Attachment_C3_Monthly_Pop-up_PM_Gate_ _Barrier_PM's.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Perform Maintenance on Gates and Barriers Federal contract opportunity
- Solicitation number
- SB1341-16-RQ-1040
About this file
Attachment C3 Monthly Pop-up PM Gate Barrier PM's
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_02_Question_and_Answers_for_SB1341-16RQ-1040.pdf | ||
| Amendment_1-_RFQ-SB1341-16-RQ-1040-FormSF1449.pdf | ||
| Attachment_A-SB1341-16-RQ-1040-Instructions_Offerors_and_Tech_Eval.pdf | ||
| Attachment_D_-_RFQ_Question_Submittal_Form.xlsx | XLSX spreadsheet | |
| Attachment_F_-_Past_Performance_Questionnaire_PPQ.docx | DOCX document | |
| Attachment_C5_Annual_Pop-up_PM_Gate_ _Barrier_PM's.xlsx | XLSX spreadsheet | |
| Attachment_E_-_Experience_Project_Data_Sheet.docx | DOCX document | |
| Attachment_C6_Lift_Master_Manual_Gate_ _Barrier_PM.pdf | ||
| Attachment_C4_Quarterly_Pop-up_PM_Gate_ _Barrier_PM's.xlsx | XLSX spreadsheet | |
| Attachment_C1_Monthly_Gate_PM_Gate_ _Barrier_PM's.xlsx | XLSX spreadsheet | |
| Attachment_B-Performance_Work_Statement_SB1341-16-RQ-1040.pdf | ||
| Attachment_C2_Annual_Gate_PM_Gate_ _Barrier_PM's.xlsx | XLSX spreadsheet | |
| RFQ-SB1341-16-RQ-1040-FormSF1449.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| jpnum | jpdesc | jptask | taskdesc | tasklongdesc |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 1 | OBTAIN PM | Obtain PM from COTR. The PM may be issued in a handheld device or paper. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 3 | SCHEDULE THE PM | Schedule the PM with the COTR. NO equipment will be shut down without scheduling with the COTR. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 5 | REVIEW | Review all steps in PM. |
Review safety requirements for this equipment and space Review manufacturer's instructions and equipment history record, if available.
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 7 | EQUIPMENT SHUTDOWN SAFETY | If shut-down is necessary; de-energize, tag, and lock out electrical circuits to motors, pumps, control circuits, etc and de-energize pressure in lines before working on equipment. Ensure that the people affected have been notified (COTR to notify) and associated equipment's operation will not be affected. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 9 | CHECK WITH OPERATING OR AREA PERSONNEL | Check with operating or area personnel for any deficiencies. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 10 | POLICE TO BLOCK TRAFFIC | Have police block traffic during maintenance to prevent accidents. Confirm that the Barrier operates smoothly during the raise and lower cycle. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 20 | SHUTDOWN SYSTEM | Shut system off and drop system pressure to zero. Check the accumulator pressure while the system is at zero pressure using Delta Charging Kit 2469-31 or equal. If tool is not available, observe the value that the pressure gage jumps to when power is again turned on. Record the value and pressure setting. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 30 | TURN POWER ON | Turn power on and confirm that the Barrier operates smoothly during the raise and lower cycle. While the barrier is in the up position, without placing any body parts under the Barrier ramp, check for indications of oil leaks around the cylinders and Barrier header fittings. Note any leakage. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 40 | CHECK HEATERS | Check the operation of the Barrier heaters. They should get warm in approximately one minute after energization. Note any discrepancy. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 50 | CHECK CONTROL FUNCTIONS | Check all control functions for complete operation of all features. Note any discrepancy. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 60 | TURN OFF PUMP/MOTOR POWER | Turn off pump/motor power, bleed system pressure to zero and add clean, filtered oil (name) to the top of the site glass. Note amount of oil added. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 70 | CLEAN DUST & DEBRIS | Clean dust and debris from around HPU tank and hydraulic lines. Wipe up any spilled oil. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 80 | TURN ALL POWER ON AND CHECK | Turn power on and bring system back to operation. Have gate security do an operational check that the barrier functions properly. Confirm that the Barrier operates smoothly during the raise and lower cycle. |
| JP-BRCD-M | JOBPLAN POP-UP BARRICADE MONTHLY | 999 | COMPLETE PM | Complete the PM on handheld or paper; noting condition, suspect problems, parts used, gauge/meter readings, etc. |
NOTIFY COTR IF ANY EQUIPMENT REQUIRES REPLACEMENT AND NOTE ON PM.