This solicitation requests proposals to perform replacement work at facility B49904. The work includes replacing an existing chiller, installing a new 2-ton mini-split system, and upgrading temperature controls and building automation systems. Proposals are due by August 16, 2022. The solicitation is issued by the Department of the Air Force Space Command for project DBEH 22-1578. The work consists of replacing the chiller asset, installing a new split system in the east UPS room, sealing ductwork, reinsulating ducts, and upgrading six air handler and one VAV controller to the EMCS platform. A controls contractor will also install new temperature sensors and reprogram controls.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

Section A - Solicitation/Contract Form

FY22 DBEH 22-1578, Replace SAB HVAC B49904

Purchase Requisition Number: F3K3DH2119AW01 Date: 07 Jul 2022 Proposal Identifier: FA252122B0017 Date: 16 Aug 2022

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Qty Unit Unit Price

Amount

0001 FY22 DBEH 22-1578 Replace SAB HVAC B49904

Product Service Code: Z2AZ

1 Each

Section C - Description/Specifications/Statement of Work

Requirements Construction requirement exists to replace chiller asset #1544 with new chiller assembly. Also, facility 49904, in the East UPS room, requires a new 2 ton mini split system on the east wall to combat the excessive heat the UPS units produce. Each unit has a required operating temperature that currently cannot be met by the current system in place. Additionally, current controls are outdated, requiring controls contractor to install new controls.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Instructions: Inspection and Acceptance will be accomplished by the designated Government Construction Contract Inspector and weekly submission of AF Form 3065 Progress Reports

DoDAAC: F3K3DH CountryCode: USA

F3K3DH 45 CES CEZ

AF NO MILSBILLS PROC CP 3214670934

180 W SKID STRIP RD

CANAVERAL AIR STATION, FL 32925-2230

UNITED STATES

Jeffrey C. Brawner Email: jeffrey.brawner.3@spaceforce.mil Telephone: (321) 853-0967

Section F - Deliveries or Performance

F-1 NOTICE TO PROCEED (NTP): An NTP will be issued within 15 days after contract award.

F-2 PERIOD OF PERFORMANCE: The period of performance for this project is one hundred and eighty days

(180) calendar days to include 25 Non-Access days.

Non-Access Period: Any period of time, during normal established duty hours, that a contractor and/or subcontractor(s), to include deliveries, are denied access to the worksite by the appropriate government authority.

NOTE: A non-access day does not allow the contractor to perform any work.

Overall Contract Delivery Period

From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt

From date of lead time event to completion of performance 180 Calendar Days Date of Notice to Proceed Receipt

Line Item Delivery Schedule QTY Address and POC

Delivery Schedule 180 Calendar Days

1 Each Place of Performance DoDAAC: F3K3DH CountryCode: USA

F3K3DH 45 CES CEZ

AF NO MILSBILLS PROC CP 3214670934

180 W SKID STRIP RD

CANAVERAL AIR STATION, FL 32925-2230

UNITED STATES

Jeffrey Brawner Email: jeffrey.brawner.3@spaceforce.mil

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.247-34 F.o.b. Destination. Nov 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date 252.204-7006 Billing Instructions. Oct 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. Dec 2018

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Construction Payment Invoice and Progress Report.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA2521 Admin DoDAAC FA2521 Inspect By DoDAAC FA2521 Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC FA2521 LPO DoDAAC FA2521 DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

Thomas.smith.139@spaceforce.mil; kiwanus.mobley.1@spaceforce.mil

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Not Applicable.

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights.

Jun 2020

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

Nov 2021

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

Nov 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.211-13 Time Extensions. Sep 2000 52.214-26 Audit and Records-Sealed Bidding. Jun 2020 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.219-8 Utilization of Small Business Concerns. Oct 2018 52.219-13 Notice of Set-Aside of Orders. Mar 2020 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside. Sep 2021 52.222-3 Convict Labor. Jun 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. May 2018 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-54 Employment Eligibility Verification. May 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

Sep 2013

52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-5 Alternate I Pollution Prevention and Right-to-Know Information. - (Alternate I) May 2011 52.223-6 Drug-Free Workplace. May 2001

52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners.

Jun 2016

52.223-15 Energy Efficiency in Energy-Consuming Products. May 2020

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts.

Aug 2018

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-20 Aerosols. Jun 2016 52.223-21 Foams. Jun 2016 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.227-1 Authorization and Consent. Jun 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. Jun 2020 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007 52.228-2 Additional Bond Security. Oct 1997 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-11 Deviation 2020-O0016 Pledges of Assets (DEVIATION 2020-O0016) Feb 2021

52.228-12 Prospective Subcontractor Requests for Bonds. May 2014 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-17 Interest. May 2014 52.232-23 Assignment of Claims. May 2014 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Nov 2021 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-3 Alternate I Protest after Award. - (Alternate I) Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

Apr 1984

52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-14 Availability and Use of Utility Services. Apr 1984 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-16 Quantity Surveys. Apr 1984 52.236-17 Layout of Work. Apr 1984 52.236-21 Alternate I Specifications and Drawings for Construction. - (Alternate I) Feb 1997 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-1 Alternate I Changes-Fixed-Price. - (Alternate I) Aug 1987 52.243-4 Changes. Jun 2007 52.243-5 Changes and Changed Conditions. Apr 1984 52.244-6 Subcontracts for Commercial Products and Commercial Services. Jan 2022 52.247-68 Report of Shipment (REPSHIP). Feb 2006 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-2 Alternate I Termination for Convenience of the Government (Fixed-Price). - (Alternate I) Apr 2012 52.249-4 Termination for Convenience of the Government (Services) (Short Form). Apr 1984 52.249-10 Default (Fixed-Price Construction). Apr 1984 52.253-1 Computer Generated Forms. Jan 1991

DFARS Clauses Incorporated by Reference

Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011

252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies.

Dec 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Sep 2013 252.204-7000 Disclosure of Information. Oct 2016 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Dec 2019 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. May 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2021

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Mar 2022 252.205-7000 Provision of Information to Cooperative Agreement Holders. Dec 1991

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.

May 2019

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Dec 2010 252.223-7004 Drug-Free Work Force. Sep 1988 252.223-7008 Prohibition of Hexavalent Chromium. Jun 2013 252.225-7001 Buy American and Balance of Payments Program. Jun 2022 252.225-7002 Qualifying Country Sources as Subcontractors. Mar 2022 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten. Oct 2020 252.227-7033 Rights in Shop Drawings. Apr 1966 252.232-7004 DoD Progress Payment Rates. Oct 2014 252.232-7010 Levies on Contract Payments. Dec 2006

252.232-7017 Accelerating Payments to Small Business Subcontractors-Prohibition on Fees and Consideration.

Apr 2020

252.242-7006 Accounting System Administration. Feb 2012 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2012 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010

FAR Clauses Incorporated by Full Text

52.211-10 Commencement, Prosecution, and Completion of Work. Apr 1984

As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days.* The time stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 Liquidated Damages-Construction. Sep 2000

As prescribed in 11.503(b), insert the following clause in solicitations and contracts:

Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $480.21 for initial and $400.93 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.219-14 Limitations on Subcontracting. Sep 2021

As prescribed in , insert the following clause:19.507(e)

LIMITATIONS ON SUBCONTRACTING (SEP 2021)

This clause does not apply to the unrestricted portion of a partial set-aside.(a)

, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-(b) Definition. Similarly situated entity

Has the same small business program status as that which qualified the prime contractor for the award ( , for a small business set-(1) e.g.

aside contract, any small business concern, without regard to its socioeconomic status); and

Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor (2) assigned to the subcontract.

This clause applies only to-(c) Applicability.

Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);(1)

Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);(2)

Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;(3)

Orders expected to exceed the simplified acquisition threshold and that are-(4)

Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or(i)

Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);(ii)

Orders, regardless of dollar value, that are-(5)

Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(i) (b)(2)(i)(F); or

Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award (ii) contracts, as described in 19.504(c)(1)(ii); and

Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the (6) evaluation preference.

An independent contractor shall be considered a subcontractor.(d) Independent contractors.

By submission of an offer and execution of a contract, the Contractor agrees that in performance of a (e) Limitations on subcontracting.

contract assigned a North American Industry Classification System (NAICS) code for-

Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to (1) subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by (2) the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the (3) cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract (4) performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

The Contractor shall comply with the limitations on subcontracting as follows:(f)

For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-(1)

[ ] Contracting Officer check as appropriate.

By the end of the base term of the contract and then by the end of each subsequent option period; or

By the end of the performance period for each order issued under the contract.

For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.(2)

A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be (g) performed by the aggregate of the joint venture participants.

(End of clause)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act. Dec 2010

As prescribed in , insert the following clause:22.1605

NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

During the term of this contract, the Contractor shall post an employee notice, of such size and in such form, and containing such content as (a) prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the National Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR471.2 (d) and (f).

Physical posting of the employee notice shall be in conspicuous places in and about the Contractor's plants and offices so that the notice (1) is prominent and readily seen by employees who are covered by the National Labor Relations Act and engage in activities related to the performance of the contract.

If the Contractor customarily posts notices to employees electronically, then the Contractor shall also post the required notice (2) electronically by displaying prominently, on any website that is maintained by the Contractor and is customarily used for notices to employees about terms and conditions of employment, a link to the Department of Labor's website that contains the full text of the poster. The link to the Department's website, as referenced in (b)(3) of this section, must read, "Important Notice about Employee Rights to Organize and Bargain Collectively with Their Employers."

This required employee notice, printed by the Department of Labor, may be-(b)

Obtained from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S. Department of Labor, 200 (1) Constitution Avenue, NW., Room N-5609, Washington, DC 20210, (202) 693-0123, or from any field office of the Office of Labor-Management Standards or Office of Federal Contract Compliance Programs;

Provided by the Federal contracting agency if requested;(2)

Downloaded from the Office of Labor-Management Standards Web site at http://www.dol.gov/olms/regs/compliance/EO13496.htm; or(3)

Reproduced and used as exact duplicate copies of the Department of Labor's official poster.(4)

The required text of the employee notice referred to in this clause is located at Appendix A, Subpart A, .(c) 29 CFR Part 471

The Contractor shall comply with all provisions of the employee notice and related rules, regulations, and orders of the Secretary of Labor.(d)

In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract (e) may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with and subpart 29 CFR 471.14

9.4. Such other sanctions or remedies may be imposed as are provided by , which implements Executive Order 13496 or as otherwise 29 CFR part 471 provided by law.

Subcontracts. (f) The Contractor shall include the substance of this clause, including this paragraph (f), in every subcontract that exceeds (1)

$10,000 and will be performed wholly or partially in the United States, unless exempted by the rules, regulations, or orders of the Secretary of Labor issued pursuant to section 3 of Executive Order 13496 of January 30, 2009, so that such provisions will be binding upon each subcontractor.

The Contractor shall not procure supplies or services in a way designed to avoid the applicability of Executive Order 13496 or this (2) clause.

The Contractor shall take such action with respect to any such subcontract as may be directed by the Secretary of Labor as a means of (3) enforcing such provisions, including the imposition of sanctions for noncompliance.

However, if the Contractor becomes involved in litigation with a subcontractor, or is threatened with such involvement, as a result of (4) such direction, the Contractor may request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.

(End of clause)

52.223-3 Hazardous Material Identification and Material Safety Data. Feb 2021

As prescribed in , insert the following clause:23.303

HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021)

"Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No.313 (a) (including revisions adopted during the term of the contract).

The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous (b) material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material (If none, insert )None Identification No.

This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered (c) under this contract is hazardous.

The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the (d) requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No.313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No.313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No.313, which renders incomplete or (e) inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or (f) liability for the safety of Government, Contractor, or subcontractor personnel or property.

Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, (g) ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

The Government's rights in data furnished under this contract with respect to hazardous material are as follows:(h)

To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to-(1)

Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous (i) materials;

Obtain medical treatment for those affected by the material; and(ii)

Have others use, duplicate, and disclose the data for the Government for these purposes.(iii)

To use, duplicate, and disclose data furnished under this clause, in accordance with paragraph (h)(1) of this clause, in precedence over (2) any other clause of this contract providing for rights in data.

The Government is not precluded from using similar or identical data acquired from other sources.(3)

(End of clause)

52.223-9 Alternate I Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (Alternate I) May 2008

As prescribed in , insert the following clause:23.406(d)

ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)

. As used in this clause-(a) Definitions means a material or finished product that has served its intended use and has been discarded for disposal or recovery, Postconsumer material having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."

"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

The Contractor, on completion of this contract, shall-(b)

Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract (1) performance, including, if applicable, the percentage of post-consumer material content; and

Submit this estimate to [Contracting Officer complete in accordance with agency procedures].(2) ____

(End of clause)

Alternate I ( 2008)May . As prescribed in 23.406(d), redesignate paragraph (b) of the basic clause as paragraph (c) and add the following paragraph

(b) to the basic clause:

(b) The Contractor shall execute the following certification required by the Resource Conservation and Recovery Act of1976 (42 U.S.C.6962(i) (2)(C)):

CERTIFICATION

I, (name of certifier), am an officer or employee responsible for the performance of this contract and hereby certify that the percentage of ____ recovered material content for EPA-designated items met the applicable contract specifications or other contractual requirements.

____ [ ]Signature of the Officer or Employee

____ [ ]Typed Name of the Officer or Employee

____ [ ]Title

____ [ ]Name of Company, Firm, or Organization

____ [ ]Date

(End of certification)

52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons. Jun 2016

As prescribed in , insert the following clause:23.804(a)(1)

OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL HYDROFLUOROCARBONS ( JUN 2016)

. As used in this clause-(a) Definitions means how much a given mass of a chemical contributes to global warming over a given time period compared to Global warming potential the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.

means any hydrofluorocarbons in a particular end use for which EPA's Significant New High global warming potential hydrofluorocarbons Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at subpart G with supplemental tables of alternatives available at (http://www.epa.gov/snap/).40 CFR Part 82 means compounds that only contain hydrogen, fluorine, and carbon.Hydrofluorocarbons

, means any substance the Environmental Protection Agency designates in as-Ozone-depleting substance 40 CFR part 82

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II, including, but not limited to, hydrochlorofluorocarbons.

The Contractor shall label products that contain or are manufactured with ozone-depleting substances in the manner and to the extent (b) required by 42 U.S.C.7671j(b), (c), (d), and (e) and , subpartE, as follows:40 CFR part 82

Warning

Contains (or manufactured with, if applicable) * , a substance(s) which harm(s) public health and environment by destroying ozone in ____ the upper atmosphere.

* The Contractor shall insert the name of the substance(s).

For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or refrigerant blends (c) Reporting.

containing hydrofluorocarbons, the Contractor shall-

Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends (1) containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by-

Type of hydrofluorocarbon (e.g., HFC-134 a, HFC-125, R-410 A, R-404 A, .);(i) etc

Contract number; and(ii)

Equipment/appliance;(iii)

Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after-(2)

Annually by November 30 of each year during contract performance; and(i)

At the end of contract performance.(ii)

The Contractor shall refer to EPA's SNAP program (available at http://www.epa.gov/snap) to identify alternatives. The SNAP list of (d) alternatives is found at subpart G with supplemental tables available at http://www.epa.gov/snap.40 CFR part 82

(End of clause)

52.225-9 Buy American-Construction Materials. Nov 2021

As prescribed in 25.1102(a), insert the following clause:

Buy American-Construction Materials (Nov 2021)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components.

Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.

Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.

The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

None.

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:

Foreign construction material ____ ____ ____ Domestic construction material ____ ____ ____

Item2: ____ ____ ____ Foreign construction material ____ ____ ____ Domestic construction material [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.][Include other applicable supporting information.] (End of clause)

52.225-21 Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute-Construction Materials. Jan 2021

As prescribed in 25.1102(e), insert the following clause:

Required Use of American Iron, Steel, and Manufactured Goods-Buy American Statute-Construction Materials (Jan 2021)

(a) Definitions. As used in this clause-

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .