(12)_Attachment_L_Drawings.pdf
PDF 10 MB Posted
- Attached to
- Site-Wide Replacement of Utility Poles Federal contract opportunity
- Solicitation number
- SP3300-17-B-0006
- Issued by
- Defense Logistics Agency Distribution
About this file
(12) Attachment L Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0003_attachments.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Revised_Dwg_ES-101_&_ES-108-_Amendment_0001.pdf | ||
| Site_Visit_Notes.pdf | ||
| (10)_Attachment_J_Wage_Determinations.pdf | ||
| (2)_Attachment_B_Short_Form_Badge_Request.pdf | ||
| (6)_Attachment_F_DLA_SP_Camera_Pass_Request_Form.pdf | ||
| (5)_Attachment_E_Deliv_Notification_Form.docm | DOCM document | |
| (7)_Attachment_G_SF24_-_Bid_Bond.pdf | ||
| (8)_Attachment_H_SF25_(Performance_Bond).pdf | ||
| SP3300-17-B-0006.pdf | ||
| (3)_Attachment_C_Long_Form_Badge_Request.pdf | ||
| (4)_Attachment_D_Badge_Renewal.doc | DOC document | |
| (1)_Attachment_A_New_Personnel_Notification_Form.docm | DOCM document | |
| (9)_Attachment_I_SF25A_(Payment_Bond).pdf | ||
| (11)_Attachment_K_Project_Specifications_and_Submittals.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ONeillJ1
RFA DLA
kingjw Text Box kingjw kingjw kingjw kingjw kingjw kingjw kingjw
ONeillJ1
RFA DLA
kingjw kingjw kingjw kingjw kingjw kingjw kingjw kingjw kingjw kingjw kingjw
PROVIDE WATER AND UV RESISTANT POLE TOP COVER.
NEW WOOD GUY POLE; SEE POLE CLASS AND HEIGHT IN POLE SCHEDULE.
SECONDARY/STREETLIGHT POWER CABLES.
15 KV FEEDER TERMINATION OR MOUNTING HEIGHT OF FEEDER CABLES.
NEW GUY CABLE WITH POLE ATTACHMENT HARDWARE. GUY SHALL BE INSTALLED
APPROXIMATELY 36" BELOW THE ACTIVE 12.47 KV CABLES AND ABOVE LOW VOLTAGE AND
SIGNAL CABLING. A GROUND ROD AND #6 AWG BARE CONDUCTOR SHALL BE INSTALLED AT
EACH DISTRIBUTION POLE WHERE NEW GUYING IS NOTED TO BOND THE GUY CABLE,
HARDWARE, EQUIPMENT, METALLIC SURFACES, AND MESSENGER CABLE ROUTED WITH THE
MV CABLES.
GUY CABLE ANCHOR SHALL BE INSTALLED AT APPROXIMATELY AT EQUAL DISTANCE FROM
POLE AS HEIGHT ABOVE GRADE. IF SUCH SPACING CANNOT BE ACCOMPLISHED THEN
SUPPORT ARM CAN BE USED TO SHORTEN THE HORIZONTAL DISTANCE FROM THE POLE.
REFER TO SPECIFICATION 337101 FOR DEPTH OF NEW GUY POLES BELOW GRADE AND FOR
RATINGS, TYPE, AND GUYING REQUIREMENTS. PROVIDE SHIELDS FOR GUYING TO GRADE, AS
OUTLINED IN SPECIFICATIONS.
LOW VOLTAGE, IT, TELECOM, CATV AND SECURITY CABLING ON POLES.
GUY POLE INSTALLATION DETAIL
NOT TO SCALEE-401
JO AA ?
E-401
JO
P O
LE
S
C H
E D
U
LE
SH
EE
T
D R
A W
N
BY
D E
S
IG
N
BY
S B
M T
BY
S
IZ
E:
FI
LE
N
AM
E:
IS
S
U E
D
AT
E:
C O
N
TR
AC
T
N O
S O
LI
C
IT
A
TI
O
N N
O
U S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
C
KD
B Y:
US Army Corps of Engineers ®
"x
A
FI
LE
N U
M
BE
R
P
LO
T S
C
AL
E:
P
LO
T D
AT
E:
/3
1/
CHARLESTON DISTRICT
C H
A R
LE
S
TO
N
D
IS
TR
IC
T C
H A
R
LE
S
TO
N ,S
O U
TH
C
AR
O
LI
N
A
JA
C
O
BS
N O
R
TH
G
LE
B E
R O
AD
,S
U
IT
E
A
R
LI
N G
TO
N
,V A
D
EF
EN
SE
D
IS
TR
IB
U
TI
O N
C E
N
TE
R S
U S
Q U
EH
AN
N A
N E
W C
U M
B E
R
LA
N D
,P A
S
IT
E -W
ID
E
R E
PL
AC
EM
EN
T O
F U
TI
LI
TY
PO
LE
S
A
PP
R M
AR
K
D
AT
E A
PP
R
/3
1/
7:
A M
2 3 4 5
B
C
D
D
AT
E D
ES
C
R
IP
TI
O
N D
ES
C
R
IP
TI
O
N M
AR
K
NOTES
THE "DEMOLITION" SCHEDULE HAS BEEN PROVIDED TO LIST WHICH POLES SHOWN
ON THE SITE PLANS ARE TO BE REMOVED. THIS SCHEDULE PROVIDES A BRIEF
DESCRIPTION OF THE SERVICES THAT EXIST ON THE POLE FOR PURPOSES OF
BIDDING. THE PLANS DETAIL WHAT IS REQUIRED AT EACH POLE AND SHOULD BE
USED FOR APPROXIMATE DISTANCES, ETC. WHERE CABLING AND LOW VOLTAGE
SERVICES ARE NOTED TO BE REMOVED.
THE NEW POLE AND EQUIPMENT SCHEDULE INDICATES THE EXISTING POLES THAT
ARE TO BE DISCONNECTED, REMOVED, AND REPLACED WITH A NEW POLE AT
APPROXIMATELY THE SAME LOCATION. SITE PLANS GO INTO SPECIFIC DETAIL OF
THE EQUIPMENT AND SERVICES TO BE REMOVED; EQUIPMENT TO BE TAKEN DOWN
AND REINSTALLED, AND WHAT IS REQUIRED AT THE NEW "REPLACEMENT" POLE.
THERE ARE TYPICAL POLE DETAILS THAT PROVIDE GUIDANCE TO THE NEW POLE
INSTALLATION AND SERVICES NOTED. REFERENCE TO THOSE TYPICAL DETAILS ARE
MADE IN THE SCHEDULE. DETAILS INDICATE INFORMATION ABOUT ALL POSSIBLE
COMBINATIONS OF SERVICES THAT MAY EXIST, BUT THE SITE PLAN NOTES SHOULD
BE THE BASIS OF SPECIFIC POLE EFFORT. NOT ALL SERVICES EXIST AT THE POLE.
POLE HEIGHT, CLASS INDICATED IN THIS SCHEDULE ARE SPECIFIC TO THE
REQUIRED POLE AT THE LOCATION ON THE PLANS. SPECIFICATIONS TECHNICALLY
ADDRESS EQUIPMENT, INSTALLATION, TESTING, ETC.
POLE NA30 IS INCLUDED IN THE NEW WORK SCHEDULE BECAUSE SPECIFIC WORK IS
REQUIRED AT THAT POLE, HOWEVER, THE EXISTING WOOD POLE IS TO REMAIN IN
PLACE AT THE COMPLETION OF WORK.
ONeillJ1
RFA DLA
kingjw
File details come from the government source that posted it. Updated .