Amendment 0003 - answers to vendor's questions, revised SOW, and cut sheet for lights

View the file

Other files

File Type Posted
BID_ABSTRACT_SP330017B0002.pdf PDF
ATTACHMENT_1_-_REVISED_SOW___Lighting_Retrofit_WHSE_17_S4-5and_WHSE_30_S1-2__Admin_Revised_5-24-17.pdf PDF
ATTACHMENT_3_-_Orion_LED_HARRIS_StripFixture_SFHC1.pdf PDF
ATTACHMENT_4_-_Orion_LED_VaporTight_xVT_Data_Sheet.pdf PDF
ATTACHMENT_2_-_OLRL_Jetson_L_Series_Contour_Data_Sheet.pdf PDF
SP330017B0002_AMENDMENT_0005_TO_FBO.pdf PDF
SP330017B0002_AMENDMENT_0004.pdf PDF
ATTACHMENT_1-_A0003_-_revised_SOW___Lighting_Retrofit_WHSE_17_S4-5and_WHSE_30_S1-2_&_Admin.pdf PDF
ATTACHMENT_2_-_ISONHighBay_HBIF3.pdf PDF
SP330017B0002_A0002.pdf PDF
Whse_17_Sec_4.pdf PDF
SP330017B0002_AMENDMENT_0001.pdf PDF
Whse_17_Sec_5.pdf PDF
Whse_30_Ceiling.pdf PDF
Whse_17_Cold_Storage_Ceiling.tif TIF image
sign_in_sheet_for_site_visit.pdf PDF
ATTACHMENT_8_-_STATEMENT_OF_WORK.pdf PDF
ATTACHMENT_6_-_DRAWINGS.pdf PDF
ATTACHMENT_7_-_Submittal_Registers_Lighting_Retrofit_WHSE_17_&_30.pdf PDF
ATTACHMENT_2_-__SF25_(Performance_Bond).pdf PDF
ATTACHMENT_3_-__SF25A_(Payment_Bond).pdf PDF
ATTACHMENT_9_-_TABLE_1__WHSE_30_Admin_Areas_Light_Counts.pdf PDF
ATTACHMENT_4_-_CONSTRUCTION_wage_determination.pdf PDF
ATTACHMENT_1_-__SF24_-_Bid_Bond.pdf PDF
ATTACHMENT_5_-_P.2016.01579__SPECS_Lighting_Retrofit_WHSE_17_&_WHSE_30.pdf PDF
SP330017B0002.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300-17-B-0002

Amendment 0003

1. The purpose of Amendment 0003 is to answer vendor’s questions, provide a revised Statement Of Work

(Attachment 1 – Revision highlighted in yellow), and provide cut sheet for lighting fixture (Attachment 2).

Question 1. The bid information lists an Orion lighting fixture and then has the standard “or equal”.

I have contacted Orion but to date have been given the run around as far as who is pricing the package.

I am being proactive due to the fact that in looking at the “or equal” with my lighting rep in the

Reno area, they have found an issue with meeting a spec, so every manufacture they represent will not offer pricing due to that spec that none of them can meet. In trying to contact Orion to see if they can meet the spec, no one will talk about or confirm they can meet it from Orion.

The spec section I refer to is 26 51 00, page 49 of the spec book. Section 2.1.1 has a table, in that table on the last line “LED Low Bay/High Bay”. The minimum efficiency is listed as 190LPW.

According to every lighting manufacture contacted for “or equal”, none can do what this number requires.

Answer 1. Market research has been done on this type of LED with efficiency more than 190LPW.

Question 2. Specification Section 26 51 00 1.6.1.1 Page 49 “provide Luminaire Useful Life Certificate”

Thermal properties of the specific luminaire and local ambient operating temperature and conditions must be taken into consideration.

Please provide normal ambient temperatures for Low Bay/High Bay and Food Rated Vapor Tight fixtures.

Answer 2. The operating ambient temperatures should range from -22deg F to 131deg F (-30deg C to 55deg

C).

Question 3. Specification Section 26 51 00 2.1.1 Page 49 LED Luminaires Chart

LED Low Bay/High Bay, Minimum Luminaire Efficacy 190 LPW, 70 CRI, 10 year warranty, L70 150000 Hrs.

The current industry standard for LE is 135 LPW, but it is advancing every year.

Do you have a specific product part number specified to comply with this requirement?

Answer 3. Yes, the approved manufacture is Orion ISON High Bay HBIF3 or equal.

Question 4. Lighting Floor Plan - Warehouse 30 Section 1 & 2 Existing Lighting System

Confirm lighting fixture mounting height.

Answer 4. Mounting height of the fixture in Warehouse 30 Section 1 and 2 is approximately 27ft.

Question 5. Confirm the mtg distance fixture to fixture, center to center, row and column distances.

Answer 5. The mounting distance from fixture to fixture is approximately 20ft. We are not sure why this question is asked, the project is to replace fixture for fixture at the same mounting height and fixture to fixture distance.

Question 6. Are product sourcing standards to comply with TAA or other governing agency?

SP3300-17-B-0002

Amendment 0003

Answer 6. We are not familiar with TAA (Trade Agreements Act) policy, but all material in this project shall be made in America and shall meet the Buy American Act.

Question 7. Can the existing lighting relay enclosures be used as junction boxes to terminate existing lighting circuits at warehouse 30?

Answer 7. Yes, the relay enclosures shall be used as junction boxes to terminate the lighting circuits.

Question 8. Are there any specific areas where work has to be scheduled after hours or over weekends?

Answer 8. No, all work shall be done during business hours 7:00 AM 3:30 PM, Monday through Friday.

Question 9. Do the existing light ballasts contain PCBs?

Answer 9. Contractor shall bear the responsibility of determining if existing light ballasts contain PCBs. If

PCBs are present the ballasts must be disposed of in accordance with the provisions in the

Statement of Work (SOW).

Question 10. Are there any environmental issues (ie. Lead, Asbestos, etc.) that the contractor needs to be made aware of in order to bid this project properly?

Answer 10. No environmental issues regarding presence of lead or asbestos at this time. However, if gypsum board walls or ceiling are to be disturbed during construction, the COR must be notified in advance for further evaluation.

2. All other terms and conditions remain unchanged.

END OF AMENDMENT 0003

SP330017B0002 A0003 PAGE 1
Amend 0001 SP330016B0016 for FBO
SP3300-15-R-5004 0003 page 1

Amend 0003 Page 2

IDCode:
Page: 1
Pages: 3
Text4: AMENDMENT/MODIFICATION NO.
AmendNo: 0003
ReqNo:
ProjNo:
IssCode: SP3300
IssuedBy: DLA Distribution

Acquisition Operations, J-7 Mifflin Avenue, Bldg 430 New Cumberland, PA 17070

AdmCode: MPGADM
AdminBy: POC: Mogen Gilson

717-770-4757 (P)

MOGEN.GILSON@DLA.MIL

ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: SP3300-17-B-0002
AmendDate: 04/12/17
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript:

SEE CONTINUATION PAGE(S)

SignName:
SignTitl:
ContDate:
CoName:
CoTitle:
CODate:
Text1: May 17, 2017