This document is a Design/Bid/Build Scope of Work for the Colorado Department of Transportation (CDOT) for the Sedgwick 9+1-Bay Vehicle Storage Facility (VSF) and Sand Shed project located at 10841 Highway 59, Sedgwick, CO. The project involves constructing a 10,000 square foot pre-engineered metal building (PEMB) with nine vehicle storage bays (two being wash bays), an administration area, and associated infrastructure. The scope includes a 4,000 square foot PEMB Sand Shed and a 48'-0" x 34'-8" Magnesium-Chloride (Mg-Cl) containment structure to hold six 21,000-gallon liquid storage tanks. The project will develop an undeveloped site, with new utilities including a water well, septic system, electrical service from Highline Electric Association, and propane from Peetz Farmers Co Op.

The project has several notable technical and environmental requirements, including compliance with the Buy Clean Colorado Act, which mandates maximum global warming potential limits for specific materials like asphalt, concrete, steel, and glass. The contractor will be responsible for detailed documentation and environmental product declarations for materials used. The scope includes comprehensive infrastructure provisions such as electrical systems, lighting, life safety equipment, communication infrastructure, and specialized systems like a vehicle wash bay water recycling treatment system. Additional requirements include installing various specialized equipment like a waste oil collection system, pressure washer, air compressor, and meeting specific building performance standards for insulation, ventilation, and energy efficiency.

View the file

Other files

File Type Posted
Sedgwick - Addendum #2 - Attachment B - Bid Submittal with Bid Alternate.pdf PDF
Sedgwick - Advertisement - Appendix C - Direct Labor Burden Calculation.pdf PDF
Segdwick - Addendum #2.pdf PDF
Sedgwick - Advertisement - Appendix L - Construction Specifications.pdf PDF
Sedgwick - Advertisement - Appendix N - State Form EE-5.2.xlsx XLSX spreadsheet
Sedgwick - Advertisement - Appendix A - Information for Bidders.pdf PDF
Sedgwick - Advertisement - Appendix B - Bid Form.pdf PDF
Sedgwick - Advertisement - Appendix I - Procedural Documents.pdf PDF
Sedgwick - Addendum #2 - Attachment A - Corrected Sign In Sheet.pdf PDF
Sedgwick - Advertisement - Appendix D - Prevailing Wages.pdf PDF
Sedgwick - Advertisement.pdf PDF
Segdwick - Addendum #1.pdf PDF
Sedgwick - Advertisement - Appendix B1 - Bid Bond Form.pdf PDF
Sedgwick - Advertisement - Appendix K - Construction Drawings.pdf PDF
Sedgwick - Addendum #1 - Attachment A - Sign In Sheet.pdf PDF
Sedgwick - Advertisement - Appendix H - Sample Contract.pdf PDF
Sedgwick - Advertisement - Appendix G - Labor and Material Bond.pdf PDF
Sedgwick - Advertisement - Appendix F - Performance Bond.pdf PDF
Sedgwick - Advertisement - Appendix E - Contract Wage Compliance Form.pdf PDF
Sedgwick - Advertisement - Appendix M - Stormwater Management Plan.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design/Bid/Build Scope of Work Sedgwick 9+1-Bay VSF and Sand Shed

Project #22137

February 5, 2025

PROJECT LOCATION:

10841 Highway 59, Sedgwick, CO 80749

PROJECT DESCRIPTION:

Qualified contractors are invited to bid on the construction of a new 9+1-bay Vehicle Storage Facility (VSF), Sand Shed and Magnesium-Chloride (Mg-Cl) Containment Structure. The project site is located on undeveloped land in Sedgwick County.

The new VSF shall be a 10,000 gross square foot pre-engineered metal building (PEMB). The VSF will contain an administration area and nine 20’-0” x 50’-0” bays used to store CDOT plow trucks, two of which shall be wash bays with waterproofed finishes and fixtures. The flooring shall be concrete slab-on-grade with a 20-foot concrete apron at the overhead doors.

The project will also include a new 4,000 gross square foot PEMB Sand Shed with a 20-foot concrete apron at the overhead door side, and a 48’-0” x 34’-8” Mg-Cl containment structure which will hold six 21,000-gallon liquid storage tanks (tanks not in this contract).

There are no existing utilities on the site. Propane gas will be provided by Peetz Farmers Co Op. Electric power will be provided by Highline Electric Association. A new Water well will be drilled by CDOT under a separate contract. All piping from the well, underground storage tanks, pumps, fittings, connections and wiring required for the water system is included in this contract. For sanitary sewer, a new septic system and leach field will be installed as part of this contract. The vehicle washbays are served by an on-site water recycling system that collects the melting snow from the plow trucks through the trench drains in the bays and this water is diverted to a treatment system that is buried outside the building. The GC is responsible for purchasing and installing the concrete tanks and install the piping and conduit for this treatment system; the equipment and final connections to the equipment is by others.

SCOPE OF SERVICES:

The following documents will be available on Bidnet and summarized at a mandatory pre-bid meeting: Drawings and Specifications by the contracted Architect/Engineer Clark + Enersen and Septic System Designer 285 Engineering. Additionally, a geotechnical report prepared by the geotechnical engineer of record Terracon will be provided as part of the Specification.

The Scope of Work, Bid Drawings and Specification should all be referenced during bidding and any contradictory information should be brought to the attention of CDOT; misunderstanding of any of the Bid Drawings, Specification and/or Scope of Work will not be grounds for change orders after the bid question period.

The Contractor is responsible for obtaining (and paying for) Permits from the State Electrical Inspector and State Plumbing Inspector. By Statute, local building permits are not required. Code reviews (including framing and insulation) and one final code review inspection for each building shall be paid for by CDOT. Any additional code review inspections due to the original inspection not passing will be paid for by the Contractor.

The Contractor is responsible for responding to and satisfying code comments related to the metal building’s deferred submittal. The metal buildings may not be ordered by the Contractor until a Notice of Compliance is received for the metal buildings submittal from the State’s code consultant, AEC-West.

CDOT requires that the geotechnical engineer of record who provided the Geotechnical Report, Terracon, or any mutually agreeable certified geotechnical engineer, perform the independent excavation and compaction observation and all testing required, as specified. The Contractor is to contract, at its cost, with the geotechnical engineer of record for all testing, including sub-grade testing, concrete testing, and observation costs.

Terracon Contact Information: Alec Strassburg (970) 351-0460 / alec.strassburg@terracon.com

This site falls under the jurisdiction of the Sedgwick Volunteer Fire Department. Inspections by SVPD for fire-related items are required and shall be coordinated and paid for by the Contractor.

Refer to Project drawings and Specification for additional details and requirements.

BID ALTERNATES:

1. Add. Alternate: Inclusion of a crystalline waterproofing admixture in the magnesium chloride containment structure concrete mix; design as indicated in specification section 03 30 00.

Site Work:

Prior to any site-disturbing activities, the Contractor will be responsible for locating all utilities. The Contractor shall notify the Utility Notification Center of Colorado (UNCC) to conduct locates for buried utilities.

1. Construct reinforced silt fencing and other erosion control measures around the Limits of

Disturbance area shown on the Civil and SWMP drawings.

2. Conduct site excavation and grading per the Civil Drawings. Install new asphalt paving, curb, gutter, concrete trickle channels, storm inlets, underground storm drainage culverts, water quality basins, water quality outlet control structures, riprap, temporary and permanent SWMP measures, and seeding per Civil and SWMP plans. Provide striping at parking spaces.

3. Install new concrete aprons, sidewalks, curbs, equipment pads, curb stops, bollards, fuel island, propane tanks pad, and Mg-Cl containment structure as shown in the Civil, Structural, and Architectural drawings.

4. Install electric vehicle charging station underground rough-ins for power and data, parking signage and striping, chain link fencing, flagpole, vehicle gates, Mg-Cl containment stair and guardrails, and exterior waste oil tank per plans and specification.

mailto:alec.strassburg@terracon.com

5. All earthwork, backfill, and compaction shall be placed and performed in strict accordance with the Specification and Division 200, including but not limited to section 206, and Division 700 of the current edition of the CDOT Standard Specifications for Road and Bridge Construction and the geotechnical engineer recommendations.

6. Contractor shall install a new water line from the well to the underground potable water storage tanks to the VSF building water service entry shown on the Plumbing drawings.

Contractor shall provide power to the well equipment per the Electrical drawings. Provide and install all water system pumps and equipment shown on the drawings and specifications. Contractor shall be responsible for filling one (1) 10,000 gallon tank with potable water prior to Substantial Completion.

7. Contractor shall connect the VSF sanitary sewer piping to a new Septic System per Plumbing and Civil drawings and specification.

8. Contractor shall connect the VSF vehicle bay floor drains to a sand & oil interceptor, then to the Onsite Wastewater Treatment System per plans and specification.

9. Contractor to work with Highline Electric Association to install new electrical service per plans and specification. Provide new underground electric conduits and conductors from transformer to meter location as shown on plans. Coordinate meter installation with Highline Electric Association. Connect new power lines to the new VSF. Provide new underground electric conduits and conductors (where indicated) from the VSF to the Sand Shed, the Mg-Cl containment structure, powered gates, pole lights, fuel island, and to vehicle-charging stations, as shown in the drawings.

10. Provide power and data via underground conduits and conductors (where indicated) to the VSF entry doors, Sand Shed entry door, fuel island, and EV charging stations. Provide card readers and cabling as specified in the door hardware schedule and connect to the card reader network system. The EV Charging stations will be installed after construction, so provide conduit only for future install.

Storm Water Quality Permit:

11. Because the area of disturbance is greater than an acre (3.78 acres), the Contractor shall be responsible for obtaining and paying for a construction Storm Water Quality Permit with Colorado Department of Public Health and Environment (CDPHE). The Storm Water Management Plan (SWMP) drawings are provided in the civil drawings as required for permit; a SWMP Narrative is included in the Bid Documents. Contractor shall obtain a SWMP Application. Both CDOT and the contractor will be permit holders. Details of the permit can be found here: https://www.colorado.gov/pacific/cdphe/cor400000-stormwater-discharge

12. All required 14 day inspections (and within 24 hours of a water event) during the course of the project, per the SWMP Permit, must be conducted by a Certified Transportation Erosion Control Supervisor. The certified Supervisor cannot be the Project Superintendent.

Contractor to provide this inspector on-site as needed.

https://www.colorado.gov/pacific/cdphe/cor400000-stormwater-discharge https://www.colorado.gov/pacific/cdphe/cor400000-stormwater-discharge

Pre-Engineered Metal Buildings:

13. (VSF Building) Provide an approximately 10,000 gross square foot pre-engineered metal building (PEMB) with nine vehicle storage bays, two of which are wash bays. Provide two demising walls, one separating the vehicle bays from the wash bays, and one separating the administrative area with mezzanine, restrooms, storage and offices from the vehicle bays, per plans.

14. (Sand Shed) Provide an approximately 4,000 square foot pre-engineered metal building (PEMB) for the storage of sand mixture. This 50’ x 80’ building will sit on a 4’-0” high concrete foundation wall, with one overhead door opening and one man-door opening in the east wall.

15. It is required that the contractor and PEMB manufacturer follow the building layouts and details shown on the drawings, including all engineering disciplines. Modification of the design drawing information without prior authorization by CDOT and the engineering team will result in the contractor being responsible for any A/E or PEMB re-design work or drawing modification. All X-bracing should be as located in the drawings.

16. All PEMBs are required to be designed as “Partially Enclosed” for wind load determination and lateral design. All lateral load and other parameters for building design are shown on the Structural Drawings.

17. The structures shall be comprised of pre-engineered metal buildings, from a vendor on CDOT’s approved vendor list as specified in Specification Section 13 34 19 and on the Drawings.

18. The roof structure of the VSF is shed style standing seam metal roof. The roof structure of the Sand Shed shall be a gabled lap seam metal roof. Refer to the drawings for roof slopes and heights.

19. The wall panels for all buildings shall be comprised of minimum 26 gauge, prefinished, steel siding. The roof panels shall be comprised of minimum 24 gauge, prefinished, metal roofing. Trim, flashing and expansion joint covers to match adjacent metal panel. Only the specified Hylar/Kynar finishes are acceptable for exterior metal panels. Silicon resin exterior finishes are not acceptable and will not be approved.

20. All exposed structural steel in the VSF, not covered with metal liner panel, shall be painted per the Specification. Exposed metal in the VSF wash bay shall be painted with epoxy paint. All structural steel in the Sand Shed shall be galvanized per the Specification.

21. Provide snow guards at all PEMB roofs. Design of snow guards shall be included in the shop drawings submitted for approval prior to ordering.

22. There shall be a shed-style standing seam metal roof canopy over some of the exterior man doors. Refer to plans for specific locations.

Concrete:

23. The VSF floor is slab-on-grade with spread footings. There are 8-inch curbs around the building perimeter and at the wash bay and administrative bay demising walls. The Sand Shed floor is slab-on-grade with spread footings and a 4-foot-high concrete foundation wall on all sides. The slab on grade supporting the magnesium-chloride tanks will be of varying thickness with a sloping perimeter drain to a sump pit, per the Structural Drawings and Specification.

24. The VSF and Sand Shed shall each have a concrete approach apron that extends from the overhead door 20 feet out from the building. Thickness and reinforcing of slabs shall be as scheduled on the drawings and slope away from the building to drain. The exterior concrete apron shall be broom finished and treated with penetrating sealant per the specification.

25. All interior slabs, and approach aprons in the VSF and Sand Shed shall be capable of supporting the wheel load from an HS20-44 truck.

26. All rooms with floor drains shall slope to drain. Cross section slope shall not exceed ANSI cross slope. Refer to Structural and Architectural drawings for floor slope plans. Coordinate wall framing with floor elevations for each room.

27. All new interior concrete floors shall have sawn shrinkage control joints that will be filled with expansion joint filler strips and polyurethane sealant. All concrete floors shall be cured and/or sealed with concrete sealer and finished as called out in the Specification.

28. Provide concrete pads for equipment, both interior and exterior. Provide a concrete pad for the air compressor, pressure washer, water heater, waste oil collection tank, fuel island, and propane tanks. Thickness of the pads and reinforcement shall be as scheduled on the civil and structural drawings.

29. All interior and exterior vertical joints in foundation walls are to be sealed with a non-sag urethane sealant.

30. The interior/exterior surfaces of the walls in the Sand Shed shall be sealed per Specification Section 03 30 00 (Cast-in-Place Concrete). The Sand Shed floor slab shall have a smooth-trowel finish.

31. At the Sand Shed paint a 4-inch horizontal stripe around perimeter of concrete walls at 3 feet above finish floor and on concrete slab-on-grade 5 feet from overhead doors, using the specified paint, color safety yellow, as specified. Add the following words, 6 inches in size, “No Sand Above/Beyond This Line” above stripe. See Specification Section 09 90 00 (Painting and Coating) for more details.

Bollards:

32. Install 6-inch diameter steel pipe post bollards in and around the buildings, at corners and at the overhead doors for protection of the structures. Provide exterior bollards to protect tanks, gas meters or other equipment as shown on the drawings. Where indicated, cast bollards into an isolated foundation and extend 42 inches above the top of the adjacent slab or finished surface. The pipe bollards shall be filled with concrete and painted with the yellow paint system as specified. Fabricate and install 6” bolt-down steel bollards with caps where indicated and per drawings and specification.

33. Interior plumbing, ductwork extensions, and equipment in the vehicle storage areas shall be protected by 4 inch, bolt-down steel bollards with caps, painted safety yellow; see drawings and specification for more details.

Flooring:

34. The concrete floor and curbs throughout the buildings shall be sealed with concrete sealer per the Specification. Finishes for each room are called out in the Finish Schedule.

Walls:

35. The VSF walls shall be insulated per the wall section details. The VSF roof shall have thermal blocks at purlins and multiple layers of insulation as required to meet the Specification, Drawings and ComCheck. VSF exterior walls shall have batt and liner system insulation (at concrete curb and admin areas) in walls to meet requirement in the Specification, Drawings and ComCheck. All VSF exterior walls and roofs shall have a vapor barrier.

36. VSF Offices: The interior walls of the offices and restrooms shall have sound insulation.

Extend walls to structure above per plans and details. Note: All gypsum board walls shall have rubber base except restrooms.

37. All restroom walls shall have floor-to-ceiling fiber glass reinforced panels (FRP). At all restroom walls and ceilings provide moisture- and mold-resistant gypsum board.

38. VSF vehicle bays: Install pre-finished metal panels (MP) on interior walled surfaces, as shown on drawings. Install per manufacturer’s recommendation, up to 8’-6”. Balance of wall shall be finished with Skyliner or other approved vapor barrier system.

39. VSF wash bay: provide pre-finished metal panels (MP) at walls and ceiling of wash bay.

Provide flashing and corner trim pieces at all edges, corners and joints.

Ceilings:

40. Offices: The ceiling in the administrative area shall be lay-in acoustical tiles in a suspended grid ceiling and gypsum board at the restrooms.

41. VSF vehicle storage bays: Furnish and install Skyliner or other approved vapor barrier system per manufacturer’s instructions.

42. VSF wash bay: Furnish and install metal panels (MP) per manufacturer’s instructions.

Doors / Windows:

43. Provide 3-foot by 7-foot insulated metal exterior doors set in hollow metal frames with specified hardware as noted in the drawings and specs. Note: Exterior doors have card access readers with lever handles. Card readers, electric strikes, conduit, back boxes and network cabling for the card readers are all to be installed by the contractor. The contractor shall employ one of the certified installers for the card reader system.

44. The exterior man doors (except at the Sand Shed) shall have a half-panel tempered, insulated glass vision panel in each door.

45. Interior doors shall be a 3-foot by 7-foot sound-insulated, hollow metal door set in a hollow metal frame with specified hardware.

46. The VSF building shall have 16-foot by 16-foot insulated sectional overhead doors in each bay. The sectional overhead doors at the VSF shall have one row of tempered glazing and one row of insulated polycarbonate glazing at the wash bay. The overhead doors shall be operated via a hand-held remote device as well as a waterproof interior operator panel with typical 3-button station.

47. Doors into/out of VSF wash bay are to have stainless steel hardware as specified.

48. The exterior of the VSF building shall be fitted with operable aluminum windows for office areas and fixed clerestory windows in vehicle bays, located per drawings. Windows to be insulated with low-e glazing in compliance with the Energy ComChecks and Specification.

49. Office interiors have fixed hollow metal frames with windows facing into the vehicle areas.

50. The Sand Shed overhead door shall be commercial roll-up overhead type; powder coated.

Door shall have both hand chain and wall-mount motor operation. The overhead door shall be operated via a hand-held remote device as well as a waterproof interior operator panel with typical 3-button station. All motors, accessories and wiring shall be appropriate for wet conditions as specified in the Specification and the Drawings.

Casework and shelving:

51. Provide built-in casework with countertop, backsplash and cabinets at the kitchenette area in the VSF. Total depth of casework and countertop is not to exceed 24 inches to comply with ADA reach requirements for outlets, see drawings.

52. Provide 30-inch-deep countertops with grommets and plastic laminate supports at the crew areas in the VSF. Provide 12-inch-deep adjustable melamine shelving above the countertops as located on the plans.

53. Provide 20-inch-deep adjustable melamine shelving in the VSF Storage Room.

Heating, Cooling and Ventilation:

54. VSF vehicle bays: provide exhaust ventilation with wall-mounted exhaust fans and louvers.

The wash bay shall have NEMA4X rated exhaust fans and a supply louver. Exhaust fans in the vehicle areas shall be tied to carbon monoxide / nitrogen dioxide (CO/NO2) detectors and shall have an override for users to turn the fans on as needed. Override system shall not disable the detection system, and in the event of above-acceptable levels of fumes, the detection system shall operate independent of any user override. Provide a waterproof enclosure for detector in wash bay.

55. Provide 56-inch (26-inch blades) ceiling fans in each enclosed VSF bay per plans. There are no ceiling fans in the wash bays or the Sand Shed.

56. VSF vehicle bays: provide infrared, low-intensity, gas-fired tube heaters, suspended from the roof with runs coordinated with-in areas shown on drawings. Radiant tube heaters in wash bay shall be rated for wet environments.

57. The VSF administrative areas shall have unit heaters / split system heat pump with auxiliary electric duct mounted heating coils and air condensing units, as shown on the mechanical drawings. All exterior piping to have hard cover UV protection over the insulation, as specified.

58. At the Sand Shed, provide an exhaust fan with aluminum backdraft damper, fan blade and motor guard per Mechanical Equipment Schedule. Exhaust fan to be tied to interior lighting and controlled with 60-minute spring-wound timer switch. On the wall opposite the exhaust fan, provide a fixed blade aluminum louver per the Drawings and Specification.

Plumbing:

59. Provide a trench drain in the VSF vehicle bay area and the wash bay per the drawings.

The trench drain is a pre-fabricated trench set into the floor slab. It is 12 inches wide and slopes to a center catch basin(s). The grates for the trench drain shall be HS20-44 rated.

Provide catch basins with lift-out sediment tray filters where indicated and per Specification and Drawings. Provide a sand and oil interceptor per drawings.

60. Provide floor drains in the restrooms, in the storage room for the air compressor and water heater, and in the vehicle storage bay below the emergency shower.

61. Provide freeze-proof exterior hose bibs and interior hose bibs located as shown on the drawings.

62. Sanitary Sewer Wastewater from the VSF will be conveyed via 4” waste line to a septic tank / leach field system complying with Sedgwick County requirements and the WW drawings. Wastewater from the VSF vehicle bay floor drains will be conveyed via 4” waste line to an Onsite Wastewater Treatment System (OWTS) designed by others.

Underground tanks, piping, conduits, disconnects, sub-panels, concrete equipment curbs, etc. for the OWTS are included in this contract and are to be provided and installed by the GC per plans and specification. Provide plumbing yard clean-outs where indicated, and per plans and Specification.

63. Domestic water shall be supplied by the on-site well and conveyed via a 2” inch water line from water well as located on the civil drawings. Provide and install underground potable water storage tanks, piping, pumps, filters and equipment shown on plans and specifications for supply water system.

64. Provide and install one electric tank-type water heater to supply all fixtures requiring hot water in the VSF.

65. The restrooms shall include plumbing fixtures and accessories as shown on the drawings.

The restrooms and all devices / accessories shall meet all the provisions of ICC/ANSI A117.1.

66. Provide a utility hand sink and mop sink with a mop holder in the VSF, where shown on the plans. Provide a kitchen sink in the admin area of the VSF only. Provide water stub out at location shown for an owner-provided refrigerator in the VSF only. Provide and install one high-low accessible drinking fountain/bottle filler where shown. Provide and install an emergency shower/eyewash station where shown.

Specialty Equipment:

67. Provide and install a waste oil collection system for the VSF. New components to be provided include the following:

a. A low-profile collection basin with handle that can be quick-coupled to a compressed air, waste pipe system.

b. Exterior Waste Oil Tank, per Specification.

c. Air-operated diaphragm waste oil evacuation pump per Specification.

d. Automatic air shut-off system per Specification.

68. Provide and install one (1) stationary, gas-fired pressure washer, properly vented with flue damper and braced back to wall at VSF adjacent to the wash bay, with all accessories per Specification. Provide a 1-1/2” PVC pipe with grommets at each end through the Wash Bay wall for the hose to pass through.

69. Provide one each (1) vertical-mount tank air compressor mounted on a concrete pad, as specified for the VSF. Provide compressed air distribution system, as specified; refer to drawings for air outlet locations.

70. Provide flammable storage cabinet in vehicle bay of the VSF building.

Electrical:

71. Power distribution as follows: install new 120/208v, 3-phase electrical service with new conduits, conductors, transformer, meter, and panels as shown in the electrical one line diagram. Ensure that all new equipment is selected for correct phase power. Coordinate transformer and meter installation with Highline Electric Association.

72. At the VSF provide Panel P-1 and P-2. Install convenience receptacles as shown on the plans. Mount at 44 inches above the floor in Vehicle Bay. Mount above counter height at kitchenette. Provide GFCI at wet areas as shown in the plans. Provide one 20-amp GFCI receptacle in each restroom.

73. Along the exterior of the buildings provide NEMA rated 20-amp duplexes (GFI and weatherproof) receptacles as shown on the drawings.

74. VSF Vehicle storage area to have one 50 amp disconnect wired for 208 volts; locate as shown on drawings.

75. All components and electrical devices within the wash bay to be NEMA 4 rated and waterproof, including all wiring and accessories.

76. At the Sand Shed, provide Panel P-3, convenience receptacles as shown on the plans, and at the exterior of the building provide NEMA rated 20-amp duplexes (GFI and weatherproof) receptacles as shown on the drawings. Make electrical connections to fan, louver, overhead door operators, and all electrical equipment shown on the drawings.

77. At the Mg-Cl containment structure, provide Panel P-4, power for fuel pump and master, sump pump (by owner) and Mg-Cl Pumps and lighting per drawings.

78. Provide underground power/conduit to fuel island for fuel pump and master switch. Install emergency shutoff switch per plans. Provide underground conduits / pull strings to junction boxes for data to fuel pump.

79. Provide underground power/conduit to new well per drawings.

80. Provide underground conduits / pull strings to in-grade junction boxes for power and data at EV-Ready spaces per drawings.

81. Provide underground power/conduit to new gate motor location, operator, and entry kiosk as required.

82. Provide flag pole and light, and associated underground power and conduit? per plans and specifications.

Lighting:

83. Restrooms: One (1) LED vanity fixture centered over mirror and recessed LED can light in each.

84. Each restroom shall have an occupancy sensor to operate the lights and fan with 10-minute delay. Each office will have an occupancy sensor to operate lighting.

85. VSF Building to have:

a. LED high bay luminaires, suspended from ceiling as scheduled at VSF.

b. Wall-mounted LED strips with acrylic lens, located on back wall.

c. Daylight harvesting / occupancy sensors to control high bay lighting with overrides.

d. Overhead lighting, task lighting as scheduled at VSF Admin Bay.

86. Exterior lighting: Photocell-controlled, night-sky compliant LED fixtures located on the building, and light poles, as shown on drawings.

87. Provide illuminated exit signs over egress doors and other emergency lighting as required by the IBC and the IFC.

88. Sand Shed to have LED high bay luminaires, suspended from ceiling and tied to occupancy sensor(s), and exterior lighting per plans and Specification.

Phones / Data:

89. The contractor shall install all conduits with pull strings, both underground and inside the building, boxes, covers, the demark panel and the IT cabinet. CDOT will have a separate contractor install cabling at its cost.

90. Communication Conduit: The contractor shall trench and install (2) 2” telecommunication conduits from the telecom provider pedestal to the demark panel in the VSF, and then to office rooms to locations shown on drawings. Exterior Conduit is to be minimum two inches in diameter, with pull string. The installation of the conduit must follow the industry standard of using "Sweeps" and NOT elbows. The total amount of bends must not exceed 270 degrees. Should more bends be required, a pull box needs to be installed. Conduit shall have length identifying pull tape.

91. Demark: Contractor will provide and install:

e. Telephone backboards (extended demark) to be of industry standard specification, painted plywood and shall be located per plans.

f. Card Reader Network Equipment

g. CDOT’s Contractor will install the network gear and make all cabling runs and terminations.

92. Provide recessed boxes, covers and conduit at locations noted on the drawings for telephone/data drops. Where there is a drop ceiling, extend conduit back to the demark. All low voltage cabling shall be inside conduit.

93. Provide J-Boxes with recessed conduit in Vehicle bays for owner provided Wireless Access Point. J-Box to be at 10 feet above finish floor; coordinate height with metal girts.

94. Provide conduit and wiring for the networked card reader at the sand shed, fuel island and at the electric gate entry kiosk. Provide conduit only for power and data to the future EV charging stations.

Life Safety:

95. The entire facility shall have the specified smoke and/or heat and carbon monoxide detection. Smoke and/or heat detection shall be provided, designed and installed to meet all NFPA requirements, including type, location, spacing and sound pressure requirements for detectors and annunciation devices such as horns and strobes. Combined carbon monoxide/nitrogen dioxide detector shall automatically engage the ventilation system to exhaust the harmful gas. An override switch shall be provided to allow the ventilation system to be turned on/off manually.

96. Provide hand-held fire extinguishers, one for every 1,500 square feet and located as determined by the local Fire AHJ. Extinguishers to be mounted to wall and labeled.

Onsite Water Treatment System (OWTS)

97. Refer to schematic drawing WTS-1 by Weaver Consultants Group. Contractor to provide and install Oil/Water Separator, Process Tanks, Reclaim Water Storage Tank, and all water conveyance piping and electrical conduits and power between tanks and Pre-Filtration Skid.

Pre-Filtration Skid provided by others (Weaver).

Buy Clean Colorado Act Requirements

98. All CDOT projects solicited for design after 1/1/2024, are required to comply with the Buy Clean Colorado Act (BCCA). This law establishes a maximum acceptable global warming potential (GWP) limit for categories of eligible materials. Complying with BCCA requires documentation and sign off from the project design consultants, contractors, and state buildings delegate. In order to better understand the requirements, contractors are encouraged to read the educational materials and do the training on the Buy Clean Colorado Act OSA Website: https://osa.colorado.gov/energy-environment/buy-clean-colorado-act.

99. The design team has determined that the following materials must comply with GWP limits under BCCA: Asphalt and Asphalt Mixtures, Cement and Concrete Mixtures, Glass, Reinforced Steel, Structural Steel. The GWP limits for these materials are shown on the Environmental Product Declaration form EE5.2, included with the Bid Documents. The Design Team shall be responsible for completing tabs “Instructions” and “EPD Design Submittal” on form EE5.2.

100. The Contractor shall be responsible for reviewing information provided on the Design Submittal and supplying the Environmental Product Declaration (EPD) submittal prior to ordering materials. Once approved the contractor will complete tabs “EPD Construction Submittal” and “Transportation” on form EE5.2 confirming that the material submittal is less than or equal to the acceptable threshold.

101. The Office of the State Architect permits waivers to the Buy Clean Colorado Act reporting if the specified eligible material is technically infeasible, non-compliant with code, significantly (5%) more expensive over the material’s lifecycle, would cause a time delay verses non-compliant material or if there is only a single supplier of the material. In this situation the contractor must submit the alternative EPD and provide justification for the waiver. Once accepted by the architect, State Buildings Delegate and Office of the State Architect the non-compliant submittal may be approved.

102. The General Contractor, Architect/Engineer and The CDOT State Buildings Delegate will be responsible for completing tab “Final Sign-Off” on form EE-5.2.

End of Scope of Work https://urldefense.proofpoint.com/v2/url?u=https-3A__osa.colorado.gov_energy-2Denvironment_buy-2Dclean-2Dcolorado-2Dact&d=DwMFaQ&c=sdnEM9SRGFuMt5z5w3AhsPNahmNicq64TgF1JwNR0cs&r=CD0yTlFI6uTmBFhR-okqd-NjVpT6guXbEd8SMKfIKgE&m=T1YK6qXzgeR9gosKrj7KbY0yfMYP1qppp00gZp1Lk_l31HMaY2oPmCHBLznhnH-l&s=1oSlcbHErH3xai8_R3RAs82CoBsZm7sGYLIkTK_ceYw&e=