ATTACHMENT_3_-_A0005-SCHEDULE_FOR_SUPPLIES_AND_SERVICES.pdf

PDF 14 KB Posted

Attached to
Track Shoe Preservation System Federal contract opportunity
Solicitation number
SP3300-15-R-5008
Issued by
Defense Logistics Agency Distribution

About this file

ATTACHMENT 3 - REVISED SCHEDULE

View the file

Other files for this federal contract opportunity

Other files attached to Track Shoe Preservation System, newest first.
File Type Posted
Amend_0008_SP330015R5008_for_FBO.pdf PDF
Amend_0007_SP330015R5008_for_FBO.pdf PDF
Amend_0006_SP330015R5008_for_FBO.pdf PDF
Amend_0005_SP330015R5008_for_FBO.pdf PDF
ATTACHMENT_1_-_A0005-_REVISED_SOW.pdf PDF
PAGE_2.pdf PDF
ATTACHMENT_2_A0005_Questions_-_SP3300-15-R-5008__DDRT_Bldg._595_Track_Shoe_Preservation_System_Rev1.pdf PDF
Pre-Bid_confernce_Sign_in_Sheet.pdf PDF
SITE_VISIT_BRIEF.pdf PDF
Amend_0004_SP330015R5008_for_FBO.pdf PDF
DDRT_BLDG-595_Track_Preservation_System_Layout-1_version_2010.dwg DWG drawing
Amend_0003_SP330015R5008_for_FBO.pdf PDF
MSDS.pdf PDF
Amend_0002_SP330015R5008_for_FBO.pdf PDF
Amend_0001_SP330015R5008_for_FBO.pdf PDF
Attachment_6_-_DDRT_Preproposal_Conference_Instructions_Rev1.docx DOCX document
RFP_SP330015R5008_final.pdf PDF
Attachment_4-_WAWF_Instructions.pdf PDF
Attachment_7_-_DDRT_Directions.pdf PDF
Attachment_5_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_2_-_BLDG-595_Track_Preservation_System_Layout-1_Model_.pdf PDF
Attachment_3_-_Track_Shoe_Preservation_System_CDRLS.pdf PDF
ATTACHMENT_1_-_DDRT_Final_Track_Dip_SOWrev1.pdf PDF
SP3300-15-R-5008_SF1449_Page_1_of_43.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

SP3300-15-R-5008

AMENDMENT 0005

PAGE 4 OF 43 OF ORIGINAL RFP

SCHEDULE FOR SUPPLIES AND SERVICES

ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE TOTAL PRICE

0001 All labor, material, engineering and 1 EA $__________ $___________ equipment to include installation of Track Dip Preservation System in accordance with Attachment 1, Statement of Work, 1.4.1.

270 DAYS AFTER AWARD

0002 All labor, material, engineering, 1 EA $__________ $___________ and equipment to include disassembly and removal of existing system in accordance with Attachment 1, Statement of Work, 1.4.2.

60 DAYS AFTER AWARD

0003 All labor, material, engineering, 1 EA $__________ $___________ and equipment to include installation of compressorsystem in accordance with Attachment 1, Statement of Work,

1.4.3. (OPTION),

270 DAYS AFTER AWARD

0004 Corrective and Preventative Maintenance 1 EA $__________ $___________ one (1) year after Government receipt of the entire system. (OPTION)

0005 Contract Data Requirements List 1 LOT NSP NSP

(CDRL)

accordance with DD Forms 1423 and DD Forms1664, Attachment 3, (NOTE: ALL COST FOR DATA MUST BE INCLUDED IN THE PRICE OF THE SYSTEM.

CONTRACTOR SHALL NOT PRICE THESE ITEMS SEPARATELY.)

A001 Installation Schedule DI-S-SAT1 A002 Dwg. Eng. $ Associated List DI-E-SAT2 A003 Dwg. Eng. $ Associated List DI-E-SAT2 A004 Commercial Manual DI-E-SAT1 A005 Commercial Manual DI-E-SAT1 A006 Contractor Officer Representative List DI-E-SAT11 A007 Training Material and Schedules DI-P-SAT A008 Power Requirements DI-P-SAT1 A009 Design Data Calculations DI-E-2440A A010 Certificate of Compliance DI-E-SAT14 A011 Test Plan DI-T-SAT1 A012 Software Documentation Manual DI-P-SAT-2

TOTAL CONTRACT PRICE $________________________

File details come from the government source that posted it. Updated .