This solicitation seeks installation of fire protection and security systems at the historic Peirce Barn located in Rock Creek Park, Washington D.C. The National Park Service is requiring installation of a new sprinkler system, fire alarm system, and intrusion detection system including exterior cameras. A wet sprinkler system will be installed on the first and second floors while a dry-pipe system will be installed in the attic. Infrastructure improvements such as sistering attic floor joists and installing new water lines are also included in the scope of work. The solicitation includes specifications, drawings, wage determinations and other attachments. The HUBZone set-aside contract will have a period of performance from June 2022 to May 2023. Offerors must be registered in SAM.gov and submit responses by April 27th, 2022.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040569223
NPS, NCR - Regional Contracting
Acquisition Management Division
1100 Ohio Drive SW Contracting Anne Washington DC 20242-0001
PCR
Bophany Drakeford 202-913-3857
1x 04/27/2022
140P3022R0009
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Attachment 1 - Specifications
Attachment 2 - Drawings
Attachment 3 - Drawings - DC Permit Approved Plans
Attachment 4 - Davis-Bacon Determination DC20222002
Attachment 5 - Vaccination Certification Notification to DOI Contractors
Attachment 6 - Certification of Vaccination Form
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 225 calendar days and complete it within ________________ ________________ calendar days after receiving
06/10/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NPS, NCR - Regional Contracting Acquisition Management Division
1100 Ohio Drive SW Contracting Anne Washington DC 20242-0001
PCR
Bophany Drakeford
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 60
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140P3022R0009
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
This requirement is 100% set-aside for HUBZone small business concern. The offeror shall be registered in System for Award Management
(SAM.GOV).
Rock Creek Park - Install Fire Protection and
Security Systems at Peirce Barn
Legacy Doc #: NPS
Delivery: 05/31/2023
Delivery Location Code: 0009060188
NPS, National Capital Region
Lands, Resources and Planning
1100 Ohio Drive, SW
Washington DC 20242 US
Period of Performance: 06/15/2022 to 05/31/2023
00010 Installation of Fire Protection and Security
Systems at Peirce Barn of Rock Creek Park as specified in Attachments and in accordance with wage determination.
Product/Service Code: Z2JZ
Product/Service Description: REPAIR OR ALTERATION
OF MISCELLANEOUS BUILDINGS
Period of Performance: 06/01/2022 to 05/31/2023
POC Information-
Contract Specialist:
Bophany Drakeford; Bophany_drakeford@nps.gov or
202-913-3857
Contracting Officer Representative:
Mohammed Saraira; mohd_saraira@nps.gov or
202-619-6378
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P3022R0009
PAGE OF
4 | 60
TABLE OF CONTENTS
SECTION DESCRIPTION PAGE
PART I – The Schedule A Solicitation/Contract Form 1 B Price Schedule 5 C Descriptions/Specifications/Statement of Work 6 D Packaging and Marking 16 E Inspection and Acceptance 16 F Deliveries or Performance 16 G Contract Administration Data 17 H Special Contract Requirements 21
PART II – Contract Clauses I Contract Clauses 24
PART III – List of Documents, Exhibits, and Other Attachments J List of Attachments 33
PART IV – Representations and Instructions K Representations, Certifications, and Other Statements of Offerors 34 L Instructions, Conditions, and Notices to Offerors 42 M Evaluation Factors for Award 57
5 | 60
PART I - THE SCHEDULE
SECTION B – PRICE SCHEDULE
Install Fire Protection & Security Systems at Historic Peirce Barn Rock Creek Park
Historic Peirce Barn 2401 Tilden St. NW
Washington, DC 20008
Item Method of No. Description Measurement Total
BASE ITEMS
001 General Requirements Lump Sum $
002 Foundations Lump Sum $
003 Superstructure Lump Sum $
004 Fire Protection Lump Sum $
005 Plumbing Lump Sum $
006 Electrical Lump Sum $
007 Security Lump Sum $
008 Site Work Lump Sum $
BASE ITEM TOTAL $
Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
FAR 36.204 Disclosure of the magnitude of construction projects
The Government’s estimate is:
Between $250,000 and $500,000.
6 | 60
SECTION C – SPECIFICATIONS
C.1 NATIONAL PARK SERVICE
The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.
The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include: Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.
C.2 BACKGROUND
Rock Creek Park (ROCR) was authorized in 1890 and is 1,754-acre city park located in the nation’s capital of Washington, DC. Rock Creek Park has several open-play tennis courts, 13 miles of bridle trails, 32 miles of hiking trails, the Rock Creek Park Golf Course, the Carter Barron Amphitheater, Meridian Hill, Nature Center and Planetarium, several Civil War, and other historic sites.
Rock Creek Park manages Peirce Mill, Peirce Barn and the Peirce Springhouse, a cluster of buildings associated with the nineteenth-century Peirce family milling and agricultural enterprise. In addition to the nineteenth century history, there is also significant twentieth century association with the area. In the first decades of Rock Creek Park’s development, the stone mill, yard, and other structures became the centerpiece of a picturesque park picnic spot. At this time a dam was constructed for the sound of its falling water; the mill was converted to a teahouse; and picnic groves were established in this area formerly devoted to the Peirce enterprise. During the 1930s, the mill was “restored” by the NPS to operation. The barn is listed individually on the National Register and is also a contributing structure to the Historic District nomination for Rock Creek Park.
Currently the historic barn does not have a fire detection or protection system. The barn is used seasonally as a weekend visitor contact station. For more detailed and general information checkout the website at: Rock Creek Park (U.S. National Park Service) (nps.gov).
C.3 PURPOSE
The NPS - NCA – Rock Creek Park has a requirement for installation of a new fire protection and security system for the 2,804 square foot historic Peirce Barn as well as infrastructure improvements to support the new systems with minimal modification or disruption to the historic fabric. The installation of a properly designed fire protection system and intrusion detection system will allow for visitor and employee safety, comply with current life safety codes and protect this valuable historic resource.
C.4 SCOPE OF WORK
The contractor shall provide for all labor, supervision, materials, supplies, equipment, tools, transportation and any other necessary items to complete the installation of new fire protection and security systems as specified in the attachments for https://www.nps.gov/rocr/index.htm https://www.nps.gov/rocr/index.htm https://www.nps.gov/rocr/index.htm
7 | 60
Specifications and Drawings. Work include but not limited to the following: installation of a new water line to connect to the existing six-inch fire main located in the vault adjacent to Peirce Mill (requires ground disturbance); installation of a new sprinkler system and fire alarm system in the barn (includes piping, sprinklerheads, pull boxes, and audio/visual devices); and installation of a instrusion detection and video surveillance system (with two discreet, exterior cameras attached to the soffit, facia, or eave). A wet sprinkler system will be installed on the first and second floor, while a dry-pipe system will be installed in the attic. The attic floor joists will be sistered to increase floor load capacity to support the added infrastructure. The mechanical room in the barn will need to be slightly reconfigured to accommodate the new sprinkler piping, which will be installed below the foundation and in a section of the barn that is not seen/accessed by visitors. New audio/visual device will be mounted on exterior wooden post at the northeast corner of the barn to alert individuals of danger.
C.5 SPECIAL PROJECT SPECIFICATIONS
• All work shall be performed in accordance with attachments for Specifications and Drawings.
• The Barn is an active public visiting area. Contractor shall manage the site with fencing and safety measures to protect the public and to maintain a clean and orderly project site.
• Contractor is responsible for site access and occupation of parking area by the work, provide protection and repair damage to existing asphalt and landscape.
• The contractor shall protect the historic fabric of the existing buildings and take care as to not damage infrastructure.
• Proposed equipment must be approved by COR and the NPS-NCA Authority Having Jurisdiction (AHJ).
• DCRA permit needs to be renewed.
C.6 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS
• All work shall comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and the Secretary of Interior’s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings.
• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.
• The contractor shall comply with all pertinent provisions of the Occupational Safety and Health Administration (OSHA) Standards, 29 CFR 1910, and 1926; the National Fire Protection Association (NFPA). Work shall conform to the latest edition of the International Building Code (IBC) and family of International Codes including but not limited to: International Plumbing Code, International Electrical Code and International Mechanical Code; work shall conform to the Life Safety Code.; ANSI; and any pertinent federal and local codes and requirements. All OSHA requirements may be obtained without cost to the general public at www.osha.gov. The Contracting Officer (CO), Safety Officer, or Risk Manager may include additional measures if determined necessary or required by other Federal, or local law, or park policy.
• All work shall meet IBC (International Building Code), NFPA 101(National Fire Protection Association), NFPA 72, NFPA 70, NFPA 100 and other applicable codes, standards, and building codes.
• Contractor shall be responsible for obtaining all required permits (if applicable) and scheduling all applicable inspections. All inspections must be signed off and completed prior to receipt of final payment. All applicable submittals required, which may include warranty, production information, operation and maintenance documentation, etc. as defined throughout various sections of Specifications must be provided to COR and CO prior to submission of final invoice. Invoice will be rejected until are required documentation is submitted.
Please refer to each Section C.6 for required submittals.
• The contractor shall not use any materials with the COR deterines would be unsuitable for the purpose of harmful to any part of the buildings, the contents, equipment or persons.
• All materials and equipment are to be installed per manufacturer’s installation guidance.
8 | 60
• All trash and debris removal must be in accordance with local, and federal regulations.
• Contractor must have adequate liability insurance and proper license to perform all work stated herein.
C.7 PERIOD OF PERFORMANCE
All performance for this contract shall be completed within 225 calendar days after Notice to Proceed is issued.
C.8 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION
National Park Service (NPS) National Capital Area (NCA) Rock Creek Park Peirce Mill Barn 2401 Tilden St. NW Washington, D.C. 20008
Normal operational hours are approximately from 07:00 am to 3:30 PM Eastern Standard, Monday through Friday.
No work shall occur on the following Federal Holidays:
New Year’s Day – January 1st
Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th
Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th
Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.
Work to be performed outside of normal hours of operation, must be requested in advance in writing to COR and must be approved by the COR.
C.9 LIST OF REQUIRED SUBMITTALS
Before any work commences, the COR must approve all submittals and must include the required CM-16 transmittal form.
The required submittals shall include, but are not limited to, the following:
• Administrative Submittals o Bid, Payment, and Performance Bonds shall be completed, signed, and emailed to the CO.
o Certificate of Insurance shall be completed and emailed to the CO.
o List of Subcontractors to be used shall be completed, signed, and emailed to the CO and COR.
9 | 60 o SF-1413 for each subcontractor shall be completed, signed, and emailed to the CO and COR.
• Product Data:
o Submit manufacturer’s data for all materials.
o Product data shall include technical specifications, instructions for application and use, and Safety Data
Sheets (SDS).
• Plan Documents (prior to commencement of work) o Detailed work plan – must include methodology of work to be performed, and any other pertinent data necessary for complete repairs.
o Site Safety Plan.
o Quality Control Plan o Building protection plan.
o Site Staging Plan – must identify proposed staging of equipment storage, material storage, construction fence, refuse receptacle, dumpster requirements, etc.
o Construction Schedule o Schedule of Values o Site Superintendant
C.10 SITE MANAGEMENT
Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment and materials on a daily basis. Maintain site free of hazards at all times. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed.
C.11 RECYCLING AND DISPOSAL OF REFUSE
With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government; all refuse, excess or waste materials resulting from construction operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of. All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing or sale of materials and/or equipment shall be allowed on Government property.
C.12 SAFETY
During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction or the US Army Corps of Engineers “Safety and Health Requirements” Manual No. 385-1-1 dated November 30, 2014 (free online -https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ ) whichever is more stringent.
General Requirements:
• Work area shall always be maintained in a clean and safe condition.
• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).
• All on-site vehicles will also be marked with the company name (if applicable).
• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
10 | 60
• Any accident or incident, regarding the work under this contract, shall be reported immediately, in writing, to the Contracting Officer.
• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.
• The Contractor shall submit a job specific safety plan for NPS approval prior to commencing work.
• The Contractor shall be responsible for all safety communication and training requirements for the safe use of all equipment and materials. All protective equipment must meet ANSI standards and used as required by OSHA and as directed by the COR.
• The contractor shall comply with all pertinent provisions of the Occupational Safety and Health Administration (OSHA) Standards, 29 CFR Part 1910; the National Fire Protection Association (NFPA).
Health Requirements:
The contractor must adhere to all policy or regulation resulting from Executive Order 13999 – Protecting Worker Health and Safety regarding COVID-19 safety precautions and/or any other health and safety risk they may develop through-out performance of this contract. This requirement also includes any supplemental policy or regulation implemented at the NPS Park Level in response to this Executive Order, and/or any future Executive Order. This may include, but is not limited to:
• Social Distancing
• Personal Protective Equipment such as masks, eye protection, gloves, etc. being worn at all times while working on
Federal Property.
• Limiting the number personal, in tight or confined quarters, etc.
C.13 WARRANTY
The contractor shall furnish the NPS with all manufacturer warranty information for materials and parts provided under the terms of the Specifications and Drawings.
C.14 FIRE CONTROL
Contractor's Responsibility for Contractor-Caused Fires. The contractor, whether or not directed by the NPS, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by contractor's employees, whether set directly or indirectly as a result of contractor operations. The contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the contractor's employees or resulting from contract operations.
(1) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(2) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material must be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the NPS when unusually hazardous conditions exist.
(3) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
11 | 60
For any hot work (welding, etc.), the contractor shall obtain a Hot Work Permit from the park structural fire coordinator on each day that hot work is to be performed.
C.15 TEMPORARY FACILITIES
(a) STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with COR/POC, and contractor must be present when any materials are delivered to ensure proper placement in directed location. The Government will provide adequate staging area as close to the construction site as practicable.
The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material or equipment left in the storage area.
(b) SANITARY FACILITIES: Toilet facilities will not be provided by the Government. There is a sanitary facility available for pubic use and park visitors located next to Peirce Barn.
(c) WATER, AND ELECTRICITY: Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work.
(d) TELEPHONE: Cell phone or wireless access may or may not be available at the construction site.
C.16 ENVIRONMENTAL AND HISTORIC PRESERVATION
(a) The contractor shall comply with all existing Federal and D.C. regulations pertaining to hazardous material use, storage and disposal. Materials shall be stored, used and disposed of in such a manner as to not endanger or threaten the environment and the health and safety of D.C., Park employees and visitors. All generated waste shall be disposed of legally at the completion of each day's work and shall be the responsibility of the contractor.
Dumpsters and other waste disposal arrangements will be made separately from those used by the NPS for daily operations.
(b) Operation shall be performed and conducted to minimize modification and historic fabric of the infrastructure.
(c) The contractor shall submit a site logistics and spill contingency plan within thirty (30) days of performance start date to the Contracting Officer and Contracting Officer Representative.
C.17 EXISTING UTILITIES
The contractor shall field verify all utility locations. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by potholing. The contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
C.18 CONSTRUCTION SCHEDULE/VALUES
Within one (1) week after approval or award of contract and/or other time as agreed to, the contractor shall prepare a construction schedule of activities indicating labor, materials and activity proposed for each day. A schedule of values linking the payment items to the Construction Schedule shall be prepared for each task. This spreadsheet shall describe multiple activities being proposed from start to finish of the project and show construction work completion in %.
The construction schedule shall define the overall time required to perform the identified work. This time schedule shall determine the overall level of effort by discipline for the task. Each major task, including beginning time and ending time, 12 | 60 shall be identified within the schedule. Notify the Contracting Officer whenever there are significant departures from the approved Construction Schedule. Submit any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.
C.19 HAZARDOUS MATERIAL IDENTIFICATION
Submit Material Safety Data Sheets (MSDS) for any materials defined as hazardous under the most current revision of Federal Standard 313. Two (2) copies of each MSDS shall be submitted to the COR/POC no later than the delivery date of the product.
C.20 PROJECT MANAGER
It shall be the responsibility of the contractor to provide a responsible project manager to represent the contractor in all matters pertaining to work under this contract. The project manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. S/he shall be available in person, by telephone, or radio to respond to any and all problems during normal working hours.
The contractor shall provide a detailed resume of project manager for review and approval by the Contracting Officer. If during the term of this contract, the contractor changes or replaces the project manager, approval by the Contracting Officer is required.
C.21 SITE SUPERINTENDENT
It shall be the responsibility of the contractor to provide a responsible site superintendent to represent the contractor in the field in all matters pertaining under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel. The site superintendent may also be designated the project manager. S/he shall be available on site in person, by telephone, or radio to respond to any and all problems during normal working hours.
It is expected that this individual will be available on site for at least three (3) hours per workday. The site superintendent shall be responsible for on-site Quality Control and shall sign all contract submittal transmittal sheets. Site superintendent shall maintain on site a file containing the following project documents when applicable.
� Executed Task Order (Task Order Request, Price Proposal) � Contract Drawings � Contract Specifications � Quality Control Plan – (up to date) � As-Built Drawing – (up to date) if required � Task Orders � Modifications
This file shall be maintained and available to the Contracting Officer upon request. If the Site Superintendent is replaced, the existing Superintendent shall review all documents and ongoing issues with the new Superintendent. The Contracting Officer shall be invited to participate in the review.
C.22 BIOBASED AND SUSTAINABLE PRODUCTS
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,”
13 | 60 dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for biopreferred products that m a y b e required in performance of this construction contract:
• 2-Cycle Engine Oils – 34% Minimum BioBased Content
• Adhesives – 24% Minimum BioBased Content
• Concrete and Asphalt Cleaners – 70% Minimum BioBased Content
• Concrete and Asphalt Release Fluids – 87% Minimum BioBased Content
• Corrosion Preventatives – 53% Minimum BioBased Content
• Fuel Conditioners – 64% Minimum BioBased Content
• Hand Cleaners and Sanitizers – Hand Cleaners – 64% Minimum BioBased Content
• Inks – Sheetfed (Black) – 49% Minimum BioBased Content
• Inks – Sheetfed (Color) – 67% Minimum BioBased Content
• Intermediates – Binders – 47% Minimum BioBased Content
• Intermediates – Chemicals – 22% Minimum BioBased Content
• Intermediates – Paint and Coating Components – 22% Minimum BioBased Content
• Multipurpose Lubricants – 88% Minimum BioBased Content
• Pneumatic Equipment Lubricants – 67% Minimum Biobased Content
• Wood and Concrete Sealers – Membrane Concrete Sealers – 11% Minimum Biobased Content
• Wood and Concrete Sealers – Penetrating Liquids – 79% Minimum Biobased Content
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.
C.23 DEFINITIONS (Not included in Federal Acquisition Regulations)
Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
2-Cycle Engine Oils - Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear.
Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.
Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.
Contract Pay Item - A pay item designated on the bid schedule and described by a specification.
Concrete and Asphalt Cleaners - Chemicals used in concrete etching as well as to remove petroleum-based soils, lubricants, paints, mastics, organic soils, rust, and dirt from concrete, asphalt, stone and other hard porous surfaces. Products within this item include only those marketed for use in commercial or residential construction or industrial applications
Concrete and Asphalt Release Fluids - Products that are designed to provide a lubricating barrier between the composite surface materials (e.g., concrete or asphalt) and the container (e.g., wood or metal forms, truck beds, roller surfaces).
http://www.biopreferred.gov./
14 | 60
Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.
Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the Contracting Officer’s Representatives are defined below in this Section or in a letter of designation issued by the Contracting Officer.
Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Corrosion Preventatives – Products designed to prevent the deterioration (corrosion) of metals.
Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of fire protection and security systems.
Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
Fuel Conditioners - Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system.
Inks – Sheetfed (Black) - Inks are liquid or powdered materials that are available in several colors and that are used to create the visual image on a substrate when writing, printing, and copying. Black inks used on coated and uncoated paper, paperboard, some plastic, and foil to print in black on annual reports, brochures, labels, and similar materials.
Inks – Sheetfed (Color) - Inks are liquid or powdered materials that are available in several colors and that are used to create the visual image on a substrate when writing, printing, and copying. Pigmented inks (other than black inks) used on coated and uncoated paper, paperboard, some plastic, and foil to print in color on annual reports, brochures, labels, and similar materials.
Intermediates – Binders - Materials used to provide cohesiveness throughout an entire finished product. Binders are generally polymers or polymer precursors (such as epoxies) and include the polymeric materials used to formulate coatings, adhesives, sealants, and elastomers. The product category does not include adhesives and glues that are finished products used to attach the surfaces of two or more distinct and separate components to one another.
Intermediates – Chemicals - Ingredients used as reactants for organic synthesis reactions rather than for their functional properties in a chemical mixture; those used as building block chemicals and secondary chemicals such as glycerol, succinic acid, propanediol, and monomers such as lactic acid and propylene; those used for specific functional properties during manufacturing of other products such as pH regulators, flocculants, precipitants, neutralizing agents, emulsifiers, viscosity reducers, rheology modifiers, adhesion agents, detergents, wetting agents, foaming agents, or dispersants; those that are added to end-use products for their specific functional properties including polyols, polymers, and solvents for thinning and drying applications but excluding solvents used for cleaning; and those used for dyes, pigments, and scents including flavorings for non-food products such as lip balm.
Intermediates – Paint and Coating Components - Ingredients used to formulate finished waterborne or solvent borne paint and coating products. Examples of Intermediates – Paint and Coating Components include binders, pigments, thickeners, curing agents, modifiers, humectants, open time additives, alkyd latex resins, polymers, polyols, reactive oligomers, or reactive diluents.
15 | 60
Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.
Materials - Any substances for use in the construction of the project and its appurtenances.
Multipurpose Lubricants - Products designed to provide lubrication under a variety of conditions and in a variety of industrial settings to prevent friction or rust. Greases, which are lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners, are not included in this item. In addition, task-specific lubricants, such as chain and cable lubricants and gear lubricants, are not included in this item.
Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.
Pneumatic Equipment Lubricants – Lubricants designed specifically for pneumatic equipment, including air compressors, vacuum pumps, in-line lubricators, rock drills, jackhammers, etc.
Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.
Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard Specifications.
Specifications - A general term applied to all written directions and requirements pertaining to performance of work.
Utility Services - Are services such as electricity, gas, steam, water and sewage.
Wood and Concrete Sealers – Membrane Concrete Sealers - Products that are penetrating liquids formulated to protect wood and/or concrete, including masonry and fiber cement siding, from damage caused by insects, moisture, and decaying fungi and to make surfaces water resistant. Concrete sealers that are formulated to form a protective layer on the surface of the substrate.
Wood and Concrete Sealers – Penetrating Liquids - Products that are penetrating liquids formulated to protect wood and/or concrete, including masonry and fiber cement siding, from damage caused by insects, moisture, and decaying fungi and to make surfaces water resistant. Wood and concrete sealers that are formulated to penetrate the outer surface of the substrate.
Work Order - An order written by the Contracting Officer or Contracting Officer’s Representative, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.
C.24 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT
ADMINISTRATION
A. Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.
B. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;
16 | 60
(1) Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;
(2) Requesting removal of unsuitable contractor employees;
(3) Ensuring adequacy of schedule and Quality Control Plan, including changes;
(4) Ordering re-performance of unacceptable work or performance by other mean, etc.
C. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.
SECTION D--PACKAGING AND MARKING
{Not Applicable. This section is intentionally left blank.}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Acquisition.GOV | www.acquisition.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements (AUG 1996)
FULL-TEXT CLAUSES
Not Applicable
SECTION F--DELIVERIES OR PERFORMANCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
17 | 60
Acquisition.GOV | www.acquisition.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FULL-TEXT CLAUSES
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -
ALTERNATE I (APR 1984)
The Contractor shall be required to:
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than two hundred twenty-five (225) days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
The completion date may be extended by the number of calendar days after the date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 POST AWARD CONFERENCE
Prior to commencement of work, the CO or COR and/or POC will arrange a meeting with the contractor to discuss the contract terms and work performance requirements. A work progress schedule will be developed at this meeting.
It will be scheduled as soon as possible after the date of the contract award. All dates and locations of the conference will be mutually agreed upon, and may be held via teleconference or onsite.
G.2 GOVERNMENT FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
Item No. Property Description Qty Location Date Available or Delivery Date
N/A
18 | 60
G.3 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-
CONTACT (POC)
A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.
B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the
Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)
D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
E. The COR's major duties and responsibilities are contained in the Forest Service Handbook of Contract
Administration. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
1. Approve Change Orders and Modifications
2. Take action to terminate the contract for default or Government convenience.
3. Make contract adjustments under the Differing Site Conditions clause.
4. Grant extensions of contract time.
5. Approve assignment of claims.
6. Make final decisions under the Disputes clause.
7. Make final acceptance under the contract.
8. Make final decisions under the Suspension of Work clause.
9. Make equitable adjustments.
10. Authorize change in amount of Payment Retention.
11. Approve subcontractors.
12. Approve payments with deductions or final payment.
13. Approve use and possession prior to completion.
14. Enforce the warranty provisions.
15. Issue any direction that would result in a possible change to contract requirements.
F. The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance.
19 | 60
• The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the CO prior to completion of the contract.
• The CO should be informed as soon as possible of any actions or inactions by the Contractor or the
Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.)
• On all matters that pertain to the contract terms the Contractor must communicate with the CO.
Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits.
Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
• The POC has limited authority under this contract and responsibilities may include, but are not limited to:
1. Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;