Sole Source Justification Form Part One ACF Technologies Sole Source Change Order.pdf
PDF 695 KB Posted
- Solicitation number
- 27-350SOS-ITSOS-B-53847
- Issued by
- Illinois
About this file
Sole Source Justification Summary
This is a Sole Source Justification Form for a change order submitted by the Illinois Secretary of State's Department of Information Technology for queuing management services with ACF Technologies. The Illinois Secretary of State, Drivers PMO, and Information Technology Department require continued queuing management services, mobile ticketing services, and online appointment capabilities across state agency facilities. The services encompass software licenses, hardware, support, maintenance, cloud hosting, and professional services to manage customer lines and wait times at 40 active sites statewide, with expansion planned to 35 online appointment sites (currently only 16 are operational). The contract began on September 9, 2026, with an estimated end date of December 31, 2026, representing a one-time purchase change order rather than a renewal with additional terms. The original contract (14IT026022) was competitively awarded via RFP in 2014 and has been continuously renewed; this change order value is $220,661.55 and addresses the agency's need to migrate from on-premises server hosting to vendor-hosted cloud services and expand SMS text messaging confirmation capabilities across facilities.
The change order is funded entirely through state appropriated funds. ACF Technologies' pricing has remained consistent throughout the contract term since 2014, with costs maintained or discounted as equipment specifications have changed. The vendor's pricing was reviewed internally and determined fair and reasonable given the operational urgency to expand online appointment availability to underserved downstate and southern Illinois regions. The agency identified no viable alternatives, as ACF Technologies provides customized, integrated software and hardware solutions specifically configured to the Secretary of State's secure operational environment and existing system architecture. Future obligations to the vendor are anticipated as the agency plans to activate additional site licenses and expand system capabilities based on evolving customer service needs. Failure to approve this sole source would prevent the agency from meeting customer service requirements and expanding appointment availability beyond the current 16 sites.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sole Source Hearing Details Form~28.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source Justification Form
Version 7.01 Page 1 of 5
27-350SOS-ITSOS-B-53847Bulletin Reference Number
IL Secretary of StateRequesting Agency/University
Sole Source Justification Form - Part I Section I - General Information
Information TechnologyDepartment/Bureau/Section:
07/01/2026Need Identified Date: 12/31/2026Supply/Service Need By Date:
Queuing Services ContractProject Title:
ACF TechnologiesVendor:
The services utilized by Secretary of State, Drivers PMO and Information Technology are for Queuing Management Services, mobile ticketing services and on-line appointments throughout agency facilities across the state.
Services include software licenses, hardware, support, maintenance, hosting and professional services. All Services are critical to these agency and customers for continued services throughout the state facilities to communicate, display and placement of requested services for customer lines.
Provide a description of the supplies or services required:
ActualValue: 220,661.55Value of Initial Term, this Change Order or Amendment:
Will this Sole Source amend a Professional or Artistic Services contract? Yes No
*Sole Source may not be used for amendments for Professional or Artistic Services if the amendment would increase the value by more than 5% of the initial award or extend the term by more than 60 days.
New Sole SourceType:
Section II - Proposed Term
One-Time Purchase Term Contract
09/09/2026Estimated Contract Begin Date:
12/31/2026Estimated Contract End Date:
0Number of Potential Renewals:
0Length of Each Renewal in Months:
0Total Value of All Renewals:
If a Term Contract, does the term, including renewals, exceed 12 months? Yes No
Section III - Funding Source Select the type of funding to be used (Check all that apply): State Appropriate Funds Federal Funds Other (Explain):
Section IV - Sole Source Justification
Software License/Upgrade/Maintenance
This purchase is economically only available from a single source primarily because it is: (If "Other" explain in one sentence)
Are there secondary justification(s) for this sole source? Yes No
Version 7.01 Page 2 of 5
27-350SOS-ITSOS-B-53847Bulletin Reference Number
IL Secretary of StateRequesting Agency/University
Section V - Purchase History
Has the Agency or University Purchased these supplies or services in the past? Yes No
Term Term From Term To Value Description Contract Number Type
1 09/10/2014 09/09/2021 693,195 Implemented queueing system, software, and licensing 14IT026022 RFP
2 08/27/2020 09/09/2021 60,000
Provided upgrades to allow SMS text features, annual licensing fees for software support, and a SMS text package
14IT026022 Amendment
3 02/01/2021 09/09/2021 68,155 Activated existing solution to include QFlow's QAnywhere, QFlow Check In Anywhere, and Wait Anywhere Qapps
14IT026022 Amendment
4 09/10/2021 09/09/2024 392,388 Three year renewal for license and maintenance 14IT026022 Renewal
5 Small Purchase
6 Small Purchase
7 Small Purchase
8 Small Purchase
9 Small Purchase
10 Amendment
In addition to the original award for 14IT026022 and the two published change orders, ILSOS purchased required equipment and software that had set pricing as part of the original contract. These orders were inadvertently obligated and paid separate of the contract. After a full audit from 2014 to the present, it was determined that a total of $217,204.48 was spent on additional equipment and software directly related to the scope of this contract.
If more than 10, or if other comments, explain:
Section VI - Business Rationale
1. Provide a detailed explanation of the need for the supplies or services:
In 2014, Secretary of State was looking for a solution to assist customers with better service at the agency facilities across the state.
Customers come to agency facilities for Driver and Vehicle requirements, testing and needs. Customers in certain areas or facilities can develop long lines for service including lines outside the facility. Secretary of State was seeking vendor for a customer management (queueing) system with mandatory components of System Administration, Queueing Hardware/Software, PSA hardware/software and Professional Services. Vendor had to provide suggested solutions/models and pricing for a Kiosk solution, mobile ticket dispensers and SMS alerts. System had to capture the actual wait time and transaction time to service each customer for each step, differentiate between types of services performed per location and be able to assign priorities to different services and /or workstations. System had to allow SOS staff to establish thresholds of tolerable customer wait times and transaction times per service at each facility. The system had to be able to feed into signage to display real time queues and notifications when the thresholds are exceeded. System had to be able to prioritize, assign, monitor and balance SOS staff workloads based on facility needs and display real time data throughout the day per service: number of customers waiting, average wait time, average service time, number of open stations, current customer service times, total customers served, current or last ticket number served. After complete Audit of this contract and review of contract services ILSOS must move from an on-prem server to vendor hosting for the queueing system. This will allow for better service, data back up, system upgrade installation, updated software at our facilities and smooth communication from the queueing ticket system and the online appointments system, currently hosted by ACF. In addition to the on-prem server, SOS activated a text messaging appointment confirmation solution in 2020. This service provided enhanced customer service and is being requested to continue forward through the life of this contract.
Version 7.01 Page 3 of 5
27-350SOS-ITSOS-B-53847Bulletin Reference Number
IL Secretary of StateRequesting Agency/University
2. Provide a list and describe in detail the specifications required to satisfy the need:
The agency currently operates 40 active sites utilizing the queueing system to assist in customer service to help regulate the customer lines. The agency requires up to 35 online appointment sites and currently there are only 16 sites available. ILSOS requires the licensing, maintenance, and SMS monthly plans for each facility. The solution provided by ACF as part of the original solicitation response for this contract provides all services to meet these needs. The request for additional online appointment sites, SMS text plans, vendor server hosting be done so to satisfy the need of the agency and its customers. In order to make sure the implementation of these new services is a smooth transition from on-prem to the vendor hosted services, SOS requires additional potential professional service hours from the vendor.
3. Provide detail explaining the justification selected in Section IV to explain why the requested supplies or services are the only ones available that can satisfy the agency or university requirements?
ACF Technologies was awarded the original contract to provide a queueing system for some of our highest volume facilities. SOS requires these specifications to be provided by the current vendor to ensure the design and implementation of the queueing system fit the secure environment including servers, database, queuing system console, licenses, support and maintenance to keep everything running smoothly for our customers at the busiest facility locations.
4. What are the unique features of the supplies or services that are not available in any other product or by any other vendor? Provide specific quantifiable factors/qualifications:
ACF technologies is not an off-the shelf product. ACF has provided complete services based off Secretary of State specifications and requirements as bid in 2014. ACF provides its own integrated software to our solution needs. They have customized their software and hardware to fit our agency environment. ACF provides proficient staff to apply updates to the system which are critical to SOS customers. The software/services described above are all required to continue serving SOS customers by shortening wait times and providing a better overall customer experience.
5. Has the Agency or University considered alternative supplies or services to satisfy their need? Yes No
5a. If no, why weren't alternatives evaluated?
ACF Technologies has met and continues to provide all services required and specified from the bid process and current contract model. The online appointment software was provided and evaluated as part of the original response, but was not activated until COVID affected the health, life, and safety of our customers by waiting in long lines at the facilities. The on-prem hosting solution originally requested no longer meets the needs of this software thus requiring SOS to move to the vendor hosted server.
6. Are there resellers or distributors?
Yes No N/A
7. What efforts were made to get the best possible price (i.e. did the agency/university negotiate) and how did you determine the price for this purchase is considered fair and reasonable?
The pricing has been consistent during the entire length of the contract. ACF Technologies continues to provide all services, including any additional contract options to this agency and its customers with same pricing format from 2014. Current pricing model has been provided with all options from the original contract. Pricing has remained the same or discounted as equipment has changed but pricing remains low to the Secretary of State. The costs were reviewed internally and determined to be fair and reasonable considering the time crunch to move sites into online appointments quickly.
8. Will this purchase obligate the State to this vendor for future purchases such as maintenance, licensing or continuing need?
Yes No
9. What will be the financial or other impact to the State if this sole source is not approved and a competitive bid is required?
If not approved, SOS will not be able to meet the needs and requirements of our customers as they have evolved over the years. We will have 16 facilities with online appointments and be unable to provide those to the downstate and southern Illinois regions.
10. Is there any additional information you would like to add to justify this sole source?
Version 7.01 Page 4 of 5
27-350SOS-ITSOS-B-53847Bulletin Reference Number
IL Secretary of StateRequesting Agency/University
Section VII
Requesting Department Representative
Requesting Department Signature Required
I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed.
Date
Kelly MehringPrinted Name kmehring@ilsos.govE-mail Address
217-843-4060Phone Number
State Agency Bureau/Division Head or University Purchasing Director Approval and Signature Required
I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed. (All prior form fields will lock once this e-signature is completed)
E-mail Address
Phone Number Date
Printed Name
Agency Bureau/Division Head or University Purchasing Director and Not a Designee
SPO Approval and Signature Required
I have reviewed and understand the contents of this Sole Source Justification and agree with the State Agency or University determination.
I have reviewed and understand the contents of this Sole Source Justification and do not agree with the State Agency or University determination. As a result, the State Agency or University must explore other sourcing methods to satisfy their need.
State Purchasing Officer Signature 217-782-3091Phone Number Aug 25, 2026Date
Dave LittrellPrinted Name dlittrell@ilsos.govE-mail Address
Version 7.01 Page 5 of 5
27-350SOS-ITSOS-B-53847Bulletin Reference Number
IL Secretary of StateRequesting Agency/University
Sole Source Justification Form - Part II Section I - General Information
Queuing Services ContractProject Title
ACF TechnologiesVendor
Aug 25, 2026Initial Date of Procurement Bulletin Posting
Was a Sole Source hearing held per 30 ILCS 500/20-25?
Yes - Complete Section II and III below (Section II will only be visible when this option is selected)
No - Section II not required, go to Section III below Section III - CPO Approval and Signature Required
Based on my review, I authorize the Agency/University to proceed in accordance with the published Notice referenced above.
Based upon my review, I authorize the Agency/University to proceed with the following Changes.
Based on my review, the Agency/University is not authorized to proceed with this sole source as presented and my recommendation is that it be cancelled.
Other
CPO Signature 217-782-8892CPO Phone
Katherine ToplePrinted Name Date ktople@ilsos.govCPO E-mail
Version 7.01 Page of Sole Source Justification Form - Part I Section I - General Information Will this Sole Source amend a Professional or Artistic Services contract?
If yes, what was the original contract value?
*Sole Source may not be used for amendments for Professional or Artistic Services if the amendment would increase the value by more than 5% of the initial award or extend the term by more than 60 days.
Section II - Proposed Term If a Term Contract, does the term, including renewals, exceed 12 months?
If yes, provide a detailed justification including any economic benefit received for agreeing to a multi-year term:
Section III - Funding Source Select the type of funding to be used (Check all that apply):
Section IV - Sole Source Justification Are there secondary justification(s) for this sole source?
Section V - Purchase History Has the Agency or University Purchased these supplies or services in the past?
Term Term From Term To Value Description Contract Number Type Section VI - Business Rationale
1. Provide a detailed explanation of the need for the supplies or services:
2. Provide a list and describe in detail the specifications required to satisfy the need:
3. Provide detail explaining the justification selected in Section IV to explain why the requested supplies or services are the only ones available that can satisfy the agency or university requirements?
4. What are the unique features of the supplies or services that are not available in any other product or by any other vendor? Provide specific quantifiable factors/qualifications:
5. Has the Agency or University considered alternative supplies or services to satisfy their need?
5a. If yes, name the alternative vendors whose supplies or services were evaluated:
5b. If yes, what were the alternatives for each vendor and why were they unacceptable? Be specific with regard to features, characteristics, requirements, capabilities and compatibility:
5c. Explain how the market evaluation was conducted?
*This evaluation is to determine available options within a market. If the evaluation is to determine quality or best suited option, this is not the appropriate source selection. Under no circumstances shall the evaluation consist of testing alternative options. These activities must be conducted in a competitive transparent environment (i.e. IFB or RFP).
5a. If no, why weren't alternatives evaluated?
6. Are there resellers or distributors?
7. What efforts were made to get the best possible price (i.e. did the agency/university negotiate) and how did you determine the price for this purchase is considered fair and reasonable?
8. Will this purchase obligate the State to this vendor for future purchases such as maintenance, licensing or continuing need?
8a. If yes, please provide details regarding future obligations and/or needs:
9. What will be the financial or other impact to the State if this sole source is not approved and a competitive bid is required?
10. Is there any additional information you would like to add to justify this sole source?
Section VII Requesting Department Signature Required I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed.
State Agency Bureau/Division Head or University Purchasing Director Approval and Signature Required I know and understand the contents of this Sole Source Justification and attest that all statements are true and correct and the fairness and reasonableness of the price was adequately confirmed. (All prior form fields will lock once this e-signature is completed) SPO Approval and Signature Required Sole Source Justification Form - Part II Section I - General Information Was a Sole Source hearing held per 30 ILCS 500/20-25?
Section II - Sole Source Hearing Details The State posted to the Illinois Procurement Bulletin a description of the State's need, the justification for the sole source decision, and information regarding the opportunity to submit comments and testify at a public hearing. Notice of the hearing was also posted outside of the hearing room 48 hours prior to the hearing.
The public hearing was conducted for the purpose of receiving testimony regarding the sole source determination. The Hearing Officer recommends the following:
The following relevant documents are attached:
Section III - CPO Approval and Signature Required 9.0.0.2.20101008.1.734229 ktople@ilsos.gov
| BulletinNum: 27-350SOS-ITSOS-B-53847 |
| Requesting: IL Secretary of State |
| CurrentPage: |
| PageCount: |
| Department: Information Technology |
| NeedIdentifiedDate: 07/01/2026 |
| NeedbyDate: 12/31/2026 |
| ProjectTitle: Queuing Services Contract |
| ProjectTitle: Queuing Services Contract |
| Vendor: ACF Technologies |
| Vendor: ACF Technologies |
| Description: The services utilized by Secretary of State, Drivers PMO and Information Technology are for Queuing Management Services, mobile ticketing services and on-line appointments throughout agency facilities across the state. Services include software licenses, hardware, support, maintenance, hosting and professional services. All Services are critical to these agency and customers for continued services throughout the state facilities to communicate, display and placement of requested services for customer lines. |
| ValueIs: Actual |
| ValueofInitialTerm: 220661.55000000 |
| P-Ayes: |
| P-Ano: |
| P-AValue: |
| ThisIsA: New Sole Source |
| One-Time: |
| Term: |
| BeginDate: 09/09/2026 |
| EndDate: 12/31/2026 |
| NumberofRenewals: 0.00000000 |
| RenewalLength: 0.00000000 |
| RenewalValue: 0.00000000 |
| ExceedingYes: |
| ExceedingNo: |
| TextField3: The pricing would be more economically beneficial if a longer term is sought out. |
| StateFunds: 1 |
| FederalFunds: 0 |
| FundingOther: 0 |
| TextField4: Implemented queueing system, software, and licensing |
| DropDownList1: Software License/Upgrade/Maintenance |
| DropDownList1: RFP |
| DropDownList1: Amendment |
| DropDownList1: Amendment |
| DropDownList1: Renewal |
| DropDownList1: Small Purchase |
| DropDownList1: Small Purchase |
| DropDownList1: Small Purchase |
| DropDownList1: Small Purchase |
| DropDownList1: Small Purchase |
| DropDownList1: Amendment |
| Justify: |
| PastYes: |
| PastNo: |
| DateTimeField20: 09/10/2014 |
| DateTimeField19: 09/09/2021 |
| NumericField8: 693195.00000000 |
| TextField5: 14IT026022 |
| DateTimeField18: 08/27/2020 |
| DateTimeField17: 09/09/2021 |
| NumericField9: 60000.00000000 |
| TextField10: Provided upgrades to allow SMS text features, annual licensing fees for software support, and a SMS text package |
| TextField11: 14IT026022 |
| DateTimeField16: 02/01/2021 |
| DateTimeField15: 09/09/2021 |
| NumericField10: 68155.00000000 |
| TextField16: Activated existing solution to include QFlow's QAnywhere, QFlow Check In Anywhere, and Wait Anywhere Qapps |
| TextField17: 14IT026022 |
| DateTimeField14: 09/10/2021 |
| DateTimeField13: 09/09/2024 |
| NumericField11: 392388.00000000 |
| TextField22: Three year renewal for license and maintenance |
| TextField23: 14IT026022 |
| DateTimeField12: |
| DateTimeField11: |
| NumericField12: |
| TextField28: |
| TextField29: |
| DateTimeField10: |
| DateTimeField9: |
| NumericField13: |
| TextField34: |
| TextField35: |
| DateTimeField8: |
| DateTimeField7: |
| NumericField14: |
| TextField40: |
| TextField41: |
| DateTimeField6: |
| DateTimeField5: |
| NumericField15: |
| TextField46: |
| TextField47: |
| DateTimeField4: |
| DateTimeField3: |
| NumericField16: |
| TextField52: |
| TextField53: |
| DateTimeField2: |
| DateTimeField1: |
| NumericField17: |
| TextField58: |
| TextField59: |
| IfMoreThan10: In addition to the original award for 14IT026022 and the two published change orders, ILSOS purchased required equipment and software that had set pricing as part of the original contract. These orders were inadvertently obligated and paid separate of the contract. After a full audit from 2014 to the present, it was determined that a total of $217,204.48 was spent on additional equipment and software directly related to the scope of this contract. |
| Q1Answer: In 2014, Secretary of State was looking for a solution to assist customers with better service at the agency facilities across the state. Customers come to agency facilities for Driver and Vehicle requirements, testing and needs. Customers in certain areas or facilities can develop long lines for service including lines outside the facility. Secretary of State was seeking vendor for a customer management (queueing) system with mandatory components of System Administration, Queueing Hardware/Software, PSA hardware/software and Professional Services. Vendor had to provide suggested solutions/models and pricing for a Kiosk solution, mobile ticket dispensers and SMS alerts. System had to capture the actual wait time and transaction time to service each customer for each step, differentiate between types of services performed per location and be able to assign priorities to different services and /or workstations. System had to allow SOS staff to establish thresholds of tolerable customer wait times and transaction times per service at each facility. The system had to be able to feed into signage to display real time queues and notifications when the thresholds are exceeded. System had to be able to prioritize, assign, monitor and balance SOS staff workloads based on facility needs and display real time data throughout the day per service: number of customers waiting, average wait time, average service time, number of open stations, current customer service times, total customers served, current or last ticket number served. After complete Audit of this contract and review of contract services ILSOS must move from an on-prem server to vendor hosting for the queueing system. This will allow for better service, data back up, system upgrade installation, updated software at our facilities and smooth communication from the queueing ticket system and the online appointments system, currently hosted by ACF. In addition to the on-prem server, SOS activated a text messaging appointment confirmation solution in 2020. This service provided enhanced customer service and is being requested to continue forward through the life of this contract. |
| Q2Answer: The agency currently operates 40 active sites utilizing the queueing system to assist in customer service to help regulate the customer lines. The agency requires up to 35 online appointment sites and currently there are only 16 sites available. ILSOS requires the licensing, maintenance, and SMS monthly plans for each facility. The solution provided by ACF as part of the original solicitation response for this contract provides all services to meet these needs. The request for additional online appointment sites, SMS text plans, vendor server hosting be done so to satisfy the need of the agency and its customers. In order to make sure the implementation of these new services is a smooth transition from on-prem to the vendor hosted services, SOS requires additional potential professional service hours from the vendor. |
| Q3Answer: ACF Technologies was awarded the original contract to provide a queueing system for some of our highest volume facilities. SOS requires these specifications to be provided by the current vendor to ensure the design and implementation of the queueing system fit the secure environment including servers, database, queuing system console, licenses, support and maintenance to keep everything running smoothly for our customers at the busiest facility locations. |
| Q4Answer: ACF technologies is not an off-the shelf product. ACF has provided complete services based off Secretary of State specifications and requirements as bid in 2014. ACF provides its own integrated software to our solution needs. They have customized their software and hardware to fit our agency environment. ACF provides proficient staff to apply updates to the system which are critical to SOS customers. The software/services described above are all required to continue serving SOS customers by shortening wait times and providing a better overall customer experience. |
| altYes: |
| altNo: |
| Q5aAnswer: ACF Technologies has met and continues to provide all services required and specified from the bid process and current contract model. The online appointment software was provided and evaluated as part of the original response, but was not activated until COVID affected the health, life, and safety of our customers by waiting in long lines at the facilities. The on-prem hosting solution originally requested no longer meets the needs of this software thus requiring SOS to move to the vendor hosted server. |
| Q5bAnswer: |
| Q5cAnswer: |
| Q6Yes: |
| Q6No: |
| Q6NA: |
| Q7Answer: The pricing has been consistent during the entire length of the contract. ACF Technologies continues to provide all services, including any additional contract options to this agency and its customers with same pricing format from 2014. Current pricing model has been provided with all options from the original contract. Pricing has remained the same or discounted as equipment has changed but pricing remains low to the Secretary of State. The costs were reviewed internally and determined to be fair and reasonable considering the time crunch to move sites into online appointments quickly. |
| Q8y: |
| Q8n: |
| Q8aAnswer: As the agency needs to increase the vendor system and solution from reviewed and approved facilities throughout the state, future obligations may be needed in the form of the purchasing new site software licenses and support, hardware licenses and support or the activation of any of the solutions that are available through the current ACF contract. Secretary of State continues to monitor facility services for customer service in regards to lines, wait times, transaction times, notifications and alerts. SOS will pursue any future obligations through the contract to continue to better serve or customers. |
| Q9Answer: If not approved, SOS will not be able to meet the needs and requirements of our customers as they have evolved over the years. We will have 16 facilities with online appointments and be unable to provide those to the downstate and southern Illinois regions. |
| Q10Answer: |
| SignatureField1: |
| TextField63: Kelly Mehring |
| TextField63: kmehring@ilsos.gov |
| TextField64: 217-843-4060 |
| TextField65: |
| Approve: |
| denied: |
| Comments: |
| Phone: 217-782-3091 |
| Date: 2026-08-25 |
| PN: Dave Littrell |
| Email: dlittrell@ilsos.gov |
| InitialPostingDate: 2026-08-25 |
| HearingYes: |
| HearingNo: |
| HearingDate: |
| HearingTime: |
| HearingLocation: |
| No: 0 |
| Members: 0 |
| recommends: |
| WrittenComments: 0 |
| DecisionMemo: 0 |
| HearingMinutes: 0 |
| Other: 0 |
| OtherComments: |
| HearingOfficerSignature: |
| Authorize: |
| AuthorizeWChanges: |
| Cancel: |
| CPOComments: |
| CPOSignature: |
| CPOTelephone: 217-782-8892 |
| CPOPrintedName: Katherine Tople |
| CPOEmail: |
File details come from the government source that posted it. Updated .