SCHEDULE 1 Excel.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 600RFP #27-1-CTY
- Issued by
- Cumberland County, North Carolina
About this file
This is a Unit Rate Price Schedule for RFP #27-1-CTY Disaster Debris Collection Services issued by North Carolina. The schedule establishes pricing for comprehensive disaster debris management services, including collection and hauling of vegetative debris from rights-of-way (ROW) and rights-of-entry (ROE), construction and demolition (C&D) debris collection and hauling, removal of hazardous trees ranging from 6 inches to 48 inches or greater in diameter, removal of dangerous hanging limbs, removal of hazardous stumps, demolition services, site management, debris reduction through grinding and incineration, haul-out of reduced debris, and removal of vessels, vehicles, animal carcasses, and asbestos. Services are differentiated by hauling distance in three categories: 0-15 miles, 15.1-30 miles, and greater than 30.1 miles. Quantities are specified as one unit for each line item, with units of measurement including cubic yards (CYD), tons (TON), each (EACH), linear feet (Linear FT), and pounds (LB).
All unit prices in the schedule are currently listed at $0.00, indicating this is a blank price schedule template awaiting bidder submissions. Bidders are required to complete this schedule with their proposed pricing for each service category and distance range. The pricing structure allows for comparison of unit rates across different service types and haul distances, enabling the evaluation of bids based on actual debris volumes and disposal locations that may be needed during the disaster debris management operation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SCHEDULE 1 – UNIT RATE PRICE SCHEDULE | |||||
| Ref. to Section No. of RFP | Description | Estimated Quantity | Unit | Unit Price | Line Item Price |
| (a) | (b) | (c) | (a) x (c) | ||
| 4.1E | Collect & Haul Vegetative – ROW | ||||
| 0 miles – 15 miles | 1 | CYD | 0.00 | ||
| 0 miles – 15 miles | 1 | TON | 0.00 | ||
| 15.1 miles – 30 miles | 1 | CYD | 0.00 | ||
| 15.1 miles – 30 miles | 1 | TON | 0.00 | ||
| >30.1 miles | 1 | CYD | 0.00 | ||
| >30.1 miles | 1 | TON | 0.00 | ||
| 4.1 F | Collect & Haul C&D – ROW | ||||
| 0 miles – 15 miles | 1 | TON | 0.00 | ||
| 15.1 miles – 30 miles | 1 | TON | 0.00 | ||
| >30.1 miles | 1 | TON | 0.00 | ||
| 4.1 G | Remove, Collect, & Haul Vegetative – ROW/ROE | ||||
| 0 miles – 15 miles | 1 | CYD | 0.00 | ||
| 0 miles – 15 miles | 1 | TON | 0.00 | ||
| 15.1 miles – 30 miles | 1 | CYD | 0.00 | ||
| 15.1 miles – 30 miles | 1 | TON | 0.00 | ||
| >30.1 miles | 1 | CYD | 0.00 | ||
| >30.1 miles | 1 | TON | 0.00 | ||
| 4.1 G (1) | Removal of Hazardous Trees | ||||
| 6” – 12” | 1 | EACH | 0.00 | ||
| 13” – 24” | 1 | EACH | 0.00 | ||
| 25” – 36” | 1 | EACH | 0.00 | ||
| 36” – 48” | 1 | EACH | 0.00 | ||
| 49” and greater | 1 | EACH | 0.00 | ||
| 4.1 G (1) | Removal of Dangerous Hanging Limbs | 1 | EACH | 0.00 | |
| 4.1 G (1) | Removal of Hazardous Stumps | ||||
| 24” – 36” | 1 | EACH | 0.00 | ||
| 36” – 48” | 1 | EACH | 0.00 | ||
| 48” and greater | 1 | EACH | 0.00 | ||
| 4.1 H | Demolish, Collect, & Haul C&D – ROW/ROE | ||||
| 0 miles – 15 miles | 1 | TON | 0.00 | ||
| 15.1 miles – 30 miles | 1 | TON | 0.00 | ||
| >30.1 miles | 1 | TON | 0.00 | ||
| 4.1 I | TDSR Site Management | 1 | CYD | 0.00 | |
| 4.1 J | Reduction by Grinding | 1 | TON | 0.00 | |
| 4.1 J (3) | Reduction by Incineration | 1 | CYD | 0.00 | |
| 4.1 K | Haul-out of Reduced Debris | ||||
| 0 miles – 15 miles | 1 | CYD | 0.00 | ||
| 0 miles – 15 miles | 1 | TON | 0.00 | ||
| 15.1 miles – 30 miles | 1 | CYD | 0.00 | ||
| 15.1 miles – 30 miles | 1 | TON | 0.00 | ||
| >30.1 miles | 1 | CYD | 0.00 | ||
| >30.1 miles | 1 | TON | 0.00 | ||
| 4.1 L | Removal of Vessels | 1 | Linear FT | 0.00 | |
| 4.1 M | Removal of Vehicles | 1 | Per Unit | 0.00 | |
| 4.1 N | Removal of Animal Carcasses | 1 | Per Unit | 0.00 | |
| 4.1 O | Removal of Asbestos | 1 | LB | 0.00 |