S02 - Att3 REV1 Drawings 585-20-111.pdf
PDF 13 MB Posted
- Solicitation number
- 36C25221B0017
About this file
This document provides details for a federal solicitation to upgrade low pressure steam risers at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The solicitation number is 36C25221B0017 and seeks a contractor to provide all labor, materials, equipment, and supervision necessary to demolish existing architectural, mechanical and electrical systems on the sub-basement through sixth floors and install new systems as outlined in the contract specifications and drawings. The period of performance is 240 calendar days from notice to proceed. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The scope of work involves upgrading low pressure steam risers through demolition and new construction of architectural, mechanical, and electrical systems on multiple floors of the medical center facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25221B0017 0002.docx | DOCX document | |
| Att.1 Drawing.pdf | ||
| 36C25221B0017 0001.docx | DOCX document | |
| S02 - Att4 Wage Rate Dickinson MI20200117dtd. 1.15.21.pdf | ||
| S02 - Att1 SOW 585-20-111.pdf | ||
| 36C25221B0017_2.docx | DOCX document | |
| S02 - Att2 Specifications 585-20-111.pdf | ||
| S02 - Att5 VHA Directive Seasonal Flu Shot.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHERE (2) STUD MOUNTED
DEVICES ARE SCHEDULED,
ALIGN HEIGHTS OF FINISHED
PRODUCT.
WHERE MULTIPLE DEVICES
ARE SCHEDULED TO OCCUR
WITHIN 16" OF EACH OTHER,
ALIGN DEVICES ON (1) FACE
OF STUD
STUDS
DOOR
WHERE MULTIPLE DEVICES ARE SCHEDULED,
ALONG A DOOR, DEVICES SHALL BE ALIGNED ON (1)
FACE OF METAL STUD AND SHALL OCCUR AT
SWING/ LATCH SIDE OF DOOR. EXC THERMOSTATS
ROOM
CORRIDOR
WHERE MULTIPLE DEVICES
ARE SCHEDULED IN CLOSE
PROXIMITY IN HEIGHT, ALIGN
DEVICES.
POSITION ROOM THERMOSTAT TO
ALIGN TOP OF THERMOSTAT WITH
LIGHT SWITCH COVER PLATE
WHERE MULTIPLE DEVICES ARE
SCHEDULED IN CLOSE PROXIMITY IN
HEIGHT, ALIGN DEVICES.
4' -0
" T O
T O
P
ITEMS ARE TO BE LOCATED ABOVE UNLESS NOTED OTHERWISE
TITLE SHEET
G001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 1 OF 40
LOW PRESSURE STEAM RISER,
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MI 49801
BID DOCUMENT SET
MAY 17, 2021
SHEET INDEXGENERAL NOTES
DIRECTOR
ASSOCIATE DIRECTOR
ASSOCIATE DIRECTOR FOR N&PCS
CHIEF OF POLICE
CHIEF OF ENGINEERING
INFECTION CONTROL NURSE
PATIENT SAFETY
A.F.G.E.
INDUSTRIAL HYGIENIST
APPROVALS
CHIEF OF STAFF
SAFETY
VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.
GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.
A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING
B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS
C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS
WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING
SEPARATION RATINGS.
3.
GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE AND PLASTER CEILINGS WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE AND PATCH PLASTER WHEN WORK ABOVE CEILING
HAS BEEN COMPLETED.
4.
CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL
EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.
5.
SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK
TIME LIMITATIONS
6.
FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE7.
WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS
STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.
8.
ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN
PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED BELOW.
9.
C5 G001
G001
C5 DEVICE MOUNTING SCHEDULE
1/4" = 1'-0" 2'0" 1' 4' 6'
J.G.D. K.K.S.
GENERAL
G001 TITLE SHEET
ARCHITECTURAL
A101 SUB-BASEMENT PLAN - WEST
A102 SUB-BASEMENT PLAN - EAST
A103 BASEMENT PLAN - WEST
A104 BASEMENT PLAN - EAST
A105 FIRST FLOOR PLAN - WEST
A106 FIRST FLOOR PLAN - EAST
A107 SECOND FLOOR PLAN - WEST
A108 SECOND FLOOR PLAN - EAST
A109 THIRD FLOOR PLAN
A110 FOURTH FLOOR PLAN
A111 FIFTH FLOOR PLAN
HVAC
MD101 SUB-BASEMENT DEMOLITION PLAN - WEST
MD102 SUB-BASEMENT DEMOLITION PLAN - EAST
MD103 BASEMENT DEMOLITION PLAN - WEST
MD104 BASEMENT DEMOLITION PLAN - EAST
MD105 FIRST FLOOR DEMOLITION PLAN - WEST
MD106 FIRST FLOOR DEMOLITION PLAN - EAST
MD107 SECOND FLOOR DEMOLITION PLAN - WEST
MD108 SECOND FLOOR DEMOLITION PLAN - EAST
MD109 THIRD FLOOR DEMOLITION PLAN
MD110 FOURTH FLOOR DEMOLITION PLAN
MD111 FIFTH FLOOR DEMOLITION PLAN
MP101 SUB-BASEMENT NEW WORK PLAN - WEST
MP102 SUB-BASEMENT NEW WORK PLAN - EAST
MP103 BASEMENT NEW WORK PLAN - WEST
MP104 BASEMENT NEW WORK PLAN - EAST
MP105 FIRST FLOOR NEW WORK PLAN - WEST
MP106 FIRST FLOOR NEW WORK PLAN - EAST
MP107 SECOND FLOOR NEW WORK PLAN - WEST
MP108 SECOND FLOOR NEW WORK PLAN - EAST
MP109 THIRD FLOOR NEW WORK PLAN
MP110 FOURTH FLOOR NEW WORK PLAN
MP111 FIFTH FLOOR NEW WORK PLAN
M401 SUB-BASEMENT MECHANICAL ROOM ENLARGED PLAN
MK501 DETAILS
MJ601 SCHEDULES
ELECTRICAL
E101 BASEMENT WEST DEMOLITION AND NEW WORK
E102 BASEMENT EAST DEMOLITION AND NEW WORK PLANS
E103 FIRST FLOOR WEST DEMOLITION AND NEW WORK PLANS
4'0" 2' 8' 12'
2'0" 1' 4' 6'
1'0" 6" 2' 3'
8"0" 4" 16" 24"
6"0" 3" 12" 18"
4"0" 2" 8" 12"
2"0" 1" 4" 6"
1/8" = 1'-0"
1/4" = 1'-0"
1/2" = 1'-0"
3/4" = 1'-0"
1" = 1'-0"
1 1/2" = 1'-0"
3" = 1'-0"
SCALE VERIFICATION
10. FURNISH AND INSTALL FIRESTOPS IN WALLS, FLOORS, AND PARTITIONS AND AROUND PENETRATIONS OF PIPE, DUCT, CABLE AND OTHER ELECTRICAL DEVICES OR IN BLANK OPENINGS AS INDICATED AT FIRE RATED LOCATION ON THE REFLECTED CEILING PLAN. FIRE STOPPING SHALL BE INSTALLED AND TESTED AS LISTED IN ASTM E814, E119, AND UNDERWRITERS LABORATORIES: FIRE RESISTANCE DIRECTORY. WHERE THERE IS NO SPECIFIC THIRD PARTY TESTED ASSEMBLY, ENGINEERING JUDGEMENTS SHALL BE BASED UPON THE REFERENCED DOCUMENTS AND MUST BE PROVIDED VIA THIRD PARTY AND SUBMITTED TO THE AHJ FOR APPROVAL PRIOR TO INSTALLATION. COSTS ASSOCIATED WITH THE ENGINEERING JUDGEMENT SHALL BE THE RESPONSIBILITY OF THE FIRESTOPPING TRADE. FIRESTOPPING OF ALL PENETRATIONS SHALL BE BY A LICENSED FIRESTOPPING TRADE. UPON COMPLETION OF THE FIRESTOPPING SYSTEM, PROVIDE A RECORD IN THE O&M MANUAL OF THE INSTALLED SYSTEMS INDICATING THE UL REFERENCE, LOCATION OF THE PENETRATION AND INSTALLED HOURLY RATING. ALL PENETRATIONS SHALL BE LABELED WITH A PERMANENT TAG INDICATED THE HOURLY RATING, SYSTEM REFERENCE NUMBER, INSTALLERS NAME, ADDRESS, PHONE NUMBER AND DATE OF INSTALLATION. TAGS SHALL BE LABELED WITH “WARNING FIRESTOPPING DO NOT
DISTURB. NOTIFY BUILDING MANAGEMENT OF ANY DAMAGE” OR SIMILAR.
A. FIRESTOPPING MATERIALS SHALL CONFORM TO FLAME (F) AND TEMPERATURE (T) RATINGS AS REQUIRED BY LOCAL BUILDING CODE AND AS TESTED BY NATIONALLY ACCEPTED TEST AGENCIES PER ASTM E814, UL 1479, OR UL 2079. THE F RATING MUST BE A MINIMUM OF ONE
(1) HOUR BUT NOT LESS THAN THE FIRE RESISTANCE RATING OF THE ASSEMBLY BEING PENETRATED. T RATING, WHEN REQUIRED BY CODE AUTHORITY, SHALL BE BASED ON THE MEASUREMENT OF THE TEMPERATURE RISE ON THE PENETRATING ITEM(S). THE FIRE TEST
PRESSURE DIFFERENTIAL OF A MINIMUM 0.01" OF WATER COLUMN IS REQUIRED.
B. T AND F RATINGS AT FLOOR PENETRATIONS SHALL BE EQUAL AND NOT LESS THAN 2 HOUR.
C. PENETRATIONS THRU WALL SHALL HAVE AN F RATING EQUAL TO THAT OF THE RATED WALL ASSEMBLY D. SYSTEM SHALL WITHSTAND THE PASSAGE OF COLD SMOKE EITHER AS AN INHERENT PROPERTY OF THE SYSTEM OR BY THE USE OF E. SEPARATE PRODUCT INCLUDED AS A PART OF THE UL SYSTEM OR DEVICE AND DESIGNED TO PERFORM THIS FUNCTION.
1.1. AT SMOKE BARRIER WALLS - 1S, 2S, AND 3S WALLS IN HOSPITAL OCCUPANCY, WALL ASSEMBLIES MUST HAVE A MAXIMUM L RATING OF 50
CFM PER 100SF OF WALL ASSEMBLY.
F. SMOKE RATED WALLS SHALL BE SEALED WITH A PRODUCT TO RESIST THE PASSAGE OF SMOKE.
G. FIRESTOPPING PRODUCTS SHALL BE ASBESTOS-FREE, FREE OF ANY PCBS, AND FREE OF ANY LEAD.
H. FOR ALL CABLING FIRE PENETRATIONS AT WALLS, PROVIDE THE EZ-PATH FIRE RATED PATHWAY SYSTEM BY SPECIFIED TECHNOLOGIES, INC. OR EQUIVALENT SYSTEM BY HILTI CORPORATION.
12. PROVIDE MANUFACTURER'S STANDARD WARRANTY ON ALL ITEMS.
13. REMOVE ALL WALL OUTLETS AND SWITCH COVERS AS REQUIRED FOR REPAINT; REINSTALL COVERS UPON COMPLETION OF
WORK
14. INFILL ALL NAIL HOLES IN WALLS SCHEDULED FOR NEW FINISH
11. WHERE MECHANICAL AND ELECTRICAL PENETRATIONS THROUGH FLOOR SLABS ARE REMOVED, OR CUT FOR NEW WORK, PATCH HOLES
THROUGH THE SLAB.
B. FILL HOLES 3" TO 12" IN DIAMETER WITH CLASS B CONCRETE. ANCHOR TO SLAB WITH TWO NO. 4 DOWELS.
C. FILL HOLES 12" X 12" TO 36" X 36" WITH NO. 4 DOWELS, 8" O.C. BOTH WAYS.
15. THE SEALANT SCHEDULE IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE BELOW SCHEDULE APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS)). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION:
D. ALL HOLES TO BE FILLED IN STRUCTURAL FLOOR SLABS SHALL BE FILLED OR FORMED IN SUCH A MANNER AS
TO PREVENT NEW CURED CONCRETE FROM FALLING TO FLOOR BELOW.
E. PATCH EXISTING SLABS ON GRADE WHERE FLOOR HAS BEEN CUT FOR PLUMBING, HEATING AND OTHER REMODELING WORK. REINFORCE CUTS GREATER THAN 24" IN EACH DIRECTION WITH 6 X 6 WL.4 X WL.4 WIRE MESH. REINFORCE TRENCHES LESS THAN 24" WIDE WITH TWO #3 RODS CONTINUOUS. REPAIR UNDERSLAB
VAPOR RETARDER WITH MATERIAL EQUAL TO ORIGINAL INSTALLATION.
A. FILL HOLES 3" AND SMALLER IN DIAMETER WITH NON-SHRINK GROUT.
1. ALL PRESENT SERVICES INSTALLED AND OPERATING SHALL BE KEPT
IN OPERATION THROUGH THE NEW CONSTRUCTION UNTIL EQUAL
NEW SERVICES OR TEMPORARY LINES SATISFACTORY TO OWNER
ARE INSTALLED AND OPERATING
2. PARTITIONS SHOWN TO BE REMOVED SHALL BE COMPLETELY
REMOVED FROM STRUCTURE ABOVE TO STRUCTURAL FLOOR SLAB
3. CUT OPENINGS IN EXISTING WALLS. OPENINGS IN MASONRY AND
CONCRETE SHALL BE SAWCUT; EXECUTE WORK WITH A MINIMUM
DISTURBANCE TO EXISTING CONSTRUCTION WHICH REMAINS
4. UNLESS NOTED OTHERWISE ON THE PLANS, REMOVE EXISTING BASE
AS REQUIRED TO INSTALL NEW BASE. BASE SHALL BE REMOVED
DOWN TO ORIGINAL FINISHED WALL SURFACE; REMOVE ALL
ADHESIVE RESIDUE WHICH WILL INTERFERE WITH INSTALLATION OF
NEW BASE
5. ALL MATERIALS, RUBBISH, AND DEBRIS SHALL BE REMOVED FROM
THE BUILDING AND FROM THE PREMISES AS SOON AS IT
ACCUMULATES; REMOVAL OF RUBBISH AND DEBRIS SHALL BE
CONDUCTED IN SUCH A WAY THAT A MINIMUM OF DUST IS CAUSED
6. MAINTAIN OWNER OCCUPIED AREAS AS CLEAN AS POSSIBLE TO
AVOID INTERFERENCE WITH OWNER'S OPERATIONS
DEMOLITION NOTES
SEALANT SCHEDULE
SILICONE - 50% MOVEMENT -
CLASS 50
SILICONE - 25%
MOVEMENT/MILDEW
RESISTANT - CLASS
SINGLE
COMPONENT
URETHANE - 35%
MOVEMENT -
CLASS 35
MULTI-COMPONENT
URETHANE - 50%
MOVEMENT - CLASS
TAMPER RESISTANT
URETHANE - 12.5%
MOVEMENT CLASS
12.5 , ASTM D-412
375 TENSILE
STRENGTH
TAMPER PROOF
EPOXY - 0%
MOVEMENT CLASS 0
ASTM C-882 3530
BOND STRENGTH
LATEX - NO MOVEMENT -
CLASS 12.5
ACOUSTICAL
SEALANT -
NON-HEAD OF
WALL - 12.5%
MOVEMENT
ACOUSTICAL SEALANT
- HEAD OF WALL -
EXPANSION JOINTS -
33% MOVEMENT
BUILDING
INTERIOR -
UTILIZE
TAMPER
RESISTANT/
PROOF
PRODUCTS
ONLY IN
PSYCHIATRIC
CARE AREAS
BELOW
CEILING
LINES
JOINT BETWEEN SILLS AND
EXTERIOR FENESTRATIONS:
GRADE NS
JOINTS BETWEEN
PLUMBING FIXTURES
AND ADJOINING
MATERIALS: GRADE
NS
CONTROL JOINTS
SCHEDULED TO
BE CAULKED:
GRADE NS
EXPANSION JOINTS
NOT EXPOSED TO
UV: GRADE NS -
VERTICAL (AND
CEILING), GRADE P,
USE T - HORIZONTAL
CONTROL JOINTS/
EXPANSION
SCHEDULED TO BE
CAULKED: GRADE
NS AT VERTICAL,
GRADE P USE T AT
HORIZONTAL
JOINT BETWEEN
WALLS AND
ACOUSTICAL GRID:
GRADE NS
INTERIOR DOOR FRAMES
NOT EXPOSED TO UV, AT
INTERSECTION OF WALL
AND FRAME: GRADE NS, P
TYPICAL. USE SINGLE
COMPONENT URETHANE
SEALANT GRADE NS, T AT
FLOOR INTERSECTION
WALL
PERIMETERS
HEAD OF WALL JOINTS
JOINT BETWEEN INTEGRAL
BASE AND DOOR FRAMES:
GRADE NS
VERTICAL JOINTS AT
INSIDE CORNERS OF
CERAMIC TILE
CONDITIONS: GRADE
NS
PENETRATIONS
OF MECHANICAL
EQUIPMENT IN
SMOKE TIGHT
WALLS: GRADE
NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS: GRADE
NS
INTERIOR DOOR
FRAMES NOT
EXPOSED TO UV, AT
INTERSECTION OF
WALL AND FRAME:
GRADE NS, P
TYPICAL.
JOINTS WHERE NO
MOVEMENT IS EXPECTED:
GRADE NS
SMOKE RESISTANT
EXPANSION JOINTS
(WHERE SILICONE
SEALANTS ARE NOT
UTILIZED)
EXPANSION JOINTS EXPOSED
TO UV: GRADE NS VERTICAL,
GRADE P USE T - HORIZONTAL
JOINT BETWEEN
TILED FLOOR AND
WALL
INTERSECTIONS:
GRADE NS, USE T
TERMINATION OF
VINYL WALL
COVERING:
GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES,
JOINTS BETWEEN
SILLS AND
EXTERIOR
FENESTRATIONS:
GRADE NS
JOINTS WHERE NO
MOVEMENT IS
EXPECTED: GRADE
NS
JOINTS BETWEEN DIS-SIMILAR
MATERIALS SUBJECT TO UV
EXPOSURE: GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES:
GRADE NS
JOINT BETWEEN
WALLS AND
ACOUSTICAL
GRID: GRADE NS
JOINTS BETWEEN
PLUMBING
FIXTURES AND
ADJOINING
MATERIALS: GRADE
NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS NOT
SUBJECT TO UV
EXPOSURE:
GRADE NS
JOINT BETWEEN
INTEGRAL BASE
AND DOOR FRAMES:
GRADE NS
1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW
2. SILICONE SEALANT
2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT
2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000
2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT
2.4. TREMCO: SPECTREM 1
3. URETHANE JOINT SEALANTS
3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1
3.2. BOSTIK, INC.: CHEM-CALK 2020
3.3. SIKA CORPORATION: SIKAFLEX-1A
4. MULTI-COMPONENT NON-SAG URETHANE
4.1. DYNATROL II
4.2. TREMCO DYMERIC 240/240FC
5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)
5.1. PECORA AC-20 FTR
5.2. USG SHEETROCK ACOUSTICAL SEALANT
6. ACOUSTICAL SEALANT (HEAD OF WALL)
6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000
6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345
7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT
7.1. PECORA DYNAFLEX
7.2. BASF MASTERSEAL CR 195
7.3. SIKAFLEX 2C NS TG
8. TAMPER PROOF EPOXY SEALANT
8.1. PECORA DYNAPOXY EP-1200
SEALANT NOTES
AutoCAD SHX Text S
FD
FD FD
FD
Fire Pump System
ERV-4
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
STAIR 2
UP
UP
SERVICE
ELEV
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
3 3
IMAGING
MATERIALS
S004
MECHANICAL
ROOM
S001
SUB-BASEMENT PLAN - WEST
A101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
J.G.D. K.K.S. DWG. 2 OF 40
4'0" 2' 8' 12'
N
KEYPLAN
NO SCALE
N
A101
F3 SUB-BASEMENT NEW WORK PLAN - WEST
1/8" = 1'-0"
PLAN KEYED NOTES
LOCATION OF 30"Ø TUNNEL ACCESS
LOCATION OF MECHANICAL ROOM TUNNEL ACCESS
PATCH 2 HOUR RATED WALL AT REMOVED PIPE
AutoCAD SHX Text
AHU
ST
EA
M
TU
NN
EL
FD
FD FD
FD
Fire Pump System
ERV-4
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
STAIR 2
UP
UP
SERVICE
ELEV
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
3 3
SWITCHGEAR
ROOM
S003
IMAGING
MATERIALS
S004
UPS
S002
MECHANICAL
ROOM
S001
SUB-BASEMENT PLAN - EAST
A102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 3 OF 40
4'0" 2' 8' 12'
N
KEYPLAN
NO SCALE
N
A102
F3 SUB-BASEMENT NEW WORK PLAN - EAST
1/8" = 1'-0"
PLAN KEYED NOTES
LOCATION OF 30"Ø TUNNEL ACCESS
LOCATION OF MECHANICAL ROOM TUNNEL ACCESS
PATCH 2 HOUR RATED WALL AT REMOVED PIPE
J.G.D. K.K.S.
AutoCAD SHX Text
AHU
LAUNDRY
CHUTE ABOVE
FIRE
EQUIP
FD
STAIR 5
UP
COIL
CABINET
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
ROOF OF MECHANICAL
ROOM 1400
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
IN
FL
OO
R
SC
AL
E
8'-5"2
8'-0"2
8'-4"2
8'-4"2 8'-0"2
8'-0"2
8'-0"2 8'-0"2
8'-0"2
9'-5"2
9'-5"2
8'-0"2
8'-0"2
8'-6"2
8'-6"2
8'-1"2
8'-0"2
8'-0"2
8'-0"2
8'-0"
9'-0"
PATCH AND
PAINT WALL
AT REMOVED
EQUIPMENT
63x28 4
SUPPLY
CHAIN
SIMS
B082A
SUPPLY
CHAIN
INVENTORY
B082
MECHANICAL
ROOM
B079
PHARMACY
CACHE
B081
VAULT
B081A
SUPPLY
CHAIN MNGT.
STORAGE/OFFICE
B083
ELECTRICAL
EQUIPMENT
B027A
ELECTRONICS
SHOP
B027
ENGINEERING
AND
EMERGENCY
MANAGEMENT
B023
LOCKSMITH
B023A
MENS
LOCKER
ROOM
B021
AQUISITION
SPECIALIST
B019
MENS
TOILET
B021A
CHIEF,
SUPPLY
CHAIN MNGT.
B086A
MACHINE
SHOP
B060
CARPENTER
SHOP
B062
CARPENTER
SHOP
OFFICE
B062A
CONFERENCE
ROOM
B077
CONST.
CONTROL
REP.
B078
I.H. AND
GEMS
B067
GENERAL
ENGINEER
B074
SUPERVISORY
ENGINEER
B072
CHIEF
ENGINEER
B070
GENERAL
ENGINEER
B076
HALLWAY
B075
TOILET
B075A
PROGRAM
ASSISTANT
B066
GENERAL
ENGINEER
B068
CORRIDOR
B099C-1
GENERAL
ENGINEER
B069
CORRIDOR
B099B-1
CORRIDOR
B099A-1
CORRIDOR
B099D-1
M & R
SUPERVISOR
AND WORK
LEADER
B022
SAFETY
MANAGER
B022
CORRIDOR
B018
MAINTENANCE
SHOP/OFFICE
B014
NESS
TEMP.
STORAGE
B010
TOILET
B008A
CHASE
B002A
NESS
TEMP.
STORAGE
B008
MECH
B002
HSKG
B004
HSKG
B006
VESTIBULE
B018A
MAINTENANCE
STORAGE
B018B
MECHANICAL
ROOM
B018C
WOMENS
LOUNGE
B196B
CORRIDOR
B199B-1
WOMENS
RESTROOM
B170
DINING
ROOM
B172
MENS
RESTROOM
B168
RETAIL
STORE
B174
CHIEF,
CANTEEN
B174A
CANTEEN
STORAGE
B175A
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
FOOD
BANK
COOLER 2
186Q
RETHERM
COOLER 1
186R
COOLER 3
B186P
COOLER 4
B186N
ROUGH
PREP.
B186H
STAFF
WORK
ROOM
B186D
FOOD
SERVICE
MANAGER
OFFICE
B186E
ELECTRIC
ROOM
B186I
CART
WASHER
B186B
UTILITY
B186C
SANITATION
B186A
CANTEEN
VENDING AND
BEVERAGE
STORAGE
B185
CANTEEN
SERVING
B192
WOMENS
TOILET
B196A
WOMENS
LOCKER
B196A STAFF
LOCKERS
B194
CORRIDOR
B199A-1
CORRIDOR
B199C-1
ASSISTANT
CHIEF SUPPLY
CHAIN MNGT.
B084
SUPPLY
CHAIN
B086B
SUPPLY
CHAIN ADMIN.
OFFR
B086
PHONE
AND
DATA
B085
SHARED
SHOPS
B087
SHOP
OFFICE
B088
BIOMED
AND
ELECTRONICS
B089
BIOMED
AND
ELECTRONICS
B009A
SUPERVISOR
BIO-MED/
ELECTRONICS
B009
SOILED
LINEN
HOLDING
AREA
B003
HSKG
STORAGE
B122
NESS
OFFICE
B123
HOUSEKEEPING
SUPERVISORS
B129C
NESS
EQUIP.
AND
SUPPLIES
B129
MECHANICAL
ROOM
B129A
CART
WASHER
B129B
CHIEF,
NESS
B121
CANTEEN
STORAGE
AND
RECIEVING
B119
UNIFORMS
B191
DATA
CLOSET
B117
CBOC
STORAGE
B187
MAIN
ROOM
B107A
MSA
SUPERVISORS
B107B
VESTIBULE
B107
WAN
ROOM
B105
MECH.
ROOM
B107D
TELEPHONE
EQUIPMENT
B103
CODERS
WORKSTATIONS
B101
MEDICAL
RECORDS
B201
MECH.
ROOM
B202
RELEASE
OF
INFO.
B203
WOMENS
TOILET
B204
MENS
TOILET
B205
CORRIDOR
B299A-1
TELE-DIETICIAN
B120
DIETETICS
OFFICE
B186F
AMBIENT
DISPOSAL AND
NOURISHMENT
STORAGE
B186G
STAIR 7
BASEMENT PLAN - WEST
A103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 4 OF 40
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12' A103
F3 BASEMENT NEW WORK PLAN - WEST
1/8" = 1'-0"
LOCATION OF 30"Ø TUNNEL ACCESS
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
PATCH HOLE FOR 2 HOUR
INFILL OPENING FROM HVAC UNIT WITH GYP. BOARD AND METAL STUDS. SIZE
AS INDICATED. PATCH TO MATCH EXISTING 4x4 TILE WALL.
J.G.D. K.K.S.
SEE GENERAL NOTE 1 FOR
THIS AREA. VA PROJECT
585-336 (EXPAND PRIMARY
CARE ADDITION).
PLAN KEYED NOTES
GENERAL NOTES
1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
AutoCAD SHX Text
UP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
FE
FD FDFD
FIRE
EQUIP
FIRE
EQUIP
DUMB
WAITER
FIRE
EQUIP
HYDRAULIC POWER
UNIT
FD
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
DN
UP
UP
PASSENGER
ELEVATOR
ACCESS
EL
EC
TR
ICA
L
EQ
UIP
ME
NT
MECH
SHAFT
D-4 D-5
ROOF OF MECHANICAL
ROOM 1400
LAUNDRY
CHUTE ABOVE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
BASEMENT
PIPE
B001
STAIR 3
STAIR 2
8'-1"2
8'-0"2
8'-0"2
8'-0"2
8'-1"2
8'-4"2
8'-4"2
8'-0"2
8'-0"2
8'-0"2
8'-0"2
8'-1"2
8'-0"2
CHIEF,
CANTEEN
B174A
CANTEEN
STORAGE
B175A
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
FOOD
BANK
COOLER 2
186Q
RETHERM
COOLER 1
186R
COOLER 3
B186P
COOLER 4
B186N
FREEZER 2
B186M
FREEZER 1
B186L
MORGUE
COOLER
B273
LOADING
DOCK
B271
VESTIBULE
B276
RECYCLING
AND SHEDDER
ROOM
B278
SHIPPING
AND
RECIEVING
B274
ELECTRICAL
EQUIP.
ROOM
B278A
ELEVATOR
EQUIPMENT
B224B
ROUGH
PREP.
B186H
STAFF
WORK
ROOM
B186D
FOOD
SERVICE
MANAGER
OFFICE
B186E
ELECTRIC
ROOM
B186I
CART
WASHER
B186B
UTILITY
B186C
SANITATION
B186A
CANTEEN
VENDING AND
BEVERAGE
STORAGE
B185
CANTEEN
SERVING
B192
STAFF
LOCKERS
B194
CORRIDOR
B199A-1
CORRIDOR
B299B-1
CORRIDOR
B199A-1
OFFICE
LOGISTICS
B298B
O2
STORAGE
B268
ELECTRICAL
ROOM
B269
NESS
OFFICE
B123
HOUSEKEEPING
SUPERVISORS
B129C
CHIEF,
NESS
B121
CANTEEN
STORAGE
AND
RECIEVING
B119
UNIFORMS
B191
DATA
CLOSET
B117
CBOC
STORAGE
B187
MAIN
ROOM
B107A
MSA
SUPERVISORS
B107B
VESTIBULE
B107
WAN
ROOM
B105
MECH.
ROOM
B107D
TELEPHONE
EQUIPMENT
B103
CODERS
WORKSTATIONS
B101
MEDICAL
RECORDS
B201
MECH.
ROOM
B202
RELEASE
OF
INFO.
B203
WOMENS
TOILET
B204
MENS
TOILET
B205
PRI. SUPPLY/
SURGURY
CASE CART
B291
CHIEF,
SPS
B291A
STOCK
BREAKOUT
B287
EMERGENCY
ELECTRICAL
ROOM
B267
CORRIDOR
B299A-1
CORRIDOR
B299D-1
NON-EXP.
EQUIPMENT
B298A
WAREHOUSE
STORAGE
B298
DECONTAMINATION
B295
MECH.
ACCESS
B295A
LOCKERS
AND
SHOWER
B297
PREPARATION
PACKAGING
B291B
MECH.
ROOM
231B
STERILIZER
291C
MECH.
ROOM
B231A
MECH.
ROOM
B231C
BULK
MEDICAL
STORAGE
B231D
STORAGE
LOGISTICS
B231
LAUNDRY
CHUTE
B230
CORRIDOR
B299C-1
MECH.
ACCESS
B227 UNISEX
BREAK
ROOM
B228
MENS
TOILET AND
SHOWER
B228C
VEST.
228A
MENS
LOCKER
ROOM
B228BMECHANICAL
ROOM
B224A
ELEVATOR
LOBBY
B224
MECH.
ROOM
B224CDATA
B296
DIETETICS
OFFICE
B186F
AMBIENT
DISPOSAL AND
NOURISHMENT
STORAGE
B186G
STAIR 2
STAIR 3
BASEMENT PLAN - EAST
A104
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 5 OF 40
KEYPLAN
NO SCALE
N
N
4'0" 2' 8' 12' A104
F3 BASEMENT NEW WORK PLAN - EAST
1/8" = 1'-0"
PLAN KEYED NOTES
LOCATION OF 30"Ø TUNNEL ACCESS
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
REMOVE AND REPLACE GYPSUM BOARD AND METAL STUD WALL FOR NEW WORK
PATCH HOLE THROUGH 2 HOUR RATED CONCRETE SLAB/WALL
PATCH 2 HOUR RATED STUD WALL - (2) LAYERS OF TYPE X GYP. BD. BOTH SIDES.
J.G.D. K.K.S.
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
AutoCAD SHX Text
FE
MA
TC
HL
INE
MA
TC
HL
INE
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
UP
DN
UP
DN
UP
MA
TC
HL
INE
MA
TC
HL
INE
STAIR 1
STAIR 2
STAIR 5
1 8'-6"
1 8'-0"
1 8'-0" 1 8'-0"
1 9'-0"
1 9'-0"
1 9'-0"
1 9'-0"
3 3
4 46x32
4 36x32
4 36x32
PATCH ROOF IN THIS
AREA FOR NEW RAIL
AND CURB.
OFFICE
CLOTHING
STORAGE
CORRIDOR
C1-11
STAIR 7
NURSE
STATION
ALCOVE
CLEAN
STORAGE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1036A
TOILET
1040A
TOILET
1044A
TOILET
1042A
TOILET
1038A
MECH.
SHAFT
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1028A
TOILET
1024A
TOILET
1020A
STORAGE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1029A
TOILET
1025A
TOILET
1009A
TOILET
1005A
TOILET
1052A
STAFF
TOILET
UTILITY
CLEAN
LINEN
DAY
ROOM
NURSE
STATION
NURSE
STATION
CLEAN
LINEN
ELECT.
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1008A
TOILET
1010A
TOILET
1006A
TOILET
1002A
EQUIPMENT
STORAGE
STAFF
TOILET
1148B
LOCKER
ROOM
1148A STAFF
LOUNGE
RECR.
THER.
STORAGE
PHYSICIAN
OFFICE
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1051A
TOILET
1055A
MECH.
CHASE
BATHING/
SPA
RECREATION
THERAPY
OFFICE
1147A
ACTIVITY/
GROUP ROOM
CORRIDOR
EQUIP. STOR.
STAIR 1
LINEN
CHUTE
MAIN
NURSE
STATION
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1028A
TOILET
1032A
TOILET
1036A
PROGRAM
ASSISTANT
1137 PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1027A
TOILET
1031A
TOILET
1035A
NURSE
STATION
NURSE
MANAGER
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1166A
TOILET
1170A
STAIR 5
IV
STOR.
1176 MDS/
RESTORATIVE
COORDINATOR
PRIVATE
RESIDENT
ROOM
PRIVATE
RESIDENT
ROOM
TOILET
1175A
TOILET
1171A
ADL.
BATH
1165B
ADL. OT AREA/
BEDROOM
OCCUPATIONAL
THERAPY
OFFICE
1165A
MEDS
ROOM
DATA
CLOSET
CLEAN
LINEN
UTILITY
CLOSET
STOR.
1116A
RESIDENT DINING AND
RECREATION AREA
UTILITY
CLOSET
PHYSICAL THERAPY
SATELLITE CLINIC
UNISEX
TOILET
NURSE
PRACTITIONER
1111A SOCIAL
WORKER
1109A
OXYGEN
STOR.
EQUIPMENT
STORAGE
RESIDENT
KITCHEN
1116B
CHAPLAIN
OFFICE
CLOSET
1182A
CLOSET
1182B
CHAPEL
CHAPEL
1284A
WAITING
ROOM
TRAVEL
OFFICE
1286A
POLICE
PIV ROOM
ENROLLMENT
ELIGIBILITY
AMERICAN
LEGION/ DAV
CHIEF,
POLICE
EVIDENCE
1201A
HOLDING
1201B
MAIN
OFFICE
LOBBY
WEAPONS
1201C
KITCHENETTE
LOCKERS
1105A
MENS
TOILET
VESTIBULE
1100A
WOMENS
TOILET
STAIR 2
PHARMACY
SUPPLY
CORRIDOR
1299A
FIRST FLOOR PLAN - WEST
A105
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 6 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A105
F3 FIRST FLOOR NEW WORK PLAN - WEST
1/8" = 1'-0"
PLAN KEYED NOTES
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
REMOVE AND REPLACE GYPSUM BOARD AND METAL STUD WALL FOR NEW
PIPING. PAINT TO MATCH EXISTING
PATCH 2 HOUR RATED, 6" CONCRETE FLOOR FOR REMOVAL OF PIPES
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
J.G.D. K.K.S.
MA
TC
HL
INE
MA
TC
HL
INE
BASEMENT ROOF
BASEMENT ROOF
UP
DN
FD
FIRE
EQUIP
LO
CK
ER
S
DNUP
UP
DN
DUMB
WAITER
PASSENGER PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
VOLUNTEER
AREA
MECH.
CHASE
UP
CARPET
CARPET
CARPET
TILE
TILE
TILE
FE FE
MECH
SHAFT
PASSENGER
ELEVATOR
D-4 D-5
MA
TC
HL
INE
MA
TC
HL
INE
STAIR 3
STAIR 2
STAIR 4
1 8'-0"
1 8'-0" 1 8'-0"
1 8'-0"
1 8'-0"
1 8'-0"
1 8'-0"
9'-0"
1 9'-0"
442x32
4 42x32
PATCH ROOF IN THIS
AREA FOR NEW RAIL
AND CURB.
1 8'-0"
PATCH 2 HR
WALL AT PIPE.
CLOSET
1182A
CHAPEL
CHAPEL
1284A
WAITING
ROOM
TRAVEL
OFFICE
1286A
WAITING
ROOM
AGENT
CASHIER
1288A
BLOOD DRAW
LAB/ EKG
BLOOD DRAW
LAB/ EKG
PIV ROOM
ENROLLMENT
ELIGIBILITY
CHIEF,
POLICE
EVIDENCE
1201A
HOLDING
1201B
MAIN
OFFICE
LOBBY
WEAPONS
1201C
KITCHENETTE
LOCKERS
1105A
MENS
TOILET
VESTIBULE
1100A
WOMENS
TOILET
STAIR 2
PHARMACY
SUPPLY
CLINICAL
PHARMACIST
CORRIDOR
1299A
PHARMACY
CONSULTING
CONSULTING
1218B
CONSULTING
1218C
1218A
URGENT
CARE OFFICE
OUTPATIENT
DISPENSING
MEDS
CAROUSAL
COAT
ROOM
TOILET
1224A
PHARMACY
OFFICE
SECURE
MED PREP
VAULT
1228A
PHARMACY
MED PREP
NON-HAZ./
CLEAN RM.
1233B
HAZARD
HOOD RM.
1233A
IV ROOM
LOUNGE
PHARMACY
CHIEF
MED PREP
& OFFICES
STAIR 3
VESTIBULE
ELECTRICAL
WAITING
AREA
CLERK
AREA
WOUND
CARE
TREATMENT
PATIENT
TOILET
1267B
SOILED
UTILITY
1267A
EXAM
ROOM
NURSE
WORKROOM
EXAM
ROOM
1275 ALCOVE
PROCEDURE
ROOM
STAIR 4
PATIENT
TOILET
SOCIAL
WORKER
OPC NURSE
MANAGER
SOCIAL
WORKER
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
NURSE
WORKROOM
1348 EXAM
ROOM
EXAM
ROOM
1344 STAFF
TOILET
1340A
BREAK ROOM/
LOCKERS
ELEVATOR
LOBBY
EXAM
ROOM
DIETICIAN
DIETICIAN
MEDICATION
FIRE ALARM/
SECURITY RM.
ELECTRICAL
MENS
TOILET
WOMENS
TOILET
HSKP.
EXAM
ROOM
STAFF
TOILET
PATIENT
TOILET
DIABETES
DIABETES
NURSE
WORKROOM
PATIENT
TOILET
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
PT. ED./
CONS.
CLEAN
SUPPLY
STERILE
SUPPLY
PYXIS
ALCOVE
DECON
ROOM
MEDICATION
SOILED
UTILITY
PATIENT
TOILET
TREATMENT
ROOM
TREATMENT
ROOM
TREATMENT
ROOM
EQUIPMENT
CHA.
ROOM
1304C
CHA.
ROOM
1304B
MRI
VESTIBULE
1304 MRI
VESTIBULE
1304A
ED
WAITING
AREA
TRIAGE
ELEVATOR
EQUIPMENT
1368 PATIENT
TOILET
1312B
TREATMENT/
ISOLATION
SECURE
TREATMENT
WHEELCHAIR
STORAGE
ANTE
ROOM
1312A
WAITING
AREA
NURSE
STATION
DICTATION
EXAM
ROOM
OFFICE
NURSE
WORKROOM
EXAM
ROOM
SCALE
ALCOVE
CLERKS
STAIR 8
FIRST FLOOR PLAN - EAST
A106
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 7 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A106
F3 FIRST FLOOR NEW WORK PLAN - EAST
1/8" = 1'-0"
PLAN KEYED NOTES
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
REMOVE AND REPLACE GYPSUM BOARD AND METAL STUD WALL FOR NEW
PIPING. PAINT TO MATCH EXISTING
PATCH 2 HOUR RATED, 6" CONCRETE FLOOR FOR REMOVAL OF PIPES
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
J.G.D. K.K.S.
SEE GENERAL NOTE 1 FOR
THIS AREA. VA PROJECT
585-336 (EXPAND PRIMARY
CARE ADDITION).
GENERAL NOTES
1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
FD FD FD
DWV
ELEC
CABINET
FD
DN
UP
DN
UP
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
1st. FLOOR ROOF
MECH.
SHAFT
SUB-STERILIZER
MECH SPACE
MECH. RM. 1400
ROOF
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
FIRST FLOOR ROOF
BASEMENT ROOF
FD
BASEMENT ROOF
STAIR 1
STAIR 2
STAIR 5
1 8'-0"
1 8'-0"
36x32
46x32
48x26
PATCH 2 HR
HOLE AT PIPE.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
2145A
CORRIDOR
OFFICE
OFFICE
OFFICE
STAFF
LOUNGE
BIOMED
DATA
DATA AND
PHONE
TREATMENT
TREATMENT
SOILED
UTILITY
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PT.
TOILET
2176A
TREATMENT
CLEAN
SUPPLY
NURSE
STATION
PACS
VIEW
TOILET
STERILE
SUPPLY
2171A
WAITING
ROOM
HALLWAY
CHECK-IN
CLERKS
WOMEN
MEN
WHEELCHAIR
ALCOVE
HSKG
CLOSET
CORRIDOR
2299B
WOMEN
2112A
LAUNDRY
CHUTE
TOILET
2143A
PACU
BED #8
2129K
PACU
BED #8
2129L
OR
SUPERVISOR
WOMEN
LCKR/
SHOWER
RM.
MEN
LCKR/
SHOWER
RM.
EQUIP.
STORAGE
SOILED
UTILITY
ANESTHESIA
WORK ROOM
BLANKET
WARMER
2110D
SEMI-RESTRICTED
CORRIDOR
MECHANICAL
MEN
2111A
CORRIDOR
2299H
PRE/POST
BED #1
2129A
PRE/POST
BED #2
2129B
PRE/POST
BED #3
2129C
PRE/POST
BED #4
2129D
EQUIPMENT
STORAGE
NURSING
STATION
PRE/POST
BED #7
2129G
PRE/POST
BED #6
2129F
PRE/POST
BED #5
2129E
STERILE
SUPPLY
CLEAN
SUPPLY
PT.
TOILET
PT.
TOILET
2131 SOILED
UTILITY
PRE/POST
CORRIDOR
TREATMENT
OPERATING
ROOM
OPERATING
ROOM
HSKG
CLOSET
STERILE
SUPPLY
CLEAN
SUPPLY
CART
ALCOVE
2110C
CART
ALCOVE
2110A
ENDOSCOPY
ENDOSCOPY
SCRUB
2105A
SUB-
STERILE
2101A
GOWNING
ALCOVE
STAIR 1
STAIR 5
STAIR 2
SECOND FLOOR PLAN - WEST
A107
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 8 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A107
F3 SECOND FLOOR NEW WORK PLAN - WEST
1/8" = 1'-0"
PLAN KEYED NOTES
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING
BASEMENT ROOF
FD FD FD
DWV
FD
UP
DN
DN
UP
UP
DN
SERVICE
ELEVATOR PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
1st. FLOOR ROOF
ROOF
ROOF
MECH
CHASE
PASSENGER
ELEVATOR
DN
UP
OPEN TO FIRST
FLOOR
MECH.
SHAFT
CHASE
CHASE
PASSENGER
ELEVATOR
MECH.
SHAFT
SUB-STERILIZER
MECH SPACE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
MA
TC
HL
INE
BASEMENT ROOF
FOLDING
WALL
FIRST FLOOR ROOF
FIRST FLOOR ROOF
STAIR 3
STAIR 2
STAIR 4
66x32
43x32
SOILED
UTILITY
ANESTHESIA
WORK ROOM
BLANKET
WARMER
2110D
SEMI-RESTRICTED
MECHANICAL
CORRIDOR
2299H
TREATMENT
OPERATING
ROOM
OPERATING
ROOM
HSKG
CLOSET
STERILE
SUPPLY
CLEAN
SUPPLY
CART
ALCOVE
2110C
CART
ALCOVE
2110A
ENDOSCOPY
ENDOSCOPY
CYSTOSCOPY
SCRUB
ALCOVE
2110B
DUMBWAITER/
CART
ALCOVE
HSKG
CLOSET
DATA
AND
PHONE
HSKG
PACS
VIEWING
CLEAN
SUPPLY
STERILE
CLEAN
ULTRASOUND
PATIENT
TOILET
ULTRASOUND
IMAGING
CHIEF
STAFF
LOUNGE
AND
LOUNGE
CHANGING
ROOM
2245A
CONTROL
ROOM
2242A
EQUIPMENT
ALCOVE
2230B
PT.
TOILET
2242B
PACS
VIEWING
STRESS
TEST
TECH
WORK
ROOM
UTILITY
CORRIDOR
2230P
PT.
TOILET
PNUEMATIC
TUBE COMP.
CORRIDOR
C2-1
PACS WORK
STATION
CLERK
CHECK-IN
PACS
COMPUTERS
2215A
WAITING
AREA
EQUIPMENT
ALCOVE
2230A BONE
DENSITY
TECH
WORK
ROOM
WOMEN
TOILET
MEN
TOILET
CHANGING
ROOM
PT.
TOILET
STORAGE
2263B
GE CT
SCANNER
CONTROL
ROOM
2263A
CONTROL
ROOM
2261A
RADIOLOGY
CORRIDOR
C2-2
ELEVATOR
LOBBY
ACCUPUNCTURE
EXAM ROOM
SOCIAL
WORKER
STAFF
LOUNGE
STERILE
SUPPLY
CLEAN
SUPPLY
SOCIAL
WORKER
DATA
CLOSET
2306 ACCUPUNCTURE
EXAM ROOM
EYE
PRE-TREATMENT
EYE
PRE-TREATMENT
OFFICE
SUB-WAIT
AREA
PATIENT
TOILET
2335A
MENTAL
HEALTH
EXAMS
CHEMOTHERAPY
SCRUB
2105A
SUB-
STERILE
2101A
GOWNING
ALCOVE
RADIOLOGY
FLUOROSCOPY
CT
SCAN
CONTROL
CT
SCAN
NUCLEAR
MEDICINE
HOT
LAB
2254A
MECHANICAL
2307A
MECHANICAL
HSKG
CLST
ELECTRICAL
ROOM
LANE
ROOM
LANE
ROOM
LANE
ROOM
EYE
INSTRUMENTS
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
SOILED
LINEN
SUB-WAIT
AREA
TELE-HEALTH
EXAM ROOM
TELE-HEALTH
EXAM ROOM
MENS
TOILET
STAFF
TOILET
2358 WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
TOILET
NEUROLOGY
EXAM
ROOM
CORRIDOR
NEUROLOGY
EXAM
ROOM
2364 NEUROLOGY
EXAM
ROOM
CLERKS
AREA
2374 STAFF
WORK AREA
2374A
WOMENS
TOILET
MEETING
ROOM
MEETING
ROOM
WAITING
AREA
FAMILY
RESTROOM
2338A
FAMILY
LOUNGE
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
WOMENS
HEALTH
EXAM
CORRIDOR
LAUNDRY
CHUTE
CORRIDOR
2252P
ONCOLOGY
EXAM/OFFICE
ONCOLOGY
EXAM/PROC.
STAIR 2
STAIR 4
STAIR 3
STAIR 8
SECOND FLOOR PLAN - EAST
A108
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 9 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A108
F3 SECOND FLOOR NEW WORK PLAN - EAST
1/8" = 1'-0"
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
J.G.D. K.K.S.
SEE GENERAL NOTE 1 FOR
THIS AREA. VA PROJECT
585-336 (EXPAND PRIMARY
CARE ADDITION).
PLAN KEYED NOTES
GENERAL NOTES
1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
DUCT
AUDIOLOGY
SOUND BOOTH
AUDIOLOGY
SOUND BOOTH
LDRY
CHUT
4 9'-2"
1 8'-0"
1 8'-0"
1 7'-9"
4 8'-0" 2 35x32
1 8'-0" 1 8'-0"
1 8'-0"
1 8'-0"
1 8'-0"
4 9'-2"
4 7'-6"
1 8'-0"
1 8'-0"
46x32
2 66x32 2 66x32
43x32
1 8'-0"
HSKG
PSYCHOLOGIST
SOCIAL
WORKER
HSKG
UTILITY
3142A
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
PSYCHOLOGIST
SOCIAL
WORKER
B.H.
ADMIN.
MEDIA
STORAGE
TOILET
B.H.
SOCIAL
WORKER
SOCIAL
WORKER
B.H.
ADMIN.
B.H.
PHARMACIST
PSYCHOLOGIST
B.H.
B.H.
PSYCHIATRIST
PSYCHIATRIST
B.H. VOC
REHAB
B.H.
PEER
CORRIDOR
3199B-1
WOMENS
TOILET
3165 MENS
TOILET
B.H.
CONFERENCE
ROOM
PSYCHOLOGIST
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
SOCIAL
WORKER
STORAGE
SOILED
LINEN
CORRIDOR
3199A-1
ADMIN.
OFFICER
BREAK
ROOM
B.H. ADMIN.
SUPPORT
PSYCHOLOGIST/
CHIEF, B.H.
PSYCHOLOGIST/
ASST. CHIEF B.H.
B.H.
TELE-HEALTH
B.H.
TELE-HEALTH
CORRIDOR
3199C-1
DATA &
PHONE
SUPPLY
CLOSET
SUPPLY
B.H.
TELE-HEALTH
PSYCHOLOGIST
AND INTERNS
B.H.
PEERS
AUDIOLOGY
CHECK-IN
3184C
AUDIOLOGY
WAITING AREA
AUDIOLOGY
WAITING
ROOM
3184B
TECHNICIAN
WORK
ROOM
3184A AUDIOLOGY
OFFICE
3280A
SPEECH
THERAPY
HEARING
TESTING
WHOLE HEALTH
GROUP ROOM
CORRIDOR
3299A-1
CORRIDOR
TELE-HEALTH
EXAM ROOM
NURSE
STATION
TELE-HEALTH
TELE-HEALTH
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
STERILE
SUPPLY
WAITING
AREA
CORRIDOR
3299C-1
TELE-HEALTH
STAFF OFFICE
MSA
OFFICE
BIO-MED
CLOSET
DATA &
PHONE
STAFF
LOUNGE AND
LOCKERS
CORRIDOR
TOILET
CORRIDOR
B.H. GROUP
ROOM
B.H. GROUP
ROOM
B.H.
CHECK-OUT
CLERK
B.H., NURSING,
AUDIOLOGY
WAITING ROOM
RECEPTION
CLERKS
3105A
WOMEN
MEN
TOILET
3225A
CLERK/
WORK
WAITING
ROOM
PASSAGE
3237A
CHIEF,
DENTAL
OPERATORY
OPERATORY
OPERATORY
X-RAY
OPERATORY
OPERATORY
OPERATORY
CONTROL
3228A
PASSAGE
CLEAN
STORAGE
STERILE
SOILED
LAB
CORRIDOR
3299B-1
NURSE
EDUCATION
TRAINING
ROOM
NURSE
EDUCATION
TRAINING
ROOM
PASSAGEWAY
NURSE
EDUCATION
OFFICE
NURSE
TRAINING
ROOM
3245NURSE
ED. STOR.
TOILET
3246A
TOILET
3250A
SOILED
UTILITY
CLEAN
SUPPLY
HSKG
STORAGE
ELEVATOR
LOBBY
MECH.
3244-A
STAIR 1
STAIR 5
STAIR 2
STAIR 4
STAIR 3
THIRD FLOOR PLAN
A109
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 10 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A109
F3 THIRD FLOOR NEW WORK PLAN
1/8" = 1'-0"
PLAN KEYED NOTES
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING
CUT AND PATCH PLASTER CEILING FOR NEW PIPING
J.G.D. K.K.S.
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
KINGSTON
K-2005
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOFFIRST FLOOR ROOFFIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
MECH
SHAFT
DN
SERVICE
ELEVATOR
UP
DN
UP K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA
K-4330KINGSTONC_TOILETSVITREOUS CHINA
MECH
SHAFT
4 9'-2"
4 8'-0"2
4 9'-2"
1 8'-0"
1 8'-0"
1 8'-0"
46x32
36x32 36x32
46x32
TREATMENT
RECEPTION
THERAPIST
HALLWAY
4143P
TREATMENT
TREATMENT
SPEECH
THERAPY
CHIRO
TREATMENT
ADL
TOILET
4142ACHIRO
TREATMENT
ADL
TREATMENT
STORAGE
ALCOVE
CLEAN
SUPPLY
PHYSICAL
THERAPY
GYMNASIUM
TECH.
WORK
ROOM
DATA &
PHONE
PT/RT
STORAGE
STAFF
LOCKER
ROOM
EQUIPMENT
STORAGE
STAFF
LOUNGE
RESP.
THERAPY
ROOM
CHIEF,
PROSTHETICS
SOILED
UTILITY
RESPIRATORY
THERAPIST
SUPPLY
ALCOVE
4134A
PROSTHETICS
STORAGE
CORRIDOR
4205C
CORRIDOR
4129P
RECEIVING AND
ASSEMBLY
CHECK-IN
CLERKS
AND WORK
STATIONS
PM&R
WAITING
AREA
PM&R
CHIEF
CHECK-IN
CLERKS
WOMENS
TOILET
MENS
TOILET
TOILET
FAMILY
BREAK
AREA
4107A
NURSING
ROOM
4116A
STERILE
SUPPLY
HSKPG
CLOSET
ELEVATOR
LOBBY
CARDIO-P
WAITING
PFL
STRESS
TEST
PASSAGE
4280P
BLOOD
GAS
TOILET
EDUCATION/
CHART ROOM
NUTRITION
OFFICE
LOCKER
DRESSING
ROOM
4282A EQUIPMENT
MED/SURG
(4E) WAITING
ROOM
ISOLATION
ROOM
PT.
TOILET
4205A
ANTI-ROOM
SEMI-PRIVATE
OBSERVATION
MED/SURG #2
TOILET
4211A
TOILET
4215A
PHYS
CHART
OFFICE
SOCIAL
WORKER
STERILE
SUPPLY
STAFF
TOILET
TOILET
4216A
MED/SURG
#3
MED/SURG
BED
MED/SURG
BED
MED/SURG
BED
MED/SURG
BED
MED/SURG
BED
TOILET
4270A
TOILET
4268A
TRAINING
ROOM
MEDS
COMMUNICATOR
NOURISH
CONSULT
ROOM
TOILET
4262A
HSKPG
CART
ALCOVE
ON-CALL
ROOM
CORRIDOR
4212C
CORRIDOR
4260C
PHONE
& DATA
NURSE
STATION
NURSE
STATION
SUPPLY
ICU
ANTEROOM
4271A
ELEVATOR
LOBBY
OFFICE
MED/ SURG #11
NURSE
STATION
MED/ SURG #10
MED/ SURG #9
SOILED
TOILET
4250A
TOILET
4245A
TOILET
4251A
PASSAGE
4242P
NURSE
MANAGER
TUB
ROOM
BARIATRIC
M/S #4
TOILET
4233A
TOILET
4237A
BARIATRIC
M/S #5
MED/SURG #6
MED/SURG #7
MED/SURG #8
STORAGE
CLEAN
LINEN
TOILET
4236A
NURSE
STATION
TOILET
4234A
PASSAGE
4230P
NURSE
STATION
STAIR 1
STAIR 5
STAIR 2
STAIR 4
STAIR 3
FOURTH FLOOR PLAN
A110
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 11 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A110
F3 FOURTH FLOOR NEW WORK PLAN
1/8" = 1'-0"
PLAN KEYED NOTES
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING
CUT AND PATCH PLASTER CEILING FOR NEW PIPING
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
4TH FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
3RD FLOOR ROOF
2ND FLOOR ROOF
246x32
46x32 PATCH 2 HR
HOLE AT PIPE.
FISCAL
WORK
STATIONS
FISCAL
MULTIPURPOSE
CHIEF,
FISCAL
ASST.
CHIEF
FISCAL
FISCAL
OFFICE
CLERK
FISCAL
GROUP
ROOM
FILE
STORAGE
STAFF
LOUNGE
FISCAL
WORK
STATIONS
CORRIDOR
5199E-1
CORRIDOR
5199C-1
CORRIDOR
5199B-1
STORAGE
WOMENS
RESTROOM
STORAGE
ROOM
MENS
RESTROOM
PRIVACY
OFFICER
COMPLIANCE
OFFICER
OPEN
WORKSTATIONS
PROGRAM
ASSISTANT
CHIEF
HR
ASSISTANT
CHIEF HR
OPEN
WORKSTATIONS
WORKROOM
WORKERS
COMP.
SPECIALIST
CREDENTIALING
EEO
HR
TEAM
ROOM
DATA
PHONE
OI&T
STORAGE
OI&T
CHIEF
5114B
LEAD IT
TECH
5114A
HSKG
CLST
OI&T
OFFICES
CORRIDOR
5199A-1
CONFERENCE
CENTER
P.A.S.
OFFICE
5111B
P.A.S.
OFFICE
5111A
P.A.S.
CLERK
CHIEF OF
MEDICINE
5111C
OFFICE
5111D
CORRIDOR
5180-1
COMPUTER
SPECIALISTS
COMPUTER
SPECIALISTS
SERVERS
MECH.
ROOM
5281B
STORAGE
5281A
UNISEX
TOILET
POLICE
STORAGE
OEF/IEF
OFFICE FOR
NURSING
5218 STAFF
LOUNGE
DATA &
PHONE
CORRIDOR
5299B-1
M.S.A.
SUPERVISOR
HSS TO
DIRECTOR
ADMIN. SUPPORT
PRI. CARE/
NURSE
PAO &
VEO
ASST.
CHIEF OF
NURSING
GRP PRACTICE
MNGR, ASST,
CHIEF
GPM & PRI.
CARE ASSOC.
CHIEF
CBOC
COORDINATOR
ADMIN. SUPPORT FOR AD,
COS, AND PRI. CARE
CORRIDOR
5299D-1
NURSING AND
DIRECTOR'S
SECRETARYS
DIRECTORS
OFFICE
DIRECTOR OF
NURSING
CHIEF OF
STAFF
ASSOCIATE
DIRECTOR
CORRIDOR
5299E-1
STORAGE
STORAGE
CHIEF OF
MEDICINE
CONFERENCE
ROOM
PRINTER
AREA
PI/QA
STORAGE
PI/QA AND
NURSING
WORKSTATIONS
PERFORMANCE
IMPROVEMENT
ADMIN.
CHIEF,
PERFORMANCE
IMPROVEMENT
CORRIDOR
5299C-1
PI/QA
CORRIDOR
5299F-1
MENWOMEN
ELEVATOR
LOBBY
5299A-1
RECEPTION
RECEPTION
STAIR 1
STAIR 5
STAIR 2
STAIR 4
STAIR 3
FIFTH FLOOR PLAN
A111
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
DWG. 12 OF 40
KEYPLAN
NO SCALE
N
4'0" 2' 8' 12'
N
A111
F3 FIFTH FLOOR NEW WORK PLAN
1/8" = 1'-0"
PLAN KEYED NOTES
2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS
REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK
INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.
SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE
REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING
J.G.D. K.K.S.
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
MECH. SHAFT
AutoCAD SHX Text
FE
AutoCAD SHX Text
MECH. SHAFT
4" HWS/R
1" 1" 2"2"
4"
2"
1" F & T
4" F & T
3"
1"
3"
2"
2"
2"
3"
DRIP & TRAP
2"
4"
4" 5"
4"
4"21 2"
2" 4"
4"
2"
3"
3"
2"
3"
2"
2"
2"
2"
2"
4"
2"
2"
2"
1" F & T
3" 2" 4" 4" 31 2" 11
2" 2" 4" 21 2"
4"
5"
2" 21
2"
5"
2"
5"
2"
4"11 2"
2"
2"
4"
4" 2"
4"
3/4"HPC
1"21 2"
4"
2"
1" F & T
2"
5"
5"
2"
5"
2" 2 1/2" 2 1/2"
2 1/2"1" F & T
2 1/2"
2" 4"
3"
3 1/2" 4"
4"
4"
3 1/2"
1 1/2"
3 1/2"
3 1/2"
3"
4"
1"
3"
3"
2"
2"
1" 2"
1" F & T
2"
1"
1" F & T 1" F & T
2"
2" 21 2"
2"
3"
4"
4"
4"
4"4"
2" 3 4" 3
4"
2" 31
2" 31 2"
1" 1"
2"
4" F. & T. TRAP
4"
2" 31
2" 31 2" 3"
4" 11
4"
4"
4" F.&T. TRAP
2"
2"2"
4"
2"
2"
2"
2"
4" 21 2" 4" 4"
4"
4"
2"
3"
4"
DEMO #50 TO #10 P.R.V. STA. FOR N. & N.W. ZONE
4"
3 1/2"
3 1/2"
2"
4" 2 1/2"
4" F & T
3 1/2"
3"
2"
2"
3 12"
6"
HOT WATER
GENERATOR
2"
6"
2"
6" LPS HEADER
5"
5"
5"
5"
2"
2 1/2"
WEST ZONE
SOUTH ZONE
EAST ZONE
NORTH ZONE
3"
3 1/2"
6"
6"
6"6"5"
2"
3"
1"
12" LPS HEADER
6" 10"
4" CONDENSATE PUMP DISCHARGE
4"
6" 3"
1"
4" COND.
100" AFF
2" OVERFLOW TO
FLOOR DRAIN
6" LPS
4" X=6'-8"
8"
1 1/2" LPS-UP
3/4" LPC-UP3/4" LPC-UP
3/4" HPC
4"
4" HPC
3/4" HPC
3/4" LPCR-UP
1 1/2" LPCR-UP
4" HWS/R-UP
EXISTING HR
CHILLER - CH9
CPD
1" 20 PSI STEAM
SUPPLY AND
CONDENSATE
RETURN
1"
2"
2" 20PSI
2"
CPD
CP
D
EXISTING PUMP
2"HPS
HOT WATER
GENERATOR
6"
3/4"
TO KITCHENPRV
6" MPS-UP
2" MPC-UP
X=8'-1"X=7'-8"
X=9'-4"
X=7'-8"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=6'-10"
X=6'-5"
4" LPS
HX-3
HX-4
3" TO DOMESTIC
HEATER
2 1/2" MPS-UP
2"
3"
3" MPS-UP
4"
2" LPC-UP
2" HPS-UP
3/4"
2"
3/4"
3/4"HPC
6"
4"
4" MPS
3"
3"
3"
1 1/4" HWS/R UP
TO MECH RM
3/4" HWS/R UP
TO 1-FTRB018
3/4" HWS/R UP
TO 1-FTRB022
3/4" HWS/R UP
TO 1-FTRB099B-1
3/4" HWS/R UP
TO 1-FTRB068
3/4" HWS/R UP
TO 1-FTRB069
3/4" HWS/R UP
TO 1-FTRB070
3/4" HWS/R UP
TO 1-FTRB072
3/4" HWS/R UP
TO 1-FTRB074
3/4" HWS/R UP
TO 1-FTRB076B
3/4" HWS/R UP
TO 1-FTRB077B
3/4" HWS/R UP
TO 1-FTRB076A
3/4" HWS/R UP
TO 1-FTRB077A
3/4" HWS/R UP
TO 1-FTRB062B
3/4" HWS/R UP
TO 1-FTRB062A
3/4" HWS/R UP
TO 1-FTRB060
1 1/4" HWS/R
1 1/4" HWS/R
1" HWS/R
3/4" HWS/R
3/4" HWS/R UP
TO 1-FTRB014
3/4"LPC-UP
TO AHU-17
1"LPS-UP
3/4"LPC-UP
CAP
CAP
1"
4"LPS
3/4" LPS-UP
CAP AT
VALVE
(TYP.)
CAP
CAP
3/4"HPC
3/4"MPC
1-1/2" 21 2"
2" LPC-UP
1" LPC-UP
3/4"HPC
CAP
1" HWS/R-UP
KEEP LPC RISER
KEEP LPC RISER
KEEP LPC RISER
KEEP LPC RISER
REMOVE MPS
AND CAP AT MAIN
REMOVE MPS
AND CAP AT MAIN
KEEP LPC RISER
KEEP LPC
KEEP LPC RISER
KEEP LPS/C RISERKEEP LPS/C RISER
REMOVE
REMOVE ALL LPS/LPC PIPING IN
TUNNEL AND SUB-BASEMENT
SHOWN AS DARK ON THIS SHEET.
REMOVE ABANDONED MPS
CAP
3/4"
CAP
CAP
CAP
CAP
CAP
CAP
CAP
C
AP
X=8'-2"
DEMO TRAP AND
LPC PIPE TO PUMP.
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
TA
TA
TA
TA
TA
TA
TA
TA
TA
S004
S001
SUB-BASEMENT DEMOLITION
PLAN - WEST
MD101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMP
321 4 5 6 7 8 9 10
Berners-Schober Associates, Inc.
310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865
LOW-PRESSURE STEAM RISER
OSCAR G. JOHNSON VAMC
585-20-111
Project Director
MAY 17, 2021Revisions: Date:
50% DESIGN SUBMITTAL 02-11-2021
6163.07
BID DOCUMENT SET
95% DESIGN SUBMITTAL 03-31-2021
100% DESIGN SUBMITTAL 04-30-2021
BID DOCUMENT SET 05-17-2021
J.G.D. K.K.S. DWG. 13 OF 40
MD101
F3 SUB-BASEMENT DEMOLITION PLAN - WEST
1/8" = 1'-0" 4'0" 2' 8' 12'
N
KEYPLAN
NO SCALE
N
DEMOLITION PLAN NOTES
1. REMOVE EXPOSED STEAM RISERS NOTED. FOR CONCEALED RISERS,
CAP RUN OUT PIPE AT RISER.
2. CAP OR PLUG OLD RISERS SO RESIDUAL LIQUID IS NOT RELEASED.
3. REMOVAL OF HEAT UNITS INCLUDES PIPING AND SELF-CONTAINED
VALVES. CAP INACCESSIBLE BRANCH PIPES.
4. RISERS IN TUNNEL DO NOT NEED TO BE CAPPED.
SEE GENERAL NOTE 1 FOR
THIS AREA. VA PROJECT
585-18-114 (UPGRADE
ENTRANCES).
GENERAL NOTES
1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
AutoCAD SHX Text
EF
AutoCAD SHX Text
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
Auto…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .