SCB_Replacement_of_Generator_Controls_and_Switchgear_(PID_004906DE)_(Addendum_#1_Revision).pdf

PDF 624 KB Posted

Attached to
SCB Replacement of Generator Controls and Switchgear (PID 004906DE) State and local contract opportunity
Solicitation number
25-0073-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is an Invitation to Bid for Construction (ITB-C) issued by Pinellas County, Florida for the SCB Replacement of Generator Controls and Switchgear project at the South Cross Bayou Advanced Waste Reclamation Facility (AWRF). The project involves removing and replacing two electrical switchboard line-ups, including utility circuit breakers, generator circuit breakers, feeder circuit breakers, group mounted devices, and automatic failover systems. The bid was released on February 4, 2025, with a mandatory site visit scheduled for February 13, 2025, at 1:00 PM. The question submission deadline is February 14, 2025, at 3:00 PM, and the Step 1 Bid submission deadline is February 18, 2025, at 3:00 PM, with the Step 2 Bid submission deadline on March 6, 2025, at 3:00 PM. The project is part of a four-year program aimed at replacing all 12 electrical switchgear components at the facility, with this specific project representing Phase 2.

The project has a two-step qualification process, with contractors required to submit detailed qualifications, including a bonding letter, OpenGov Fillable-Final form, project experience, and reference letters. The contract will be awarded to the lowest responsive and responsible bidder, with a contract time of 450 consecutive calendar days. Liquidated damages are set at $1,612.43 per calendar day for late completion. The project requires comprehensive insurance coverage, including workers' compensation, commercial general liability, excess liability, and cyber risk liability insurance. Contractors must comply with local, state, and federal regulations, including E-Verify requirements and small business enterprise (SBE) participation guidelines. The project is funded internally by Pinellas County, with the work to be performed at the South Cross Bayou Advanced Waste Reclamation Facility.

View the file

Other files for this state and local contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID - CONSTRUCTION (ITB-C)

25-0073-ITB-C

SCB REPLACEMENT OF GENERATOR CONTROLS AND

SWITCHGEAR (PID 004906DE)

Pinellas County

Pinellas County Courthouse Annex Bldg., Sixth Floor

Clearwater, FL 33765

THE MISSION OF PINELLAS COUNTY

"Pinellas County Government is committed to progressive public policy, superior public service, courteous public contact, judicious exercise of authority and sound management of public resources to meet the needs and concerns of our citizens today and tomorrow."

ISSUE/RELEASE DATE: February 4, 2025

QUESTION SUBMISSION DEADLINE: February 14, 2025

PROPOSAL SUBMISSION DEADLINE: February 18, 2025, 3:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY VIA OPENGOV TO:

https://procurement.opengov.com/portal/pinellasfl https://procurement.opengov.com/portal/%7bproject.government.code%7d

Pinellas County

INVITATION TO BID - CONSTRUCTION (ITB-C)

SCB Replacement of Generator Controls and Switchgear (PID 004906DE)

Table of Contents No table of contents entries found.

Attachments:

A - OpenGov Fillable- Final

B - E-Verify_Affidavit

C - QUALIFICATION SUBMITTAL FORM Non FDOT

D - Affdavit of Release and Guarantee

E - Performance and Payment Bonds

F - Sample Change Order

G - Sample Application for Payment

H - SCB AWRF Switchboard BLA & BLB Replacement S&S Specs 11-06-24

I - Final Plans 09-13-24

J - SBE Compliance Form

K - Affdavit of Release and Guaranteev25-0073

L - Agreement-25-0073

M - Pricing Proposal 25-0073(reference only)

W - Florida Trench Safety Form

Invitation to Bid - Construction (ITB-C) #25-0073-ITB-C Title: SCB Replacement of Generator Controls and Switchgear (PID 004906DE)

1. Notice

INVITATION TO BID

SUBMITTALS ARE OPENED PUBLICLY AND ARE ACCEPTED VIA OPENGOV

ITB - Construction 2-Step

25-0073-ITB-C

SCB Replacement of Generator Controls and Switchgear (PID 004906DE)

ALL QUESTIONS MUST BE SUBMITTED IN OPENGOV WITHIN THE QUESTION & ANSWER SECTION.

SOLICITATION MEETINGS: Site Visit: Mandatory; Pre-Conference: Non-Mandatory

SUBMITTALS MAY NOT BE WITHDRAWN FOR120 DAYS AFTER OPENING DATE.

PUBLIC MICROSOFT TEAMS MEETING - https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?co ntext=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-

8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d @ 3:30 on the Bid 2 Submittal Date.

Meeting ID: 292 583 511 912

Passcode: avjUPp

Or call in (audio only)

+1 813-644-3116

Phone Conference ID: 487 254 075#

The Purchasing and Risk Management Division for the Pinellas County Board of County Commissioners has transitioned to OpenGov Procurement for contractor/vendor registration, and for posting, submitting and receiving bids, quotes and proposals for active solicitations. Contractors/Vendors must register with OpenGov Procurement (https://procurement.opengov.com/signup) to participate in active County solicitations.

Should you need technical assistance with OpenGov, the following options are available:

Phone: (855) 680-4747, 8 a.m. to 8 p.m., Monday - Friday

Email:procurement-support@opengov.com

Chat is available in the OpenGov application

Web:https://help.procurement.opengov.com https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YTk2ZDM5NzgtZmFiOS00ZWM1LTk1NjgtYWIxOWZiYzliMGQ4%40thread.v2/0?context=%7b%22Tid%22%3a%22c32ee18f-a4c7-46ff-af40-8ed605642745%22%2c%22Oid%22%3a%227427c034-238b-4d40-aa5d-19b05166cbf8%22%7d https://procurement.opengov.com/signup mailto:procurement-support@opengov.com https://help.procurement.opengov.com/

Please Note:

From time to time, addenda may be issued to this solicitation. Any such addenda will be posted to https://procurement.opengov.com/portal/pinellasfl. Receipt of addenda confirmation is required in

OpenGov.

AUTHORIZED BY:

Merry Celeste, CPPB

Division Director of Purchasing and Risk Management

2. Introduction

2.1. Summary

The work to be performed under these Contract Documents consists of the removal and replacement of two (2) switchboard line-ups, which include utility circuit breakers, generator circuit breakers, feeder circuit breakers, group mounted devices and automatic failover systems. The installation work is located at the Pinellas County South Cross Bayou Advanced Waste Reclamation Facility (AWRF). The work shall be inclusive of all equipment, materials and work required for operational systems that are complete and fully tested.

2.2. Contact Information

Michelle Jurek

Procurement Analyst

400 S. Ft. Harrison Ave. 6th Floor

Clearwater, FL 33756

Email: mjurek@pinellas.gov

Phone: (727) 464-4382

Department:

UTILITIES

2.3. Timeline

Issue Date February 4, 2025

Site Visit & Pre-Conference Information

(Non-Mandatory)

February 13, 2025, 1:00pm

7401 54th Avenue North St. Petersburg, FL 33709

Step 1 Question Submission Deadline February 14, 2025, 3:00pm

Step 1 Bid Submission Deadline February 18, 2025, 3:00pm

Step 2 Bid Submission Deadline March 6, 2025, 3:00pm mailto:mjurek@pinellas.gov tel:(727)464-4382

3. Definitions - 2-Step Construction

Whenever the following terms, or pronouns used in place of them, are used in these Contract

Documents they shall have the meanings given below:

Addendum: A modification, revision or clarification of the Plans or other Contract Documents, issued by the Purchasing Department and distributed to prospective Bidders before the bid opening.

Approved Equal: An approved equivalent item that is approved in writing, (via an Addendum to the Agreement), prior to the Bid Opening. Bidder must submit their proposed equivalent item no later than question deadline date on Section 2 Introduction. Any information received after this deadline will not be considered.

Bid Publication: The date on which public notice is made to request a bid/request for proposal for this Project.

Bid/Request for Proposal: The offer to perform the Work described in the Contract Documents at a specified cost.

Architect/Design Professional/Engineer of Record: The Professional Architect/Design Professional/Engineer or Architectural/Design Professional/Engineering Firm contracted by the County and registered in the State of Florida who develops criteria and concept for the Project, performs the analysis and is responsible for the preparation of the Contract Plans and Specifications. The Architect/Design Professional/Engineer of Record will be a Consultant retained by the County or a county in-house staff member.

Board of County Commissioners: Governing body of Pinellas County hereinafter referred to as the Board.

Calendar Day: Every day shown on the calendar, ending and beginning at Midnight.

Change Order: A written order authorized by the Board or County Administrator, issued by the Design Professional/Engineer/Project Manager, and accepted by the Contractor directing certain changes, additions or reductions in the Work or in the materials used.

Commencement Date: Date established in the Notice to Proceed. Contractor shall commence the Work within fifteen (15) consecutive calendar days or as mutually agreed by the Parties, from the date of the Notice to Proceed.

Consultant: The Professional Engineer/Design Professional or Engineering Firm registered in the State of Florida who performs Professional Engineering Services for the County, other than County personnel. The Consultant may be the Design Professional/Engineer of Record or may provide services through and be subcontracted to the Design Professional/Engineer of Record or maybe providing construction engineering and inspection (CEI) services, as applicable.

Contractor: The General Contractor, the Individual, Partnership or Corporation agreeing to do the Work for the County as Prime Contractor. The Contractor may be refereed to interchangeably as Vendor and/or Bidder in this document pending on the contracting phase governed herein.

Contract Documents: All documents referred to herein in addition to all duly executed and issued addenda, legal advertisements and change orders.

Design Professional: A collective term intended to apply to “Architect/Engineer of Record”, licensed and registered in the State of Florida, the prime party responsible for the design, engineering, and construction documentation of the project and contracted directly with the Owner.

Engineer: The Engineer, a staff member of the County or his duly authorized representative, acting on behalf of the County.

FDOT: The Florida Department of Transportation.

FDOT Specifications: Florida Department of Transportation, “STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION”, (latest edition at time of advertisement), and all supplemental specifications thereto.

Final Acceptance: Whenever the Work provided for under the Agreement has been completely performed by the Contractor, and the final inspection has been made by the Design Professional/Engineer/Project Manager.

Final Completion: The point in which all Work is complete and all other Agreement requirements have been satisfied.

Inspector: An authorized representative of the Design Professional/Engineer/Project Manager, assigned to make any or all necessary inspections of the Work performed, and materials furnished by the Contractor.

Man Day: A unit of measure for work by one person in a calendar day.

Notice of Award: The formal document informing the Contractor of its successful selection to construct the Project.

Notice to Proceed: Formal written document informing the Contractor to begin the Work, and notifying the Contractor of the architect, project engineer and other agency or person to which the Contractor may submit its payment request or invoice.

Owner: Is Pinellas County, a political subdivision of the State of Florida, herein after referred to as the County.

PCU - Standard Specifications: Pinellas County Utilities (PCU) “Material Specification Manual”, “Technical Specifications”, “Pump Station Standard Details” and “Standard Details” as described and defined on the Utility Department’s website at www.pinellascounty.org/utilities under the Engineering header. Contractor’s bid must be based on those standards that are in place as of the Bid Publication date.

PC Special Provisions: Specifications approved by Pinellas County that modify or amend the Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition) (“Standard Specifications”), setting forth conditions that vary from the Standard Specifications and are applicable to a specific type of Project, or a specific set of conditions.

PC Std. Tech. Spec.: Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition at time of advertisement) shown on the Pinellas County website.

PC Supplemental Specifications: Specifications approved by Pinellas County that are in addition to the Pinellas County Standard Technical Specifications for Roadway and General Construction (latest edition) (“Standard Specifications”) setting forth conditions that are additional to the Standard Specifications and are applicable to a specific type of Project, or a specific set of conditions.

Plans: Approved drawings or reproductions thereof, showing the location, character, dimension and details of the work to be done as issued by the Design Professional/Engineer.

Project: All Work, materials or equipment (whether or not specifically called for) required to produce the intended result as described within the Contract Documents.

Project Manager: The individual designated by the Owner to represent the owner on all administrative matters related to the Project.

Proposal and Bid Submittal Sheets: Form, as required in Section 9 Pricing Proposal.

Punch List: The written compilation of those items identified by the Design Professional/Engineer/Project Manager after Substantial Completion is achieved, which are required to render complete, satisfactory and acceptable the Project (or phase of a Project).

Record Drawings: Record Drawings are a set of signed/sealed CONTRACT PLANS that are maintained by the Contractor for the express use of recording AS-BUILT INFORMATION.

Regular Workday or Business Day: Any calendar day from 7:00 AM to 7:00 PM except a Saturday, Sunday or recognized holiday.

Schedule of Values: The individual values as set forth by the Contractor as payment for the bid quantity units identified on the bid submittal sheets. The total of the extended units in the Schedule of Values determines the Agreement Amount. The Agreement Amount may only be modified by Change Order approved by the Board, or County Administrator.

http://www.pinellascounty.org/utilities

Scope of Work: The general intent of the Work to be accomplished as defined by the Project Plans and Specifications.

Special Notices: Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications, for a specific Project.

Specifications: The directions, provisions and requirements contained herein, together with all stipulations contained in the plans or Contract Documents, setting out or relating to the method and manner of performing the Work, or to the quantities and qualities of materials and labor to be furnished under the Agreement.

Substantial Completion: The date of “Substantial Completion” of the Work (or designated portions thereof) is the date certified by the Consultant and approved by the Design Professional/Engineer/Project Manager when construction is sufficiently complete, in accordance with the Contract Documents, so the county can occupy or utilize the Work (or designated portions thereof) for the use for which it was intended.

Survey Crew Day: A unit of measurement for Work by a survey crew in a calendar day.

Survey and Layout Plan: See Section 5 Special Conditions.

Technical Special Provisions: Specifications prepared, signed and sealed by the Consultant. These would be listed in the document hierarchy ahead of any other “Standard Specifications”, if applicable.

Unforeseen Work: Conditions encountered during the performance of the Work, sub-surface or otherwise concealed, or of an unusual nature, which differ materially from those indicated in the Contract Documents.

Unspecified: A pay item included for usage as directed by the County, and for usage under conditions or circumstances unforeseen at the time of Agreement.

Work: All labor, materials & incidentals required for the construction of the improvement for which the Agreement is made, including superintendence, use of equipment & tools, and all services & responsibilities prescribed or implied, which are necessary for the complete performance by the Contractor of his obligations under the contact. Unless otherwise specified herein or in the Agreement, all costs of liability and of performing the Work shall be at the Contractor's expense.

4. Instructions & General Conditions for Submittals

4.1. INSTRUCTIONS & PROCEDURES

A. PREPARATION OF SUBMITTAL - Submittal will be prepared in accordance with the following:

1. Submittals must be uploaded on forms furnished, utilizing the OpenGov procurement website. Failure to comply could result in the submission being rejected.

2. If price is factor, unit prices must be shown and where there is an error in extension of price, the unit price will govern.

3. Alternate submittals will not be considered unless authorized by the solicitation.

4. Proposed delivery time must be shown and any date calculations must include weekends and holidays.

5. Contractor is advised that exceptions to any terms and conditions contained or referenced in this solicitation must be stated with specificity in its response to the solicitation.

Contractor is deemed to have accepted and to be bound by the solicitation and referenced agreement terms and conditions that contractor does not take exception to in its response.

The County reserves the right to modify or add terms and conditions based upon the exceptions stated by the contractor, or to declare any terms and conditions non-negotiable, as determined by the County in its sole discretion.

6. Contractors will thoroughly examine the drawings, specifications, schedule, instructions and/or all other solicitation documents.

7. Contractors will make all investigations necessary to thoroughly inform themselves regarding plant and facilities for delivery of material and equipment as required by the solicitation. Plea of ignorance by the contractor of conditions that exist or that may hereafter exist as a result of failure or omission on the part of the contractor to make the necessary examinations and investigations, or failure to fulfill in every detail the requirements of the solicitation documents, will not be accepted as a basis for varying the requirements of the County or the compensation to the contractor.

8. Contractors are advised that all County solicitations are subject to all legal requirements provided for in the Purchasing Ordinance and/or State and Federal Statutes.

B. SUBMITTAL METHOD & FORMAT

1. Submittals must be uploaded utilizing the OpenGov procurement website

(https://procurement.opengov.com/portal/pinellasfl). Failure to comply could result in the submittal being rejected.

2. Submittals must be uploaded in the Vendor Questionnaire section of this solicitation.

Submittals sent via email, facsimile, or delivered in-person will not be considered.

3. The preferred format for submittal is PDF conversion from your source files (to minimize file size and maximize quality and accessibility) rather than scanning. Instructions for Providing

Files in PDF Format to Pinellas County Government:

a. How do I convert my files to PDF format?

b. Answer- If you have a program such as Adobe Acrobat, creating a PDF of any file is a simple print function. Rather than printing to a traditional printer, the file converts to a

PDF format copy of your original. Any program (such as Word, PowerPoint, Excel, etc.)

can be converted this way by simply selecting the print command and choosing PDF as the printer.

c. Should I scan everything and save as PDF?

d. Answer- Not unless you are scanning with OCR (optical character recognition). Scanning will create unnecessarily large files because a scan is just a picture of a page rather than actual page text. Furthermore, the result of scanning is that your pages will not look nearly as “clean” or professional as simply using the print to PDF method from the program from which the file originates. Additionally, since scan pages are pictures of text, not really text, they may not be considered accessible* under Federal ADA guidelines (*unless the scans are OCR.)

C. SUBMITTALS FROM RELATED PARTIES OR MULTIPLE SUBMITTALS RECEIVED FROM ONE

CONTRACTOR

1. Where two (2) or more related parties each upload a submittal, or multiple submittals are received from one (1) contractor, for any solicitation, such submittals will be judged non-responsive. Related parties mean contractors or the principles thereof, which have a direct or indirect ownership interest in another contractor for the same solicitation or in which a parent company or the principles thereof of one (1) contractor have a direct or indirect ownership interest in another contractor for the same solicitation.

D. INTEGRITY OF SOLICITATION DOCUMENTS

1. Contractors will use the original solicitation form(s) provided by the Purchasing & Risk

Management Division and enter information only in the spaces where a response is requested. Contractors may use an attachment as an addendum to the solicitation form(s) if sufficient space is not available on the original form for the contractor to enter a complete response. Any modifications or alterations to the original solicitation documents by the contractor, whether intentional or otherwise, will constitute grounds for rejection of a solicitation. Any such modifications or alterations a contractor wishes to propose must be clearly stated in the contractor’s submittal response and presented in the form of an addendum to the original solicitation documents.

E. LATE SUBMISSION OR MODIFICATIONS

1. Submittals and modifications received after the time set for the submission will not be considered. This upholds the integrity of the process.

2. Modifications in writing received prior to the time set for the submittal will be accepted.

F. WITHDRAWAL OF SUBMITTAL

1. The submittal may be withdrawn prior to the solicitation opening date, however, a submittal may not be withdrawn for a period of time as specified in this solicitation document.

G. WRITTEN REQUESTS FOR INTERPRETATIONS/CLARIFICATIONS

1. No oral interpretations will be made to any firms as to the meaning of specifications or any other contractor documents. All questions pertaining to the terms and conditions or scope of work of this solicitation must be sent in writing (electronically) to the Purchasing and Risk

Management Division and received by the date specified in solicitation. Responses to questions may be handled as an addendum if the response would provide clarification to requirements of the solicitation. All such addenda will become part of the agreement documents. The County will not be responsible for any other explanation or interpretation of the proposed solicitation made or given prior to the award of the agreement. The

Purchasing and Risk Management Division will be unable to respond to questions received after the specified time frame.

H. REJECTION OF SUBMISSION

1. The County may reject a submittal if:

a. The contractor incorrectly states or conceals any material fact in the solicitation.

b. The solicitation does not strictly conform to the law or requirements of solicitation including insurance requirements.

c. The solicitation is conditional, except that the contractor may qualify its submittal for acceptance by the County on an "all or none" basis, or a "low item" basis. An "all or none" basis submittal must include all items upon which the contractor was invited.

2. The respective constitutional officer, County Administrator, on behalf of the Board of

County Commissioners or within their delegated financial approval authority, or Director of

Purchasing, within their delegated financial approval authority, has the authority when the public interest will be served thereby to reject all submittals or parts of submittals at any stage of the procurement process through the award of an agreement.

3. The County reserves the right to waive minor informalities or irregularities in any submittal.

I. PUBLIC REVIEW AT OPENING

1. Pursuant to Florida Statute, Section 119.071(1)(b)2, all submittals will be subject to review as public records after 30-days from opening, or earlier if an intended decision is reached before the thirty-day period expires. Unless a specific exemption exists, all documents submitted will be released pursuant to a valid public records request. All trade secrets claims must be dispositively determined by a court of law prior to trade secret protection being granted.

J. TABULATION INQUIRIES

1. Inquiries relating to the results of this solicitation, prior to the official award by the Pinellas

County Board of County Commissioners may be made by visiting OpenGov or calling the

Purchasing Office after 30 days to comply with Florida Statute, Section 119.071(1)(b)2.

K. EQUAL OPPORTUNITY & COUNTY GIFT/GRATUITY POLICY

1. Pinellas County is committed to a workplace, which is free from harassment or discrimination of any kind. CONTRACTOR and its agents are expected to conduct themselves accordingly in all interactions related to the Agreement. All employees of Pinellas County are prohibited from accepting gifts and/or gratuities from Contractors. CONTRACTOR agrees to ensure that its employees, subcontractors, consultants and other agents honor this policy.

4.2. PRE-CONFERENCE

A. PRE-CONFERENCE (Mandatory & Non-Mandatory)

1. The County may at its discretion hold a pre-conference to address all respondent questions pertaining to the solicitation or technical specifications. Solicitation suggestions or modifications may be discussed with County representatives at this meeting and may be considered by representatives as possible addenda to the solicitation. The County may elect, based on the scope of a specific project, to make the pre-conference mandatory, which will be specified in the “Special Terms & Conditions” section of this solicitation document. If the pre-conference is advertised as mandatory, any responses received from respondents who did not attend the mandatory pre-conference will be judged non-responsive and will not be considered for award.

4.3. JOINT VENTURES

Contractors intending to submit as a joint venture are required to have filed proper documents with the

Florida Department of State, the Division of Professions, Construction Industry Licensing Board and any other state or local licensing Agency prior to submitting (see Section 489.119 Florida Statutes). Joint ventures must provide an affidavit attesting to the formulation of a joint venture and provide either proof of incorporation as a joint venture or a copy of the formal joint venture agreement between all joint venture parties, indicating their respective roles, responsibilities and levels of participation for the project.

4.4. AWARD OF CONTRACT - ITB

A. The contract will be awarded to the lowest responsive, responsible bidder whose submittal, conforming to the solicitation, is most advantageous to Pinellas County, price and other factors considered. For Invitation to Bid for Sale of Real or Surplus Property, award will be made to the highest and most advantageous bid including price and other factors considered.

B. The County reserves the right to accept and award item by item, and/or by group, or in the aggregate, unless the respondent qualifies their bid by specified limitations. See Rejection of

Submission.

C. If two or more bids received are for the same total amount or unit price or in the case of proposals, the qualifications, quality and service are equal then the contract will be awarded by drawing lots in public.

D. Prices quoted must be Free on Board (FOB) Pinellas County with all transportation charges prepaid unless otherwise specified in the Invitation to Bid.

4.5. PROTEST PROCEDURE

Protest procedures are governed by Pinellas County Code Section 2-162, which states:

Right to Protest. "A vendor who is aggrieved by the contents of the bid or proposal package, or a vendor who is aggrieved in connection with the recommended award on a bid or proposal solicitation, may file a written protest to the director, as provided herein. This right to protest is strictly limited to those procurements of goods and/or services solicited through invitations to bid or requests for proposals, including solicitations pursuant to F.S. § 287.055, the "Consultants' Competitive Negotiation Act." No other actions or recommendations in connection with a solicitation can be protested, including: (i) requests for quotations, negotiations, qualifications or letters of interest; (ii) rejection of some, all or parts of bids or proposals; (iii) disqualification of respondents or proposers as non-responsive or non-responsible; or (iv) recommended awards less than the mandatory bid or proposal amount. Protests failing to comply with the provisions of this section will not be reviewed."

"Posting. The purchasing department will post the recommended award on or through the departmental website."

Requirements to protest.

"If the protest relates to the content of the bid or proposal package, a formal written protest must be filed no later than 5:00 p.m. EST on the fifth full business day after issuance of the bid or proposal package."

"If the protest relates to the recommended award of a bid or proposal, a formal written protest must be filed no later than 5:00 p.m. EST on the fifth full business day after posting of the award recommendation."

"The formal written protest shall identify the protesting party and the solicitation involved; include a statement of the grounds on which the protest is based; refer to the statutes, laws, ordinances or other legal authorities which the protesting party deems applicable to such grounds; and specifically request the relief to which the protesting party deems itself entitled by application of such authorities to such grounds.".

"A formal written protest is considered filed with the county when the purchasing department receives

it. Accordingly, a protest is not timely filed unless it is received within the time specified above by the purchasing department. Failure to file a formal written protest within the time period specified shall constitute a waiver of the right to protest and result in relinquishment of all rights to protest by the respondent or proposer."

"Sole remedy. These procedures shall be the sole remedy for challenging the content of the bid or proposal package or the recommended award."

"Lobbying. Protestors and anyone acting on their behalf, are prohibited from attempts to influence, persuade, or promote a bid or proposal protest through any other channels or means, and contacting any county official, employee, advisory board member, or representative to discuss any matter relating in any way to the solicitation being protested, other than the purchasing department's or county attorney's office to address situations such as clarification and/or pose questions related to the procurement process. The prohibitions provided for herein shall begin with the filing of the protest and end upon the final disposition of the protest; provided, however, at all times protestors shall be subject to the procurement lobbying prohibitions in section 2-189 of this Code. Failure to adhere to the prohibitions herein shall result in the rejection of the protest without further consideration."

"Time limits. The time limits in which protests must be filed as specified herein may be altered by specific provisions in the bid or proposal."

"Authority to resolve. The director shall resolve the protest in accordance with the documentation and applicable legal authorities and shall issue a written decision to the protestor no later than 5:00 p.m. EST on the tenth full business day after the filing thereof."

"Review of director's decision."

"The protesting party may request a review of the director's decision to the county administrator by delivering written request for review of the decision to the director by 5:00 p.m. EST on the fifth full business day after the date of the written decision. The written notice shall include any materials, statements, and arguments which the respondent or proposer deems relevant to the issues raised in the request to review the decision of the director."

"The county administrator shall issue a decision in writing stating the reason for the action with a copy furnished to the protesting party no later than 5:00 p.m. EST on the seventh full business day after receipt of the request for review. The decision shall be final and conclusive as to the county unless a party commences action in a court of competent jurisdiction."

"Stay of procurement during protests. There shall be no stay of procurement during protests."

(Ord. No. 94-51, § 5, 6-7-94; Ord. No. 04-87, § 1, 12-7-04; Ord. No. 14-11, § 2, 2-11-14; Ord. No. 18-34, 10-23-18)

4.6. ADA REQUIREMENT FOR PUBLIC NOTICES

Persons with disabilities requiring reasonable accommodation to participate in this proceeding/event, should call 727-464-4062 (voice/tdd) fax 727-464-4157, not later than seven days prior to the proceeding.

4.7. ADDITIONAL REQUIREMENTS

The County reserves the right to request additional goods or services relating to this agreement from the contractor. When approved by the County as an amendment to this agreement and authorized in writing, the contractor will provide such additional requirements as may become necessary.

4.8. ADD/DELETE LOCATIONS SERVICES

The County reserves the right to unilaterally add or delete locations/services, either collectively or individually, at the County’s sole option, at any time after award has been made as may be deemed necessary or in the best interests of the County. In such case, the contractor(s) will be required to provide services to this agreement in accordance with the terms, conditions, and specifications.

4.9. COLLUSION

The Contractor, by affixing a signature to their response, certifies that its submittal is made without previous understanding, agreement, or connection with any person, firm or corporation making a submittal for the same item(s) and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action.

4.10. CONFLICT OF INTEREST

A. The Contractor, by affixing a signature to their response, represents that it presently has no interest and will acquire no interest, either direct or indirect, which would conflict in any manner with the performance or services required hereunder. The contractor further represents that, if it is awarded a contract under this solicitation, no person having any such interest will be employed during the contract term and any extensions. In addition, the contractor will not offer gifts or gratuities to County employees as County employees are not permitted to accept gifts or gratuities. By signing this document, the contractor acknowledges that no gifts or gratuities have been offered to County employees or anyone else involved in this competitive solicitation process.

B. The contractor will promptly notify the County’s representative, in writing, by certified mail, of all potential conflicts of interest for any prospective business association, interest, or other circumstance, which may influence or appear to influence the contractor’s judgment or quality of services being provided hereunder. Such written notification will identify the prospective business association, interest or circumstance, the nature of work that the contractor may undertake and request an opinion of the County as to whether the association, interest or circumstance would, in the opinion of the County, constitute a conflict of interest if entered into by the contractor. The County agrees to notify the contractor of its opinion, by certified mail, within thirty days of receipt of notification by the contractor.

C. It is essential to government procurement that the process be open, equitable and ethical. To this end, if potential unethical practices including but not limited to collusion, receipt or solicitation of gifts and conflicts of interest (direct/indirect) etc. are observed or perceived, please report such activity to:

1. Pinellas County Clerk of Circuit Court – Division of Inspector General

2. Phone – (727) 45FRAUD (453-7283)

3. Fax – 727-464-8386

4.11. MATERIAL SAFETY DATA SHEETS

In accordance with OSHA Hazardous Communications Standards, it is the Contractor seller's duty to advise if a product is a toxic substance and to provide a Material Safety Data Sheet (SDS) at time of delivery.

4.12. CONTRACTOR CAPABILITY / REFERENCES

Prior to agreement award, any contractor may be required to show that the company has the necessary facilities, equipment, ability and financial resources to perform the work specified in a satisfactory manner and within the time specified. In addition, the company must have experience in work of the same or similar nature, and can provide references, which will satisfy the County. Contractors must furnish a reference list of at least four (4) customers for whom they have performed similar services.

4.13. CONTRACTOR LICENSE REQUIREMENT

All Contractors performing construction and related work in Pinellas County must comply with our regulatory legislation, Chapter 75-489, Laws of Florida, as amended. Failure to have a competency license in a regulated trade will be cause for rejection of any submittal and/or award.

4.14. CORPORATE REGISTRATION

An award may not be issued without proof that your firm is registered with the Florida Division of

Corporations, as per Florida Statute §607.1501 www.flsenate.gov/Laws/Statutes/2011/607.1501.

A foreign corporation (foreign to the State of Florida) may not transact business in this state until it obtains a certificate of authority from the Department of State. Please visit dos.myflorida.com/sunbiz/ for this information on how to become registered.

4.15. DESCRIPTION OF GOODS/SERVICES/SUPPLIES

A. Any manufacturer's names, trade names, brand name, or catalog numbers used in specifications are for the purpose of describing and establishing general quality levels. Such references are not intended to be restrictive. Submittals will be considered for all brands which meet the quality of the specifications listed for any items.

B. Contractors are required to state exactly what they intend to furnish otherwise they will be required to furnish the items as specified.

https://www.flsenate.gov/Laws/Statutes/2011/607.1501 https://dos.myflorida.com/sunbiz/

C. Contractor submission must include all data necessary to evaluate and determine the quality of the item(s) they intend to furnish.

D. ALTERNATES: Alternates will not be considered unless authorized by the solicitation. Such alternates may or may not be accepted by the County. If approved, it is at the County’s discretion to accept said alternate(s) in any sequence or combination therein. If the contractor is proposing an alternate that is not provided in the solicitation, alternate(s) must be submitted within the OpenGov Q & A section prior to the question deadline, and receive approval prior to the solicitation opening date in order to be considered for award.

E. OR EQUAL DETERMINATION: Where submitting other than specified, the determination of equivalency will be at the sole discretion of Pinellas County and its specialized personnel.

4.16. E-VERIFY

The contractor and their subcontractor(s) must register with and use the E-verify system in accordance with Florida Statute 448.095. A contractor and subcontractor may not enter into a contract with the

County unless each party registers with and uses the E-verify system.

If a contractor enters a contract with a subcontractor, the subcontractor must provide the contractor with an affidavit stating that the Subcontractor does not employ, contract with, or subcontract with unauthorized aliens. The contractor must maintain a copy of the affidavit for the duration of the contract.

If the County, Contractor, or Subcontractor has a good faith belief that a person or entity with which it is contracting has knowingly violated Florida Statute 448.09(1) they must immediately terminate the contract with the person or entity.

If the County has a good faith belief that a Subcontractor knowingly violated this provision, but the

Contractor otherwise complied with this provision, the County will notify the Contractor and order that the Contractor immediately terminate the contract with the Subcontractor.

A contract terminated under the provisions of this section is not a breach of contract and may not be considered such. Any contract termination under the provisions of this section may be challenged to

Section 448.095(2)(d), Florida Statute. Contractor acknowledges upon termination of this agreement by the County for violation of this section by Contractor, Contractor may not be awarded a public contract for at least one (1) year. Contractor acknowledges that Contractor is liable for any additional costs incurred by the County as a result of termination of any contract for a violation of this section.

Contractor or Subcontractor will insert in any subcontracts the clauses set forth in this section, requiring the subcontracts to include these clauses in any lower tier subcontracts. Contractor will be responsible for compliance by any Subcontractor or Lower Tier Subcontractor with the clause set for in this section.

4.17. EXCEPTIONS

Contractor is advised that if it wishes to take exception to any of the terms contained or referenced in this solicitation it must explicitly identify the term and the exception in its response to the solicitation.

Contractor's stated exception to a non-negotiable term may disqualify it from consideration for award.

4.18. INDEMNIFICATION

A. Unless otherwise provided in the special provisions, special conditions, and specifications, Contractor assumes liability for all damage to Work under construction or completed, whether from fire, water, winds, vandalism, or other causes, until final completion and acceptance by the

County and notwithstanding the fact that partial payments may have been made during construction.

B. No subcontract or transfer of Agreement shall in any case release either the Contractor or its surety of any liability under the Agreement. The County reserves the right to reject any subcontractors or equipment.

C. Unless specifically prohibited by Florida law, the Contractor shall defend, indemnify and hold harmless the County and its officers and employees from any and all liabilities, claims, damages, penalties, demands, judgments, actions, proceedings, losses or costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, or by, or on account of, any claim or amounts recovered under the "Workers' Compensation Law" or of any other laws, by-laws, ordinance, order or decree, including but not limited to any violation of requirements of the

Americans with Disabilities Act of 1990, as may be amended, and all rules and regulations issued pursuant thereto (collectively the “ADA”) whether resulting from any claimed breach of this

Agreement by the Contractor or from personal injury, property damage, direct or consequential damages, or economic loss, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of the Contractor or anyone employed or utilized by the Contractor in the performance of this Agreement. The duty to defend under this paragraph is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, the County and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to the Contractor. The Contractor's obligation to indemnify and defend under this

Article will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the County or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. The

Contractor shall guarantee the payment of all just claims for materials, supplies, tools, labor or other just claims against it or any subcontractor in connection with this Agreement; and its bonds will not be released by final acceptance and payment by the County unless all such claims are paid or released.

4.19. INDEPENDENT CONTRACTOR STATUS AND COMPLIANCE WITH THE

IMMIGRATION REFORM AND CONTROL ACT OF 1986

Contractor acknowledges that it is functioning as an independent contractor in performing under the terms of this agreement, and it is not acting as an employee of Pinellas County. The contractor acknowledges that it is responsible for complying with the provisions of the Immigration Reform and

Control Act of 1986, located at 8 U.S.C. Section 1324, et seq., and regulations relating thereto. Failure to comply with the above provisions of the agreement will be considered a material breach and grounds for immediate termination of the agreement.

4.20. INSURANCE

The contractor must provide a certificate of insurance and endorsement in accordance with the insurance requirements listed in the insurance section below. Failure to provide the required insurance within a ten (10) day period following the determination or recommendation of award may result in the

County to vacate the original determination or recommendation and proceed with recommendation to another contractor.

4.21. LOBBYING

All Contractors agree to adhere to Pinellas County Code Section 2-189, which states:

Lobbying shall be prohibited on all county competitive selection processes and purchasing contract awards pursuant to this division, including, but not limited to, requests for proposals, requests for quotations, requests for qualifications, bids or the award of purchasing contracts of any type. The purpose of this prohibition is to protect the integrity of the procurement process by shielding it from undue influences prior to the contract award, or the competitive selection process is otherwise concluded. However, nothing herein shall prohibit a prospective respondent/proposer/protestor from contacting the Purchasing Department or the County Attorney's Office to address situations such as clarification and/or pose questions related to the procurement process.

Lobbying of evaluation committee members, county government employees, elected/appointed officials, or advisory board members regarding requests for proposals, requests for quotations, requests for qualifications, bids, or purchasing contracts, by the respondent, any member of the respondent's staff, any agent or representative of the respondent, or any person employed by any legal entity affiliated with or representing a respondent, is strictly prohibited from the date of the advertisement, or on a date otherwise established by the Board, until either an award is final, or the competitive selection process is otherwise concluded. Any lobbying activities in violation of this section by or on behalf of a respondent/proposer shall result in the disqualification or rejection of the proposal, quotation, statement of qualification, bid or contract.

For purposes of this provision, "lobbying" shall mean influencing or attempting to influence action or non-action, and/or attempting to obtain the goodwill of persons specified herein relating to the selection, ranking, or contract award in connection with any request for proposal, request for quotation, request for qualification, bid or purchasing contract through direct or indirect oral or written communication. The final award of a purchasing contract shall be the effective date of the purchasing contract.

Any evaluation committee member, county government employee, elected/appointed official, or advisory board member who has been lobbied shall immediately report the lobbying activity to the director.

(Ord. No. 02-35, 5-7-02; Ord. No. 04-64, § 12, 9-21-04; Ord. No. 04-87, § 1, 12-7-04; Ord. No. 10-09, § 6, 2-16-10; Ord. No. 11-23, § 2, 7-26-11; Ord. No. 14-11, § 5, 2-11-14; Ord. No. 18-34, 10-23-18).

4.22. LOCAL, STATE, AND FEDERAL COMPLIANCE REQUIREMENTS

The laws of the State of Florida apply to any purchase made under this solicitation. Contractors must comply with all local, state, and federal directives, orders and laws as applicable to this solicitation and subsequent agreement(s) including but not limited to Americans with Disabilities Act (ADA), Section 504 of the Rehabilitation Act of 1973, Equal Employment Opportunity (EEO), Minority Business Enterprise

(MBE), and Occupational Safety and Health Administration (OSHA) as applicable to this agreement.

4.23. NON-EXCLUSIVE CONTRACT

Award of this agreement will impose no obligation on the County to utilize the contractor for all work of this type, which may develop during the agreement period. This is not an exclusive agreement. The

County specifically reserves the right to concurrently contract with other companies for similar work if it deems such action to be in the County's best interest. In the case of multiple-term agreements, this provision will apply separately to each term.

4.24. PROCUREMENT POLICY FOR RECYCLED MATERIALS

A. Pinellas County wishes to encourage its contractors to use recycled products in fulfilling contractual obligations to the County and that such a policy will serve as a model for other public entities and private sector companies.

B. When awarding a purchase or recommending a purchase for products, materials, or services, the Director of Purchasing and Risk Management may allow a preference to a responsive contractor who certifies that their product or material contains the greatest percentage of postconsumer material. If solicitation includes paper products, contractor must certify that their materials and/or products contain at least the content recommended by the Environmental

Protection Agency (EPA) guidelines.

C. On all quotes, or as required by law, the Director of Purchasing and Risk Management require

Contractors to specify which products have recycled materials, what percentage or amount is postconsumer material, and to provide certification of the percentages of recycled materials used in the manufacture of goods and commodities procured by the County.

D. Price preference is not the preferred practice the County wishes to employ in meeting the goals of this resolution. If a price preference is deemed to serve the best interest of the County and further supports the purchase of recycled materials, the Director of Purchasing will make a recommendation that a price preference be allowed up to an amount not to exceed 10% above the lowest complying submittal received.

Definitions for Recycled Materials:

Recovered Materials: Materials that have recycling potential, can be recycled, and have been diverted or removed from the solid waste stream for sale, use or reuse, by separation, collection, or processing.

Recycled Materials: Materials that contain recovered materials. This term may include internally generated scrap that is commonly used in industrial…