SCHEDULE 1 Excel.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
RFP #27-1-CTY DISASTER DEBRIS COLLECTION SERVICES
Solicitation number
600RFP #27-1-CTY
Issued by
Cumberland County, North Carolina

About this file

This is a Unit Rate Price Schedule for RFP #27-1-CTY Disaster Debris Collection Services issued by North Carolina. The schedule establishes pricing for comprehensive disaster debris management services, including collection and hauling of vegetative debris from rights-of-way (ROW) and rights-of-entry (ROE), construction and demolition (C&D) debris collection and hauling, removal of hazardous trees ranging from 6 inches to 48 inches or greater in diameter, removal of dangerous hanging limbs, removal of hazardous stumps, demolition services, site management, debris reduction through grinding and incineration, haul-out of reduced debris, and removal of vessels, vehicles, animal carcasses, and asbestos. Services are differentiated by hauling distance in three categories: 0-15 miles, 15.1-30 miles, and greater than 30.1 miles. Quantities are specified as one unit for each line item, with units of measurement including cubic yards (CYD), tons (TON), each (EACH), linear feet (Linear FT), and pounds (LB).

All unit prices in the schedule are currently listed at $0.00, indicating this is a blank price schedule template awaiting bidder submissions. Bidders are required to complete this schedule with their proposed pricing for each service category and distance range. The pricing structure allows for comparison of unit rates across different service types and haul distances, enabling the evaluation of bids based on actual debris volumes and disposal locations that may be needed during the disaster debris management operation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SCHEDULE 1 – UNIT RATE PRICE SCHEDULE
Ref. to Section No. of RFPDescriptionEstimated QuantityUnitUnit PriceLine Item Price
(a)(b)(c)(a) x (c)
4.1ECollect & Haul Vegetative – ROW
0 miles – 15 miles1CYD0.00
0 miles – 15 miles1TON0.00
15.1 miles – 30 miles1CYD0.00
15.1 miles – 30 miles1TON0.00
>30.1 miles1CYD0.00
>30.1 miles1TON0.00
4.1 FCollect & Haul C&D – ROW
0 miles – 15 miles1TON0.00
15.1 miles – 30 miles1TON0.00
>30.1 miles1TON0.00
4.1 GRemove, Collect, & Haul Vegetative – ROW/ROE
0 miles – 15 miles1CYD0.00
0 miles – 15 miles1TON0.00
15.1 miles – 30 miles1CYD0.00
15.1 miles – 30 miles1TON0.00
>30.1 miles1CYD0.00
>30.1 miles1TON0.00
4.1 G (1)Removal of Hazardous Trees
6” – 12”1EACH0.00
13” – 24”1EACH0.00
25” – 36”1EACH0.00
36” – 48”1EACH0.00
49” and greater1EACH0.00
4.1 G (1)Removal of Dangerous Hanging Limbs1EACH0.00
4.1 G (1)Removal of Hazardous Stumps
24” – 36”1EACH0.00
36” – 48”1EACH0.00
48” and greater1EACH0.00
4.1 HDemolish, Collect, & Haul C&D – ROW/ROE
0 miles – 15 miles1TON0.00
15.1 miles – 30 miles1TON0.00
>30.1 miles1TON0.00
4.1 ITDSR Site Management1CYD0.00
4.1 JReduction by Grinding1TON0.00
4.1 J (3)Reduction by Incineration1CYD0.00
4.1 KHaul-out of Reduced Debris
0 miles – 15 miles1CYD0.00
0 miles – 15 miles1TON0.00
15.1 miles – 30 miles1CYD0.00
15.1 miles – 30 miles1TON0.00
>30.1 miles1CYD0.00
>30.1 miles1TON0.00
4.1 LRemoval of Vessels1Linear FT0.00
4.1 MRemoval of Vehicles1Per Unit0.00
4.1 NRemoval of Animal Carcasses1Per Unit0.00
4.1 ORemoval of Asbestos1LB0.00