor type and size involved.
3.1.7.8 New Conductor Installation
String new conductors to "initial" sag table values recommended by the manufacturer for conductor type and size of conductor and ruling span indicated.
3.1.7.9 Fittings
Dead end fittings, clamp or compression type, shall conform to written recommendations of conductor manufacturer and shall develop full ultimate strength of conductor.
3.1.7.10 Aluminum Connections
Make aluminum connections to copper or other material using only splices, connectors, lugs, or fittings designed for that specific purpose. Keep a copy of manufacturer's instructions for applying these fittings at job site for use of the inspector.
SECTION 33 71 01 Page 18
3.1.8 Risers
Secure galvanized steel conduits on poles by two hole galvanized steel pipe straps spaced as indicated and within 3 feet of any outlet or termination.
Ground metallic conduits.
3.2 TRANSFORMER INSTALLATION
Transformers shall be carefully installed so as not to scratch finishes or damage bushings. Transformers shall be installed in accordance with the manufacturer's instructions. After installation, surfaces shall be inspected and scratches shall be touched up with a finish provided by the transformer manufacturer for this purpose.
3.3 FIELD FABRICATED NAMEPLATE MOUNTING
Provide number, location, and letter designation of nameplates as indicated. Fasten nameplates to the device with a minimum of two sheet-metal screws or two rivets.
3.4 FIELD QUALITY CONTROL
3.4.1 General
Field testing shall be performed in the presence of the Contracting Officer. The Contractor shall notify the Contracting Officer 14 days prior to conducting tests. The Contractor shall furnish materials, labor, and equipment necessary to conduct field tests. The Contractor shall perform tests and inspections recommended by the manufacturer unless specifically waived by the Contracting Officer. The Contractor shall maintain a written record of tests which includes date, test performed, personnel involved, devices tested, serial number and name of test equipment, and test results. Field reports will be signed and dated by the Contractor.
3.4.2 Safety
The Contractor shall provide and use safety devices such as rubber gloves, protective barriers, and danger signs to protect and warn personnel in the test vicinity. The Contractor shall replace any devices or equipment which are damaged due to improper test procedures or handling.
3.4.3 Medium-Voltage Preassembled Cable Test
After installation, prior to connection to an existing system, and before the operating test, the medium-voltage preassembled cable system shall be given a high potential test. Direct-current voltage shall be applied on each phase conductor of the system by connecting conductors at one terminal and connecting grounds or metallic shieldings or sheaths of the cable at the other terminal for each test. Prior to the test, the cables shall be isolated by opening applicable protective devices and disconnecting equipment. The method, voltage, length of time, and other characteristics of the test for initial installation shall be in accordance with NEMA WC 74/ICEA S-93-639 for the particular type of cable installed, and shall not exceed the recommendations of IEEE 404 for cable joints unless the cable and accessory manufacturers indicate higher voltages are acceptable for testing. Should any cable fail due to a weakness of conductor insulation or due to defects or injuries incidental to the installation or because of improper installation of cable, cable joints, SECTION 33 71 01 Page 19 terminations, or other connections, the Contractor shall make necessary repairs or replace cables as directed. Repaired or replaced cables shall be retested.
3.4.4 Sag and Tension Test
The Contracting Officer shall be given prior notice of the time schedule for stringing conductors or cables serving overhead medium-voltage circuits and reserves the right to witness the procedures used for ascertaining that initial stringing sags and tensions are in compliance with requirements for the applicable loading district and cable weight.
3.4.5 Low-Voltage Cable Test
For underground secondary or service laterals from overhead lines, the low-voltage cable, complete with splices, shall be tested for insulation resistance after the cables are installed, in their final configuration, ready for connection to the equipment, and prior to energization. The test voltage shall be 500 volts dc, applied for one minute between each conductor and ground and between all possible combinations of conductors in the same trench, duct, or cable, with other conductors in the same trench, duct, or conduit. The minimum value of insulation shall be:
R in megohms = (rated voltage in kV + 1) x 1000/(length of cable in feet)
Each cable failing this test shall be repaired or replaced. The repaired cable shall then be retested until failures have been eliminated.
3.4.6 Pre-Energization Services
The following services shall be performed on the equipment listed below.
These services shall be performed subsequent to testing but prior to the initial energization. The equipment shall be inspected to insure that installation is in compliance with the recommendations of the manufacturer and as shown on the detail drawings. Terminations of conductors at major equipment shall be inspected to ensure the adequacy of connections. Bare and insulated conductors between such terminations shall be inspected to detect possible damage during installation. If factory tests were not performed on completed assemblies, tests shall be performed after the installation of completed assemblies. Components shall be inspected for damage caused during installation or shipment and to ensure that packaging materials have been removed. Components capable of being both manually and electrically operated shall be operated manually prior to the first electrical operation. Components capable of being calibrated, adjusted, and tested shall be calibrated, adjusted, and tested in accordance with the instructions of the equipment manufacturer.
3.4.7 Performance of Acceptance Checks and Tests
Perform in accordance with the manufacturer's recommendations and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA ATS.
3.4.7.1 Overhead-Type Distribution Transformers
a. Visual and mechanical inspection
(1) Compare equipment nameplate information with specifications and approved shop drawings.
SECTION 33 71 01 Page 20
(2) Inspect physical and mechanical condition.
(3) Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method. Thermographic survey is not required.
(4) Perform specific inspections and mechanical tests as recommended by manufacturer.
(5) Verify correct equipment grounding.
b. Electrical tests
(1) Insure…