S02 - Att3 REV1 Drawings 585-20-111.pdf

PDF 13 MB Posted

Attached to
Z1DA--585-20-111 Upgrade Low Pressure Steam Risers
Solicitation number
36C25221B0017
Issued by

About this file

This document provides details for a federal solicitation to upgrade low pressure steam risers at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The solicitation number is 36C25221B0017 and seeks a contractor to provide all labor, materials, equipment, and supervision necessary to demolish existing architectural, mechanical and electrical systems on the sub-basement through sixth floors and install new systems as outlined in the contract specifications and drawings. The period of performance is 240 calendar days from notice to proceed. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12. The scope of work involves upgrading low pressure steam risers through demolition and new construction of architectural, mechanical, and electrical systems on multiple floors of the medical center facility.

View the file

Other files

File Type Posted
36C25221B0017 0002.docx DOCX document
Att.1 Drawing.pdf PDF
36C25221B0017 0001.docx DOCX document
S02 - Att4 Wage Rate Dickinson MI20200117dtd. 1.15.21.pdf PDF
S02 - Att1 SOW 585-20-111.pdf PDF
36C25221B0017_2.docx DOCX document
S02 - Att2 Specifications 585-20-111.pdf PDF
S02 - Att5 VHA Directive Seasonal Flu Shot.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHERE (2) STUD MOUNTED

DEVICES ARE SCHEDULED,

ALIGN HEIGHTS OF FINISHED

PRODUCT.

WHERE MULTIPLE DEVICES

ARE SCHEDULED TO OCCUR

WITHIN 16" OF EACH OTHER,

ALIGN DEVICES ON (1) FACE

OF STUD

STUDS

DOOR

WHERE MULTIPLE DEVICES ARE SCHEDULED,

ALONG A DOOR, DEVICES SHALL BE ALIGNED ON (1)

FACE OF METAL STUD AND SHALL OCCUR AT

SWING/ LATCH SIDE OF DOOR. EXC THERMOSTATS

ROOM

CORRIDOR

WHERE MULTIPLE DEVICES

ARE SCHEDULED IN CLOSE

PROXIMITY IN HEIGHT, ALIGN

DEVICES.

POSITION ROOM THERMOSTAT TO

ALIGN TOP OF THERMOSTAT WITH

LIGHT SWITCH COVER PLATE

WHERE MULTIPLE DEVICES ARE

SCHEDULED IN CLOSE PROXIMITY IN

HEIGHT, ALIGN DEVICES.

4' -0

" T O

T O

P

ITEMS ARE TO BE LOCATED ABOVE UNLESS NOTED OTHERWISE

TITLE SHEET

G001

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 1 OF 40

LOW PRESSURE STEAM RISER,

OSCAR G. JOHNSON VA MEDICAL CENTER

IRON MOUNTAIN, MI 49801

BID DOCUMENT SET

MAY 17, 2021

SHEET INDEXGENERAL NOTES

DIRECTOR

ASSOCIATE DIRECTOR

ASSOCIATE DIRECTOR FOR N&PCS

CHIEF OF POLICE

CHIEF OF ENGINEERING

INFECTION CONTROL NURSE

PATIENT SAFETY

A.F.G.E.

INDUSTRIAL HYGIENIST

APPROVALS

CHIEF OF STAFF

SAFETY

VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.

GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.

A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING

B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS

C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS

WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING

SEPARATION RATINGS.

3.

GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE AND PLASTER CEILINGS WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE AND PATCH PLASTER WHEN WORK ABOVE CEILING

HAS BEEN COMPLETED.

4.

CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL

EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.

5.

SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK

TIME LIMITATIONS

6.

FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE7.

WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS

STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.

8.

ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN

PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED BELOW.

9.

C5 G001

G001

C5 DEVICE MOUNTING SCHEDULE

1/4" = 1'-0" 2'0" 1' 4' 6'

J.G.D. K.K.S.

GENERAL

G001 TITLE SHEET

ARCHITECTURAL

A101 SUB-BASEMENT PLAN - WEST

A102 SUB-BASEMENT PLAN - EAST

A103 BASEMENT PLAN - WEST

A104 BASEMENT PLAN - EAST

A105 FIRST FLOOR PLAN - WEST

A106 FIRST FLOOR PLAN - EAST

A107 SECOND FLOOR PLAN - WEST

A108 SECOND FLOOR PLAN - EAST

A109 THIRD FLOOR PLAN

A110 FOURTH FLOOR PLAN

A111 FIFTH FLOOR PLAN

HVAC

MD101 SUB-BASEMENT DEMOLITION PLAN - WEST

MD102 SUB-BASEMENT DEMOLITION PLAN - EAST

MD103 BASEMENT DEMOLITION PLAN - WEST

MD104 BASEMENT DEMOLITION PLAN - EAST

MD105 FIRST FLOOR DEMOLITION PLAN - WEST

MD106 FIRST FLOOR DEMOLITION PLAN - EAST

MD107 SECOND FLOOR DEMOLITION PLAN - WEST

MD108 SECOND FLOOR DEMOLITION PLAN - EAST

MD109 THIRD FLOOR DEMOLITION PLAN

MD110 FOURTH FLOOR DEMOLITION PLAN

MD111 FIFTH FLOOR DEMOLITION PLAN

MP101 SUB-BASEMENT NEW WORK PLAN - WEST

MP102 SUB-BASEMENT NEW WORK PLAN - EAST

MP103 BASEMENT NEW WORK PLAN - WEST

MP104 BASEMENT NEW WORK PLAN - EAST

MP105 FIRST FLOOR NEW WORK PLAN - WEST

MP106 FIRST FLOOR NEW WORK PLAN - EAST

MP107 SECOND FLOOR NEW WORK PLAN - WEST

MP108 SECOND FLOOR NEW WORK PLAN - EAST

MP109 THIRD FLOOR NEW WORK PLAN

MP110 FOURTH FLOOR NEW WORK PLAN

MP111 FIFTH FLOOR NEW WORK PLAN

M401 SUB-BASEMENT MECHANICAL ROOM ENLARGED PLAN

MK501 DETAILS

MJ601 SCHEDULES

ELECTRICAL

E101 BASEMENT WEST DEMOLITION AND NEW WORK

E102 BASEMENT EAST DEMOLITION AND NEW WORK PLANS

E103 FIRST FLOOR WEST DEMOLITION AND NEW WORK PLANS

4'0" 2' 8' 12'

2'0" 1' 4' 6'

1'0" 6" 2' 3'

8"0" 4" 16" 24"

6"0" 3" 12" 18"

4"0" 2" 8" 12"

2"0" 1" 4" 6"

1/8" = 1'-0"

1/4" = 1'-0"

1/2" = 1'-0"

3/4" = 1'-0"

1" = 1'-0"

1 1/2" = 1'-0"

3" = 1'-0"

SCALE VERIFICATION

10. FURNISH AND INSTALL FIRESTOPS IN WALLS, FLOORS, AND PARTITIONS AND AROUND PENETRATIONS OF PIPE, DUCT, CABLE AND OTHER ELECTRICAL DEVICES OR IN BLANK OPENINGS AS INDICATED AT FIRE RATED LOCATION ON THE REFLECTED CEILING PLAN. FIRE STOPPING SHALL BE INSTALLED AND TESTED AS LISTED IN ASTM E814, E119, AND UNDERWRITERS LABORATORIES: FIRE RESISTANCE DIRECTORY. WHERE THERE IS NO SPECIFIC THIRD PARTY TESTED ASSEMBLY, ENGINEERING JUDGEMENTS SHALL BE BASED UPON THE REFERENCED DOCUMENTS AND MUST BE PROVIDED VIA THIRD PARTY AND SUBMITTED TO THE AHJ FOR APPROVAL PRIOR TO INSTALLATION. COSTS ASSOCIATED WITH THE ENGINEERING JUDGEMENT SHALL BE THE RESPONSIBILITY OF THE FIRESTOPPING TRADE. FIRESTOPPING OF ALL PENETRATIONS SHALL BE BY A LICENSED FIRESTOPPING TRADE. UPON COMPLETION OF THE FIRESTOPPING SYSTEM, PROVIDE A RECORD IN THE O&M MANUAL OF THE INSTALLED SYSTEMS INDICATING THE UL REFERENCE, LOCATION OF THE PENETRATION AND INSTALLED HOURLY RATING. ALL PENETRATIONS SHALL BE LABELED WITH A PERMANENT TAG INDICATED THE HOURLY RATING, SYSTEM REFERENCE NUMBER, INSTALLERS NAME, ADDRESS, PHONE NUMBER AND DATE OF INSTALLATION. TAGS SHALL BE LABELED WITH “WARNING FIRESTOPPING DO NOT

DISTURB. NOTIFY BUILDING MANAGEMENT OF ANY DAMAGE” OR SIMILAR.

A. FIRESTOPPING MATERIALS SHALL CONFORM TO FLAME (F) AND TEMPERATURE (T) RATINGS AS REQUIRED BY LOCAL BUILDING CODE AND AS TESTED BY NATIONALLY ACCEPTED TEST AGENCIES PER ASTM E814, UL 1479, OR UL 2079. THE F RATING MUST BE A MINIMUM OF ONE

(1) HOUR BUT NOT LESS THAN THE FIRE RESISTANCE RATING OF THE ASSEMBLY BEING PENETRATED. T RATING, WHEN REQUIRED BY CODE AUTHORITY, SHALL BE BASED ON THE MEASUREMENT OF THE TEMPERATURE RISE ON THE PENETRATING ITEM(S). THE FIRE TEST

PRESSURE DIFFERENTIAL OF A MINIMUM 0.01" OF WATER COLUMN IS REQUIRED.

B. T AND F RATINGS AT FLOOR PENETRATIONS SHALL BE EQUAL AND NOT LESS THAN 2 HOUR.

C. PENETRATIONS THRU WALL SHALL HAVE AN F RATING EQUAL TO THAT OF THE RATED WALL ASSEMBLY D. SYSTEM SHALL WITHSTAND THE PASSAGE OF COLD SMOKE EITHER AS AN INHERENT PROPERTY OF THE SYSTEM OR BY THE USE OF E. SEPARATE PRODUCT INCLUDED AS A PART OF THE UL SYSTEM OR DEVICE AND DESIGNED TO PERFORM THIS FUNCTION.

1.1. AT SMOKE BARRIER WALLS - 1S, 2S, AND 3S WALLS IN HOSPITAL OCCUPANCY, WALL ASSEMBLIES MUST HAVE A MAXIMUM L RATING OF 50

CFM PER 100SF OF WALL ASSEMBLY.

F. SMOKE RATED WALLS SHALL BE SEALED WITH A PRODUCT TO RESIST THE PASSAGE OF SMOKE.

G. FIRESTOPPING PRODUCTS SHALL BE ASBESTOS-FREE, FREE OF ANY PCBS, AND FREE OF ANY LEAD.

H. FOR ALL CABLING FIRE PENETRATIONS AT WALLS, PROVIDE THE EZ-PATH FIRE RATED PATHWAY SYSTEM BY SPECIFIED TECHNOLOGIES, INC. OR EQUIVALENT SYSTEM BY HILTI CORPORATION.

12. PROVIDE MANUFACTURER'S STANDARD WARRANTY ON ALL ITEMS.

13. REMOVE ALL WALL OUTLETS AND SWITCH COVERS AS REQUIRED FOR REPAINT; REINSTALL COVERS UPON COMPLETION OF

WORK

14. INFILL ALL NAIL HOLES IN WALLS SCHEDULED FOR NEW FINISH

11. WHERE MECHANICAL AND ELECTRICAL PENETRATIONS THROUGH FLOOR SLABS ARE REMOVED, OR CUT FOR NEW WORK, PATCH HOLES

THROUGH THE SLAB.

B. FILL HOLES 3" TO 12" IN DIAMETER WITH CLASS B CONCRETE. ANCHOR TO SLAB WITH TWO NO. 4 DOWELS.

C. FILL HOLES 12" X 12" TO 36" X 36" WITH NO. 4 DOWELS, 8" O.C. BOTH WAYS.

15. THE SEALANT SCHEDULE IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE BELOW SCHEDULE APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS)). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION:

D. ALL HOLES TO BE FILLED IN STRUCTURAL FLOOR SLABS SHALL BE FILLED OR FORMED IN SUCH A MANNER AS

TO PREVENT NEW CURED CONCRETE FROM FALLING TO FLOOR BELOW.

E. PATCH EXISTING SLABS ON GRADE WHERE FLOOR HAS BEEN CUT FOR PLUMBING, HEATING AND OTHER REMODELING WORK. REINFORCE CUTS GREATER THAN 24" IN EACH DIRECTION WITH 6 X 6 WL.4 X WL.4 WIRE MESH. REINFORCE TRENCHES LESS THAN 24" WIDE WITH TWO #3 RODS CONTINUOUS. REPAIR UNDERSLAB

VAPOR RETARDER WITH MATERIAL EQUAL TO ORIGINAL INSTALLATION.

A. FILL HOLES 3" AND SMALLER IN DIAMETER WITH NON-SHRINK GROUT.

1. ALL PRESENT SERVICES INSTALLED AND OPERATING SHALL BE KEPT

IN OPERATION THROUGH THE NEW CONSTRUCTION UNTIL EQUAL

NEW SERVICES OR TEMPORARY LINES SATISFACTORY TO OWNER

ARE INSTALLED AND OPERATING

2. PARTITIONS SHOWN TO BE REMOVED SHALL BE COMPLETELY

REMOVED FROM STRUCTURE ABOVE TO STRUCTURAL FLOOR SLAB

3. CUT OPENINGS IN EXISTING WALLS. OPENINGS IN MASONRY AND

CONCRETE SHALL BE SAWCUT; EXECUTE WORK WITH A MINIMUM

DISTURBANCE TO EXISTING CONSTRUCTION WHICH REMAINS

4. UNLESS NOTED OTHERWISE ON THE PLANS, REMOVE EXISTING BASE

AS REQUIRED TO INSTALL NEW BASE. BASE SHALL BE REMOVED

DOWN TO ORIGINAL FINISHED WALL SURFACE; REMOVE ALL

ADHESIVE RESIDUE WHICH WILL INTERFERE WITH INSTALLATION OF

NEW BASE

5. ALL MATERIALS, RUBBISH, AND DEBRIS SHALL BE REMOVED FROM

THE BUILDING AND FROM THE PREMISES AS SOON AS IT

ACCUMULATES; REMOVAL OF RUBBISH AND DEBRIS SHALL BE

CONDUCTED IN SUCH A WAY THAT A MINIMUM OF DUST IS CAUSED

6. MAINTAIN OWNER OCCUPIED AREAS AS CLEAN AS POSSIBLE TO

AVOID INTERFERENCE WITH OWNER'S OPERATIONS

DEMOLITION NOTES

SEALANT SCHEDULE

SILICONE - 50% MOVEMENT -

CLASS 50

SILICONE - 25%

MOVEMENT/MILDEW

RESISTANT - CLASS

SINGLE

COMPONENT

URETHANE - 35%

MOVEMENT -

CLASS 35

MULTI-COMPONENT

URETHANE - 50%

MOVEMENT - CLASS

TAMPER RESISTANT

URETHANE - 12.5%

MOVEMENT CLASS

12.5 , ASTM D-412

375 TENSILE

STRENGTH

TAMPER PROOF

EPOXY - 0%

MOVEMENT CLASS 0

ASTM C-882 3530

BOND STRENGTH

LATEX - NO MOVEMENT -

CLASS 12.5

ACOUSTICAL

SEALANT -

NON-HEAD OF

WALL - 12.5%

MOVEMENT

ACOUSTICAL SEALANT

- HEAD OF WALL -

EXPANSION JOINTS -

33% MOVEMENT

BUILDING

INTERIOR -

UTILIZE

TAMPER

RESISTANT/

PROOF

PRODUCTS

ONLY IN

PSYCHIATRIC

CARE AREAS

BELOW

CEILING

LINES

JOINT BETWEEN SILLS AND

EXTERIOR FENESTRATIONS:

GRADE NS

JOINTS BETWEEN

PLUMBING FIXTURES

AND ADJOINING

MATERIALS: GRADE

NS

CONTROL JOINTS

SCHEDULED TO

BE CAULKED:

GRADE NS

EXPANSION JOINTS

NOT EXPOSED TO

UV: GRADE NS -

VERTICAL (AND

CEILING), GRADE P,

USE T - HORIZONTAL

CONTROL JOINTS/

EXPANSION

SCHEDULED TO BE

CAULKED: GRADE

NS AT VERTICAL,

GRADE P USE T AT

HORIZONTAL

JOINT BETWEEN

WALLS AND

ACOUSTICAL GRID:

GRADE NS

INTERIOR DOOR FRAMES

NOT EXPOSED TO UV, AT

INTERSECTION OF WALL

AND FRAME: GRADE NS, P

TYPICAL. USE SINGLE

COMPONENT URETHANE

SEALANT GRADE NS, T AT

FLOOR INTERSECTION

WALL

PERIMETERS

HEAD OF WALL JOINTS

JOINT BETWEEN INTEGRAL

BASE AND DOOR FRAMES:

GRADE NS

VERTICAL JOINTS AT

INSIDE CORNERS OF

CERAMIC TILE

CONDITIONS: GRADE

NS

PENETRATIONS

OF MECHANICAL

EQUIPMENT IN

SMOKE TIGHT

WALLS: GRADE

NS

JOINTS BETWEEN

DIS-SIMILAR

MATERIALS: GRADE

NS

INTERIOR DOOR

FRAMES NOT

EXPOSED TO UV, AT

INTERSECTION OF

WALL AND FRAME:

GRADE NS, P

TYPICAL.

JOINTS WHERE NO

MOVEMENT IS EXPECTED:

GRADE NS

SMOKE RESISTANT

EXPANSION JOINTS

(WHERE SILICONE

SEALANTS ARE NOT

UTILIZED)

EXPANSION JOINTS EXPOSED

TO UV: GRADE NS VERTICAL,

GRADE P USE T - HORIZONTAL

JOINT BETWEEN

TILED FLOOR AND

WALL

INTERSECTIONS:

GRADE NS, USE T

TERMINATION OF

VINYL WALL

COVERING:

GRADE NS

BETWEEN

COUNTERTOP AND

WALL SURFACES,

JOINTS BETWEEN

SILLS AND

EXTERIOR

FENESTRATIONS:

GRADE NS

JOINTS WHERE NO

MOVEMENT IS

EXPECTED: GRADE

NS

JOINTS BETWEEN DIS-SIMILAR

MATERIALS SUBJECT TO UV

EXPOSURE: GRADE NS

BETWEEN

COUNTERTOP AND

WALL SURFACES:

GRADE NS

JOINT BETWEEN

WALLS AND

ACOUSTICAL

GRID: GRADE NS

JOINTS BETWEEN

PLUMBING

FIXTURES AND

ADJOINING

MATERIALS: GRADE

NS

JOINTS BETWEEN

DIS-SIMILAR

MATERIALS NOT

SUBJECT TO UV

EXPOSURE:

GRADE NS

JOINT BETWEEN

INTEGRAL BASE

AND DOOR FRAMES:

GRADE NS

1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW

2. SILICONE SEALANT

2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT

2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000

2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT

2.4. TREMCO: SPECTREM 1

3. URETHANE JOINT SEALANTS

3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1

3.2. BOSTIK, INC.: CHEM-CALK 2020

3.3. SIKA CORPORATION: SIKAFLEX-1A

4. MULTI-COMPONENT NON-SAG URETHANE

4.1. DYNATROL II

4.2. TREMCO DYMERIC 240/240FC

5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)

5.1. PECORA AC-20 FTR

5.2. USG SHEETROCK ACOUSTICAL SEALANT

6. ACOUSTICAL SEALANT (HEAD OF WALL)

6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000

6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345

7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT

7.1. PECORA DYNAFLEX

7.2. BASF MASTERSEAL CR 195

7.3. SIKAFLEX 2C NS TG

8. TAMPER PROOF EPOXY SEALANT

8.1. PECORA DYNAPOXY EP-1200

SEALANT NOTES

AutoCAD SHX Text S

FD

FD FD

FD

Fire Pump System

ERV-4

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

STAIR 2

UP

UP

SERVICE

ELEV

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

3 3

IMAGING

MATERIALS

S004

MECHANICAL

ROOM

S001

SUB-BASEMENT PLAN - WEST

A101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

J.G.D. K.K.S. DWG. 2 OF 40

4'0" 2' 8' 12'

N

KEYPLAN

NO SCALE

N

A101

F3 SUB-BASEMENT NEW WORK PLAN - WEST

1/8" = 1'-0"

PLAN KEYED NOTES

LOCATION OF 30"Ø TUNNEL ACCESS

LOCATION OF MECHANICAL ROOM TUNNEL ACCESS

PATCH 2 HOUR RATED WALL AT REMOVED PIPE

AutoCAD SHX Text

AHU

ST

EA

M

TU

NN

EL

FD

FD FD

FD

Fire Pump System

ERV-4

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

STAIR 2

UP

UP

SERVICE

ELEV

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

3 3

SWITCHGEAR

ROOM

S003

IMAGING

MATERIALS

S004

UPS

S002

MECHANICAL

ROOM

S001

SUB-BASEMENT PLAN - EAST

A102

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 3 OF 40

4'0" 2' 8' 12'

N

KEYPLAN

NO SCALE

N

A102

F3 SUB-BASEMENT NEW WORK PLAN - EAST

1/8" = 1'-0"

PLAN KEYED NOTES

LOCATION OF 30"Ø TUNNEL ACCESS

LOCATION OF MECHANICAL ROOM TUNNEL ACCESS

PATCH 2 HOUR RATED WALL AT REMOVED PIPE

J.G.D. K.K.S.

AutoCAD SHX Text

AHU

LAUNDRY

CHUTE ABOVE

FIRE

EQUIP

FD

STAIR 5

UP

COIL

CABINET

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

ROOF OF MECHANICAL

ROOM 1400

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

IN

FL

OO

R

SC

AL

E

8'-5"2

8'-0"2

8'-4"2

8'-4"2 8'-0"2

8'-0"2

8'-0"2 8'-0"2

8'-0"2

9'-5"2

9'-5"2

8'-0"2

8'-0"2

8'-6"2

8'-6"2

8'-1"2

8'-0"2

8'-0"2

8'-0"2

8'-0"

9'-0"

PATCH AND

PAINT WALL

AT REMOVED

EQUIPMENT

63x28 4

SUPPLY

CHAIN

SIMS

B082A

SUPPLY

CHAIN

INVENTORY

B082

MECHANICAL

ROOM

B079

PHARMACY

CACHE

B081

VAULT

B081A

SUPPLY

CHAIN MNGT.

STORAGE/OFFICE

B083

ELECTRICAL

EQUIPMENT

B027A

ELECTRONICS

SHOP

B027

ENGINEERING

AND

EMERGENCY

MANAGEMENT

B023

LOCKSMITH

B023A

MENS

LOCKER

ROOM

B021

AQUISITION

SPECIALIST

B019

MENS

TOILET

B021A

CHIEF,

SUPPLY

CHAIN MNGT.

B086A

MACHINE

SHOP

B060

CARPENTER

SHOP

B062

CARPENTER

SHOP

OFFICE

B062A

CONFERENCE

ROOM

B077

CONST.

CONTROL

REP.

B078

I.H. AND

GEMS

B067

GENERAL

ENGINEER

B074

SUPERVISORY

ENGINEER

B072

CHIEF

ENGINEER

B070

GENERAL

ENGINEER

B076

HALLWAY

B075

TOILET

B075A

PROGRAM

ASSISTANT

B066

GENERAL

ENGINEER

B068

CORRIDOR

B099C-1

GENERAL

ENGINEER

B069

CORRIDOR

B099B-1

CORRIDOR

B099A-1

CORRIDOR

B099D-1

M & R

SUPERVISOR

AND WORK

LEADER

B022

SAFETY

MANAGER

B022

CORRIDOR

B018

MAINTENANCE

SHOP/OFFICE

B014

NESS

TEMP.

STORAGE

B010

TOILET

B008A

CHASE

B002A

NESS

TEMP.

STORAGE

B008

MECH

B002

HSKG

B004

HSKG

B006

VESTIBULE

B018A

MAINTENANCE

STORAGE

B018B

MECHANICAL

ROOM

B018C

WOMENS

LOUNGE

B196B

CORRIDOR

B199B-1

WOMENS

RESTROOM

B170

DINING

ROOM

B172

MENS

RESTROOM

B168

RETAIL

STORE

B174

CHIEF,

CANTEEN

B174A

CANTEEN

STORAGE

B175A

CANTEEN

KITCHEN

B175

MAIN

KITCHEN

B186

FOOD

BANK

COOLER 2

186Q

RETHERM

COOLER 1

186R

COOLER 3

B186P

COOLER 4

B186N

ROUGH

PREP.

B186H

STAFF

WORK

ROOM

B186D

FOOD

SERVICE

MANAGER

OFFICE

B186E

ELECTRIC

ROOM

B186I

CART

WASHER

B186B

UTILITY

B186C

SANITATION

B186A

CANTEEN

VENDING AND

BEVERAGE

STORAGE

B185

CANTEEN

SERVING

B192

WOMENS

TOILET

B196A

WOMENS

LOCKER

B196A STAFF

LOCKERS

B194

CORRIDOR

B199A-1

CORRIDOR

B199C-1

ASSISTANT

CHIEF SUPPLY

CHAIN MNGT.

B084

SUPPLY

CHAIN

B086B

SUPPLY

CHAIN ADMIN.

OFFR

B086

PHONE

AND

DATA

B085

SHARED

SHOPS

B087

SHOP

OFFICE

B088

BIOMED

AND

ELECTRONICS

B089

BIOMED

AND

ELECTRONICS

B009A

SUPERVISOR

BIO-MED/

ELECTRONICS

B009

SOILED

LINEN

HOLDING

AREA

B003

HSKG

STORAGE

B122

NESS

OFFICE

B123

HOUSEKEEPING

SUPERVISORS

B129C

NESS

EQUIP.

AND

SUPPLIES

B129

MECHANICAL

ROOM

B129A

CART

WASHER

B129B

CHIEF,

NESS

B121

CANTEEN

STORAGE

AND

RECIEVING

B119

UNIFORMS

B191

DATA

CLOSET

B117

CBOC

STORAGE

B187

MAIN

ROOM

B107A

MSA

SUPERVISORS

B107B

VESTIBULE

B107

WAN

ROOM

B105

MECH.

ROOM

B107D

TELEPHONE

EQUIPMENT

B103

CODERS

WORKSTATIONS

B101

MEDICAL

RECORDS

B201

MECH.

ROOM

B202

RELEASE

OF

INFO.

B203

WOMENS

TOILET

B204

MENS

TOILET

B205

CORRIDOR

B299A-1

TELE-DIETICIAN

B120

DIETETICS

OFFICE

B186F

AMBIENT

DISPOSAL AND

NOURISHMENT

STORAGE

B186G

STAIR 7

BASEMENT PLAN - WEST

A103

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 4 OF 40

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12' A103

F3 BASEMENT NEW WORK PLAN - WEST

1/8" = 1'-0"

LOCATION OF 30"Ø TUNNEL ACCESS

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

PATCH HOLE FOR 2 HOUR

INFILL OPENING FROM HVAC UNIT WITH GYP. BOARD AND METAL STUDS. SIZE

AS INDICATED. PATCH TO MATCH EXISTING 4x4 TILE WALL.

J.G.D. K.K.S.

SEE GENERAL NOTE 1 FOR

THIS AREA. VA PROJECT

585-336 (EXPAND PRIMARY

CARE ADDITION).

PLAN KEYED NOTES

GENERAL NOTES

1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text K-4330

AutoCAD SHX Text

KINGSTON

AutoCAD SHX Text

C_TOILETS

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

FE

FD FDFD

FIRE

EQUIP

FIRE

EQUIP

DUMB

WAITER

FIRE

EQUIP

HYDRAULIC POWER

UNIT

FD

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

DN

UP

UP

PASSENGER

ELEVATOR

ACCESS

EL

EC

TR

ICA

L

EQ

UIP

ME

NT

MECH

SHAFT

D-4 D-5

ROOF OF MECHANICAL

ROOM 1400

LAUNDRY

CHUTE ABOVE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

BASEMENT

PIPE

B001

STAIR 3

STAIR 2

8'-1"2

8'-0"2

8'-0"2

8'-0"2

8'-1"2

8'-4"2

8'-4"2

8'-0"2

8'-0"2

8'-0"2

8'-0"2

8'-1"2

8'-0"2

CHIEF,

CANTEEN

B174A

CANTEEN

STORAGE

B175A

CANTEEN

KITCHEN

B175

MAIN

KITCHEN

B186

FOOD

BANK

COOLER 2

186Q

RETHERM

COOLER 1

186R

COOLER 3

B186P

COOLER 4

B186N

FREEZER 2

B186M

FREEZER 1

B186L

MORGUE

COOLER

B273

LOADING

DOCK

B271

VESTIBULE

B276

RECYCLING

AND SHEDDER

ROOM

B278

SHIPPING

AND

RECIEVING

B274

ELECTRICAL

EQUIP.

ROOM

B278A

ELEVATOR

EQUIPMENT

B224B

ROUGH

PREP.

B186H

STAFF

WORK

ROOM

B186D

FOOD

SERVICE

MANAGER

OFFICE

B186E

ELECTRIC

ROOM

B186I

CART

WASHER

B186B

UTILITY

B186C

SANITATION

B186A

CANTEEN

VENDING AND

BEVERAGE

STORAGE

B185

CANTEEN

SERVING

B192

STAFF

LOCKERS

B194

CORRIDOR

B199A-1

CORRIDOR

B299B-1

CORRIDOR

B199A-1

OFFICE

LOGISTICS

B298B

O2

STORAGE

B268

ELECTRICAL

ROOM

B269

NESS

OFFICE

B123

HOUSEKEEPING

SUPERVISORS

B129C

CHIEF,

NESS

B121

CANTEEN

STORAGE

AND

RECIEVING

B119

UNIFORMS

B191

DATA

CLOSET

B117

CBOC

STORAGE

B187

MAIN

ROOM

B107A

MSA

SUPERVISORS

B107B

VESTIBULE

B107

WAN

ROOM

B105

MECH.

ROOM

B107D

TELEPHONE

EQUIPMENT

B103

CODERS

WORKSTATIONS

B101

MEDICAL

RECORDS

B201

MECH.

ROOM

B202

RELEASE

OF

INFO.

B203

WOMENS

TOILET

B204

MENS

TOILET

B205

PRI. SUPPLY/

SURGURY

CASE CART

B291

CHIEF,

SPS

B291A

STOCK

BREAKOUT

B287

EMERGENCY

ELECTRICAL

ROOM

B267

CORRIDOR

B299A-1

CORRIDOR

B299D-1

NON-EXP.

EQUIPMENT

B298A

WAREHOUSE

STORAGE

B298

DECONTAMINATION

B295

MECH.

ACCESS

B295A

LOCKERS

AND

SHOWER

B297

PREPARATION

PACKAGING

B291B

MECH.

ROOM

231B

STERILIZER

291C

MECH.

ROOM

B231A

MECH.

ROOM

B231C

BULK

MEDICAL

STORAGE

B231D

STORAGE

LOGISTICS

B231

LAUNDRY

CHUTE

B230

CORRIDOR

B299C-1

MECH.

ACCESS

B227 UNISEX

BREAK

ROOM

B228

MENS

TOILET AND

SHOWER

B228C

VEST.

228A

MENS

LOCKER

ROOM

B228BMECHANICAL

ROOM

B224A

ELEVATOR

LOBBY

B224

MECH.

ROOM

B224CDATA

B296

DIETETICS

OFFICE

B186F

AMBIENT

DISPOSAL AND

NOURISHMENT

STORAGE

B186G

STAIR 2

STAIR 3

BASEMENT PLAN - EAST

A104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 5 OF 40

KEYPLAN

NO SCALE

N

N

4'0" 2' 8' 12' A104

F3 BASEMENT NEW WORK PLAN - EAST

1/8" = 1'-0"

PLAN KEYED NOTES

LOCATION OF 30"Ø TUNNEL ACCESS

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

REMOVE AND REPLACE GYPSUM BOARD AND METAL STUD WALL FOR NEW WORK

PATCH HOLE THROUGH 2 HOUR RATED CONCRETE SLAB/WALL

PATCH 2 HOUR RATED STUD WALL - (2) LAYERS OF TYPE X GYP. BD. BOTH SIDES.

J.G.D. K.K.S.

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

AutoCAD SHX Text

FE

MA

TC

HL

INE

MA

TC

HL

INE

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

UP

DN

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

UP

DN

UP

DN

UP

MA

TC

HL

INE

MA

TC

HL

INE

STAIR 1

STAIR 2

STAIR 5

1 8'-6"

1 8'-0"

1 8'-0" 1 8'-0"

1 9'-0"

1 9'-0"

1 9'-0"

1 9'-0"

3 3

4 46x32

4 36x32

4 36x32

PATCH ROOF IN THIS

AREA FOR NEW RAIL

AND CURB.

OFFICE

CLOTHING

STORAGE

CORRIDOR

C1-11

STAIR 7

NURSE

STATION

ALCOVE

CLEAN

STORAGE

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1036A

TOILET

1040A

TOILET

1044A

TOILET

1042A

TOILET

1038A

MECH.

SHAFT

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1028A

TOILET

1024A

TOILET

1020A

STORAGE

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1029A

TOILET

1025A

TOILET

1009A

TOILET

1005A

TOILET

1052A

STAFF

TOILET

UTILITY

CLEAN

LINEN

DAY

ROOM

NURSE

STATION

NURSE

STATION

CLEAN

LINEN

ELECT.

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1008A

TOILET

1010A

TOILET

1006A

TOILET

1002A

EQUIPMENT

STORAGE

STAFF

TOILET

1148B

LOCKER

ROOM

1148A STAFF

LOUNGE

RECR.

THER.

STORAGE

PHYSICIAN

OFFICE

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1051A

TOILET

1055A

MECH.

CHASE

BATHING/

SPA

RECREATION

THERAPY

OFFICE

1147A

ACTIVITY/

GROUP ROOM

CORRIDOR

EQUIP. STOR.

STAIR 1

LINEN

CHUTE

MAIN

NURSE

STATION

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1028A

TOILET

1032A

TOILET

1036A

PROGRAM

ASSISTANT

1137 PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1027A

TOILET

1031A

TOILET

1035A

NURSE

STATION

NURSE

MANAGER

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1166A

TOILET

1170A

STAIR 5

IV

STOR.

1176 MDS/

RESTORATIVE

COORDINATOR

PRIVATE

RESIDENT

ROOM

PRIVATE

RESIDENT

ROOM

TOILET

1175A

TOILET

1171A

ADL.

BATH

1165B

ADL. OT AREA/

BEDROOM

OCCUPATIONAL

THERAPY

OFFICE

1165A

MEDS

ROOM

DATA

CLOSET

CLEAN

LINEN

UTILITY

CLOSET

STOR.

1116A

RESIDENT DINING AND

RECREATION AREA

UTILITY

CLOSET

PHYSICAL THERAPY

SATELLITE CLINIC

UNISEX

TOILET

NURSE

PRACTITIONER

1111A SOCIAL

WORKER

1109A

OXYGEN

STOR.

EQUIPMENT

STORAGE

RESIDENT

KITCHEN

1116B

CHAPLAIN

OFFICE

CLOSET

1182A

CLOSET

1182B

CHAPEL

CHAPEL

1284A

WAITING

ROOM

TRAVEL

OFFICE

1286A

POLICE

PIV ROOM

ENROLLMENT

ELIGIBILITY

AMERICAN

LEGION/ DAV

CHIEF,

POLICE

EVIDENCE

1201A

HOLDING

1201B

MAIN

OFFICE

LOBBY

WEAPONS

1201C

KITCHENETTE

LOCKERS

1105A

MENS

TOILET

VESTIBULE

1100A

WOMENS

TOILET

STAIR 2

PHARMACY

SUPPLY

CORRIDOR

1299A

FIRST FLOOR PLAN - WEST

A105

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 6 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A105

F3 FIRST FLOOR NEW WORK PLAN - WEST

1/8" = 1'-0"

PLAN KEYED NOTES

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

REMOVE AND REPLACE GYPSUM BOARD AND METAL STUD WALL FOR NEW

PIPING. PAINT TO MATCH EXISTING

PATCH 2 HOUR RATED, 6" CONCRETE FLOOR FOR REMOVAL OF PIPES

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

J.G.D. K.K.S.

MA

TC

HL

INE

MA

TC

HL

INE

BASEMENT ROOF

BASEMENT ROOF

UP

DN

FD

FIRE

EQUIP

LO

CK

ER

S

DNUP

UP

DN

DUMB

WAITER

PASSENGER PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

VOLUNTEER

AREA

MECH.

CHASE

UP

CARPET

CARPET

CARPET

TILE

TILE

TILE

FE FE

MECH

SHAFT

PASSENGER

ELEVATOR

D-4 D-5

MA

TC

HL

INE

MA

TC

HL

INE

STAIR 3

STAIR 2

STAIR 4

1 8'-0"

1 8'-0" 1 8'-0"

1 8'-0"

1 8'-0"

1 8'-0"

1 8'-0"

9'-0"

1 9'-0"

442x32

4 42x32

PATCH ROOF IN THIS

AREA FOR NEW RAIL

AND CURB.

1 8'-0"

PATCH 2 HR

WALL AT PIPE.

CLOSET

1182A

CHAPEL

CHAPEL

1284A

WAITING

ROOM

TRAVEL

OFFICE

1286A

WAITING

ROOM

AGENT

CASHIER

1288A

BLOOD DRAW

LAB/ EKG

BLOOD DRAW

LAB/ EKG

PIV ROOM

ENROLLMENT

ELIGIBILITY

CHIEF,

POLICE

EVIDENCE

1201A

HOLDING

1201B

MAIN

OFFICE

LOBBY

WEAPONS

1201C

KITCHENETTE

LOCKERS

1105A

MENS

TOILET

VESTIBULE

1100A

WOMENS

TOILET

STAIR 2

PHARMACY

SUPPLY

CLINICAL

PHARMACIST

CORRIDOR

1299A

PHARMACY

CONSULTING

CONSULTING

1218B

CONSULTING

1218C

1218A

URGENT

CARE OFFICE

OUTPATIENT

DISPENSING

MEDS

CAROUSAL

COAT

ROOM

TOILET

1224A

PHARMACY

OFFICE

SECURE

MED PREP

VAULT

1228A

PHARMACY

MED PREP

NON-HAZ./

CLEAN RM.

1233B

HAZARD

HOOD RM.

1233A

IV ROOM

LOUNGE

PHARMACY

CHIEF

MED PREP

& OFFICES

STAIR 3

VESTIBULE

ELECTRICAL

WAITING

AREA

CLERK

AREA

WOUND

CARE

TREATMENT

PATIENT

TOILET

1267B

SOILED

UTILITY

1267A

EXAM

ROOM

NURSE

WORKROOM

EXAM

ROOM

1275 ALCOVE

PROCEDURE

ROOM

STAIR 4

PATIENT

TOILET

SOCIAL

WORKER

OPC NURSE

MANAGER

SOCIAL

WORKER

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

NURSE

WORKROOM

1348 EXAM

ROOM

EXAM

ROOM

1344 STAFF

TOILET

1340A

BREAK ROOM/

LOCKERS

ELEVATOR

LOBBY

EXAM

ROOM

DIETICIAN

DIETICIAN

MEDICATION

FIRE ALARM/

SECURITY RM.

ELECTRICAL

MENS

TOILET

WOMENS

TOILET

HSKP.

EXAM

ROOM

STAFF

TOILET

PATIENT

TOILET

DIABETES

DIABETES

NURSE

WORKROOM

PATIENT

TOILET

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

PT. ED./

CONS.

CLEAN

SUPPLY

STERILE

SUPPLY

PYXIS

ALCOVE

DECON

ROOM

MEDICATION

SOILED

UTILITY

PATIENT

TOILET

TREATMENT

ROOM

TREATMENT

ROOM

TREATMENT

ROOM

EQUIPMENT

CHA.

ROOM

1304C

CHA.

ROOM

1304B

MRI

VESTIBULE

1304 MRI

VESTIBULE

1304A

ED

WAITING

AREA

TRIAGE

ELEVATOR

EQUIPMENT

1368 PATIENT

TOILET

1312B

TREATMENT/

ISOLATION

SECURE

TREATMENT

WHEELCHAIR

STORAGE

ANTE

ROOM

1312A

WAITING

AREA

NURSE

STATION

DICTATION

EXAM

ROOM

OFFICE

NURSE

WORKROOM

EXAM

ROOM

SCALE

ALCOVE

CLERKS

STAIR 8

FIRST FLOOR PLAN - EAST

A106

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 7 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A106

F3 FIRST FLOOR NEW WORK PLAN - EAST

1/8" = 1'-0"

PLAN KEYED NOTES

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

REMOVE AND REPLACE GYPSUM BOARD AND METAL STUD WALL FOR NEW

PIPING. PAINT TO MATCH EXISTING

PATCH 2 HOUR RATED, 6" CONCRETE FLOOR FOR REMOVAL OF PIPES

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

J.G.D. K.K.S.

SEE GENERAL NOTE 1 FOR

THIS AREA. VA PROJECT

585-336 (EXPAND PRIMARY

CARE ADDITION).

GENERAL NOTES

1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

FD FD FD

DWV

ELEC

CABINET

FD

DN

UP

DN

UP

UP

DN

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

1st. FLOOR ROOF

MECH.

SHAFT

SUB-STERILIZER

MECH SPACE

MECH. RM. 1400

ROOF

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

FIRST FLOOR ROOF

BASEMENT ROOF

FD

BASEMENT ROOF

STAIR 1

STAIR 2

STAIR 5

1 8'-0"

1 8'-0"

36x32

46x32

48x26

PATCH 2 HR

HOLE AT PIPE.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

2145A

CORRIDOR

OFFICE

OFFICE

OFFICE

STAFF

LOUNGE

BIOMED

DATA

DATA AND

PHONE

TREATMENT

TREATMENT

SOILED

UTILITY

TREATMENT

TREATMENT

TREATMENT

TREATMENT

PT.

TOILET

2176A

TREATMENT

CLEAN

SUPPLY

NURSE

STATION

PACS

VIEW

TOILET

STERILE

SUPPLY

2171A

WAITING

ROOM

HALLWAY

CHECK-IN

CLERKS

WOMEN

MEN

WHEELCHAIR

ALCOVE

HSKG

CLOSET

CORRIDOR

2299B

WOMEN

2112A

LAUNDRY

CHUTE

TOILET

2143A

PACU

BED #8

2129K

PACU

BED #8

2129L

OR

SUPERVISOR

WOMEN

LCKR/

SHOWER

RM.

MEN

LCKR/

SHOWER

RM.

EQUIP.

STORAGE

SOILED

UTILITY

ANESTHESIA

WORK ROOM

BLANKET

WARMER

2110D

SEMI-RESTRICTED

CORRIDOR

MECHANICAL

MEN

2111A

CORRIDOR

2299H

PRE/POST

BED #1

2129A

PRE/POST

BED #2

2129B

PRE/POST

BED #3

2129C

PRE/POST

BED #4

2129D

EQUIPMENT

STORAGE

NURSING

STATION

PRE/POST

BED #7

2129G

PRE/POST

BED #6

2129F

PRE/POST

BED #5

2129E

STERILE

SUPPLY

CLEAN

SUPPLY

PT.

TOILET

PT.

TOILET

2131 SOILED

UTILITY

PRE/POST

CORRIDOR

TREATMENT

OPERATING

ROOM

OPERATING

ROOM

HSKG

CLOSET

STERILE

SUPPLY

CLEAN

SUPPLY

CART

ALCOVE

2110C

CART

ALCOVE

2110A

ENDOSCOPY

ENDOSCOPY

SCRUB

2105A

SUB-

STERILE

2101A

GOWNING

ALCOVE

STAIR 1

STAIR 5

STAIR 2

SECOND FLOOR PLAN - WEST

A107

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 8 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A107

F3 SECOND FLOOR NEW WORK PLAN - WEST

1/8" = 1'-0"

PLAN KEYED NOTES

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING

BASEMENT ROOF

FD FD FD

DWV

FD

UP

DN

DN

UP

UP

DN

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

1st. FLOOR ROOF

ROOF

ROOF

MECH

CHASE

PASSENGER

ELEVATOR

DN

UP

OPEN TO FIRST

FLOOR

MECH.

SHAFT

CHASE

CHASE

PASSENGER

ELEVATOR

MECH.

SHAFT

SUB-STERILIZER

MECH SPACE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

MA

TC

HL

INE

BASEMENT ROOF

FOLDING

WALL

FIRST FLOOR ROOF

FIRST FLOOR ROOF

STAIR 3

STAIR 2

STAIR 4

66x32

43x32

SOILED

UTILITY

ANESTHESIA

WORK ROOM

BLANKET

WARMER

2110D

SEMI-RESTRICTED

MECHANICAL

CORRIDOR

2299H

TREATMENT

OPERATING

ROOM

OPERATING

ROOM

HSKG

CLOSET

STERILE

SUPPLY

CLEAN

SUPPLY

CART

ALCOVE

2110C

CART

ALCOVE

2110A

ENDOSCOPY

ENDOSCOPY

CYSTOSCOPY

SCRUB

ALCOVE

2110B

DUMBWAITER/

CART

ALCOVE

HSKG

CLOSET

DATA

AND

PHONE

HSKG

PACS

VIEWING

CLEAN

SUPPLY

STERILE

CLEAN

ULTRASOUND

PATIENT

TOILET

ULTRASOUND

IMAGING

CHIEF

STAFF

LOUNGE

AND

LOUNGE

CHANGING

ROOM

2245A

CONTROL

ROOM

2242A

EQUIPMENT

ALCOVE

2230B

PT.

TOILET

2242B

PACS

VIEWING

STRESS

TEST

TECH

WORK

ROOM

UTILITY

CORRIDOR

2230P

PT.

TOILET

PNUEMATIC

TUBE COMP.

CORRIDOR

C2-1

PACS WORK

STATION

CLERK

CHECK-IN

PACS

COMPUTERS

2215A

WAITING

AREA

EQUIPMENT

ALCOVE

2230A BONE

DENSITY

TECH

WORK

ROOM

WOMEN

TOILET

MEN

TOILET

CHANGING

ROOM

PT.

TOILET

STORAGE

2263B

GE CT

SCANNER

CONTROL

ROOM

2263A

CONTROL

ROOM

2261A

RADIOLOGY

CORRIDOR

C2-2

ELEVATOR

LOBBY

ACCUPUNCTURE

EXAM ROOM

SOCIAL

WORKER

STAFF

LOUNGE

STERILE

SUPPLY

CLEAN

SUPPLY

SOCIAL

WORKER

DATA

CLOSET

2306 ACCUPUNCTURE

EXAM ROOM

EYE

PRE-TREATMENT

EYE

PRE-TREATMENT

OFFICE

SUB-WAIT

AREA

PATIENT

TOILET

2335A

MENTAL

HEALTH

EXAMS

CHEMOTHERAPY

SCRUB

2105A

SUB-

STERILE

2101A

GOWNING

ALCOVE

RADIOLOGY

FLUOROSCOPY

CT

SCAN

CONTROL

CT

SCAN

NUCLEAR

MEDICINE

HOT

LAB

2254A

MECHANICAL

2307A

MECHANICAL

HSKG

CLST

ELECTRICAL

ROOM

LANE

ROOM

LANE

ROOM

LANE

ROOM

EYE

INSTRUMENTS

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

SOILED

LINEN

SUB-WAIT

AREA

TELE-HEALTH

EXAM ROOM

TELE-HEALTH

EXAM ROOM

MENS

TOILET

STAFF

TOILET

2358 WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

TOILET

NEUROLOGY

EXAM

ROOM

CORRIDOR

NEUROLOGY

EXAM

ROOM

2364 NEUROLOGY

EXAM

ROOM

CLERKS

AREA

2374 STAFF

WORK AREA

2374A

WOMENS

TOILET

MEETING

ROOM

MEETING

ROOM

WAITING

AREA

FAMILY

RESTROOM

2338A

FAMILY

LOUNGE

WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

WOMENS

HEALTH

EXAM

CORRIDOR

LAUNDRY

CHUTE

CORRIDOR

2252P

ONCOLOGY

EXAM/OFFICE

ONCOLOGY

EXAM/PROC.

STAIR 2

STAIR 4

STAIR 3

STAIR 8

SECOND FLOOR PLAN - EAST

A108

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 9 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A108

F3 SECOND FLOOR NEW WORK PLAN - EAST

1/8" = 1'-0"

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

J.G.D. K.K.S.

SEE GENERAL NOTE 1 FOR

THIS AREA. VA PROJECT

585-336 (EXPAND PRIMARY

CARE ADDITION).

PLAN KEYED NOTES

GENERAL NOTES

1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

DUCT

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

LDRY

CHUT

4 9'-2"

1 8'-0"

1 8'-0"

1 7'-9"

4 8'-0" 2 35x32

1 8'-0" 1 8'-0"

1 8'-0"

1 8'-0"

1 8'-0"

4 9'-2"

4 7'-6"

1 8'-0"

1 8'-0"

46x32

2 66x32 2 66x32

43x32

1 8'-0"

HSKG

PSYCHOLOGIST

SOCIAL

WORKER

HSKG

UTILITY

3142A

PSYCHOLOGIST

SOCIAL

WORKER

SOCIAL

WORKER

PSYCHOLOGIST

SOCIAL

WORKER

B.H.

ADMIN.

MEDIA

STORAGE

TOILET

B.H.

SOCIAL

WORKER

SOCIAL

WORKER

B.H.

ADMIN.

B.H.

PHARMACIST

PSYCHOLOGIST

B.H.

B.H.

PSYCHIATRIST

PSYCHIATRIST

B.H. VOC

REHAB

B.H.

PEER

CORRIDOR

3199B-1

WOMENS

TOILET

3165 MENS

TOILET

B.H.

CONFERENCE

ROOM

PSYCHOLOGIST

SOCIAL

WORKER

SOCIAL

WORKER

SOCIAL

WORKER

SOCIAL

WORKER

STORAGE

SOILED

LINEN

CORRIDOR

3199A-1

ADMIN.

OFFICER

BREAK

ROOM

B.H. ADMIN.

SUPPORT

PSYCHOLOGIST/

CHIEF, B.H.

PSYCHOLOGIST/

ASST. CHIEF B.H.

B.H.

TELE-HEALTH

B.H.

TELE-HEALTH

CORRIDOR

3199C-1

DATA &

PHONE

SUPPLY

CLOSET

SUPPLY

B.H.

TELE-HEALTH

PSYCHOLOGIST

AND INTERNS

B.H.

PEERS

AUDIOLOGY

CHECK-IN

3184C

AUDIOLOGY

WAITING AREA

AUDIOLOGY

WAITING

ROOM

3184B

TECHNICIAN

WORK

ROOM

3184A AUDIOLOGY

OFFICE

3280A

SPEECH

THERAPY

HEARING

TESTING

WHOLE HEALTH

GROUP ROOM

CORRIDOR

3299A-1

CORRIDOR

TELE-HEALTH

EXAM ROOM

NURSE

STATION

TELE-HEALTH

TELE-HEALTH

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

EXAM

ROOM

STERILE

SUPPLY

WAITING

AREA

CORRIDOR

3299C-1

TELE-HEALTH

STAFF OFFICE

MSA

OFFICE

BIO-MED

CLOSET

DATA &

PHONE

STAFF

LOUNGE AND

LOCKERS

CORRIDOR

TOILET

CORRIDOR

B.H. GROUP

ROOM

B.H. GROUP

ROOM

B.H.

CHECK-OUT

CLERK

B.H., NURSING,

AUDIOLOGY

WAITING ROOM

RECEPTION

CLERKS

3105A

WOMEN

MEN

TOILET

3225A

CLERK/

WORK

WAITING

ROOM

PASSAGE

3237A

CHIEF,

DENTAL

OPERATORY

OPERATORY

OPERATORY

X-RAY

OPERATORY

OPERATORY

OPERATORY

CONTROL

3228A

PASSAGE

CLEAN

STORAGE

STERILE

SOILED

LAB

CORRIDOR

3299B-1

NURSE

EDUCATION

TRAINING

ROOM

NURSE

EDUCATION

TRAINING

ROOM

PASSAGEWAY

NURSE

EDUCATION

OFFICE

NURSE

TRAINING

ROOM

3245NURSE

ED. STOR.

TOILET

3246A

TOILET

3250A

SOILED

UTILITY

CLEAN

SUPPLY

HSKG

STORAGE

ELEVATOR

LOBBY

MECH.

3244-A

STAIR 1

STAIR 5

STAIR 2

STAIR 4

STAIR 3

THIRD FLOOR PLAN

A109

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 10 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A109

F3 THIRD FLOOR NEW WORK PLAN

1/8" = 1'-0"

PLAN KEYED NOTES

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING

CUT AND PATCH PLASTER CEILING FOR NEW PIPING

J.G.D. K.K.S.

AutoCAD SHX Text

VITREOUS CHINA

AutoCAD SHX Text

C_LAVATORY

AutoCAD SHX Text

KINGSTON

K-2005

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOFFIRST FLOOR ROOFFIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

MECH

SHAFT

DN

SERVICE

ELEVATOR

UP

DN

UP K-4330KINGSTONC_TOILETSVITREOUS CHINA K-4330KINGSTONC_TOILETSVITREOUS CHINA

K-4330KINGSTONC_TOILETSVITREOUS CHINA

MECH

SHAFT

4 9'-2"

4 8'-0"2

4 9'-2"

1 8'-0"

1 8'-0"

1 8'-0"

46x32

36x32 36x32

46x32

TREATMENT

RECEPTION

THERAPIST

HALLWAY

4143P

TREATMENT

TREATMENT

SPEECH

THERAPY

CHIRO

TREATMENT

ADL

TOILET

4142ACHIRO

TREATMENT

ADL

TREATMENT

STORAGE

ALCOVE

CLEAN

SUPPLY

PHYSICAL

THERAPY

GYMNASIUM

TECH.

WORK

ROOM

DATA &

PHONE

PT/RT

STORAGE

STAFF

LOCKER

ROOM

EQUIPMENT

STORAGE

STAFF

LOUNGE

RESP.

THERAPY

ROOM

CHIEF,

PROSTHETICS

SOILED

UTILITY

RESPIRATORY

THERAPIST

SUPPLY

ALCOVE

4134A

PROSTHETICS

STORAGE

CORRIDOR

4205C

CORRIDOR

4129P

RECEIVING AND

ASSEMBLY

CHECK-IN

CLERKS

AND WORK

STATIONS

PM&R

WAITING

AREA

PM&R

CHIEF

CHECK-IN

CLERKS

WOMENS

TOILET

MENS

TOILET

TOILET

FAMILY

BREAK

AREA

4107A

NURSING

ROOM

4116A

STERILE

SUPPLY

HSKPG

CLOSET

ELEVATOR

LOBBY

CARDIO-P

WAITING

PFL

STRESS

TEST

PASSAGE

4280P

BLOOD

GAS

TOILET

EDUCATION/

CHART ROOM

NUTRITION

OFFICE

LOCKER

DRESSING

ROOM

4282A EQUIPMENT

MED/SURG

(4E) WAITING

ROOM

ISOLATION

ROOM

PT.

TOILET

4205A

ANTI-ROOM

SEMI-PRIVATE

OBSERVATION

MED/SURG #2

TOILET

4211A

TOILET

4215A

PHYS

CHART

OFFICE

SOCIAL

WORKER

STERILE

SUPPLY

STAFF

TOILET

TOILET

4216A

MED/SURG

#3

MED/SURG

BED

MED/SURG

BED

MED/SURG

BED

MED/SURG

BED

MED/SURG

BED

TOILET

4270A

TOILET

4268A

TRAINING

ROOM

MEDS

COMMUNICATOR

NOURISH

CONSULT

ROOM

TOILET

4262A

HSKPG

CART

ALCOVE

ON-CALL

ROOM

CORRIDOR

4212C

CORRIDOR

4260C

PHONE

& DATA

NURSE

STATION

NURSE

STATION

SUPPLY

ICU

ANTEROOM

4271A

ELEVATOR

LOBBY

OFFICE

MED/ SURG #11

NURSE

STATION

MED/ SURG #10

MED/ SURG #9

SOILED

TOILET

4250A

TOILET

4245A

TOILET

4251A

PASSAGE

4242P

NURSE

MANAGER

TUB

ROOM

BARIATRIC

M/S #4

TOILET

4233A

TOILET

4237A

BARIATRIC

M/S #5

MED/SURG #6

MED/SURG #7

MED/SURG #8

STORAGE

CLEAN

LINEN

TOILET

4236A

NURSE

STATION

TOILET

4234A

PASSAGE

4230P

NURSE

STATION

STAIR 1

STAIR 5

STAIR 2

STAIR 4

STAIR 3

FOURTH FLOOR PLAN

A110

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 11 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A110

F3 FOURTH FLOOR NEW WORK PLAN

1/8" = 1'-0"

PLAN KEYED NOTES

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING

CUT AND PATCH PLASTER CEILING FOR NEW PIPING

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

4TH FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

3RD FLOOR ROOF

2ND FLOOR ROOF

246x32

46x32 PATCH 2 HR

HOLE AT PIPE.

FISCAL

WORK

STATIONS

FISCAL

MULTIPURPOSE

CHIEF,

FISCAL

ASST.

CHIEF

FISCAL

FISCAL

OFFICE

CLERK

FISCAL

GROUP

ROOM

FILE

STORAGE

STAFF

LOUNGE

FISCAL

WORK

STATIONS

CORRIDOR

5199E-1

CORRIDOR

5199C-1

CORRIDOR

5199B-1

STORAGE

WOMENS

RESTROOM

STORAGE

ROOM

MENS

RESTROOM

PRIVACY

OFFICER

COMPLIANCE

OFFICER

OPEN

WORKSTATIONS

PROGRAM

ASSISTANT

CHIEF

HR

ASSISTANT

CHIEF HR

OPEN

WORKSTATIONS

WORKROOM

WORKERS

COMP.

SPECIALIST

CREDENTIALING

EEO

HR

TEAM

ROOM

DATA

PHONE

OI&T

STORAGE

OI&T

CHIEF

5114B

LEAD IT

TECH

5114A

HSKG

CLST

OI&T

OFFICES

CORRIDOR

5199A-1

CONFERENCE

CENTER

P.A.S.

OFFICE

5111B

P.A.S.

OFFICE

5111A

P.A.S.

CLERK

CHIEF OF

MEDICINE

5111C

OFFICE

5111D

CORRIDOR

5180-1

COMPUTER

SPECIALISTS

COMPUTER

SPECIALISTS

SERVERS

MECH.

ROOM

5281B

STORAGE

5281A

UNISEX

TOILET

POLICE

STORAGE

OEF/IEF

OFFICE FOR

NURSING

5218 STAFF

LOUNGE

DATA &

PHONE

CORRIDOR

5299B-1

M.S.A.

SUPERVISOR

HSS TO

DIRECTOR

ADMIN. SUPPORT

PRI. CARE/

NURSE

PAO &

VEO

ASST.

CHIEF OF

NURSING

GRP PRACTICE

MNGR, ASST,

CHIEF

GPM & PRI.

CARE ASSOC.

CHIEF

CBOC

COORDINATOR

ADMIN. SUPPORT FOR AD,

COS, AND PRI. CARE

CORRIDOR

5299D-1

NURSING AND

DIRECTOR'S

SECRETARYS

DIRECTORS

OFFICE

DIRECTOR OF

NURSING

CHIEF OF

STAFF

ASSOCIATE

DIRECTOR

CORRIDOR

5299E-1

STORAGE

STORAGE

CHIEF OF

MEDICINE

CONFERENCE

ROOM

PRINTER

AREA

PI/QA

STORAGE

PI/QA AND

NURSING

WORKSTATIONS

PERFORMANCE

IMPROVEMENT

ADMIN.

CHIEF,

PERFORMANCE

IMPROVEMENT

CORRIDOR

5299C-1

PI/QA

CORRIDOR

5299F-1

MENWOMEN

ELEVATOR

LOBBY

5299A-1

RECEPTION

RECEPTION

STAIR 1

STAIR 5

STAIR 2

STAIR 4

STAIR 3

FIFTH FLOOR PLAN

A111

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

DWG. 12 OF 40

KEYPLAN

NO SCALE

N

4'0" 2' 8' 12'

N

A111

F3 FIFTH FLOOR NEW WORK PLAN

1/8" = 1'-0"

PLAN KEYED NOTES

2'-0" x 2'-0" ACT CEILING, HEIGHT AS NOTED. REMOVE TILE AND/OR GRID AS

REQUIRED FOR NEW WORK. RE-INSTALL AFTER COMPLETION OF WORK

INFILL OPENING FROM HVAC UNIT WITH GYPSUM BOARD AND METAL STUDS.

SIZE AS INDICATED. PAINT TO MATCH EXISTING. PROVIDE 4" RUBBER BASE

REMOVE AND REPLACE A SECTION OF WALL FOR NEW PIPING

J.G.D. K.K.S.

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

MECH. SHAFT

AutoCAD SHX Text

FE

AutoCAD SHX Text

MECH. SHAFT

4" HWS/R

1" 1" 2"2"

4"

2"

1" F & T

4" F & T

3"

1"

3"

2"

2"

2"

3"

DRIP & TRAP

2"

4"

4" 5"

4"

4"21 2"

2" 4"

4"

2"

3"

3"

2"

3"

2"

2"

2"

2"

2"

4"

2"

2"

2"

1" F & T

3" 2" 4" 4" 31 2" 11

2" 2" 4" 21 2"

4"

5"

2" 21

2"

5"

2"

5"

2"

4"11 2"

2"

2"

4"

4" 2"

4"

3/4"HPC

1"21 2"

4"

2"

1" F & T

2"

5"

5"

2"

5"

2" 2 1/2" 2 1/2"

2 1/2"1" F & T

2 1/2"

2" 4"

3"

3 1/2" 4"

4"

4"

3 1/2"

1 1/2"

3 1/2"

3 1/2"

3"

4"

1"

3"

3"

2"

2"

1" 2"

1" F & T

2"

1"

1" F & T 1" F & T

2"

2" 21 2"

2"

3"

4"

4"

4"

4"4"

2" 3 4" 3

4"

2" 31

2" 31 2"

1" 1"

2"

4" F. & T. TRAP

4"

2" 31

2" 31 2" 3"

4" 11

4"

4"

4" F.&T. TRAP

2"

2"2"

4"

2"

2"

2"

2"

4" 21 2" 4" 4"

4"

4"

2"

3"

4"

DEMO #50 TO #10 P.R.V. STA. FOR N. & N.W. ZONE

4"

3 1/2"

3 1/2"

2"

4" 2 1/2"

4" F & T

3 1/2"

3"

2"

2"

3 12"

6"

HOT WATER

GENERATOR

2"

6"

2"

6" LPS HEADER

5"

5"

5"

5"

2"

2 1/2"

WEST ZONE

SOUTH ZONE

EAST ZONE

NORTH ZONE

3"

3 1/2"

6"

6"

6"6"5"

2"

3"

1"

12" LPS HEADER

6" 10"

4" CONDENSATE PUMP DISCHARGE

4"

6" 3"

1"

4" COND.

100" AFF

2" OVERFLOW TO

FLOOR DRAIN

6" LPS

4" X=6'-8"

8"

1 1/2" LPS-UP

3/4" LPC-UP3/4" LPC-UP

3/4" HPC

4"

4" HPC

3/4" HPC

3/4" LPCR-UP

1 1/2" LPCR-UP

4" HWS/R-UP

EXISTING HR

CHILLER - CH9

CPD

1" 20 PSI STEAM

SUPPLY AND

CONDENSATE

RETURN

1"

2"

2" 20PSI

2"

CPD

CP

D

EXISTING PUMP

2"HPS

HOT WATER

GENERATOR

6"

3/4"

TO KITCHENPRV

6" MPS-UP

2" MPC-UP

X=8'-1"X=7'-8"

X=9'-4"

X=7'-8"

VFD-CHWP1

VFD-CHWP2

VFD-CHWP2A

X=6'-10"

X=6'-5"

4" LPS

HX-3

HX-4

3" TO DOMESTIC

HEATER

2 1/2" MPS-UP

2"

3"

3" MPS-UP

4"

2" LPC-UP

2" HPS-UP

3/4"

2"

3/4"

3/4"HPC

6"

4"

4" MPS

3"

3"

3"

1 1/4" HWS/R UP

TO MECH RM

3/4" HWS/R UP

TO 1-FTRB018

3/4" HWS/R UP

TO 1-FTRB022

3/4" HWS/R UP

TO 1-FTRB099B-1

3/4" HWS/R UP

TO 1-FTRB068

3/4" HWS/R UP

TO 1-FTRB069

3/4" HWS/R UP

TO 1-FTRB070

3/4" HWS/R UP

TO 1-FTRB072

3/4" HWS/R UP

TO 1-FTRB074

3/4" HWS/R UP

TO 1-FTRB076B

3/4" HWS/R UP

TO 1-FTRB077B

3/4" HWS/R UP

TO 1-FTRB076A

3/4" HWS/R UP

TO 1-FTRB077A

3/4" HWS/R UP

TO 1-FTRB062B

3/4" HWS/R UP

TO 1-FTRB062A

3/4" HWS/R UP

TO 1-FTRB060

1 1/4" HWS/R

1 1/4" HWS/R

1" HWS/R

3/4" HWS/R

3/4" HWS/R UP

TO 1-FTRB014

3/4"LPC-UP

TO AHU-17

1"LPS-UP

3/4"LPC-UP

CAP

CAP

1"

4"LPS

3/4" LPS-UP

CAP AT

VALVE

(TYP.)

CAP

CAP

3/4"HPC

3/4"MPC

1-1/2" 21 2"

2" LPC-UP

1" LPC-UP

3/4"HPC

CAP

1" HWS/R-UP

KEEP LPC RISER

KEEP LPC RISER

KEEP LPC RISER

KEEP LPC RISER

REMOVE MPS

AND CAP AT MAIN

REMOVE MPS

AND CAP AT MAIN

KEEP LPC RISER

KEEP LPC

KEEP LPC RISER

KEEP LPS/C RISERKEEP LPS/C RISER

REMOVE

REMOVE ALL LPS/LPC PIPING IN

TUNNEL AND SUB-BASEMENT

SHOWN AS DARK ON THIS SHEET.

REMOVE ABANDONED MPS

CAP

3/4"

CAP

CAP

CAP

CAP

CAP

CAP

CAP

C

AP

X=8'-2"

DEMO TRAP AND

LPC PIPE TO PUMP.

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

TA

TA

TA

TA

TA

TA

TA

TA

TA

S004

S001

SUB-BASEMENT DEMOLITION

PLAN - WEST

MD101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMP

321 4 5 6 7 8 9 10

Berners-Schober Associates, Inc.

310 Pine Street Green Bay, WI 54301 Phone: (920) 432-4865

LOW-PRESSURE STEAM RISER

OSCAR G. JOHNSON VAMC

585-20-111

Project Director

MAY 17, 2021Revisions: Date:

50% DESIGN SUBMITTAL 02-11-2021

6163.07

BID DOCUMENT SET

95% DESIGN SUBMITTAL 03-31-2021

100% DESIGN SUBMITTAL 04-30-2021

BID DOCUMENT SET 05-17-2021

J.G.D. K.K.S. DWG. 13 OF 40

MD101

F3 SUB-BASEMENT DEMOLITION PLAN - WEST

1/8" = 1'-0" 4'0" 2' 8' 12'

N

KEYPLAN

NO SCALE

N

DEMOLITION PLAN NOTES

1. REMOVE EXPOSED STEAM RISERS NOTED. FOR CONCEALED RISERS,

CAP RUN OUT PIPE AT RISER.

2. CAP OR PLUG OLD RISERS SO RESIDUAL LIQUID IS NOT RELEASED.

3. REMOVAL OF HEAT UNITS INCLUDES PIPING AND SELF-CONTAINED

VALVES. CAP INACCESSIBLE BRANCH PIPES.

4. RISERS IN TUNNEL DO NOT NEED TO BE CAPPED.

SEE GENERAL NOTE 1 FOR

THIS AREA. VA PROJECT

585-18-114 (UPGRADE

ENTRANCES).

GENERAL NOTES

1. SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY

EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION

NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS

MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY

APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR

PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND

COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY

DISCREPANICES WITHIN PROJECTS.

AutoCAD SHX Text

EF

AutoCAD SHX Text

AutoCAD SHX Text

ERV

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

Auto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .