Section_B_.docx
DOCX document 642 KB Posted
- Attached to
- Guardrail Services and Materials State and local contract opportunity
- Solicitation number
- 25-0288-ITB- C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is an Invitation to Bid (ITB) from Pinellas County, Florida for Guardrail Services and Materials, Bid No. 190-0211-CP(PLU). The contract is a work order agreement for maintenance and repair of guardrail and handrail systems damaged by vehicular accidents, with the primary goal of timely repair and returning areas to a safe condition for vehicular and pedestrian traffic. The contract will have an initial term of three years, with the option to extend for up to two additional years. The county seeks a contractor who can respond quickly to repair guardrail systems across Pinellas, Hillsborough, Pasco, and Manatee Counties.
The bid includes specific requirements for Small Business Enterprise (SBE) participation, with a mandatory goal of 10% SBE subcontractor involvement. SBE firms must be independently owned, located in the specified counties, have annual sales not exceeding $3 million for services or $8 million for construction, and employ no more than 50 employees. Pre-qualification is required for construction services with an engineering estimate over $100,000, and bidders must be pre-qualified with Pinellas County or the Florida Department of Transportation. The contract will be awarded to the lowest responsible and responsive bidder, with unit prices to be held firm for the duration of the agreement. Bidders must provide comprehensive insurance coverage, performance and payment bonds, and meet various technical and safety requirements specified in the document.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Guardrail_Services_and_Materials_(Addendum_#2_Revision).pdf | ||
| Florida_Trench_Safety.pdf | ||
| Airport_Security_Program.pdf | ||
| Appendix_4_-Special_Notices_(outdated_language_needs_to_be_revised_per_ITB,_which_is_highlighted_in_yellow).rtf | RTF text file | |
| Appendix_4_-Special_Notices_REVS.pdf | ||
| E-Verify_Affidavit.pdf | ||
| Sample_Application_for_Payment.pdf | ||
| Bid_Submittal_Form-JOC.pdf | ||
| Non-Competitive_Oversight_Committee_Justification_Form.docx | DOCX document | |
| Agreement-25-0288.pdf | ||
| Florida_Trench_Safety_Form.pdf | ||
| OpenGov_Fillable-_Final.pdf | ||
| Performance_and_Payment_Bonds.pdf | ||
| Sample_Change_Order.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
190-0211-CP(PLU)
APPENDIX 7 – SBE COMPLIANCE FORM
Bid Title: Guardrail Services and Materials Bid Number: 190-0211-CP(PLU)
SECTION B – SPECIAL CONDITIONS INSTRUCTIONS TO BIDDERS:
1. SMALL BUSINESS ENTERPRISE (SBE) PARTICIPATION REQUIREMENTS:
a. It is the policy of the Board of County Commissioners (Board) that SBE qualified firms have the maximum opportunity to participate on County projects. In this regard, the contractor to whom any award of this solicitation is made shall take all necessary and reasonable steps to ensure that SBE qualified firms have the maximum opportunity to participate in this contract. Failure of the bidder to comply with SBE pre-award requirements may result in rejection of the bid. Failure of the contractor to perform contractual requirements of the SBE requirements pertaining to this contract may constitute a material breach of the contract and may result in contract termination.
b. This section outlines the requirements for Small Business Enterprise (SBE) participation as outlined in Purchasing Procedures Section 14. An SBE is defined as a local business that is independently owned and which is not dominant in its field of operation. The Small Business must also comply with the following:
i. The business must serve a commercially useful function.
ii. The business must be located in Pinellas, Hillsborough. Pasco or Manatee Counties.
iii. The company’s total annual sales do not exceed the maximum three (3) year average gross revenue of three (3) million dollars for businesses providing services or gross revenues not exceeding eight (8) million for construction service providers.
iv. The number of employees of the company does not exceed the maximum three (3) year average of fifty (50) employees.
c. Information pertaining to SBE registration may be found at the Economic Development website: https://www.pced.org/page/sbe.
d. The Board has established an overall annual goal for the participation of SBE qualified firms in all construction contract awards of $100,000 or more. As subcontract awards by the successful bidder on this solicitation to SBE qualified firms are essential to the achievement of the Board’s SBE goals, this specification includes requirements with which bidders must comply. Bidders must meet the goal as set forth below for participation of SBE qualified firms.
e. In connection with this solicitation and resulting contract, a goal of 10% percent has been established for participation by SBE firms as subcontractors. The mandatory goal shall be applied to the full monetary value of the contract and shall be reflected in the monetary portion spent on subcontractors for consulting or construction services to be awarded to those SBE qualified firms meeting contract specifications.
f. Provisional reciprocity shall be granted to SBE firms that are principally domiciled in Pinellas, Pasco, Hillsborough, and Manatee Counties and have registered through that agency or municipality. SBE firms qualified by the State of Florida and located in the counties listed above will also be granted reciprocity.
g. In order to be considered for provisional certification and be counted toward the goal attainment, the contractor or subcontractor must be registered with the Pinellas County Department of Economic Development website https://www.pced.org/page/sbe.
h. The Subcontractors/Material Suppliers List (List) must be completed and submitted with your bid submittal. Refer to Appendix 7, SBE Compliance Form. The List must include the suppliers name, scope or type of work to be performed and dollar amount. The identification of all SBE firms to be utilized on the project must be shown on this List. This List is the basis for determining whether the bidder met the SBE goal attainment.
190-0211-CP(PLU)
SECTION B - SPECIAL CONDITIONS
PINELLAS COUNTY PURCHASING
ITB –PURCHASING CONSTRUCTION
REVISED: 04-2019
2. PRE-QUALIFICATION OF BIDDER: Awards of bids for construction services with an engineering estimate in excess of $100,000 will only be made to Bidders who have pre-qualified with Pinellas County for Road, Street, Storm Sewer type construction, or those that are pre-qualified by the Florida Department of Transportation (FDOT) in an equivalent prequalification, in the amount that equals or exceeds their bid. Only those bids from Bidders that meet the pre-qualification requirements from either Pinellas County or FDOT prior to a bid opening will be considered.
| 3. PRICING/PERIOD OF AGREEMENT: Unit prices bid of listed items shall be held firm for the duration of the Agreement. Duration of the Agreement shall be to commence Work under this Agreement with an adequate force and equipment within fifteen (15) consecutive calendar days or as mutually agreed by the Parties, after receipt of written notice from the County to proceed and to fully complete all necessary Work under the same within not more than 1095 consecutive calendar days. | Comment by Deranzio, David A: This will be a 3 year contract. Can we please change to reflect. |
| 4. TERM EXTENSION(S) OF AGREEMENT: The Agreement may be extended subject to written notice of agreement from the County and successful Bidder, for an additional 730 calendar days period beyond the primary Agreement Period. The extension shall be exercised only if all prices, terms and conditions remain the same and approval is granted by the County Administrator or Director of Purchasing. | Comment by Deranzio, David A: Would like to have the option to extend for up to two additional years. |
5. NON-MANDATORY PRE-BID CONFERENCE: Not Applicable
6. BID BOND GUARANTEE: Comment by Deranzio, David A: Bid Bond is not needed for this contract.
A. All bids must be accompanied by a Bid Bond guarantee in the sum of five percent (5%) of the base bid and made payable to Pinellas County. Said bid bond shall be a guarantee that should the bid be accepted, the Bidder will, within ten (10) days after the acceptance of its bid, enter into an Agreement with Pinellas County for the services proposed to be performed and will at that time furnish an acceptable Agreement surety. Cash, certified check, cashiers check, trust company treasurer check, company or personal checks and bank draft of any national or state bank are not acceptable.
B. Said bid bond and the monies payable thereon, will, at the option of the County, be forfeited if the Bidder fails to execute the written Agreement and furnish the required surety bond within ten (10) consecutive calendar days following written notice of the award of the Contract.
C. Attorneys-in-fact who sign bonds must file with such bond one (I) certified copy of their power of attorney to sign said bond.
D. Bid bond shall have been issued within thirty (30) days of the date for receiving bids.
7. CONTRACT SECURITY:
A. The Bidder shall provide a Performance Bond and a Payment Bond in the form prescribed in Section I and each in the amount of 100% of the Agreement amount, the costs of which are to be paid by the Bidder. The Bonds will be acceptable to the County only if the following conditions are met:
1. For contracts that do not exceed $500,000.00, the Surety Company:
a. is licensed to do business in the State of Florida;
b. holds a certificate of authority authorizing it to write surety bonds in this state and provides proof of same;
c. has twice the minimum surplus and capital required by the Florida Insurance Code at the time the invitation to bid is issued;
d. is otherwise in compliance with the provisions of the Florida Insurance Code; and
e. holds a currently valid certificate of authority issued by the United States Department of Treasury under 31 U.S.C. ss 9304-9308.
2. For contracts over $500,000.00, all of the requirements of paragraph A.1 above apply. In addition, the Surety Company must have a current rating of at least Excellent (A or A-) all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc., of 75 Fulton Street, New York, New York 10038, with an underwriting limitation of at least two times the dollar amount of the Agreement.
3. All bonds must be signed by an insurance agent who is licensed to do business in the state of Florida. The license may be held by a resident agent or a non-resident agent.
B. If the Surety for any Bond furnished by the Bidder is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Bidder shall, within five (5) calendar days thereafter, substitute another Bond and Surety, both of which shall be subject to the County's approval.
C. By execution of these bonds, the Surety acknowledges that it has read the Surety qualifications and Surety obligations imposed by the Contract Documents and hereby satisfies those conditions.
8. LICENSES, PERMITS, FEES AND TAXES:
A. Pursuant to section 218.80, Florida Statutes, Pinellas County discloses to the Contractor the following permits and fees generally which will have to be obtained by and will be payable by the Contractor who is the successful bidder or proposer. Specific permits required will be shown in Appendix 1 – Permits. Contractor will be reimbursed for the actual amount paid for the permits as evidenced by official receipts from the office(s) collecting the fees. No reimbursement will be provided for license fees. Permits/fees may include the following:
1. Impact Fees.
2. Inspection Fees.
3. Other Permits or Fees Required by Pinellas County for the Completion of the Work, if applicable.
4. License Fees: The Pinellas County Construction Licensing Board (PCCLB), an independent government agency, may require licensure or registration of a State of Florida Construction License. These are not Pinellas County Government fees, but the Contractor is hereby put on notice that fees may be required by the PCCLB. License fees are not reimbursable.
The foregoing list of fees apply only to those fees imposed by Pinellas County or imposed by another governmental agency which has assigned or delegated the responsibility for issuance of permits, licenses and conduction of inspections and attendant collection of fees to Pinellas County. The Contractor is responsible for determining if other fees and permits are required by any other Federal, State, or local governmental entity, agency, or board.
B. All sales, consumer, use, and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work, shall be paid by the Contractor.
C. Compliance with Permit and Licenses Requirements: The Contractor shall comply with all applicable Local, State and Federal permit conditions and license requirements, applicable building and construction code requirements and such other rules and regulations as may apply to the prosecution of Work. Failure of the Contractor to comply with the above -specified requirements shall result in Contractor being prohibited from performing Work pursuant to this Agreement. Any additional costs incurred by the Contractor as a result of non-compliance shall be the responsibility of the Contractor and shall not be paid by the County. Additionally, Contractor shall be required to pay any fines due as a result of non-compliance with the applicable requirements.
9. COMPLIANCE WITH LAWS: The Contractor agrees to comply, at its own expense, with all Federal, State and Local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to, those dealing with taxation, Workers' Compensation, equal employment, safety (including, but not limited to, the Trench Safety Act, Chapter 553.60-553.64, Florida Statutes), labor, work hours, labor conditions, environment, and related matters. If the Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify the Design Professional/Engineer/Project Manager in writing.
10. QUANTITIES:
A. Quantities shown on the Bid Submittal Form are estimated for bidding purposes only and shall be verified by the Contractor before placing orders for material. No payment shall be allowed for excess materials. Comment by Deranzio, David A: Can be removed. Will address in Appendix.
B. Payment for Work performed under this Agreement shall be based on the pay items and bid quantities shown on the Bid Submittal Form, subject to such extension of pay quantities as may be required.
C. Regardless of uncertainties of material supply and production at the time of bidding, Bidders shall base their bids in strict accordance with items, materials and methods as set forth in the Contract Documents.
D. Pay items that are required to complete the scope of the Work, as defined by the Project Plans and Specifications may be added to the list of pay items by the Design Professional/Engineer/Project Manager at a later date through a change order process.
11. QUANTITIES REFLECTED IN PERMITTING DOCUMENTS: Any construction items or quantities reflected in the permitting documents, if any, required for this Project are provided only for the purpose of enabling permitting authorities to assess the probable impact of the Project on environmental concerns, and are in no way intended to reflect or represent actual construction items or quantities for pay purposes. Comment by Deranzio, David A: Can be removed. Will address in Appendix
12. AWARD OF CONTRACT: The Contract will be awarded for the entire Work (with or without optional/alternates items) to the lowest responsible and responsive Bidder, provided that the bid is reasonable, and that it is in the best interest of the County to accept. Comment by Deranzio, David A: These 4 words can be removed.
13. AFTER NOTICE OF AWARD TO CONTRACTOR: Subsequent communications between the County and the Contractor shall be delivered to the County's representative. A Preconstruction Conference will be held following execution of the Contract Documents and prior to the Notice to Proceed.
14. INTENT OF THE CONTRACT DOCUMENTS:
A. It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents which combine to define the Scope of Work. Any Work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe Work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard Specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard Specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein. Comment by Deranzio, David A: Can be removed.
B. The Contract Documents and all referenced standards cited therein are essential parts of the Agreement requirements. A requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete Project.
C. Plans are intended to show general arrangements, design and extent of Work. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the Plans, Specifications or other Contract Document provisions, the Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon the Contractor, as determined by the Design Professional/Engineer/Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the Contract Documents.
15. STORAGE OF MATERIALS: Materials shall be so placed so as to permit easy access for proper inspection and identification of each shipment. Any material which has deteriorated, become damaged, or is otherwise unfit for use, as determined by the Design Professional/Engineer/Project Manager, shall not be used in the Work, and shall be removed from the site by the Contractor at its expense.
16. SANITATION: The Contractor shall provide and maintain adequate sanitary conveniences for the use of persons employed on the Work. These conveniences shall be maintained at all times without nuisance, and their use shall be strictly enforced. The location of these conveniences shall be subject to the Design Professional/Engineer/Project Manager’s approval.
17. ERRORS AND OMISSIONS: The Contractor shall not take advantage of any apparent error or omission in the Contract Documents. If any errors and/or omissions appear in the Contract Documents, or construction stakeout, the Contractor shall immediately notify the Purchasing Department, in writing, of such errors and/or omissions. In the event the Contractor knows or should have known of any errors and/or omissions and fails to provide such notification, it shall be deemed to have waived any claim for increased time or compensation it may have had and he shall be held responsible for the results and the costs of rectifying any such errors and/or omissions. Comment by Deranzio, David A: Can be removed.
18. CONTRACTORS AND SUBCONTRACTORS:
a. Qualification
1. The Contractor shall assure that all personnel are competent, careful and reliable. All personnel must have sufficient skill and experience to properly perform the Work assigned them. All personnel shall have had sufficient experience to perform their assigned task properly and satisfactorily and to operate any equipment involved, and shall make due and proper effort to execute the Work in the manner prescribed in the Contract Documents, or the Design Professional/Engineer/Project Manager may take action as prescribed below.
2. Whenever the Design Professional/Engineer/Project Manager shall determine that any person is incompetent, unfaithful, intemperate, disorderly or insubordinate, such person shall upon notice, be discharged from the Work and shall not again be employed on it except with the written consent of the Design Professional/Engineer/Project Manager. Should the Contractor fail to remove such person or persons the Design Professional/Engineer/Project Manager may withhold all estimates which are or may become due, or may suspend the Work until such orders are complied with.
b. Identification
1. Within ten (10) days after the award of any subcontract, either by himself or a subcontractor, the Contractor shall deliver to the Design Professional/Engineer/Project Manager a statement setting forth the name and address of the subcontractor and a summary description of the Work subcontracted.
2. The Contractor shall be as fully responsible to the County for acts and omissions the subcontractor and of persons either directly or indirectly employed by the subcontractor, as the Contractor is for the acts and omissions of persons directly employed by the Contractor.
19. AUTHORITY OF THE DESIGN PROFESSIONAL/ENGINEER/PROJECT MANAGER AND DESIGN PROFESSIONAL/ENGINEER/PROJECT MANAGER'S DESIGNEES/REPRESENTATIVES
A. All Work shall be done in accordance with the Contract Documents.
B. It is agreed by the parties hereto that the Design Professional/Engineer/Project Manager shall decide all questions, difficulties and disputes, of whatever nature, which may arise relative to the interpretation of the Plans, construction, prosecution and fulfillment of the Agreement, and as to the character, quality, amount and value of any Work done, and materials furnished, under or by reason of the Agreement.
C. The County retains the right to inspect all Work to verify compliance with the Contract Documents. The Design Professional/Engineer/Project Manager may appoint such designees and/or representatives as desired. They shall be authorized to inspect all Work done and all materials furnished. This right of inspection in no way means or implies County control or other supervision over the Work done or the work site. This right is solely for the County's benefit and imposes no duties or responsibilities on the County and confers no rights on any other parties. Such inspection may extend to all or any part of the Work and to the manufacture, preparation or fabrication of the materials to be used. Such designees and/or representatives shall not be authorized to revoke, alter or waive any requirement of the Contract Documents.
D. The designees and/or representatives shall be authorized to call to the attention of the Contractor any failure of the Work or materials to conform to the Contract Documents, and shall have the authority to reject materials or suspend the Work until any questions at issue can be referred to and decided by the Design Professional/Engineer/Project Manager. The Contractor shall be immediately notified in writing of any such suspension of the Work and such notice shall state in detail the reasons for the suspension. The presence of the inspector or other designee shall in no way lessen the responsibility of the Contractor.
E. Contractor's Supervision
1. Prosecution of Work: The Contractor shall give the Work the constant attention necessary to assure the scheduled progress and it shall cooperate fully with the Design Professional/Engineer/Project Manager and with other Contractors at Work in the vicinity.
2. Contractor's Superintendent:
a. The Contractor shall at all times have on the Work as his agent, a competent superintendent capable of thoroughly interpreting the Plans and Specifications and thoroughly experienced in the type of Work being performed, who shall receive the instructions from the Design Professional/Engineer/Project Manager or his/her authorized representatives. The superintendent shall have full authority to execute the orders or directions of the Design Professional/Engineer/Project Manager and to supply promptly any materials, tools, equipment, labor and incidentals which may be required. Such superintendence shall be furnished regardless of the amount of Work sublet.
b. The Contractor's superintendent shall speak and understand English, and at least one responsible person who speaks and understands English shall be on the Project during all working hours.
3. Supervision for Emergencies: The Contractor shall have a responsible person available at or reasonably near the work site on a twenty-four (24) hour basis, seven (7) days a week, in order that he/she may be contacted in emergencies and in cases where immediate action must be taken to maintain traffic or to handle any other problem that might arise. The Contractor's responsible person for supervision for emergencies shall speak and understand English. The Contractor shall submit, by certified mail, phone numbers and names of personnel designated to be contacted in cases of emergencies along with a description of the Project location to the Florida Highway Patrol and all other local law enforcement agencies.
4. Worksite Traffic Supervisor: (When the work involves road construction/reconstruction or changes affect normal traffic patterns)
a. The Contractor shall have a Worksite Traffic Supervisor who will be responsible for initiating, installing and maintaining all traffic control devices as described in Section 102 of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, and in the Plans. The Worksite Traffic Supervisor shall have at least one year of experience directly related to worksite traffic control in a supervisory or responsible capacity and shall be certified by the American Traffic Safety Services Association Worksite Traffic Supervisor Certification Program or an equal approved by the Florida Department of Transportation. Approved alternate Worksite Traffic Supervisors may be used when necessary.
b. The Worksite Traffic Supervisor shall be available on a twenty-four (24) hour per day basis and shall review the Project on a day to day basis as well as being involved in all changes to traffic control. The Worksite Traffic Supervisor shall have access to all equipment and materials needed to maintain traffic control and handle traffic related situations. The Worksite Traffic Supervisor shall ensure that routine deficiencies are corrected within a 24-hour period.
c. The Worksite Traffic Supervisor shall be available on the site within forty-five (45) minutes after notification of an emergency situation, prepared to positively respond to repair the Work zone traffic control or to provide alternate traffic arrangements.
d. Failure of the Worksite Traffic Supervisor to comply with the provisions of the Sub-article may be grounds for decertification or removal from the Project or both. Failure to maintain a designated Worksite Traffic Supervisor or failure to comply with these provisions will result in temporary suspension of all activities except traffic and erosion control and such other activities deemed to be necessary for Project maintenance.
F. General Inspection Requirements
1. Cooperation by the Contractor: No Work shall be done nor materials used, without suitable supervision or inspection by the Design Professional/Engineer/Project Manager or his/her representative, and the Contractor shall furnish the Design Professional/Engineer/Project Manager with every reasonable facility for ascertaining whether the Work performed and materials used are in accordance with the requirements and intent of the Plans and Specifications. If the Design Professional/Engineer/Project Manager so requests, the Contractor shall, at any time before final acceptance of the Work, remove or uncover such portions of the finished Work as may be directed. After examination, the Contractor shall restore the uncovered portions of the Work to the standard required by the Specifications. Should the Work so exposed or examined prove unacceptable, the uncover or removal, and the replacing of the covering or making good of the parts removed, shall be at the Contractor's expense. However, should the Work thus exposed or examined prove acceptable, the uncovering or removing, and the replacing of the covering or making good of the parts removed, shall be paid for as Unforeseeable Work.
2. Failure of the Design Professional/Engineer/Project Manager to Reject Work During Construction: If, during or prior to construction operations, the Design Professional/Engineer/Project Manager should fail to reject defective Work or materials, whether from lack of discovery of such defect or for any other reason, such initial failure to reject shall in no way prevent his/her later rejection when such defect is discovered, or obligate the County to final acceptance, and the Contractor shall make no claim for losses suffered due to any necessary removals or repairs of such defects.
3. Failure to Remove and Renew Defective Materials and Work:
a. Should the Contractor fail or refuse to remove and renew any defective materials used or Work performed, or to make any necessary corrections in an acceptable manner and in accordance with the requirements of the Specifications, within the time indicated in writing, the Design Professional/Engineer/Project Manager shall have the authority to cause the unacceptable or defective materials or Work to be repaired, removed and renewed, as may be necessary; all at the Contractor's expense.
b. Any expense incurred by the County in making these repairs, removals, or renewals, which the Contractor has failed or refused to make, shall be paid for out of any moneys due or which may become due the Contractor, or may be charged against the Performance Bond. Continued failure or refusal on the part of the Contractor to make any or all necessary repairs promptly, fully and in an acceptable manner shall be sufficient cause for the County, at its option, to perform the Work with its own organization, or to contract with any other individual, firm or corporation to perform the Work. All costs and expenses incurred thereby shall be charged against the defaulting Contractor and the amount thereof deducted from any moneys due or which may become due him, or shall be charged against the applicable bond. Any Work performed subsequent to forfeiture of the Agreement, as described in this Paragraph, shall not relieve the Contractor in any way of its responsibility for the Work performed by it.
4. Inspection by the Federal Government: When the Work involves the Federal Government it is to pay a portion of the cost of construction the construction Work will be subject to inspection by its representatives as they may deem necessary, but such inspection will in no case make the Federal Government a party to Agreement.
20. CONTRACT TIME AND TIME EXTENSIONS
A. Unless otherwise provided, Agreement Time shall mean the number of consecutive calendar days from the commencement date noted in the Notice to Proceed to the date on which all Work is to be completed. The Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and material suppliers, as well as coordinate its Work with the Work of other contractors so that his Work or the Work of others shall not be delayed or impaired by any act or omission of any act by a Contractor. The Contractor shall coordinate and schedule the Work to allow, without delays to the Contract, for any sampling and testing activities deemed necessary by the Design Professional/Engineer/Project Manager. The Contractor shall be solely responsible for all construction means methods, techniques, sequences and procedures, as well as coordination of all portions of the Work under the Contract Documents. Comment by Deranzio, David A: Can remove. Wont apply to this work order contract. Contract will not be extended due to work.
B. Should the Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of the Contractor, and not due to his fault or neglect, including but not restricted to acts of God or the public enemy, acts of government, fires, floods, discovery of pre-existing hazardous materials, utility conflicts, epidemics, quarantine regulations, strikes or lockouts, the Contractor shall notify the Design Professional/Engineer/Project Manager in writing within two (2) regular Work days after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which the Contractor may have had to request the time extension. It is the contractor’s responsibility to safely and appropriately secure the worksite prior to the approach of unfavorable weather conditions such as the onset of a tropical storm, hurricane, or similar event.
C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatsoever, including those for which the County may be responsible, in whole or in part, shall relieve the Contractor of his duty to perform or give rise to any right to damages or additional compensation from the County. It being expressly acknowledged and agreed by the parties hereto that the Contractor shall receive no damages for delay. The Contractor's sole remedy, if any, against the County shall be the right to seek an extension to the Contract Time. Such extensions of time will not be granted for delays caused by unfavorable weather, ground conditions related to the weather, inadequate construction force or for the failure of the Contractor to timely order equipment or materials.
D. If the Contractor complies with the two (2) regular Work days notice requirement, the Design Professional/Engineer/Project Manager shall ascertain the facts and the extent of the delay being claimed and recommend to the Board an extension to the Contract Time when, in the Design Professional/Engineer/Project Manager’s sole judgment, the findings of fact justify such an extension, and the Design Professional/Engineer/Project Managers finding of fact shall be final and conclusive on the parties. The Contractor shall cooperate with the Design Professional/Engineer/Project Manager’s investigation of the delays by providing any schedules, correspondence or other data that may be required to complete the findings of fact. Extensions of the Contract Time must be authorized by Change Order approved by the Board.
21. PROSECUTION OF WORK ON SATURDAYS, SUNDAYS AND RECOGNIZED HOLIDAYS
A. All Work must be done during Regular Work Day hours (7:00 AM to 7:00 PM) Monday through Friday. The County may require alternative Work hours due to specific individual Project conditions when necessary. Work will not be done beyond hours specified herein or on Saturdays, Sundays or holidays unless authorized in advance by the Design Professional/Engineer/Project Manager to meet special requirements. Contractor must comply with the County noise ordinance.
B. Work will not be permitted on Saturdays, Sundays and recognized Holidays unless permission to Work has been requested in writing by the Contractor and approval, in writing, has been granted by the Design Professional/Engineer/Project Manager. Request for permission to Work must be received by the Design Professional/Engineer/Project Manager no less than twenty-four (24) hours prior to the regular Work day.
C. No Work will be permitted on:
New Year’s Day Independence Day Thanksgiving Day Christmas Day D. When approval is granted in accordance with the provisions stated above, Work will be allowed on:
Martin Luther King, Jr. Day Memorial Day Labor Day Veterans Day Friday after Thanksgiving Day If Christmas or New Year's Day shall fall on Tuesday or Thursday, the preceding Monday or the following Friday shall be recognized as a holiday also. If any recognized holiday shall fall on a Saturday, the preceding Friday shall be observed as a holiday. If any recognized holiday shall fall on a Sunday, the following Monday shall be observed as a holiday.
E. The Contractor shall pay to the County, as reimbursement of costs incurred by the County, the sum of One hundred DOLLARS ($ 100.00) per man day for each Saturday and Sunday on which the Contractor Works. Comment by Deranzio, David A: Not necessary for this contract.
F. The Contractor shall pay to the County, as reimbursement of costs incurred by the County, the sum of One hundred fifty DOLLARS ($ 150.00) per man day for each recognized Holiday on which the Contractor Works.
G. Payment to the County of such sums as may become payable under the provisions of this paragraph shall be made by identifying the said sums as a credit item on the Contractor’s pay estimate for the period during which the liability for the sums occurred. The credit item shall show the total number of days applicable under (E) and/or (F) above, times the corresponding per day or per hour cost.
22. LIQUIDATED DAMAGES – Not Applicable
23. PINELLAS COUNTY’S COMMITMENT TO SAFETY
A All work shall be completed in a safe manner and consideration for cost of any equipment needed to perform contract in a safe manner, including personal protection equipment, shall be included in the contract bid.
B If County discovers an unsafe act or condition in contractor’s performance under this contract, County shall inform Design Professional/Engineer/Project Manager of unsafe act or condition. If unsafe act or condition poses the threat of imminent danger, Design Professional/Engineer/Project Manager shall be authorized to stop work until unsafe act or condition is remedied. No time extension shall be allowed. If remedy causes contractor to fail to meet the time specified, County shall be entitled to liquidated damages as outlined under 21.B. If unsafe act or condition is does not pose the threat of imminent danger, Design Professional/Engineer/Project Manager shall be authorized to require contractor remedy the unsafe act or unsafe condition as soon as possible, but in no event later than 3 days from date of notice. No time extension shall be allowed. If remedy causes contractor to fail to meet the time specified, County shall be entitled to liquidated damages as outlined under 21.B. Comment by Deranzio, David A: Can be removed. Not applicable for this contract. Comment by Deranzio, David A: This can be removed.
24. CHANGES IN THE WORK
A. Without invalidating the Agreement, the Design Professional/Engineer/Project Manager may at any time, by written order, direct extra Work within the general scope or alter the Work by addition or deduction of items that do not alter the scope of the Work. Such changes may be effected by Field Order or by other written order. Such changes shall be binding on the Contractor. No officer, employee, or agent of the County is authorized to direct any extra or change Work orally.
B. If changes to the Scope of the Work are required or if the Contract time or the total Contract Amount is increased by the additional Work, a Change Order approved by the Board will be required. Comment by Deranzio, David A: This is a work order contact. Each project will be separate and not go to board for changes in time or amount. Contract time can not changed. Once expired it has to be rebid.
C. The value of such extra Work or change shall be determined by schedule of values if applicable unit values are set forth in the Agreement. The amount of the change shall be computed from such values and added to or deducted from the Agreement Amount. If the applicable unit values are not in the Contract, the value of such extra Work or change shall be determined by negotiation. Comment by Deranzio, David A: Can be removed. Schedule of values will be used for this contract.
D. Should a Change Order be required, and the County and the Contractor are unable to agree on the requested change, the Contractor shall, nevertheless, promptly perform the change as directed in writing by the Design Professional/Engineer/Project Manager. If the Contractor disagrees with the Design Professional/Engineer/Project Manager's adjustment determination, the Contractor must make a claim pursuant to the Claims and Dispute Section herein, or else be deemed to have waived any claim on this matter it might otherwise have had.
E. For new Work not covered by schedule of values, the amount of an increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10%) markup for all overhead and profit. In the event such change Work is performed by a subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5%) markup thereon by the Contractor for all of its overhead and profit, for a total overall maximum markup of fifteen percent (15%) of the amount of change Work. Sales and use taxes are not subject to the markup allowance. Material provided by the Contractor, for use by the Subcontractor, is only allowed the ten percent (10%) markup by the Contractor. All compensation due the Contractor and any Subcontractor or sub-subcontractor for field and home office overhead is included in the markups noted above. Comment by Deranzio, David A: Change to Bid Tab F. In an emergency endangering life or property, or as expressly set forth herein, the Design Professional/Engineer/Project Manager has the authority to order the necessary Work in writing. The County shall not be liable to the Contractor for any increased compensation without such written order. The payment authorized by a written order shall represent full and complete compensation to the Contractor for labor, materials, incidental expenses, overhead, profit, impact costs, and time associated with the Work authorized by such written order.
G. Execution by the Contractor of a properly authorized Change Order (see Appendix Sample Change Order) shall be considered a waiver of all claims or requests for additional time or compensation for any activities prior to the time of execution related to items included in the Change Order. Comment by Deranzio, David A: Can be removed. Work orders will be issued for each task. A change order will be made on the PO not contract.
25. CLAIMS AND DISPUTES
A. A Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time or other relief with respect to the terms of the Contract Documents. The term "Claim" also includes other disputes and matters in question between the County and the Contractor arising out of or relating to the Contract Documents. The responsibility to substantiate a claim shall rest with the party making the Claim.
B. Claims by the Contractor shall be made in writing to the Design Professional/Engineer/Project Manager within two (2) regular Work days after the commencement of the event giving rise to such Claim or else the Contractor shall be deemed to have waived the claim. Written supporting data shall be submitted to the Design Professional/Engineer/Project Manager within fifteen (15) calendar days after the occurrence of the event, unless the County grants additional time in writing, or else the Contractor shall be deemed to have waived the Claim. All Claims shall be priced in accordance with provisions of the section in this document entitled Changes in the Work.
C. The Contractor shall proceed diligently with its performance as directed by the County, regardless of any pending Claim, action, suit, or administrative proceeding, unless otherwise agreed to by the County in writing. The County shall continue to make payments in accordance with the Contract Documents during the pendency of any Claim.
26. MEASUREMENT AND PAYMENT
A. All Work completed under the terms of this Agreement shall be measured according to United States Standard Measures.
B. All measurements shall be taken horizontally or vertically, unless specifically provided otherwise.
C. In the measurement of items to be paid for on the basis of area of finished Work, when the pay quantity is designated to be determined by calculation, the lengths and/or widths to be used in the calculations shall be the station-to-station dimensions shown on the Plans, the station-to-station dimensions actually constructed within the limits designated by the Design Professional/Engineer/Project Manager, or the final dimensions measured of the completed Work within the lines shown on the Plans or designated by the Design Professional/Engineer/Project Manager. The method, or combination of methods, shall be those which reflect with reasonable accuracy the actual area of finished Work as determined and authorized by the Design Professional/Engineer/Project Manager.
D. No payment will be made for either construction over a greater area than authorized, or for material moved from outside of stakes and data shown on the Plans, except when such Work is performed upon instructions of the Design Professional/Engineer/Project Manager. Comment by Deranzio, David A: Can be removed
E. The Contractor shall accept compensation provided under the terms of this Agreement as full payment for furnishing all materials and for performing all Work contemplated and embraced under this Agreement. Such compensation shall also be for any and all loss or damage arising out of the nature of the Work or from the action of the elements, or from any unforeseen difficulties or obstructions encountered during the Agreement Time until final acceptance by the County.
F. Whenever any change, or combination of changes in the Plans, results in an increase or decrease in the original Contract quantities, and the Work added or decreased/eliminated is of the same general character as that called for in the Plans, the Contractor shall accept payment in full at the original schedule of values for the actual quantity of Work performed, with no allowance for any loss of anticipated profits.
G. Where the pay quantity for an item is designated to be Lump Sum, and the Plans or Specifications indicate an estimated quantity, compensation for that item will be adjusted proportionately if a plan change results in a significant change in the quantity from such estimated plan quantity. Comment by Deranzio, David A: Can be removed. No lump sum will be provided
H. Failure to construct any item to plan or authorized dimensions within the Specification tolerances shall result in reconstruction by the Contractor to acceptable tolerances at no additional cost to the County, acceptance at no pay, or acceptance at reduced final pay as determined by the Design Professional/Engineer/Project Manager. Adjustments to final pay for those items designated to be paid on the basis of Lump Sum quantity under these provisions shall not be made unless such adjustments results in an aggregate change per item of more than $1,000.00 for earthwork items, or more than $100.00 for any other item. Comment by Deranzio, David A: This can be removed. First part is ok.
I. At the discretion of the Design Professional/Engineer/Project Manager, the County will allow partial payments for new materials that will be permanently incorporated into the Project and are stored in approved locations in the Project vicinity. Said materials are described as having the greatest impact on completing the Project on time; and can fluctuate as the Project progresses. Contractor shall store materials so that they will not be damaged by the elements and in a manner that identifies the Project on which they are to be used. The following conditions apply to all payments for stored materials. Comment by Deranzio, David A: Will not allow partial payments for this contract. This section can be omitted.
1. There must be reasonable assurance that the stored material will be incorporated into the specific Project on which partial payment is made.
2. The stored material must be approved as meeting applicable Specifications.
3. The total quantity for which partial payment is made shall not exceed the estimated total quantity required to complete the Project.
4. The Contractor shall furnish the County with copies of certified invoices to document the value of the materials received. The contractor’s documentation for stored materials payment shall also include a reconciliation of the beginning balance, materials purchased, materials used, and ending balance. The amount of the partial payment will be determined from invoices for the material not to exceed one half of the unit value bid in the Contract.
5. Delivery charges for materials delivered to the jobsite will be included in partial payments if properly documented on the certified invoices for the materials received.
6. Partial payments will not be made for materials which were stored prior to award of the Contract for the Project.
7. If payment is made the materials shall become the property of the County. The Contractor shall be responsible for loss or theft and shall replace, at the Contractor's expense, any such materials lost for any reason.
27. PAYMENTS TO CONTRACTOR
A. Prior to submitting its first monthly Application for Payment, Contractor shall submit to the Design Professional/Engineer/Project Manager, for its review and approval, a Schedule of Values based upon the “Contract Amount” and the Construction Progress Schedule numbering system format listing the major elements of the Work and the dollar value for each element. After its approval by the County, this Schedule of Values shall be used as the basis for Contractor’s monthly Application for Payment. This Schedule shall be updated and submitted each month to the Design Professional/Engineer/Project Manager along with a completed and notarized copy of the Application for Payment and any Payment Continuation forms. Comment by Deranzio, David A: Remove and add. “Contract shall submit final invoice for payment once completed. If the project will last more than 30 days, contractor can submit for partial payment.”
B. Prior to submitting its first monthly Application for Payment, Contractor shall submit to the Design Professional/Engineer/Project Manager a complete list of all of its proposed subcontractors and materialmen, showing the Work and materials involved and the dollar amount of each proposed subcontract and purchase order. The first Application for Payment shall be submitted no earlier than thirty (30) days after the Commencement Date.
C. If payment is requested on the basis of materials and equipment not incorporated into the Work, but delivered and suitably stored at the site or at another location agreed to by the Design Professional/Engineer/Project Manager in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice or other documentation warranting that the County has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, together with evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect the County’s interest therein, all of which shall be subject to the County’s satisfaction. Contractor shall complete a Schedule of Stored Materials form.
D. Contractor shall submit three (3) notarized original copies of its monthly Application for Payment to Design…
This is the start of the file's text. The full file is on GovTribe.