This Statement of Work (SOW) details an electrical work contract for the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) Dam Neck Activity (DNA) located in Virginia Beach, VA. The project requires a contractor to update electrical outlets and panels, specifically involving replacing 480V feed conductors, installing a new 200A 480V 3-phase panel with six new 480V 3-phase receptacles, replacing a 45 KVA transformer with a 225 KVA transformer, and upgrading the existing feeder breaker from 40A to 100A. The contract includes providing power to six new 120V, 20A duplex outlets and twelve 208V 3-phase receptacles. The work must be completed within thirty (30) days, performed during normal working hours (Monday through Friday, 0800-1700), and comply with applicable safety, electrical, and industry standards. Up to three personnel may travel to the site throughout the performance period, with all work classified as unclassified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA.docx_complete.pdf | ||
| 0708-02 - Electrical Install - Drawing_Redacted.pdf | ||
| SF 1449 - N0017825Q0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.7 The Contractor shall complete electrical work within thirty (30) days.
3.8 The Contractor shall provide a warranty for their electrical work.
3.9 The Contractor shall be responsible for properly disposing of any shipping and packaging material associated with the furniture items provided.
3.10 The Contractor shall protect Government property from damage or disfigurement.
3.11 The Contractor shall keep all supplies, equipment, and tools out of traffic lanes or other areas where they might create a hazard.
3.12 At the end of each work period, the Contractor shall secure all supplies, equipment and tools.
3.13 The Contractor shall perform all work during normal working hours, Monday through Friday, 0800 – 1700. (Unless otherwise agreed by customer in writing)
3.14 The Contractor shall coordinate with the Technical Point of Contact (TPOC) identified below to schedule all required work.
3.15 The Contractor shall ensure all receptacles will be properly sized, installed, and grounded per specifications. All equipment and systems will be grounded according to applicable codes and specifications. Voltages will be checked and verified prior to project completion.
4.0 DATA DELIVERABLES
4.1 N/A
5.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION
(GFP/GFM/GFI)
5.1 The Government will provide access to the base and work locations.
6.0 TRAVEL
The Contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated: Up to three (3) personnel to the NSWCDD DNA, located in Virginia Beach, VA, throughout the period of performance.
7.0 SECURITY
7.1 All work to be performed under this SOW is Unclassified.
8.0 TECHNICAL POINT OF CONTACT