Attachment_C3_Monthly_Pop-up_PM_Gate_ _Barrier_PM's.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Perform Maintenance on Gates and Barriers Federal contract opportunity
Solicitation number
SB1341-16-RQ-1040
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

Attachment C3 Monthly Pop-up PM Gate Barrier PM's

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

jpnumjpdescjptasktaskdesctasklongdesc
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY1OBTAIN PMObtain PM from COTR. The PM may be issued in a handheld device or paper.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY3SCHEDULE THE PMSchedule the PM with the COTR. NO equipment will be shut down without scheduling with the COTR.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY5REVIEWReview all steps in PM.

Review safety requirements for this equipment and space Review manufacturer's instructions and equipment history record, if available.

JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY7EQUIPMENT SHUTDOWN SAFETYIf shut-down is necessary; de-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and de-energize pressure in lines before working on equipment. Ensure that the people affected have been notified (COTR to notify) and associated equipment's operation will not be affected.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY9CHECK WITH OPERATING OR AREA PERSONNELCheck with operating or area personnel for any deficiencies.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY10POLICE TO BLOCK TRAFFICHave police block traffic during maintenance to prevent accidents. Confirm that the Barrier operates smoothly during the raise and lower cycle.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY20SHUTDOWN SYSTEMShut system off and drop system pressure to zero. Check the accumulator pressure while the system is at zero pressure using Delta Charging Kit 2469-31 or equal. If tool is not available, observe the value that the pressure gage jumps to when power is again turned on. Record the value and pressure setting.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY30TURN POWER ONTurn power on and confirm that the Barrier operates smoothly during the raise and lower cycle. While the barrier is in the up position, without placing any body parts under the Barrier ramp, check for indications of oil leaks around the cylinders and Barrier header fittings. Note any leakage.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY40CHECK HEATERSCheck the operation of the Barrier heaters. They should get warm in approximately one minute after energization. Note any discrepancy.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY50CHECK CONTROL FUNCTIONSCheck all control functions for complete operation of all features. Note any discrepancy.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY60TURN OFF PUMP/MOTOR POWERTurn off pump/motor power, bleed system pressure to zero and add clean, filtered oil (name) to the top of the site glass. Note amount of oil added.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY70CLEAN DUST & DEBRISClean dust and debris from around HPU tank and hydraulic lines. Wipe up any spilled oil.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY80TURN ALL POWER ON AND CHECKTurn power on and bring system back to operation. Have gate security do an operational check that the barrier functions properly. Confirm that the Barrier operates smoothly during the raise and lower cycle.
JP-BRCD-MJOBPLAN POP-UP BARRICADE MONTHLY999COMPLETE PMComplete the PM on handheld or paper; noting condition, suspect problems, parts used, gauge/meter readings, etc.

NOTIFY COTR IF ANY EQUIPMENT REQUIRES REPLACEMENT AND NOTE ON PM.