United States Department of the Interior
NATIONAL PARK SERVICE
Golden Gate National Recreation Area
Fort Mason Bldg. 201
San Francisco, CA 94123
October 14, 2022
Revised February 19, 2023
MUWO 324995
Replace HVAC System, Flooring, and Electrical at Muir Woods Administration Building
Statement of Work
1. Demo
a. Remove all carpeting from Administration Building. All carpet to be recycled.
b. Remove “ramp” at bathroom.
c. Furniture may need to be moved to complete flooring.
d. Remove furnace and associated duct work that is inside of the building (not in crawlspace).
e. Cap propane line.
f. Patch opening in mechanical shed from return vent.
g. Recycle all materials.
2. Flooring
a. Build single step at bathroom.
b. Fill floor vents with rigid foam. Cover holes with sheet metal.
c. Install snap-and-lock style floating floor with underlayment.
d. Install flooring with nosing at all steps.
e. Install shoe molding in all rooms.
f. Install transition strips as necessary.
3. Electrical
a. Replace existing Federal Pacific panel with new panel.
b. Trace all circuits.
c. Label all breakers.
d. Include panel schedule in new panel.
e. Install wiring and circuits as necessary for heat pump system.
RFQ 140P8623Q0012
Section J - Att No. 009 Updated SOW
4. HVAC
a. Conduct engineering calculation to properly size new heat pump system and determine the location of zoned wall units.
b. Install new multi-zoned ductless heat pump system.
c. Install wall units.
d. Install thermostats for each wall unit.
e. Complete all necessary piping and insulate pipe.
f. Set controls to disable air conditioning-units are for heat only or properly drain condensate. Do not enter crawlspace.
5. Moving Services
a. Provide professional office moving service to move office furniture and contents from the
Administration Building to the Conifer Classroom prior to the start of construction.
b. Provide professional office moving service to move office furniture and contents from the
Conifer Classroom back to the Administration Building at the end of construction.
Schedule of Government Furnished Equipment (GFE)
a) none
RFQ 140P8623Q0012
Section J - Att No. 009 Updated SOW