SHARP_-_Painting_Services_for_Three_Properties.pdf
PDF 287 KB Posted
- Attached to
- SHARP - Painting Services for Three Properties
- Solicitation number
- SHARP IFB-2026-071-PS
- Issued by
- Sacramento County, San Francisco City, California
About this file
This is an Invitation for Bid (IFB) document issued by SHARP LLC, a California-based housing authority, soliciting competitive sealed bids from qualified, licensed C-33 Painting and Decorating Contractors to perform comprehensive interior painting services across three residential mid-rise apartment properties in Sacramento. The scope of work includes complete surface preparation, repair, priming, and finish painting at Washington Plaza Apartments (1318 E Street), Sierra Vista Apartments (2300 K Street), and Sutterview Apartments (2526 L Street). Work encompasses corridors, hallways, common areas, community rooms, and office spaces at all three locations. Pre-bid site visits are scheduled for August 19, 2026, beginning at 1:30 PM at the first location and continuing sequentially through the remaining properties, though attendance is non-mandatory. The Request for Information (RFI) deadline is August 25, 2026, at 12:00 PM, with any necessary addenda issued by August 28, 2026, at 4:00 PM. Bids must be submitted via OpenGov by 2:00 PM on Thursday, September 3, 2026. The successful contractor must complete all work within 120 calendar days of the effective contract date. The properties will remain occupied during performance, and work must be conducted Monday through Friday between 7:00 AM and 7:00 PM, excluding Sundays and Agency-recognized holidays.
Bidders must submit lump-sum pricing for each of the three locations, with separate pricing for paint-only and paint-plus-primer options; all costs must be all-inclusive with no allowance for fuel surcharges, travel time, or equipment rentals. For bids exceeding $300,000, a bid bond of at least 5% of the total bid price is required, with the successful bidder required to furnish performance and payment bonds equal to 100% of the contract price. Contractors must hold an active California State License Board C-33 license in good standing and maintain general liability, workers' compensation, and auto insurance throughout contract performance. No subcontracting is permitted except at the Agency's sole discretion for minor incidental work outside the C-33 license scope. The project is not subject to prevailing wage requirements; the applicable wage standard is California Minimum Wage. Only low-VOC or zero-VOC paint products are permitted to preserve indoor air quality. Liquidated damages of $100 per unit per day apply for delays beyond the contract completion date. SHARP LLC retains the right to reject any or all bids and waive any informalities in the bidding process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SHARP_-_Painting_Services_for_Three_Properties_(Addendum_#2_Revision).pdf | ||
| 2300_K_Street-_painting_services_SOW.docx | DOCX document | |
| Painting_Specifications.pdf | ||
| 1318_E_Street-_painting_services_SOW.docx | DOCX document | |
| 2526_L_Street-_painting_services_SOW.docx | DOCX document | |
| Exhibit_A_-_SHARP_Investment_LLC_-_Insurance_Requirements_04.22.pdf | ||
| New_Bonds_(SHARP).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD CONTRACT
undefined
1. INTRODUCTION
1.1. Summary
The SHARP LLC is soliciting competetive sealed bids for Invitation for Bid SHARP IFB-2026-071-PS from qualified, licensed, and experienced painting contractors to to perform complete interior surface preparation, repair, priming, and finish painting across three (3) designated residential mid-rise apartment properties located in Sacramento: Washington
Plaza Apartment (1318 E Street), Sierra Vista Apartment (2300 K Street), and Sutterview Apartments (2526 L Street).
Interested licensed C-33 - Painting and Decorating Contractor should plan to attend the Pre-Bid Conference(s) to be held at the location(s), date(s) and time(s) indicated in the Timeline.
All contractors and potential subcontractors are urged to attend the Pre-Bid Conference(s) including the site inspection.
Although attendance is not mandatory, contractors will be required to verify that they are aware of the existing site conditions.
Bids will be received via OpenGov ONLY until 2:00 pm on Thursday, September 3, 2026.
For bids in excess of $300,000, bidders will be required to furnish and pay for a satisfactory Bid Bond in the amount of not less than 5% of the total bid price. The successful bidder will be required to furnish and pay for a satisfactory
Performance Bond and Payment Bond in the amount of not less than 100% of the contract price.
Please direct all general and contractual questions to Procurement Services, Buyer – Procurement Services, at ps@shra.org. For any questions regarding the Technical Plans and Specifications, all questions must be submitted via
OpenGov. SHARP LLC reserves the right to reject any or all bids and waive any informalities in the bidding. SHARP LLC is an Equal Opportunity Employment employer.
1.2. Background
This project is NOT subject to prevailing wage requirements. The applicable wage is the California Minumum Wage.
1.3. Contact Information
Procurement Services Procurement 801 12th Street Procurement Sacramento, CA 95814 Email: ps@shra.org Phone: (916) 440-1378
Department:
Procurement Services Division
1.4. Timeline
Bid Release Date August 12, 2026
1st Pre-Bid Site Visit (Non-Mandatory)
(Non-Mandatory)
August 19, 2026, 1:30pm
The first pre-bid site visit will begin at 1318 E. Street and continue to the second site visit location.
mailto:ps@shra.org tel:(916)440-1378
2nd Pre-Bid Site Visit (Non-Mandatory)
(Non-Mandatory)
August 19, 2026, 2:10pm
The second pre-bid site visit will begin at 2300 K
Street and continue to the third site visit location.
3rd Pre-Bid Site Visit (Non-Mandatory)
(Non-Mandatory)
August 19, 2026, 2:50pm
Third Pre-Bid will be at 2625 L Street and conclude here.
Request for Information (RFI) Due August 25, 2026, 12:00pm
Addendum (if necessary) issued August 28, 2026, 4:00pm
Bid Due Date September 3, 2026, 2:00pm
2. SCOPE OF WORK AND SERVICE REQUIREMENTS
Refer to the plans and specifications in the
2.1. Project Overview & General Objectives
The selected Contractor shall furnish all labor, supervision, materials, tools, equipment, staging, containment, transportation, and incidentals necessary to deliver high-quality, durable, aesthetically pleasing, and uniform finishes. All work must strictly comply with professional industry standards set forth by the Master Painters Institute (MPI) and the
Painting Contractors Association (PCA).
2.2. Project Locations & Scope Summary
This master scope covers interior painting services across the following three residential property sites:
A. Washington Plaza Apartments o Address: 1318 E Street, Sacramento, CA 95814 o Scope Summary: Comprehensive surface preparation, patching, sanding, priming, finish painting, and cleanup of designated interior spaces.
B. Sierra Vista Apartments o Address: 2300 K Street, Sacramento, CA 95816 o Scope Summary: Comprehensive surface preparation, patching, sanding, priming, finish painting, and cleanup of designated interior spaces.
C. Sutterview Apartments o Address: 2526 L Street, Sacramento, CA 95816 o Scope Summary: Comprehensive surface preparation, patching, sanding, priming, finish painting, and cleanup of designated interior spaces.
See the detailed site-specific descriptions and layout requirements which are provided in the Attachements.
2.3. Designated Interior Work Areas (Applicable to All Locations):
• Corridors and Hallways: Primary and secondary circulation paths, stairwells, and entry vestibules.
• Common Areas: Elevator lobbies, public restrooms, laundry facilities, and shared amenity spaces.
https://procurement.opengov.com/governments/4017/projects/292603/builder/attachments
• Community Rooms: Main gathering spaces, associated kitchenette/pantry areas, and adjoining storage closets.
• Office Areas: Individual administrative offices, conference rooms, reception desks, and staff breakrooms.
2.4. Detailed Technical Requirements
A. Site Protection & Containment
• Furnishing & Surface Protection: Cover and protect all non-painted surfaces—including flooring, carpets, light fixtures, architectural millwork, hardware, fire alarm pull stations, smoke detectors, and office equipment—using heavy-duty drop cloths, plastic sheeting, and low-tack painter's tape.
• Containment: Install dust barriers (e.g., ZipWall systems) where necessary to isolate work zones from active, occupied resident or administrative areas and prevent dust migration.
B. Surface Preparation & Minor Repairs
• Inspection & Cleaning: Inspect all surfaces to be painted. Clean areas free of dirt, dust, grease, oils, mildew, and loose debris prior to patching or priming.
• Minor Patching & Surface Repair:
o Fill all nail holes, screw holes, cracks, gouges, and deep dents in drywall and plaster using appropriate joint compound or spackle.
o Repair minor water spots or stains using stain-blocking sealers.
o Re-tape peeling or damaged drywall joints where minor in scope.
• Sanding & Feathering: Sand all patch work, joint compound, and glossy existing paint surfaces smooth and flush with surrounding substrate. Feather edges to ensure seamless, invisible repairs after paint application.
• Caulking: Apply acrylic latex painter’s caulk to gaps along baseboards, door frames, window trim, and wall transitions where existing caulk is missing, cracked, or deteriorated.
C. Primer & Paint Application
• Priming:
o Apply one (1) coat of high-quality primer/sealer over all bare drywall, patched areas, bare wood, or stained surfaces.
o Use tintable primer matched to the final topcoat color when applying dark or vivid accent colors.
• Finish Paint Application:
o Apply a minimum of two (2) full coverage finish coats of specified paint product to achieve a smooth, uniform color, sheen, and finish free of lap marks, runs, sags, brush marks, or holidays (gaps).
o Walls: Apply specified interior acrylic latex paint (Eggshell or Satin finish recommended for high-traffic corridors and common areas).
o Ceilings (where designated): Apply flat interior ceiling paint.
o Doors, Trim, & Baseboards: Apply high-durability acrylic enamel or urethane alkyd enamel (Semi-Gloss or
Gloss finish) to doors, door frames, baseboards, and window trim.
• Color Scheme & Clean Lines: Adhere strictly to the designated color schedule provided by Property
Management for each location. Provide crisp, straight cut-in lines at ceiling joints, corners, trim, and wall transitions.
D. Quality Control & Site Clean-Up
• Daily Clean-Up: Maintain a neat and safe work environment at all sites. At the end of each workday, collect, bag, and remove trash; safely store paints, solvents, and equipment in designated storage areas.
• Final Clean-Up: Upon completion of painting in each zone:
o Remove all masking tape, protective plastic, and floor coverings.
o Clean paint drips, overspray, and splatters from glass, hardware, floors, and unpainted surfaces.
o Reinstall all wall plates, light switch covers, signage, and hardware removed for painting.
o Vacuum and mop affected floor areas.
• Touch-Up Paint Delivery: Provide the Property Manager at each site with one (1) unopened, clearly labeled gallon of each paint color and finish used, including manufacturer details, color codes, and batch numbers for future maintenance.
2.5. EXECUTION, SITE CONSTRAINTS & SCHEDULE
• Phasing & Execution: Work may be executed concurrently or phased sequentially across locations as directed by the Property Administrator.
• Active Community Constraints: All sites are active residential communities. The Contractor shall minimize disruption to residents and staff, maintain clear egress corridors at all times, and coordinate any noisy operations in advance.
• Operational Hours: Standard work hours are Monday through Friday, 7:00 AM to 7:00 PM. No work is permitted on Sundays or Agency holidays except in emergencies or with prior written authorization.
Agency Recognized Holidays: New Year’s Day, Martin Luther King Jr. Day, Presidents Day, Cesar Chavez Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day & Day After, Christmas Eve (after 12:00
PM), Christmas Day, New Year’s Eve (after 12:00 PM).
2.6. SAFETY, AIR QUALITY & WORKPLACE CONDUCT
• Safety & Air Quality: Comply strictly with OSHA safety standards. Maintain adequate ventilation during application and drying. To preserve indoor air quality for residents and staff, only low-VOC or zero-VOC paint products shall be used.
• PPE & Apparel: Workers must use appropriate PPE. All personnel must wear identifiable clothing displaying their company name while on site.
• Workplace Behavior Guidelines o No loud music or offensive language.
o Respectful treatment of all residents and staff.
o Smoking is strictly prohibited on all Agency properties.
o The Agency reserves the right to request immediate removal of any personnel deemed unsatisfactory.
2.7. CONTRACTOR REQUIREMENTS & BIDDING INSTRUCTIONS
• Pre-Bid Site Visit: Bidders are encouraged to inspect the site locations prior to submitting a bid to understand existing conditions. Failure to visit the sites does not relieve the contractor of contract obligations.
• Discrepancies & Ambiguities: Any discrepancies or questions regarding specifications must be submitted in writing to the Procurement Department by the Written Questions Deadline. Discrepancies noted in the field post-award will be corrected at no additional cost to the Agency.
• Licensing & Insurance: Bidders must hold an active California State License Board (CSLB) C-33 Painting
Contractor License in good standing and maintain required General Liability, Workers' Comp, and Auto insurance coverage throughout the contract.
• Subcontracting Policy: No subcontracting is permitted under this contract, except at the Agency’s sole discretion for minor incidental work outside the C-33 license scope.
2.8. COMPLETION, INSPECTION & ACCEPTANCE
• Inspection Protocol: An authorized Agency representative will inspect completed interior painting work within
3–5 business days following notification of completion.
• Approval & Payment: Upon approval of the work and receipt of any required permit sign-offs, a Completion
Notification will be issued to authorize invoice submission.
• Punch List Process: If corrections are required, a Punch List will be issued via email. Deficiencies must be corrected by a mutually agreed date. Failure to complete punch list items promptly will result in work being completed by secondary means, with costs deducted from final payment.
3. BID FORM
3.1. TERMS IN THE BID FORM
SUMMARY:
• Work: to perform complete interior surface preparation, repair, priming, and finish painting across three (3) designated residential mid-rise apartment properties located in Sacramento: Washington Plaza Apartment (1318
E Street), Sierra Vista Apartment (2300 K Street), and Sutterview Apartments (2526 L Street)
• Owner: SHARP LLC
• Property: 1318 E Street, 2300 K Street, and 2526 I Street, Sacramento, CA 95816
FOR:
• LUMP SUM BID for Work on SHARP LLCowned Property.
TO:
• SHARP LLC
• 801 12th Street, 2nd Floor
• Sacramento, California 95814
3.2. SCOPE OF WORK
The Contractor proposes to furnish all labor, materials, equipment, and services required to complete the work required in strict compliance with the Bidders Response Questionnaire, Project Contract Manual, Technical Specifications
Manual, Drawings, Notifications, and/or any Addenda for the above referenced project.
3.3. BID AMOUNT
The Contractor, having become familiar with the local conditions affecting the cost of the work, submits a LUMP SUM
BID in the amount auto-tabulated in the #BID SCHEDULE section.
3.4. CONTRACT PERIOD
The Contractor shall complete all work required under this contract within One Hundred Twenty (120) calendar days of the effective date of the contract, or within the time schedule established in the Notice to Proceed issued by the
Contracting Officer.
3.5. PROJECT LOCATION(S)
Please Note: Additionally, the Contractor will be required to provide the following throughout the duration of the project at no additional cost to SHARP:
• Separate payment requests for each address https://procurement.opengov.com/portal/shra/projects/292603/document?section=2817294
3.6. PERMITS
No permits are required for this project.
3.7. SUPERINTENDENT
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the work site a competent superintendent who is satisfactory to the
Contracting Officer and has authority to act for the Contractor.
3.8. CONSTRUCTION MEETINGS
Construction meetings will be scheduled by the SHARP LLC representative as required.
3.9. OCCUPANCY
The property WILL BE occupied during the performance of this contract.
3.10. CONTRACT EXECUTION
If written notice of the acceptance of this Bid is mailed, emailed, or delivered to the undersigned within sixty (60) calendar days after the opening thereof, or at any time thereafter before this Bid is withdrawn, in writing, the undersigned agrees to execute and deliver a contract in the prescribed form and furnish the required bonds within fourteen (14) calendar days after contract is presented for signature.
3.11. RIGHT TO REJECT ALL BIDS AND WAIVERS
Bidder understands that SHARP retains the right, in its sole and exclusive discretion to (1) reject all bids for the subject project(s) and (2) waive any informalities in its consideration and review of the submitted bids.
3.12. EXAMINATION OF WORKSITE AND CONTRACT DOCUMENTS
The undersigned represents and warrants that the undersigned has examined the locations of the proposed work and is familiar with the local conditions at the places where the work is to be done, and the undersigned has reviewed and understands the plans, specifications, and other contract documents, and the undersigned is satisfied with all conditions for performance of the work.
3.13. BIDDER'S CALCULATIONS
The undersigned has checked carefully all of the bid's figures and calculations and understands that SHARP will not be responsible for any errors or omissions on the part of the undersigned in preparing and submitting this bid.
3.14. LIQUIDATED DAMAGES
If the Contractor fails to complete the work within the time specified in the contract, or any extension, as specified in the clause entitled Default of this contract, the Contractor shall pay to the PHA as liquidated damages, the sum of $100 per unit for each calendar day of delay. If different completion dates are specified in the contract for separate parts or stages of the work, the amount of liquidated damages shall be assessed on those parts or stages which are delayed. To the extent that the Contractor’s delay or nonperformance is excused under another clause in this contract, liquidated damages shall not be due SHARP. The contractor remains liable for damages caused other than by delay.
3.15. CERTIFICATION OF NONSEGREGATED FACILITIES
By signing this Bid the Bidder certifies that the Bidder does not maintain or provide for employees any segregated facilities at any establishment, and that the Bidder does not permit employees to perform their services at any location under the Bidder's control where segregated facilities are maintained. The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term
"segregated facilities" means any waiting room, work areas, rest rooms, washrooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion or national origin, because of habit, local custom, or otherwise. The Bidder further agrees to obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, to retain such certification on file, and to forward a notice to proposed subcontractors as provided in the Instructions to Bidders.
Note: The penalty for making false statements of offers is prescribed in 18 U.S.C. 1001.
3.16. NONDISCRIMINATION, WORKER'S COMPENSATION AND NATIONAL LABOR RELATIONS BOARD
CERTIFICATION
Bidder, in submitting a bid for performing the following work by contract certifies the following:
A. Bidder is in compliance with the Nondiscriminating requirements of the General Conditions.
B. Bidder is aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that Code, and bidder will comply with these provisions before commencing the performance of the work of this contract.
C. Bidder states, under penalty of perjury, that no more than one final appealable finding of contempt of court by a
Federal Court has been issued against the bidder within the immediately preceding two-year period because of the bidder's failure to comply with an order of a Federal Court ordering compliance with an order of the National
Labor Relations Board.
D. Bidder certifies, unless specifically exempted, compliance with Government Code Section 12990 and California
Code of Regulations, Title II, Division 4, Chapter 5 in matters relating to the development, implementation, and maintenance of a nondiscrimination program. Bidder agrees that it will not unlawfully discriminate against employees, or applicants for employment, based on race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status, sex or age (over forty).
This certification constitutes a part of the Bid, and signature on the signature portion of this Bid shall constitute signature of this certification.
4. CSLB LICENSE
4.1. CSLB
Per State Law - All contractors and sub-contractors, of any tier, must hold the appropriate license with the California
State License Board (CSLB), that is current and in good standing.
5. BIDDER RESPONSE
1. BID FORM*
CONTRACTOR SHALL CONFIRM THAT THEY HAVE READ, UNDERSTOOD AND AGREE TO THE#BID FORM
SECTION.
☐ Please confirm
*Response required
2. Bid Verification * I confirm that I am an authorized representative of my company and submit this response.
☐ Please confirm
*Response required
3. Business Type*
☐ Corporation
☐ Partnership
☐ Sole Proprietor
☐ LLC / LLP
*Response required
4. Contractors State License # * https://procurement.opengov.com/portal/shra/projects/292603/document?section=2817295
5. LIFE AND SAFETY QUESTIONNAIRE*
Bidder shall answer the following:
Has the bidder, any officer of the bidder, or any employee of the bidder who has proprietary interest in the bidder, ever been disqualified, removed or otherwise prevented from bidding on, or completing a Federal, State, or Local government project because of a violation of law or a violation of a safety regulation?
☐ Yes
☐ No
*Response required
When equals "Yes"
5.1. Life and Safety Questionnaire Continued*
If the answer is yes, explain the circumstances in the following space.
(Attach additional pages if necessary.) If the answer is No, type N/A.
6. NON-COLLUSION STATEMENT OF PRIME BIDDER*
A. I, an authorized representative of my company with binding authority, the Bidder who has submitted the attached Bid, being first duly sworn, deposes and says that:
B. The Bidder is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
C. Such Bid is genuine and is not a collusive or sham bid;
D. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm or person, to submit a collusive or sham Bid in connection with the contract for which the attached has been submitted, or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person, to fix the price or prices in the attached Bid or of any other bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure, through any collusion, conspiracy, connivance or unlawful agreement, any advantage against the Owner or any person interested in the proposed Contract;
E. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.
☐ Please confirm
*Response required
7. LEAD-BASED PAINT CERTIFICATIONS*
LEAD-BASED PAINT
“Lead-based paint” as defined in Section 501(s) of the Act as amended by PL94-317 (42 U.S.C. 4801 et seq), the
National Consumer Information and Health Promotion Act of 1986 means:
A. Any paint containing more than five-tenths of one per centum lead by weight (calculated as lead metal) in the total nonvolatile content of the paint or the equivalent measure of lead in the dried film of paint already applied or both; or
B. With respect to paint which is manufactured after June 22, 1977 lead-based means that any paint containing more than six one-hundredths of one per centum lead by weight (calculated as lead metal) in the total nonvolatile content of the paint or the equivalent measure of lead in the dried film of paint already applied.
I HEREBY CERTIFY THAT I WILL NOT USE LEAD-BASED PAINT ON THE STRUCTURE(S) LISTED ON THIS
CONTRACT, AND I FURTHER ACKNOWLEDGE THAT I AM AWARE OF THE HAZARDS OF LEAD-BASED PAINT
THAT MAY EXIST FROM PREVIOUSLY PAINTED SURFACES OF THE STRUCTURE(S).
☐ Please confirm
*Response required
8. BONDS
8.1. BID BOND*
Please download the Bid Bond, complete, and upload a FULLY EXECUTED copy here prior to the deadline of 2:00 pm on Thursday, September 3, 2026.
Original bonds to be delivered in hard copy format within three (3) days following bid opening.
If submitting cash, cashier's check, certified check, bank draft, or government bond it shall be submitted PRIOR to the deadline of 2:00 pm on Thursday, September 3, 2026 in original hard copy format.
• Section_00490_-_Bid_Bond.docx
*Response required
6. PRICING PROPOSAL
1318 E STREET - PAINTING SERVICES – LUMP-SUM PRICING
Provide two fixed, lump-sum prices for all Work described in the Scope of Work for the specified location: (1) paint only, and (2) paint and primer. Each price shall be all-inclusive and cover all labor, supervision, materials, equipment, surface preparation, transportation, waste disposal/hauling, overhead, and profit. No separate charges for fuel surcharges, travel time, or equipment rentals will be accepted.
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 Paint Only 1 Lump Sum
2 Paint and Primer 1 Lump Sum
TOTAL
2300 K STREET - PAINTING SERVICES – LUMP-SUM PRICING
Provide two fixed, lump-sum prices for all Work described in the Scope of Work for the specified location: (1) paint only, and (2) paint and primer. Each price shall be all-inclusive and cover all labor, supervision, materials, equipment, surface preparation, transportation, waste disposal/hauling, overhead, and profit. No separate charges for fuel surcharges, travel time, or equipment rentals will be accepted.
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 Paint Only 1 Lump Sum
2 Paint and Primer 1 Lump Sum https://government-project.s3.us-west-2.amazonaws.com/26354/9b81cf0b-6ad1-4cc2-84d7-326d0e75821b_Section_00490_-_Bid_Bond.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LX2U5PRK%2F20260812%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260812T235703Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEBAaCXVzLXdlc3QtMiJHMEUCIQCjSLL3XewseWekgss6f6I1MzMWja5ujTkWcEm2El2DHgIgH%2F0mKJ0w1pOiHtAPCWyO8hJlgdFWShNhJSQ4sKBksQoqlQUI2f%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDBtZL5s99C5dnmSaXCrpBBX%2BlDe%2BlL%2B5ZqkJIEibCRuMVZUQwftlIDzVi3qNdbQK%2BCRup6sxYji3%2FWAx2BMPJNa78WMClP1tQ%2F9aKLzIPJlAMCNZJ1jfv9FfhX04Ni3ldDv4q2iNNwVmcK9gVxHgIDRhHOYB%2Fd7GZJVzzj1zPbRmLmBCGGGzNv8Z80K%2FyAuT1jTU2zT3OjLGnqlOe5BoLOjoZy2Vcba0eC0%2BRlMLllIWDl4By8v1t20Bc10HN%2Bu%2FNtuxmu2hO3AmHko9ch0wiTXVoZFof7odc%2FM4aMAHxvTJwIskhu9iQh6wrj6pOqeMNRRtC6qHipa2btHMTJTLt773gIF0uLtjmFj0Gi5d9MawI%2Biudj%2BIbnvTV5egYBqNIrKL0cf3VBw%2B%2FalQpC1b1byFmujXjp6YitTbqBKvnMLCG86VRczRO0WFHxF5WdhcvfhopZX7zCq9z5Sgs%2FQ07rWgiNkaDVZlVR%2B6Msj%2FfUT2K246q9jRIaIRwJ2J67iAoBBt%2FVCdUOxOH9IX%2Fb4Z1uy3jlh6ZiniQJKGodPTPuErHESW4Z%2BBcyiEV8pQt%2FoOknfDgpK%2BNtPXBDGP%2BjHeIwxNSHJQK6J2P1nGpckXlAYKx3ZeUglW3kEDHFi7ivpBw4cBaFlAvqpMEw1fU2JRmWqHVYUsEBvJ%2BZXxlJ8A7tJiqW0KP5X7SM8kmNqcZLwt5dc2qgsVgmLGrTLAiijsAtEAEM7UOMkL%2BE5V6JevKU1dlEUCrGErlE45%2Bt%2BcoWJlD%2F%2BcAHJoI6%2FPZLGdGego1G6zljBJKs94N4P8I6rD5r4wlU7ITDBLoYq%2Fj2rbAvZfZduNpq3wcJsmMOKN9NMGOpkBJo%2BVVEnKKGxfoh4jOMGVj0Z429tyosvVNSYW2cKrPoLBBbT7kmmkxIuwsIryhNSFVQ6p2fnpVROqYWCppycNm%2BujM3gPirncf8NEJUWp2FsFaKicYzj64Xwrom99bp0jZlNmIex9wxoqEFp459pCmqmyEsjkTpz0fspfkhuXdiZIvmP6AX1b3KQ66%2BM%2FOwQlZwLmc5XDyYgr&X-Amz-Signature=1094cc9f7e99f92cccb7a1c0e523015b41f8e8453dd19a7405c067f6437ee608&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Section_00490_-_Bid_Bond.docx%22&x-id=GetObject
2526 I STREET - PAINTING SERVICES – LUMP-SUM PRICING
Provide two fixed, lump-sum prices for all Work described in the Scope of Work for the specified location: (1) paint only, and (2) paint and primer. Each price shall be all-inclusive and cover all labor, supervision, materials, equipment, surface preparation, transportation, waste disposal/hauling, overhead, and profit. No separate charges for fuel surcharges, travel time, or equipment rentals will be accepted.
Line Item Description Quantity Unit of
Measure
Unit Cost Total
1 Paint Only 1 Lump Sum
2 Paint and Primer 1 Lump Sum
| 1. INTRODUCTION |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. SCOPE OF WORK AND SERVICE REQUIREMENTS |
| 2.1. Project Overview & General Objectives |
| 2.2. Project Locations & Scope Summary |
| 2.3. Designated Interior Work Areas (Applicable to All Locations): |
| 2.4. Detailed Technical Requirements |
| 2.5. EXECUTION, SITE CONSTRAINTS & SCHEDULE |
| 2.6. SAFETY, AIR QUALITY & WORKPLACE CONDUCT |
| 2.7. CONTRACTOR REQUIREMENTS & BIDDING INSTRUCTIONS |
| 2.8. COMPLETION, INSPECTION & ACCEPTANCE |
| 3. BID FORM |
| 3.1. TERMS IN THE BID FORM |
| 3.2. SCOPE OF WORK |
| 3.3. BID AMOUNT |
| 3.4. CONTRACT PERIOD |
| 3.5. PROJECT LOCATION(S) |
| 3.6. PERMITS |
| 3.7. SUPERINTENDENT |
| 3.8. CONSTRUCTION MEETINGS |
| 3.9. OCCUPANCY |
| 3.10. CONTRACT EXECUTION |
| 3.11. RIGHT TO REJECT ALL BIDS AND WAIVERS |
| 3.12. EXAMINATION OF WORKSITE AND CONTRACT DOCUMENTS |
| 3.13. BIDDER'S CALCULATIONS |
| 3.14. LIQUIDATED DAMAGES |
| 3.15. CERTIFICATION OF NONSEGREGATED FACILITIES |
| 3.16. NONDISCRIMINATION, WORKER'S COMPENSATION AND NATIONAL LABOR RELATIONS BOARD CERTIFICATION |
| 4. CSLB LICENSE |
| 4.1. CSLB |
| 5. BIDDER RESPONSE |
| 1. BID FORM* |
| 2. Bid Verification * |
| 3. Business Type* |
| 4. Contractors State License # * |
| 5. LIFE AND SAFETY QUESTIONNAIRE* |
| 5.1. Life and Safety Questionnaire Continued* |
| 6. NON-COLLUSION STATEMENT OF PRIME BIDDER* |
| 7. LEAD-BASED PAINT CERTIFICATIONS* |
| 8. BONDS |
| 8.1. BID BOND* |
6. PRICING PROPOSAL
File details come from the government source that posted it. Updated .