This solicitation seeks proposals for the installation of fire protection and security systems at the historic Peirce Barn located in Rock Creek Park, Washington D.C. The National Park Service is soliciting bids to install a new sprinkler system, fire alarm system, and intrusion detection and video surveillance system at the 2,804 square foot barn with minimal disruption to the historic structure. Proposals are due by April 27th, 2022 and the contract is valued between $250,000 to $500,000 with work to be completed within 225 calendar days of the notice to proceed. The selected contractor will be responsible for all labor, materials, equipment, permits, and insurance to install the new systems in compliance with historic preservation standards and applicable safety codes.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P3022R0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PCR

Washington DC 20242-0001 1100 Ohio Drive SW Contracting Anne Acquisition Management Division NPS, NCR - Regional Contracting

04/27/20220001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/27/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Rock Creek Park - Install Fire Protection and Security Systems at Peirce Barn

Amendment P00001 is to amend Section L of the solicitation under FAR 52.236-27 Site Visit to add date, time and location. Site visit will be held on Monday, May 23, 2022 at 8:00 a.m. EDT located at:

Peirce Barn

2401 Tilden St. NW

Washington, D.C. 20008

All other terms and conditions remain unchanged as a result of this amendment.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Bophany Drakeford

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 59

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P3022R0009/0001

Legacy Doc #: NPS

Period of Performance: 06/15/2022 to 05/31/2023

POC Information-

Contract Specialist:

Bophany Drakeford; Bophany_drakeford@nps.gov or

202-913-3857

Contracting Officer Representative:

Mohammed Saraira; mohd_saraira@nps.gov or

202-619-6378

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED

140P3022R0009

PAGE OF

4 | 60

TABLE OF CONTENTS

SECTION DESCRIPTION PAGE

PART I – The Schedule A Solicitation/Contract Form 1 B Price Schedule 5 C Descriptions/Specifications/Statement of Work 6 D Packaging and Marking 16 E Inspection and Acceptance 16 F Deliveries or Performance 16 G Contract Administration Data 17 H Special Contract Requirements 21

PART II – Contract Clauses I Contract Clauses 24

PART III – List of Documents, Exhibits, and Other Attachments J List of Attachments 33

PART IV – Representations and Instructions K Representations, Certifications, and Other Statements of Offerors 34 L Instructions, Conditions, and Notices to Offerors 42 M Evaluation Factors for Award 57

5 | 60

PART I - THE SCHEDULE

SECTION B – PRICE SCHEDULE

Install Fire Protection & Security Systems at Historic Peirce Barn Rock Creek Park

Historic Peirce Barn 2401 Tilden St. NW

Washington, DC 20008

Item Method of No. Description Measurement Total

BASE ITEMS

001 General Requirements Lump Sum $

002 Foundations Lump Sum $

003 Superstructure Lump Sum $

004 Fire Protection Lump Sum $

005 Plumbing Lump Sum $

006 Electrical Lump Sum $

007 Security Lump Sum $

008 Site Work Lump Sum $

BASE ITEM TOTAL $

Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

FAR 36.204 Disclosure of the magnitude of construction projects

The Government’s estimate is:

Between $250,000 and $500,000.

6 | 60

SECTION C – SPECIFICATIONS

C.1 NATIONAL PARK SERVICE

The National Park Service (NPS) is a bureau of the U.S. Department of the Interior (DOI) that has been entrusted with the care of our national parks since 1916. The NPS preserves unimpaired natural and cultural resources, and values of the National Park System for the enjoyment, education, and inspiration of this and future generations. The NPS cooperates with partners to extend the benefits of natural and cultural resource conservation and outdoor recreation throughout this country and the world.

The NPS - National Capital Area (NCA) supports natural wonders to man-made marvels in Virginia, West Virginia, Maryland, and the District of Columbia. The NCA parks include: Antietam National Battlefield, Catoctin Mountain Park, Chesapeake & Ohio Canal National Historical Park, George Washington Memorial Parkway, Harpers Ferry National Historical Park, Manassas National Battlefield Park, Monocacy National Battlefield, National Capital Parks - East, National Mall and Memorial Parks, Potomac Heritage National Scenic Trail, President’s Park, Prince William Forest Park, Rock Creek Park, and Wolf Trap National Park for the Performing Arts.

C.2 BACKGROUND

Rock Creek Park (ROCR) was authorized in 1890 and is 1,754-acre city park located in the nation’s capital of Washington, DC. Rock Creek Park has several open-play tennis courts, 13 miles of bridle trails, 32 miles of hiking trails, the Rock Creek Park Golf Course, the Carter Barron Amphitheater, Meridian Hill, Nature Center and Planetarium, several Civil War, and other historic sites.

Rock Creek Park manages Peirce Mill, Peirce Barn and the Peirce Springhouse, a cluster of buildings associated with the nineteenth-century Peirce family milling and agricultural enterprise. In addition to the nineteenth century history, there is also significant twentieth century association with the area. In the first decades of Rock Creek Park’s development, the stone mill, yard, and other structures became the centerpiece of a picturesque park picnic spot. At this time a dam was constructed for the sound of its falling water; the mill was converted to a teahouse; and picnic groves were established in this area formerly devoted to the Peirce enterprise. During the 1930s, the mill was “restored” by the NPS to operation. The barn is listed individually on the National Register and is also a contributing structure to the Historic District nomination for Rock Creek Park.

Currently the historic barn does not have a fire detection or protection system. The barn is used seasonally as a weekend visitor contact station. For more detailed and general information checkout the website at: Rock Creek Park (U.S. National Park Service) (nps.gov).

C.3 PURPOSE

The NPS - NCA – Rock Creek Park has a requirement for installation of a new fire protection and security system for the 2,804 square foot historic Peirce Barn as well as infrastructure improvements to support the new systems with minimal modification or disruption to the historic fabric. The installation of a properly designed fire protection system and intrusion detection system will allow for visitor and employee safety, comply with current life safety codes and protect this valuable historic resource.

C.4 SCOPE OF WORK

The contractor shall provide for all labor, supervision, materials, supplies, equipment, tools, transportation and any other necessary items to complete the installation of new fire protection and security systems as specified in the attachments for https://www.nps.gov/rocr/index.htm https://www.nps.gov/rocr/index.htm https://www.nps.gov/rocr/index.htm

7 | 60

Specifications and Drawings. Work include but not limited to the following: installation of a new water line to connect to the existing six-inch fire main located in the vault adjacent to Peirce Mill (requires ground disturbance); installation of a new sprinkler system and fire alarm system in the barn (includes piping, sprinklerheads, pull boxes, and audio/visual devices); and installation of a instrusion detection and video surveillance system (with two discreet, exterior cameras attached to the soffit, facia, or eave). A wet sprinkler system will be installed on the first and second floor, while a dry-pipe system will be installed in the attic. The attic floor joists will be sistered to increase floor load capacity to support the added infrastructure. The mechanical room in the barn will need to be slightly reconfigured to accommodate the new sprinkler piping, which will be installed below the foundation and in a section of the barn that is not seen/accessed by visitors. New audio/visual device will be mounted on exterior wooden post at the northeast corner of the barn to alert individuals of danger.

C.5 SPECIAL PROJECT SPECIFICATIONS

• All work shall be performed in accordance with attachments for Specifications and Drawings.

• The Barn is an active public visiting area. Contractor shall manage the site with fencing and safety measures to protect the public and to maintain a clean and orderly project site.

• Contractor is responsible for site access and occupation of parking area by the work, provide protection and repair damage to existing asphalt and landscape.

• The contractor shall protect the historic fabric of the existing buildings and take care as to not damage infrastructure.

• Proposed equipment must be approved by COR and the NPS-NCA Authority Having Jurisdiction (AHJ).

• DCRA permit needs to be renewed.

C.6 CONTRACTOR AND PRODUCT ADDITIONAL REQUIREMENTS

• All work shall comply with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, and the Secretary of Interior’s Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings.

• The contractor is responsible for adherence to all Occupational Safety and Health Administration (OSHA) Regulation, specifically 29 CFR 1910 - General Industry and 29 CFR 1926 – Construction and applicable State Regulations.

• The contractor shall comply with all pertinent provisions of the Occupational Safety and Health Administration (OSHA) Standards, 29 CFR 1910, and 1926; the National Fire Protection Association (NFPA). Work shall conform to the latest edition of the International Building Code (IBC) and family of International Codes including but not limited to: International Plumbing Code, International Electrical Code and International Mechanical Code; work shall conform to the Life Safety Code.; ANSI; and any pertinent federal and local codes and requirements. All OSHA requirements may be obtained without cost to the general public at www.osha.gov. The Contracting Officer (CO), Safety Officer, or Risk Manager may include additional measures if determined necessary or required by other Federal, or local law, or park policy.

• All work shall meet IBC (International Building Code), NFPA 101(National Fire Protection Association), NFPA 72, NFPA 70, NFPA 100 and other applicable codes, standards, and building codes.

• Contractor shall be responsible for obtaining all required permits (if applicable) and scheduling all applicable inspections. All inspections must be signed off and completed prior to receipt of final payment. All applicable submittals required, which may include warranty, production information, operation and maintenance documentation, etc. as defined throughout various sections of Specifications must be provided to COR and CO prior to submission of final invoice. Invoice will be rejected until are required documentation is submitted.

Please refer to each Section C.6 for required submittals.

• The contractor shall not use any materials with the COR deterines would be unsuitable for the purpose of harmful to any part of the buildings, the contents, equipment or persons.

• All materials and equipment are to be installed per manufacturer’s installation guidance.

8 | 60

• All trash and debris removal must be in accordance with local, and federal regulations.

• Contractor must have adequate liability insurance and proper license to perform all work stated herein.

C.7 PERIOD OF PERFORMANCE

All performance for this contract shall be completed within 225 calendar days after Notice to Proceed is issued.

C.8 GENERAL PLACE OF PERFORMANCE AND HOURS OF OPERATION

National Park Service (NPS) National Capital Area (NCA) Rock Creek Park Peirce Mill Barn 2401 Tilden St. NW Washington, D.C. 20008

Normal operational hours are approximately from 07:00 am to 3:30 PM Eastern Standard, Monday through Friday.

No work shall occur on the following Federal Holidays:

New Year’s Day – January 1st

Martin Luther King Junior’s Birthday – Third Monday in January President’s Day – Third Monday in February Memorial Day – Last Monday in May Juneteenth – June 19th Independence Day – July 4th Labor Day – First Monday in September Columbus Day/Indigenous Peoples Day – Second Monday in October Veteran’s Day – November 11th

Thanksgiving Day – Fourth Thursday in November Christmas Day – December 25th

Note - if any of the holidays stated above fall on a Saturday, the Friday before the actual day is the official day the Government takes for the holiday. If the holiday falls on a Sunday, the Monday after the actual day is the official day the Government takes for the holiday. These dates do not account for any other days or shorten days that may be added prior to any of the holidays mentioned above that may be added at the discretion of any Presidential Administration and implemented by the DOI.

Work to be performed outside of normal hours of operation, must be requested in advance in writing to COR and must be approved by the COR.

C.9 LIST OF REQUIRED SUBMITTALS

Before any work commences, the COR must approve all submittals and must include the required CM-16 transmittal form.

The required submittals shall include, but are not limited to, the following:

• Administrative Submittals o Bid, Payment, and Performance Bonds shall be completed, signed, and emailed to the CO.

o Certificate of Insurance shall be completed and emailed to the CO.

o List of Subcontractors to be used shall be completed, signed, and emailed to the CO and COR.

9 | 60 o SF-1413 for each subcontractor shall be completed, signed, and emailed to the CO and COR.

• Product Data:

o Submit manufacturer’s data for all materials.

o Product data shall include technical specifications, instructions for application and use, and Safety Data

Sheets (SDS).

• Plan Documents (prior to commencement of work) o Detailed work plan – must include methodology of work to be performed, and any other pertinent data necessary for complete repairs.

o Site Safety Plan.

o Quality Control Plan o Building protection plan.

o Site Staging Plan – must identify proposed staging of equipment storage, material storage, construction fence, refuse receptacle, dumpster requirements, etc.

o Construction Schedule o Schedule of Values o Site Superintendant

C.10 SITE MANAGEMENT

Maintain walkways, driveways, roads, parking, and project site to be free of all construction debris, equipment and materials on a daily basis. Maintain site free of hazards at all times. Occupancy access shall be negotiated on a project specific basis. Maintain the level of access provided to the facility through the project duration if tenant occupancy is retained. Safety equipment, fencing and barriers shall be installed per safety plan. Erosion control and sedimentation structures shall be constructed in according with EPA standards as needed. All historical and/or archeological issues shall be addressed as needed.

C.11 RECYCLING AND DISPOSAL OF REFUSE

With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government; all refuse, excess or waste materials resulting from construction operations shall become the property of the contractor (excluding native vegetative and soil debris) and shall be recycled and/or disposed of. All disposals shall be in accordance with federal, state, and local laws and regulations. No disposal, viewing or sale of materials and/or equipment shall be allowed on Government property.

C.12 SAFETY

During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction or the US Army Corps of Engineers “Safety and Health Requirements” Manual No. 385-1-1 dated November 30, 2014 (free online -https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ ) whichever is more stringent.

General Requirements:

• Work area shall always be maintained in a clean and safe condition.

• All personnel providing service on-site shall have pictured identification and uniform displaying the name of the company (if appliable).

• All on-site vehicles will also be marked with the company name (if applicable).

• Use of barricades, ropes, signs, or audible signals is required, and the contractor must take all necessary precautions for the protection of the work, property, and safety of the public.

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

10 | 60

• Any accident or incident, regarding the work under this contract, shall be reported immediately, in writing, to the Contracting Officer.

• Smoking of any kind will not be permitted on premises. The COR/POC may authorize the use of a designated smoking if requested.

• The Contractor shall submit a job specific safety plan for NPS approval prior to commencing work.

• The Contractor shall be responsible for all safety communication and training requirements for the safe use of all equipment and materials. All protective equipment must meet ANSI standards and used as required by OSHA and as directed by the COR.

• The contractor shall comply with all pertinent provisions of the Occupational Safety and Health Administration (OSHA) Standards, 29 CFR Part 1910; the National Fire Protection Association (NFPA).

Health Requirements:

The contractor must adhere to all policy or regulation resulting from Executive Order 13999 – Protecting Worker Health and Safety regarding COVID-19 safety precautions and/or any other health and safety risk they may develop through-out performance of this contract. This requirement also includes any supplemental policy or regulation implemented at the NPS Park Level in response to this Executive Order, and/or any future Executive Order. This may include, but is not limited to:

• Social Distancing

• Personal Protective Equipment such as masks, eye protection, gloves, etc. being worn at all times while working on

Federal Property.

• Limiting the number personal, in tight or confined quarters, etc.

C.13 WARRANTY

The contractor shall furnish the NPS with all manufacturer warranty information for materials and parts provided under the terms of the Specifications and Drawings.

C.14 FIRE CONTROL

Contractor's Responsibility for Contractor-Caused Fires. The contractor, whether or not directed by the NPS, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by contractor's employees, whether set directly or indirectly as a result of contractor operations. The contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the contractor's employees or resulting from contract operations.

(1) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(2) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material must be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the NPS when unusually hazardous conditions exist.

(3) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

11 | 60

For any hot work (welding, etc.), the contractor shall obtain a Hot Work Permit from the park structural fire coordinator on each day that hot work is to be performed.

C.15 TEMPORARY FACILITIES

(a) STAGING AREA: The contractor shall arrange the location for exterior stockpiling of materials (i.e. storage) with COR/POC, and contractor must be present when any materials are delivered to ensure proper placement in directed location. The Government will provide adequate staging area as close to the construction site as practicable.

The Government will NOT provide any secured storage/staging areas for the contractor. The contractor shall be responsible for protecting materials stockpiled against adverse weather, damage, theft, and other risks of loss. The Government assumes no responsibility for material or equipment left in the storage area.

(b) SANITARY FACILITIES: Toilet facilities will not be provided by the Government. There is a sanitary facility available for pubic use and park visitors located next to Peirce Barn.

(c) WATER, AND ELECTRICITY: Should water and electricity not be readily available, the contractor shall provide these services as needed to perform the required work.

(d) TELEPHONE: Cell phone or wireless access may or may not be available at the construction site.

C.16 ENVIRONMENTAL AND HISTORIC PRESERVATION

(a) The contractor shall comply with all existing Federal and D.C. regulations pertaining to hazardous material use, storage and disposal. Materials shall be stored, used and disposed of in such a manner as to not endanger or threaten the environment and the health and safety of D.C., Park employees and visitors. All generated waste shall be disposed of legally at the completion of each day's work and shall be the responsibility of the contractor.

Dumpsters and other waste disposal arrangements will be made separately from those used by the NPS for daily operations.

(b) Operation shall be performed and conducted to minimize modification and historic fabric of the infrastructure.

(c) The contractor shall submit a site logistics and spill contingency plan within thirty (30) days of performance start date to the Contracting Officer and Contracting Officer Representative.

C.17 EXISTING UTILITIES

The contractor shall field verify all utility locations. This shall include but not be limited to the use of sonic, electronic or magnetic detection devices, by noting pull box and utility box locations at the surface, use of locator services, and by potholing. The contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

C.18 CONSTRUCTION SCHEDULE/VALUES

Within one (1) week after approval or award of contract and/or other time as agreed to, the contractor shall prepare a construction schedule of activities indicating labor, materials and activity proposed for each day. A schedule of values linking the payment items to the Construction Schedule shall be prepared for each task. This spreadsheet shall describe multiple activities being proposed from start to finish of the project and show construction work completion in %.

The construction schedule shall define the overall time required to perform the identified work. This time schedule shall determine the overall level of effort by discipline for the task. Each major task, including beginning time and ending time, 12 | 60 shall be identified within the schedule. Notify the Contracting Officer whenever there are significant departures from the approved Construction Schedule. Submit any requests to modify the Construction Schedule, in writing to the Contracting Officer with an explanation for the deviation.

C.19 HAZARDOUS MATERIAL IDENTIFICATION

Submit Material Safety Data Sheets (MSDS) for any materials defined as hazardous under the most current revision of Federal Standard 313. Two (2) copies of each MSDS shall be submitted to the COR/POC no later than the delivery date of the product.

C.20 PROJECT MANAGER

It shall be the responsibility of the contractor to provide a responsible project manager to represent the contractor in all matters pertaining to work under this contract. The project manager shall have the responsibility of overall supervision, quality control, cost estimating and be responsible for the management of all ongoing work. S/he shall be available in person, by telephone, or radio to respond to any and all problems during normal working hours.

The contractor shall provide a detailed resume of project manager for review and approval by the Contracting Officer. If during the term of this contract, the contractor changes or replaces the project manager, approval by the Contracting Officer is required.

C.21 SITE SUPERINTENDENT

It shall be the responsibility of the contractor to provide a responsible site superintendent to represent the contractor in the field in all matters pertaining under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel. The site superintendent may also be designated the project manager. S/he shall be available on site in person, by telephone, or radio to respond to any and all problems during normal working hours.

It is expected that this individual will be available on site for at least three (3) hours per workday. The site superintendent shall be responsible for on-site Quality Control and shall sign all contract submittal transmittal sheets. Site superintendent shall maintain on site a file containing the following project documents when applicable.

� Executed Task Order (Task Order Request, Price Proposal) � Contract Drawings � Contract Specifications � Quality Control Plan – (up to date) � As-Built Drawing – (up to date) if required � Task Orders � Modifications

This file shall be maintained and available to the Contracting Officer upon request. If the Site Superintendent is replaced, the existing Superintendent shall review all documents and ongoing issues with the new Superintendent. The Contracting Officer shall be invited to participate in the review.

C.22 BIOBASED AND SUSTAINABLE PRODUCTS

The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,”

13 | 60 dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.

All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.

The following is a list of categories for biopreferred products that m a y b e required in performance of this construction contract:

• 2-Cycle Engine Oils – 34% Minimum BioBased Content

• Adhesives – 24% Minimum BioBased Content

• Concrete and Asphalt Cleaners – 70% Minimum BioBased Content

• Concrete and Asphalt Release Fluids – 87% Minimum BioBased Content

• Corrosion Preventatives – 53% Minimum BioBased Content

• Fuel Conditioners – 64% Minimum BioBased Content

• Hand Cleaners and Sanitizers – Hand Cleaners – 64% Minimum BioBased Content

• Inks – Sheetfed (Black) – 49% Minimum BioBased Content

• Inks – Sheetfed (Color) – 67% Minimum BioBased Content

• Intermediates – Binders – 47% Minimum BioBased Content

• Intermediates – Chemicals – 22% Minimum BioBased Content

• Intermediates – Paint and Coating Components – 22% Minimum BioBased Content

• Multipurpose Lubricants – 88% Minimum BioBased Content

• Pneumatic Equipment Lubricants – 67% Minimum Biobased Content

• Wood and Concrete Sealers – Membrane Concrete Sealers – 11% Minimum Biobased Content

• Wood and Concrete Sealers – Penetrating Liquids – 79% Minimum Biobased Content

For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.

C.23 DEFINITIONS (Not included in Federal Acquisition Regulations)

Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

2-Cycle Engine Oils - Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear.

Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.

Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.

Contract Pay Item - A pay item designated on the bid schedule and described by a specification.

Concrete and Asphalt Cleaners - Chemicals used in concrete etching as well as to remove petroleum-based soils, lubricants, paints, mastics, organic soils, rust, and dirt from concrete, asphalt, stone and other hard porous surfaces. Products within this item include only those marketed for use in commercial or residential construction or industrial applications

Concrete and Asphalt Release Fluids - Products that are designed to provide a lubricating barrier between the composite surface materials (e.g., concrete or asphalt) and the container (e.g., wood or metal forms, truck beds, roller surfaces).

http://www.biopreferred.gov./

14 | 60

Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.

Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the Contracting Officer’s Representatives are defined below in this Section or in a letter of designation issued by the Contracting Officer.

Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

Corrosion Preventatives – Products designed to prevent the deterioration (corrosion) of metals.

Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of fire protection and security systems.

Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.

Fuel Conditioners - Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system.

Inks – Sheetfed (Black) - Inks are liquid or powdered materials that are available in several colors and that are used to create the visual image on a substrate when writing, printing, and copying. Black inks used on coated and uncoated paper, paperboard, some plastic, and foil to print in black on annual reports, brochures, labels, and similar materials.

Inks – Sheetfed (Color) - Inks are liquid or powdered materials that are available in several colors and that are used to create the visual image on a substrate when writing, printing, and copying. Pigmented inks (other than black inks) used on coated and uncoated paper, paperboard, some plastic, and foil to print in color on annual reports, brochures, labels, and similar materials.

Intermediates – Binders - Materials used to provide cohesiveness throughout an entire finished product. Binders are generally polymers or polymer precursors (such as epoxies) and include the polymeric materials used to formulate coatings, adhesives, sealants, and elastomers. The product category does not include adhesives and glues that are finished products used to attach the surfaces of two or more distinct and separate components to one another.

Intermediates – Chemicals - Ingredients used as reactants for organic synthesis reactions rather than for their functional properties in a chemical mixture; those used as building block chemicals and secondary chemicals such as glycerol, succinic acid, propanediol, and monomers such as lactic acid and propylene; those used for specific functional properties during manufacturing of other products such as pH regulators, flocculants, precipitants, neutralizing agents, emulsifiers, viscosity reducers, rheology modifiers, adhesion agents, detergents, wetting agents, foaming agents, or dispersants; those that are added to end-use products for their specific functional properties including polyols, polymers, and solvents for thinning and drying applications but excluding solvents used for cleaning; and those used for dyes, pigments, and scents including flavorings for non-food products such as lip balm.

Intermediates – Paint and Coating Components - Ingredients used to formulate finished waterborne or solvent borne paint and coating products. Examples of Intermediates – Paint and Coating Components include binders, pigments, thickeners, curing agents, modifiers, humectants, open time additives, alkyd latex resins, polymers, polyols, reactive oligomers, or reactive diluents.

15 | 60

Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.

Materials - Any substances for use in the construction of the project and its appurtenances.

Multipurpose Lubricants - Products designed to provide lubrication under a variety of conditions and in a variety of industrial settings to prevent friction or rust. Greases, which are lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners, are not included in this item. In addition, task-specific lubricants, such as chain and cable lubricants and gear lubricants, are not included in this item.

Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.

Pneumatic Equipment Lubricants – Lubricants designed specifically for pneumatic equipment, including air compressors, vacuum pumps, in-line lubricators, rock drills, jackhammers, etc.

Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.

Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard Specifications.

Specifications - A general term applied to all written directions and requirements pertaining to performance of work.

Utility Services - Are services such as electricity, gas, steam, water and sewage.

Wood and Concrete Sealers – Membrane Concrete Sealers - Products that are penetrating liquids formulated to protect wood and/or concrete, including masonry and fiber cement siding, from damage caused by insects, moisture, and decaying fungi and to make surfaces water resistant. Concrete sealers that are formulated to form a protective layer on the surface of the substrate.

Wood and Concrete Sealers – Penetrating Liquids - Products that are penetrating liquids formulated to protect wood and/or concrete, including masonry and fiber cement siding, from damage caused by insects, moisture, and decaying fungi and to make surfaces water resistant. Wood and concrete sealers that are formulated to penetrate the outer surface of the substrate.

Work Order - An order written by the Contracting Officer or Contracting Officer’s Representative, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.

C.24 THE ROLE OF GOVERNMENT PERSONNEL AND RESPONSIBILITY FOR CONTRACT

ADMINISTRATION

A. Contracting Officer: The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to amend, modify, or deviate from the contract. Other responsibilities may be delegated to authorized representatives.

B. Contracting Officer's Representative (COR): The COR will be designated in writing at the time of award to assist the CO in the day-to-day on-site administration of the contract requirements. The responsibilities of the COR include, but are not limited to;

16 | 60

(1) Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;

(2) Requesting removal of unsuitable contractor employees;

(3) Ensuring adequacy of schedule and Quality Control Plan, including changes;

(4) Ordering re-performance of unacceptable work or performance by other mean, etc.

C. Point-of-Contact (POC): The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements.

SECTION D--PACKAGING AND MARKING

{Not Applicable. This section is intentionally left blank.}

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Acquisition.GOV | www.acquisition.gov

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements (AUG 1996)

FULL-TEXT CLAUSES

Not Applicable

SECTION F--DELIVERIES OR PERFORMANCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

17 | 60

Acquisition.GOV | www.acquisition.gov

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

FULL-TEXT CLAUSES

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -

ALTERNATE I (APR 1984)

The Contractor shall be required to:

(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than two hundred twenty-five (225) days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

The completion date may be extended by the number of calendar days after the date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 POST AWARD CONFERENCE

Prior to commencement of work, the CO or COR and/or POC will arrange a meeting with the contractor to discuss the contract terms and work performance requirements. A work progress schedule will be developed at this meeting.

It will be scheduled as soon as possible after the date of the contract award. All dates and locations of the conference will be mutually agreed upon, and may be held via teleconference or onsite.

G.2 GOVERNMENT FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.

Item No. Property Description Qty Location Date Available or Delivery Date

N/A

18 | 60

G.3 DESIGNATION OF CONTRACTING OFFICERS REPRESENTATIVE (COR) AND/OR POINT-OF-

CONTACT (POC)

A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award of the contract in accordance with DIAR 1452.201-70 Authorities and Delegations (SEP 2011). The name will be designated on a letter or form.

B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.

C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the

Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)

D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.

Whenever, in the opinion of the Contractor, the COR’s requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the COR persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

E. The COR's major duties and responsibilities are contained in the Forest Service Handbook of Contract

Administration. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1. Approve Change Orders and Modifications

2. Take action to terminate the contract for default or Government convenience.

3. Make contract adjustments under the Differing Site Conditions clause.

4. Grant extensions of contract time.

5. Approve assignment of claims.

6. Make final decisions under the Disputes clause.

7. Make final acceptance under the contract.

8. Make final decisions under the Suspension of Work clause.

9. Make equitable adjustments.

10. Authorize change in amount of Payment Retention.

11. Approve subcontractors.

12. Approve payments with deductions or final payment.

13. Approve use and possession prior to completion.

14. Enforce the warranty provisions.

15. Issue any direction that would result in a possible change to contract requirements.

F. The POC will be used if an official certified COR cannot be designated at the time of award. The POC will not be designated in writing and will assist the CO in the day-to-day on-site administration of the contract requirements and/or performance.

19 | 60

• The POC is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the CO prior to completion of the contract.

• The CO should be informed as soon as possible of any actions or inactions by the Contractor or the

Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the OCO provided they do not affect the delivery schedule or performance period stated in the contract.)

• On all matters that pertain to the contract terms the Contractor must communicate with the CO.

Whenever, in the opinion of the Contractor, the POC requests effort outside the scope of the contract, the Contractor should so advise the CO. If the POC persists and there still exists a disagreement as to proper contractual coverage, the CO should be notified immediately, preferably in writing if time permits.

Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

• The POC has limited authority under this contract and responsibilities may include, but are not limited to:

1. Determining the compliance and adequacy of performance by the Contractor in accordance with the terms and conditions of this contract;

2. Requesting removal of unsuitable contractor employees;

3. Ensuring adequacy of schedule and Quality Control Plan, including changes;

4. Ordering re-performance of unacceptable work or performance by other means, etc.

5. Approval or invoices and submitted reports

6. Requesting any the work contained within specific Task Order’s

G.4 ADMINISTRATIVE CONTRACTING OFFICE

National Park Service NCR - Regional Contracting Acquistion Management Division 1100 Ohio Drive SW Washington, D.C. 20242

G.5 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING

PLATFORM (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

https://www.ipp.gov/

20 | 60

1. Contractor’s Invoice

2. Pay Estimate Form

3. Certified payroll reports

4. Schedule of Values

5. Construction Schedule

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .