Section_J_-_Att_No__005_Floor_Plans.pdf

PDF 731 KB Posted

Attached to
MUIR WOODS ADMIN BUILDING REHABILITATION
Solicitation number
140P8623Q0012
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

101 102

103a

101-Supervisor Office 102-Office 103-Education Office 103a-closet 104-Ranger Office 105-Mail Room 106-Entry 107-Conservancy Office 108-Bathroom

Room Schedule RFQ 140P8623Q0012 Section J- Att No 005

103a

101-Supervisor Office 102-Office 103-Education Office 103a-closet 104-Ranger Office 105-Mail Room 106-Entry 107-Conservancy Office 108-Bathroom

Room Schedule

Flooring Schedule 101- 131ft2, floating floor 102-120 ft2, floating floor 103-126 ft2, floating floor 103a-NIC 104-135 ft2 floating floor.

105-50 ft2, floating floor.

106- 98ft2, floating floor.

107- 154 ft2, floating floor.

108-NIC

Stairs at 105-floating floor w/nosing floating floor not in contractGeneral Notes

1. Install thresholds at all changes of flooring and exterior doors.

Thresholds to meet ADA standards.

2. Install quarter round on all walls.

3. Carpet tile to match existing installed at bathroom ramp.

RFQ 140P8623Q0012

103a

101-Supervisor Office 102-Office 103-Education Office 103a-closet 104-Ranger Office 105-Mail Room 106-Entry 107-Conservancy Office 108-Bathroom

Room Schedule

Ceiling Plan

Dropped Ceiling

Hard Ceiling

RFQ 140P8623Q0012

Room Schedule
Flooring Plan
Ceiling Plan

File details come from the government source that posted it. Updated .