6_-_Pricing__Tables.xlsx

XLSX spreadsheet 84 KB Posted

Attached to
Protective Technology Services Federal contract opportunity
Solicitation number
SAQMMA16R0014
Issued by
Department of State Office of Acquisition Management

About this file

Pricing Tables

View the file

Other files for this federal contract opportunity

Other files attached to Protective Technology Services, newest first.
File Type Posted
Questions_and_Answers_A004.pdf PDF
PTS_Labor_Category_Descriptions_A004.pdf PDF
SAQMMA16R0014-A004.pdf PDF
SAQMMA16R0014-A003.pdf PDF
SAQMMA16R0014-A002.pdf PDF
SAQMMA16R0014-A001.pdf PDF
5_-_Past_Performance_Customer_Satisfaction_Survey.docx DOCX document
4_-_Summary_of_Professional_Employee_Benefits.docx DOCX document
2_-_PTS_Labor_Category_Descriptions.pdf PDF
3_-_Wage_Determination_15-4281_Rev_3.pdf PDF
1_-_Bidders_DD254_SAQMMA16R0014.pdf PDF
SAQMMA16R0014.pdf PDF
DRAFT_-_PTS_-_PWS_-_Comment_Matrix.xlsx XLSX spreadsheet
DRAFT_-_PTS_-_PWS_for_Presolicitation_-_04.11.16.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Year 1

SAQMMA16R0014 (“PTS”) SECTION J, ATTACHMENT 6

For Offeror Cost/Price Proposal Submission and Government Evaluation Purposes Only -- To be Removed Upon Award

Instructions to Offerors: Each worksheet ("tab") of this workbook represents separate one-year pricing for each of the 10 contract years. (See RFP section F-005 for an explanation of the contract periods of performance.) For each Contract year, the Offeror shall complete ONLY the below yellow highlighted cells, and shall submit all 10 completed tabs of this workbook as part of its cost/price proposal. In completing the yellow-highlighted cells, the Offeror shall follow the steps immediately below. Except as specifically indicated below in italics, the Offeror shall not edit or modify cells other than those highlighted in yellow.
PWS Reference: Section 6 — The Offeror shall enter its proposed firm-fixed-price for the Program Management Office requirements for the year.
PWS Reference: 5.2.1 through 5.3 and “All Work Except Section 6 (PMO)”—
1. The Offeror shall enter its proposed direct hourly cost amount for each labor category (LCAT). The Offeror shall propose costs for all LCATS shown below (since they are required by the PWS). Note: The Offeror must not propose additional LCATs.
2. The Offeror shall add or remove "Indirect Cost" columns only within the direct labor section as needed to properly reflect the Offeror's indirect rate pools applicable to the direct labor proposed.
3. The Offeror shall enter for each applicable "Indirect Cost Amount" column the name of the pool, the allocation base of the pool, and the rate percentage of the pool.
4. The Offeror shall enter formulas within the "Indirect Cost" columns as necessary to ensure proper application ("stacking") of the indirect rates to the proposed direct labor costs. This will yield the estimated indirect cost amount per hour per LCAT. The Offeror shall ensure that the formulas in the "Total estimated hourly costs for each LCAT" column represent the sum of the direct labor cost and all indirect cost amounts for the respective LCAT.
5. The Offeror shall repeat steps 2, 3, and 4 for the "Other Direct Costs" (ODC) row, adding or removing columns only within that ODC row for applicable indirect rates as necessary, and using a formula to apply ("stack") the applicable indirect rates and reach the proposed indirect cost estimate. The Offeror shall not change the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)".
6. The Offeror shall enter in the row indicated below a proposed percentage that, when applied to the total proposed costs, shall be used by the Government to calculate the fixed-fee amount to be awarded.
Government Evaluation: The Government will evaluate the proposed costs and prices for all (potentially 10) years in accordance with RFP Section M. With regard to this proposal workbook, for purposes of calculating prices for evaluation and for establishing the estimated cost and fixed-fee, the Government will do the following steps for each tab (i.e. for each contract year). Due to the classified or sensitive nature of some data required for the analysis, the Offeror should not include the Government's calculations in its proposal or in any unclassified contractor system or other medium.
(1) The Government will multiply the number of full-time-equivalents (FTE) identified in the PWS for each LCAT by the "Estimated Billable Hours per FTE per Year". This product will represent the estimated level of effort (LOE) for each LCAT. (Note that some FTE are estimated to bill more hours than typical for a standard year, due to anticipated billable hours during extended overseas flights, extended work weeks at certain overseas locations, etc.)
(2) The Government will multiply the estimated LOE for each LCAT by the proposed "Total estimated hourly cost for each LCAT" (which should already have been correctly calculated in the proposal by applying the proposed indirect costs to the proposed direct labor costs). This product will represent the proposed estimated costs for each LCAT (before travel premium).
(3) For positions NOT designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by 44%, which is the average unweighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 75%, which is the anticipated percentage of travel in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT. For positions designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by the average weighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) for the location(s) identified by LCAT in the PWS, based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 100%, which is the anticipated percentage of travel (or primary duty station performance) in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT.
(4) The Government will multiply the annualized pay premium costs for each LCAT by the percentage of Estimated Travel Required (ETR) stated in the PWS for each LCAT. This product will represent the estimated pay premium costs for each LCAT.
(5) The Government will add the proposed estimated costs for each LCAT (before travel premium) to the estimated pay premium costs for each LCAT. This sum will represent the proposed estimated costs per LCAT (with travel premium).
(6) The Government will add the proposed estimated costs per LCAT (with travel premium) to the "Total estimated ODC cost (which should already have been correctly calculated in the proposal by applying the proposed indirect costs to the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)"). The sum will represent the total estimated cost amount (for the CPFF portion of the contract) for that year.
(7) The Government will multiply the total estimated cost amount (for the CPFF portion of the contract) for the year by the proposed percentage to be used to calculate fixed-fee. The product will represent the proposed fixed-fee amount (for the CPFF portion of the contract) for that year.
(8) The Government will add the total estimated cost amount (for the CPFF portion of the contract) for that year to the proposed fixed-fee amount (for the CPFF portion of the contract) for that year and the proposed firm-fixed-price for the Program Management Office requirements for that year. The sum will represent the total proposed price for that year.

YEAR 1 (see RFP section F-005)

PWS ReferenceDescriptionQuantityUnit of MeasureFirm-Fixed-Price (year)
Section 6Program Management Office1LT$0.00
PWS ReferenceDirect Labor CategoryDirect Labor Cost per HourIndirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)(etc…)Total estimated hourly costs for each LCATEstimated Billable Hours per FTE per Year
5.2.1VPIM Program Lead$0.002,130
5.2.1VPIM Deputy Program Lead$0.002,130
5.2.1VPIM QC/Safety Site Lead$0.002,130
5.2.1VPIM Configuration Manager III$0.002,130
5.2.1VPIM Configuration Manager II$0.002,130
5.2.1VPIM Automotive Engineer II$0.002,130
5.2.1VPIM Electronics Technician I$0.002,230
5.2.1VPIM Electronics Technician II$0.002,230
5.2.1VPIM Electronics Technician III$0.002,230
5.2.2ECM Program Lead$0.002,130
5.2.2ECM Deputy Program Lead$0.002,130
5.2.2ECM Electronics Technician I$0.002,130
5.2.2ECM Electronics Technician II$0.002,130
5.2.2ECM Electronics Technician III$0.002,130
5.2.2ECM Electronics Technician I (OCONUS)$0.002,908
5.2.2ECM Electronics Technician II (OCONUS)$0.002,908
5.2.2ECM Electronics Technician III (OCONUS)$0.002,908
5.2.2ECM Project Manager$0.002,130
5.2.2ECM Project Manager (OCONUS)$0.002,908
5.2.2ECM Material Manager$0.001,980
5.2.2ECM Sr. Material Manager$0.001,980
5.2.2ECM Material Manager (OCONUS)$0.002,908
5.2.2ECM Sr. Material Manager (OCONUS)$0.002,908
5.2.2ECM Engineer III$0.002,130
5.2.2ECM Engineer II$0.002,130
5.2.2ECM Testing Coordinator$0.002,130
5.2.3CCR Program Lead$0.002,130
5.2.3CCR Deputy Program Lead$0.002,130
5.2.3CCR Material Manager$0.002,130
5.2.3CCR Material Manager (OCONUS)$0.002,908
5.2.3CCR Sr. Material Manager$0.002,130
5.2.3CCR Country Lead (OCONUS)$0.002,908
5.2.3CCR Project Manager$0.002,380
5.2.3CCR Technician III$0.002,630
5.2.3CCR Technician III (OCONUS)$0.002,908
5.2.3CCR Technician II$0.002,630
5.2.3CCR Technician II (OCONUS)$0.002,908
5.2.3CCR Technician I$0.002,630
5.2.3CCR Communications Integration SME$0.002,130
5.2.4S&W Program Lead$0.002,130
5.2.4S&W Deputy Program Lead$0.002,130
5.2.4S&W Material Manager$0.002,130
5.2.4S&W Operations Coordinator$0.002,130
5.2.4S&W Project Lead$0.002,130
5.2.4S&W Rapid Deployment Radar Technician$0.002,630
5.2.4S&W Rapid Deployment Field Service Representative$0.002,630
5.2.4S&W Forensics Analyst (OCONUS)$0.002,908
5.2.4S&W Site Lead (OCONUS)$0.002,908
5.2.4S&W Regional Manager (OCONUS)$0.002,908
5.2.4S&W Radar Operator (OCONUS)$0.002,908
5.2.4S&W Radar Field Service Representative (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Operator (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Technician (OCONUS)$0.002,908
5.2.5MVS Project Manager$0.002,380
5.2.7PTL Program Lead$0.002,380
5.2.7PTL Deputy Program Lead$0.002,380
5.2.7PTL Operations Coordinator$0.001,980
5.2.7PTL Global Support Team Specialist$0.002,630
5.2.7PTL Domestic Support Team Specialist$0.002,130
5.2.7PTL Technical Operations Team Leader (Global Watch Operations, Global Support Operations- 2)$0.002,380
5.2.7PTL Technical Operations Team Leader (Worldwide Logistics and Domestic Support)$0.001,980
5.2.7PTL Watch Stander Level I (domestic)$0.001,980
5.2.7PTL Watch Stander Level II (domestic)$0.002,130
5.2.7PTL Watch Stander Level III (domestic)$0.002,130
5.2.7PTL Sr. Material Manager$0.002,130
5.2.7PTL Material Manager$0.002,130
5.2.7PTL Information Assurance SME$0.001,880
5.2.7PTL Electronics Systems Engineer$0.001,980
5.2.7PTL Computer Network Engineer$0.001,980
5.2.7PTL Integration & Systems Engineer$0.001,880
5.2.7PTL Configuration Manager$0.001,880
5.2.7PTL Integrated Broadcast Service SME$0.002,630
5.2.7PTL Country Lead (OCONUS)$0.002,908
5.2.7PTL WatchStander Level II (OCONUS)$0.002,908
5.2.7PTL WatchStander Level III (OCONUS)$0.002,908
5.2.8S&T Electronics Engineer$0.001,980
5.2.8S&T Electronics Technician$0.001,980
5.2.8S&T Project Engineer$0.002,130
5.2.8S&T Principal Engineer$0.001,980
5.3OSB Material Manager (OCONUS)$0.002,908
5.3OSB Sr. Material Manager (OCONUS)$0.002,908
PWS ReferenceDescriptionEstimated Other Direct Cost Amount (Gov't "Plug" Number)Indirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 3 name) (allocation base) (%)Indirect Cost Amount (Pool 4 name) (allocation base) (%) (etc…)Total estimated ODC cost
All Work Except Section 6 (PMO)Other Direct Costs (e.g. Travel, DBA Insurance, foreign Taxes, etc.)$10,061,646.25$10,061,646.25

Proposed percentage to be used to calculate Fixed-Fee: 0.00%

Year 2

SAQMMA16R0014 (“PTS”) SECTION J, ATTACHMENT 6

For Offeror Cost/Price Proposal Submission and Government Evaluation Purposes Only -- To be Removed Upon Award

Instructions to Offerors: Each worksheet ("tab") of this workbook represents separate one-year pricing for each of the 10 contract years. (See RFP section F-005 for an explanation of the contract periods of performance.) For each Contract year, the Offeror shall complete ONLY the below yellow highlighted cells, and shall submit all 10 completed tabs of this workbook as part of its cost/price proposal. In completing the yellow-highlighted cells, the Offeror shall follow the steps immediately below. Except as specifically indicated below in italics, the Offeror shall not edit or modify cells other than those highlighted in yellow.
PWS Reference: Section 6 — The Offeror shall enter its proposed firm-fixed-price for the Program Management Office requirements for the year.
PWS Reference: 5.2.1 through 5.3 and “All Work Except Section 6 (PMO)”—
1. The Offeror shall enter its proposed direct hourly cost amount for each labor category (LCAT). The Offeror shall propose costs for all LCATS shown below (since they are required by the PWS). Note: The Offeror must not propose additional LCATs.
2. The Offeror shall add or remove "Indirect Cost" columns only within the direct labor section as needed to properly reflect the Offeror's indirect rate pools applicable to the direct labor proposed.
3. The Offeror shall enter for each applicable "Indirect Cost Amount" column the name of the pool, the allocation base of the pool, and the rate percentage of the pool.
4. The Offeror shall enter formulas within the "Indirect Cost" columns as necessary to ensure proper application ("stacking") of the indirect rates to the proposed direct labor costs. This will yield the estimated indirect cost amount per hour per LCAT. The Offeror shall ensure that the formulas in the "Total estimated hourly costs for each LCAT" column represent the sum of the direct labor cost and all indirect cost amounts for the respective LCAT.
5. The Offeror shall repeat steps 2, 3, and 4 for the "Other Direct Costs" (ODC) row, adding or removing columns only within that ODC row for applicable indirect rates as necessary, and using a formula to apply ("stack") the applicable indirect rates and reach the proposed indirect cost estimate. The Offeror shall not change the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)".
6. The Offeror shall enter in the row indicated below a proposed percentage that, when applied to the total proposed costs, shall be used by the Government to calculate the fixed-fee amount to be awarded.
Government Evaluation: The Government will evaluate the proposed costs and prices for all (potentially 10) years in accordance with RFP Section M. With regard to this proposal workbook, for purposes of calculating prices for evaluation and for establishing the estimated cost and fixed-fee, the Government will do the following steps for each tab (i.e. for each contract year). Due to the classified or sensitive nature of some data required for the analysis, the Offeror should not include the Government's calculations in its proposal or in any unclassified contractor system or other medium.
(1) The Government will multiply the number of full-time-equivalents (FTE) identified in the PWS for each LCAT by the "Estimated Billable Hours per FTE per Year". This product will represent the estimated level of effort (LOE) for each LCAT. (Note that some FTE are estimated to bill more hours than typical for a standard year, due to anticipated billable hours during extended overseas flights, extended work weeks at certain overseas locations, etc.)
(2) The Government will multiply the estimated LOE for each LCAT by the proposed "Total estimated hourly cost for each LCAT" (which should already have been correctly calculated in the proposal by applying the proposed indirect costs to the proposed direct labor costs). This product will represent the proposed estimated costs for each LCAT (before travel premium).
(3) For positions NOT designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by 44%, which is the average unweighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 75%, which is the anticipated percentage of travel in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT. For positions designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by the average weighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) for the location(s) identified by LCAT in the PWS, based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 100%, which is the anticipated percentage of travel (or primary duty station performance) in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT.
(4) The Government will multiply the annualized pay premium costs for each LCAT by the percentage of Estimated Travel Required (ETR) stated in the PWS for each LCAT. This product will represent the estimated pay premium costs for each LCAT.
(5) The Government will add the proposed estimated costs for each LCAT (before travel premium) to the estimated pay premium costs for each LCAT. This sum will represent the proposed estimated costs per LCAT (with travel premium).
(6) The Government will add the proposed estimated costs per LCAT (with travel premium) to the "Total estimated ODC cost (which should already bhave been correctly calculated in the proposal by applying the proposed indirect costs to the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)"). The sum will represent the total estimated cost amount (for the CPFF portion of the contract) for that year.
(7) The Government will multiply the total estimated cost amount (for the CPFF portion of the contract) for the year by the proposed percentage to be used to calculate fixed-fee. The product will represent the proposed fixed-fee amount (for the CPFF portion of the contract) for that year.
(8) The Government will add the total estimated cost amount (for the CPFF portion of the contract) for that year to the proposed fixed-fee amount (for the CPFF portion of the contract) for that year and the proposed firm-fixed-price for the Program Management Office requirements for that year. The sum will represent the total proposed price for that year.

YEAR 2 (see RFP section F-005)

PWS ReferenceDescriptionQuantityUnit of MeasureFirm-Fixed-Price (year)
Section 6Program Management Office1LT$0.00
PWS ReferenceDirect Labor CategoryDirect Labor Cost per HourIndirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)(etc…)Total estimated hourly costs for each LCATEstimated Billable Hours per FTE per Year
5.2.1VPIM Program Lead$0.002,130
5.2.1VPIM Deputy Program Lead$0.002,130
5.2.1VPIM QC/Safety Site Lead$0.002,130
5.2.1VPIM Configuration Manager III$0.002,130
5.2.1VPIM Configuration Manager II$0.002,130
5.2.1VPIM Automotive Engineer II$0.002,130
5.2.1VPIM Electronics Technician I$0.002,230
5.2.1VPIM Electronics Technician II$0.002,230
5.2.1VPIM Electronics Technician III$0.002,230
5.2.2ECM Program Lead$0.002,130
5.2.2ECM Deputy Program Lead$0.002,130
5.2.2ECM Electronics Technician I$0.002,130
5.2.2ECM Electronics Technician II$0.002,130
5.2.2ECM Electronics Technician III$0.002,130
5.2.2ECM Electronics Technician I (OCONUS)$0.002,908
5.2.2ECM Electronics Technician II (OCONUS)$0.002,908
5.2.2ECM Electronics Technician III (OCONUS)$0.002,908
5.2.2ECM Project Manager$0.002,130
5.2.2ECM Project Manager (OCONUS)$0.002,908
5.2.2ECM Material Manager$0.001,980
5.2.2ECM Sr. Material Manager$0.001,980
5.2.2ECM Material Manager (OCONUS)$0.002,908
5.2.2ECM Sr. Material Manager (OCONUS)$0.002,908
5.2.2ECM Engineer III$0.002,130
5.2.2ECM Engineer II$0.002,130
5.2.2ECM Testing Coordinator$0.002,130
5.2.3CCR Program Lead$0.002,130
5.2.3CCR Deputy Program Lead$0.002,130
5.2.3CCR Material Manager$0.002,130
5.2.3CCR Material Manager (OCONUS)$0.002,908
5.2.3CCR Sr. Material Manager$0.002,130
5.2.3CCR Country Lead (OCONUS)$0.002,908
5.2.3CCR Project Manager$0.002,380
5.2.3CCR Technician III$0.002,630
5.2.3CCR Technician III (OCONUS)$0.002,908
5.2.3CCR Technician II$0.002,630
5.2.3CCR Technician II (OCONUS)$0.002,908
5.2.3CCR Technician I$0.002,630
5.2.3CCR Communications Integration SME$0.002,130
5.2.4S&W Program Lead$0.002,130
5.2.4S&W Deputy Program Lead$0.002,130
5.2.4S&W Material Manager$0.002,130
5.2.4S&W Operations Coordinator$0.002,130
5.2.4S&W Project Lead$0.002,130
5.2.4S&W Rapid Deployment Radar Technician$0.002,630
5.2.4S&W Rapid Deployment Field Service Representative$0.002,630
5.2.4S&W Forensics Analyst (OCONUS)$0.002,908
5.2.4S&W Site Lead (OCONUS)$0.002,908
5.2.4S&W Regional Manager (OCONUS)$0.002,908
5.2.4S&W Radar Operator (OCONUS)$0.002,908
5.2.4S&W Radar Field Service Representative (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Operator (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Technician (OCONUS)$0.002,908
5.2.5MVS Project Manager$0.002,380
5.2.7PTL Program Lead$0.002,380
5.2.7PTL Deputy Program Lead$0.002,380
5.2.7PTL Operations Coordinator$0.001,980
5.2.7PTL Global Support Team Specialist$0.002,630
5.2.7PTL Domestic Support Team Specialist$0.002,130
5.2.7PTL Technical Operations Team Leader (Global Watch Operations, Global Support Operations- 2)$0.002,380
5.2.7PTL Technical Operations Team Leader (Worldwide Logistics and Domestic Support)$0.001,980
5.2.7PTL Watch Stander Level I (domestic)$0.001,980
5.2.7PTL Watch Stander Level II (domestic)$0.002,130
5.2.7PTL Watch Stander Level III (domestic)$0.002,130
5.2.7PTL Sr. Material Manager$0.002,130
5.2.7PTL Material Manager$0.002,130
5.2.7PTL Information Assurance SME$0.001,880
5.2.7PTL Electronics Systems Engineer$0.001,980
5.2.7PTL Computer Network Engineer$0.001,980
5.2.7PTL Integration & Systems Engineer$0.001,880
5.2.7PTL Configuration Manager$0.001,880
5.2.7PTL Integrated Broadcast Service SME$0.002,630
5.2.7PTL Country Lead (OCONUS)$0.002,908
5.2.7PTL WatchStander Level II (OCONUS)$0.002,908
5.2.7PTL WatchStander Level III (OCONUS)$0.002,908
5.2.8S&T Electronics Engineer$0.001,980
5.2.8S&T Electronics Technician$0.001,980
5.2.8S&T Project Engineer$0.002,130
5.2.8S&T Principal Engineer$0.001,980
5.3OSB Material Manager (OCONUS)$0.002,908
5.3OSB Sr. Material Manager (OCONUS)$0.002,908
PWS ReferenceDescriptionEstimated Other Direct Cost Amount (Gov't "Plug" Number)Indirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 3 name) (allocation base) (%)Indirect Cost Amount (Pool 4 name) (allocation base) (%) (etc…)Total estimated ODC cost
All Work Except Section 6 (PMO)Other Direct Costs (e.g. Travel, DBA Insurance, foreign Taxes, etc.)$10,557,110.33$10,557,110.33

Proposed percentage to be used to calculate Fixed-Fee: 0.00%

Year 3

SAQMMA16R0014 (“PTS”) SECTION J, ATTACHMENT 6

For Offeror Cost/Price Proposal Submission and Government Evaluation Purposes Only -- To be Removed Upon Award

Instructions to Offerors: Each worksheet ("tab") of this workbook represents separate one-year pricing for each of the 10 contract years. (See RFP section F-005 for an explanation of the contract periods of performance.) For each Contract year, the Offeror shall complete ONLY the below yellow highlighted cells, and shall submit all 10 completed tabs of this workbook as part of its cost/price proposal. In completing the yellow-highlighted cells, the Offeror shall follow the steps immediately below. Except as specifically indicated below in italics, the Offeror shall not edit or modify cells other than those highlighted in yellow.
PWS Reference: Section 6 — The Offeror shall enter its proposed firm-fixed-price for the Program Management Office requirements for the year.
PWS Reference: 5.2.1 through 5.3 and “All Work Except Section 6 (PMO)”—
1. The Offeror shall enter its proposed direct hourly cost amount for each labor category (LCAT). The Offeror shall propose costs for all LCATS shown below (since they are required by the PWS). Note: The Offeror must not propose additional LCATs.
2. The Offeror shall add or remove "Indirect Cost" columns only within the direct labor section as needed to properly reflect the Offeror's indirect rate pools applicable to the direct labor proposed.
3. The Offeror shall enter for each applicable "Indirect Cost Amount" column the name of the pool, the allocation base of the pool, and the rate percentage of the pool.
4. The Offeror shall enter formulas within the "Indirect Cost" columns as necessary to ensure proper application ("stacking") of the indirect rates to the proposed direct labor costs. This will yield the estimated indirect cost amount per hour per LCAT. The Offeror shall ensure that the formulas in the "Total estimated hourly costs for each LCAT" column represent the sum of the direct labor cost and all indirect cost amounts for the respective LCAT.
5. The Offeror shall repeat steps 2, 3, and 4 for the "Other Direct Costs" (ODC) row, adding or removing columns only within that ODC row for applicable indirect rates as necessary, and using a formula to apply ("stack") the applicable indirect rates and reach the proposed indirect cost estimate. The Offeror shall not change the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)".
6. The Offeror shall enter in the row indicated below a proposed percentage that, when applied to the total proposed costs, shall be used by the Government to calculate the fixed-fee amount to be awarded.
Government Evaluation: The Government will evaluate the proposed costs and prices for all (potentially 10) years in accordance with RFP Section M. With regard to this proposal workbook, for purposes of calculating prices for evaluation and for establishing the estimated cost and fixed-fee, the Government will do the following steps for each tab (i.e. for each contract year). Due to the classified or sensitive nature of some data required for the analysis, the Offeror should not include the Government's calculations in its proposal or in any unclassified contractor system or other medium.
(1) The Government will multiply the number of full-time-equivalents (FTE) identified in the PWS for each LCAT by the "Estimated Billable Hours per FTE per Year". This product will represent the estimated level of effort (LOE) for each LCAT. (Note that some FTE are estimated to bill more hours than typical for a standard year, due to anticipated billable hours during extended overseas flights, extended work weeks at certain overseas locations, etc.)
(2) The Government will multiply the estimated LOE for each LCAT by the proposed "Total estimated hourly cost for each LCAT" (which should already have been correctly calculated in the proposal by applying the proposed indirect costs to the proposed direct labor costs). This product will represent the proposed estimated costs for each LCAT (before travel premium).
(3) For positions NOT designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by 44%, which is the average unweighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 75%, which is the anticipated percentage of travel in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT. For positions designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by the average weighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) for the location(s) identified by LCAT in the PWS, based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 100%, which is the anticipated percentage of travel (or primary duty station performance) in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT.
(4) The Government will multiply the annualized pay premium costs for each LCAT by the percentage of Estimated Travel Required (ETR) stated in the PWS for each LCAT. This product will represent the estimated pay premium costs for each LCAT.
(5) The Government will add the proposed estimated costs for each LCAT (before travel premium) to the estimated pay premium costs for each LCAT. This sum will represent the proposed estimated costs per LCAT (with travel premium).
(6) The Government will add the proposed estimated costs per LCAT (with travel premium) to the "Total estimated ODC cost (which should already bhave been correctly calculated in the proposal by applying the proposed indirect costs to the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)"). The sum will represent the total estimated cost amount (for the CPFF portion of the contract) for that year.
(7) The Government will multiply the total estimated cost amount (for the CPFF portion of the contract) for the year by the proposed percentage to be used to calculate fixed-fee. The product will represent the proposed fixed-fee amount (for the CPFF portion of the contract) for that year.
(8) The Government will add the total estimated cost amount (for the CPFF portion of the contract) for that year to the proposed fixed-fee amount (for the CPFF portion of the contract) for that year and the proposed firm-fixed-price for the Program Management Office requirements for that year. The sum will represent the total proposed price for that year.

YEAR 3 (see RFP section F-005)

PWS ReferenceDescriptionQuantityUnit of MeasureFirm-Fixed-Price (year)
Section 6Program Management Office1LT$0.00
PWS ReferenceDirect Labor CategoryDirect Labor Cost per HourIndirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)(etc…)Total estimated hourly costs for each LCATEstimated Billable Hours per FTE per Year
5.2.1VPIM Program Lead$0.002,130
5.2.1VPIM Deputy Program Lead$0.002,130
5.2.1VPIM QC/Safety Site Lead$0.002,130
5.2.1VPIM Configuration Manager III$0.002,130
5.2.1VPIM Configuration Manager II$0.002,130
5.2.1VPIM Automotive Engineer II$0.002,130
5.2.1VPIM Electronics Technician I$0.002,230
5.2.1VPIM Electronics Technician II$0.002,230
5.2.1VPIM Electronics Technician III$0.002,230
5.2.2ECM Program Lead$0.002,130
5.2.2ECM Deputy Program Lead$0.002,130
5.2.2ECM Electronics Technician I$0.002,130
5.2.2ECM Electronics Technician II$0.002,130
5.2.2ECM Electronics Technician III$0.002,130
5.2.2ECM Electronics Technician I (OCONUS)$0.002,908
5.2.2ECM Electronics Technician II (OCONUS)$0.002,908
5.2.2ECM Electronics Technician III (OCONUS)$0.002,908
5.2.2ECM Project Manager$0.002,130
5.2.2ECM Project Manager (OCONUS)$0.002,908
5.2.2ECM Material Manager$0.001,980
5.2.2ECM Sr. Material Manager$0.001,980
5.2.2ECM Material Manager (OCONUS)$0.002,908
5.2.2ECM Sr. Material Manager (OCONUS)$0.002,908
5.2.2ECM Engineer III$0.002,130
5.2.2ECM Engineer II$0.002,130
5.2.2ECM Testing Coordinator$0.002,130
5.2.3CCR Program Lead$0.002,130
5.2.3CCR Deputy Program Lead$0.002,130
5.2.3CCR Material Manager$0.002,130
5.2.3CCR Material Manager (OCONUS)$0.002,908
5.2.3CCR Sr. Material Manager$0.002,130
5.2.3CCR Country Lead (OCONUS)$0.002,908
5.2.3CCR Project Manager$0.002,380
5.2.3CCR Technician III$0.002,630
5.2.3CCR Technician III (OCONUS)$0.002,908
5.2.3CCR Technician II$0.002,630
5.2.3CCR Technician II (OCONUS)$0.002,908
5.2.3CCR Technician I$0.002,630
5.2.3CCR Communications Integration SME$0.002,130
5.2.4S&W Program Lead$0.002,130
5.2.4S&W Deputy Program Lead$0.002,130
5.2.4S&W Material Manager$0.002,130
5.2.4S&W Operations Coordinator$0.002,130
5.2.4S&W Project Lead$0.002,130
5.2.4S&W Rapid Deployment Radar Technician$0.002,630
5.2.4S&W Rapid Deployment Field Service Representative$0.002,630
5.2.4S&W Forensics Analyst (OCONUS)$0.002,908
5.2.4S&W Site Lead (OCONUS)$0.002,908
5.2.4S&W Regional Manager (OCONUS)$0.002,908
5.2.4S&W Radar Operator (OCONUS)$0.002,908
5.2.4S&W Radar Field Service Representative (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Operator (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Technician (OCONUS)$0.002,908
5.2.5MVS Project Manager$0.002,380
5.2.7PTL Program Lead$0.002,380
5.2.7PTL Deputy Program Lead$0.002,380
5.2.7PTL Operations Coordinator$0.001,980
5.2.7PTL Global Support Team Specialist$0.002,630
5.2.7PTL Domestic Support Team Specialist$0.002,130
5.2.7PTL Technical Operations Team Leader (Global Watch Operations, Global Support Operations- 2)$0.002,380
5.2.7PTL Technical Operations Team Leader (Worldwide Logistics and Domestic Support)$0.001,980
5.2.7PTL Watch Stander Level I (domestic)$0.001,980
5.2.7PTL Watch Stander Level II (domestic)$0.002,130
5.2.7PTL Watch Stander Level III (domestic)$0.002,130
5.2.7PTL Sr. Material Manager$0.002,130
5.2.7PTL Material Manager$0.002,130
5.2.7PTL Information Assurance SME$0.001,880
5.2.7PTL Electronics Systems Engineer$0.001,980
5.2.7PTL Computer Network Engineer$0.001,980
5.2.7PTL Integration & Systems Engineer$0.001,880
5.2.7PTL Configuration Manager$0.001,880
5.2.7PTL Integrated Broadcast Service SME$0.002,630
5.2.7PTL Country Lead (OCONUS)$0.002,908
5.2.7PTL WatchStander Level II (OCONUS)$0.002,908
5.2.7PTL WatchStander Level III (OCONUS)$0.002,908
5.2.8S&T Electronics Engineer$0.001,980
5.2.8S&T Electronics Technician$0.001,980
5.2.8S&T Project Engineer$0.002,130
5.2.8S&T Principal Engineer$0.001,980
5.3OSB Material Manager (OCONUS)$0.002,908
5.3OSB Sr. Material Manager (OCONUS)$0.002,908
PWS ReferenceDescriptionEstimated Other Direct Cost Amount (Gov't "Plug" Number)Indirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 3 name) (allocation base) (%)Indirect Cost Amount (Pool 4 name) (allocation base) (%) (etc…)Total estimated ODC cost
All Work Except Section 6 (PMO)Other Direct Costs (e.g. Travel, DBA Insurance, foreign Taxes, etc.)$10,937,346.72$10,937,346.72

Proposed percentage to be used to calculate Fixed-Fee: 0.00%

Year 4

SAQMMA16R0014 (“PTS”) SECTION J, ATTACHMENT 6

For Offeror Cost/Price Proposal Submission and Government Evaluation Purposes Only -- To be Removed Upon Award

Instructions to Offerors: Each worksheet ("tab") of this workbook represents separate one-year pricing for each of the 10 contract years. (See RFP section F-005 for an explanation of the contract periods of performance.) For each Contract year, the Offeror shall complete ONLY the below yellow highlighted cells, and shall submit all 10 completed tabs of this workbook as part of its cost/price proposal. In completing the yellow-highlighted cells, the Offeror shall follow the steps immediately below. Except as specifically indicated below in italics, the Offeror shall not edit or modify cells other than those highlighted in yellow.
PWS Reference: Section 6 — The Offeror shall enter its proposed firm-fixed-price for the Program Management Office requirements for the year.
PWS Reference: 5.2.1 through 5.3 and “All Work Except Section 6 (PMO)”—
1. The Offeror shall enter its proposed direct hourly cost amount for each labor category (LCAT). The Offeror shall propose costs for all LCATS shown below (since they are required by the PWS). Note: The Offeror must not propose additional LCATs.
2. The Offeror shall add or remove "Indirect Cost" columns only within the direct labor section as needed to properly reflect the Offeror's indirect rate pools applicable to the direct labor proposed.
3. The Offeror shall enter for each applicable "Indirect Cost Amount" column the name of the pool, the allocation base of the pool, and the rate percentage of the pool.
4. The Offeror shall enter formulas within the "Indirect Cost" columns as necessary to ensure proper application ("stacking") of the indirect rates to the proposed direct labor costs. This will yield the estimated indirect cost amount per hour per LCAT. The Offeror shall ensure that the formulas in the "Total estimated hourly costs for each LCAT" column represent the sum of the direct labor cost and all indirect cost amounts for the respective LCAT.
5. The Offeror shall repeat steps 2, 3, and 4 for the "Other Direct Costs" (ODC) row, adding or removing columns only within that ODC row for applicable indirect rates as necessary, and using a formula to apply ("stack") the applicable indirect rates and reach the proposed indirect cost estimate. The Offeror shall not change the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)".
6. The Offeror shall enter in the row indicated below a proposed percentage that, when applied to the total proposed costs, shall be used by the Government to calculate the fixed-fee amount to be awarded.
Government Evaluation: The Government will evaluate the proposed costs and prices for all (potentially 10) years in accordance with RFP Section M. With regard to this proposal workbook, for purposes of calculating prices for evaluation and for establishing the estimated cost and fixed-fee, the Government will do the following steps for each tab (i.e. for each contract year). Due to the classified or sensitive nature of some data required for the analysis, the Offeror should not include the Government's calculations in its proposal or in any unclassified contractor system or other medium.
(1) The Government will multiply the number of full-time-equivalents (FTE) identified in the PWS for each LCAT by the "Estimated Billable Hours per FTE per Year". This product will represent the estimated level of effort (LOE) for each LCAT. (Note that some FTE are estimated to bill more hours than typical for a standard year, due to anticipated billable hours during extended overseas flights, extended work weeks at certain overseas locations, etc.)
(2) The Government will multiply the estimated LOE for each LCAT by the proposed "Total estimated hourly cost for each LCAT" (which should already have been correctly calculated in the proposal by applying the proposed indirect costs to the proposed direct labor costs). This product will represent the proposed estimated costs for each LCAT (before travel premium).
(3) For positions NOT designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by 44%, which is the average unweighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 75%, which is the anticipated percentage of travel in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT. For positions designated as "OCONUS", the Government will multiply the proposed estimated costs for each LCAT (before travel premium) by the average weighted worldwide pay premium (including Post (Hardship) Differential and Danger Pay Allowance) for the location(s) identified by LCAT in the PWS, based on the Department of State Standardized Regulations (DSSR) in effect at the time of solicitation issuance, and will multiply that product by 100%, which is the anticipated percentage of travel (or primary duty station performance) in locations for which pay premiums apply. This product will represent the annualized pay premium costs for each LCAT.
(4) The Government will multiply the annualized pay premium costs for each LCAT by the percentage of Estimated Travel Required (ETR) stated in the PWS for each LCAT. This product will represent the estimated pay premium costs for each LCAT.
(5) The Government will add the proposed estimated costs for each LCAT (before travel premium) to the estimated pay premium costs for each LCAT. This sum will represent the proposed estimated costs per LCAT (with travel premium).
(6) The Government will add the proposed estimated costs per LCAT (with travel premium) to the "Total estimated ODC cost (which should already bhave been correctly calculated in the proposal by applying the proposed indirect costs to the "Estimated Other Direct Cost Amount (Gov't 'Plug' Number)"). The sum will represent the total estimated cost amount (for the CPFF portion of the contract) for that year.
(7) The Government will multiply the total estimated cost amount (for the CPFF portion of the contract) for the year by the proposed percentage to be used to calculate fixed-fee. The product will represent the proposed fixed-fee amount (for the CPFF portion of the contract) for that year.
(8) The Government will add the total estimated cost amount (for the CPFF portion of the contract) for that year to the proposed fixed-fee amount (for the CPFF portion of the contract) for that year and the proposed firm-fixed-price for the Program Management Office requirements for that year. The sum will represent the total proposed price for that year.

YEAR 4 (see RFP section F-005)

PWS ReferenceDescriptionQuantityUnit of MeasureFirm-Fixed-Price (year)
Section 6Program Management Office1LT$0.00
PWS ReferenceDirect Labor CategoryDirect Labor Cost per HourIndirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)(etc…)Total estimated hourly costs for each LCATEstimated Billable Hours per FTE per Year
5.2.1VPIM Program Lead$0.002,130
5.2.1VPIM Deputy Program Lead$0.002,130
5.2.1VPIM QC/Safety Site Lead$0.002,130
5.2.1VPIM Configuration Manager III$0.002,130
5.2.1VPIM Configuration Manager II$0.002,130
5.2.1VPIM Automotive Engineer II$0.002,130
5.2.1VPIM Electronics Technician I$0.002,230
5.2.1VPIM Electronics Technician II$0.002,230
5.2.1VPIM Electronics Technician III$0.002,230
5.2.2ECM Program Lead$0.002,130
5.2.2ECM Deputy Program Lead$0.002,130
5.2.2ECM Electronics Technician I$0.002,130
5.2.2ECM Electronics Technician II$0.002,130
5.2.2ECM Electronics Technician III$0.002,130
5.2.2ECM Electronics Technician I (OCONUS)$0.002,908
5.2.2ECM Electronics Technician II (OCONUS)$0.002,908
5.2.2ECM Electronics Technician III (OCONUS)$0.002,908
5.2.2ECM Project Manager$0.002,130
5.2.2ECM Project Manager (OCONUS)$0.002,908
5.2.2ECM Material Manager$0.001,980
5.2.2ECM Sr. Material Manager$0.001,980
5.2.2ECM Material Manager (OCONUS)$0.002,908
5.2.2ECM Sr. Material Manager (OCONUS)$0.002,908
5.2.2ECM Engineer III$0.002,130
5.2.2ECM Engineer II$0.002,130
5.2.2ECM Testing Coordinator$0.002,130
5.2.3CCR Program Lead$0.002,130
5.2.3CCR Deputy Program Lead$0.002,130
5.2.3CCR Material Manager$0.002,130
5.2.3CCR Material Manager (OCONUS)$0.002,908
5.2.3CCR Sr. Material Manager$0.002,130
5.2.3CCR Country Lead (OCONUS)$0.002,908
5.2.3CCR Project Manager$0.002,380
5.2.3CCR Technician III$0.002,630
5.2.3CCR Technician III (OCONUS)$0.002,908
5.2.3CCR Technician II$0.002,630
5.2.3CCR Technician II (OCONUS)$0.002,908
5.2.3CCR Technician I$0.002,630
5.2.3CCR Communications Integration SME$0.002,130
5.2.4S&W Program Lead$0.002,130
5.2.4S&W Deputy Program Lead$0.002,130
5.2.4S&W Material Manager$0.002,130
5.2.4S&W Operations Coordinator$0.002,130
5.2.4S&W Project Lead$0.002,130
5.2.4S&W Rapid Deployment Radar Technician$0.002,630
5.2.4S&W Rapid Deployment Field Service Representative$0.002,630
5.2.4S&W Forensics Analyst (OCONUS)$0.002,908
5.2.4S&W Site Lead (OCONUS)$0.002,908
5.2.4S&W Regional Manager (OCONUS)$0.002,908
5.2.4S&W Radar Operator (OCONUS)$0.002,908
5.2.4S&W Radar Field Service Representative (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Operator (OCONUS)$0.002,908
5.2.4S&W Command and Control (C2) Technician (OCONUS)$0.002,908
5.2.5MVS Project Manager$0.002,380
5.2.7PTL Program Lead$0.002,380
5.2.7PTL Deputy Program Lead$0.002,380
5.2.7PTL Operations Coordinator$0.001,980
5.2.7PTL Global Support Team Specialist$0.002,630
5.2.7PTL Domestic Support Team Specialist$0.002,130
5.2.7PTL Technical Operations Team Leader (Global Watch Operations, Global Support Operations- 2)$0.002,380
5.2.7PTL Technical Operations Team Leader (Worldwide Logistics and Domestic Support)$0.001,980
5.2.7PTL Watch Stander Level I (domestic)$0.001,980
5.2.7PTL Watch Stander Level II (domestic)$0.002,130
5.2.7PTL Watch Stander Level III (domestic)$0.002,130
5.2.7PTL Sr. Material Manager$0.002,130
5.2.7PTL Material Manager$0.002,130
5.2.7PTL Information Assurance SME$0.001,880
5.2.7PTL Electronics Systems Engineer$0.001,980
5.2.7PTL Computer Network Engineer$0.001,980
5.2.7PTL Integration & Systems Engineer$0.001,880
5.2.7PTL Configuration Manager$0.001,880
5.2.7PTL Integrated Broadcast Service SME$0.002,630
5.2.7PTL Country Lead (OCONUS)$0.002,908
5.2.7PTL WatchStander Level II (OCONUS)$0.002,908
5.2.7PTL WatchStander Level III (OCONUS)$0.002,908
5.2.8S&T Electronics Engineer$0.001,980
5.2.8S&T Electronics Technician$0.001,980
5.2.8S&T Project Engineer$0.002,130
5.2.8S&T Principal Engineer$0.001,980
5.3OSB Material Manager (OCONUS)$0.002,908
5.3OSB Sr. Material Manager (OCONUS)$0.002,908
PWS ReferenceDescriptionEstimated Other Direct Cost Amount (Gov't "Plug" Number)Indirect Cost Amount (Pool 1 name) (allocation base) (%)Indirect Cost Amount (Pool 2 name) (allocation base) (%)Indirect Cost Amount (Pool 3 name) (allocation base) (%)Indirect Cost Amount (Pool 4 name) (allocation base) (%) (etc…)Total estimated ODC cost
All Work Except Section 6 (PMO)Other Direct Costs (e.g. Travel, DBA Insurance, foreign Taxes, etc.)$11,476,595.83$11,476,595.83

Proposed percentage to be used to calculate Fixed-Fee: 0.00%

Year 5

SAQMMA16R0014 (“PTS”) SECTION J, ATTACHMENT 6

For Offeror Cost/Price Proposal Submission and Government Evaluation Purposes Only -- To be Removed Upon Award

Instructions to Offerors: Each worksheet ("tab") of this workbook represents separate one-year pricing for each of the 10 contract years. (See RFP section F-005 for an explanation of the contract periods of performance.) For each Contract year, the Offeror shall complete ONLY the below yellow highlighted cells, and shall submit all 10 completed tabs of this workbook as part of its cost/price proposal. In completing the yellow-highlighted cells, the Offeror shall follow the steps immediately below. Except as specifically indicated below in italics, the Offeror shall not edit or modify cells other than those highlighted in yellow.
PWS Reference: Section 6 — The Offeror shall enter its proposed firm-fixed-price for the Program Management Office requirements for the year.
PWS Reference: 5.2.1 through 5.3 and “All Work Except Section 6 (PMO)”—
1. The Offeror shall enter its proposed direct hourly cost amount for each labor category (LCAT). The Offeror shall propose costs for all LCATS shown below (since they are required by the PWS). Note: The Offeror must not propose additional LCATs.
2. The Offeror shall add or remove "Indirect Cost" columns only within the direct labor section as needed to properly reflect the Offeror's indirect rate pools applicable to the direct labor proposed.
3. The Offeror shall enter for each applicable "Indirect Cost Amount" column the name of the pool, the allocation base of the pool, and the rate percentage of the pool.
4. The Offeror shall enter formulas within the "Indirect Cost" columns as necessary to ensure proper application ("stacking") of the indirect rates to the proposed direct labor costs. This will yield the estimated indirect cost amount per hour per LCAT. The Offeror shall ensure that the formulas in the "Total estimated hourly costs for each LCAT" column represent the sum of the direct labor cost and all indirect cost amounts for the respective LCAT.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .