S02 - Att1 SOW 585-20-111.pdf
PDF 116 KB Posted
- Solicitation number
- 36C25221B0017
About this file
This federal solicitation is for upgrade work to low pressure steam risers at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The contractor will demolish some existing architectural, mechanical and electrical systems and furnish and install new systems on the sub-basement, basement, and first through sixth floors. Specific work includes upgrading low pressure steam risers as outlined in contract specifications and drawings. The period of performance is 240 calendar days from notice to proceed. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25221B0017 0002.docx | DOCX document | |
| Att.1 Drawing.pdf | ||
| 36C25221B0017 0001.docx | DOCX document | |
| S02 - Att4 Wage Rate Dickinson MI20200117dtd. 1.15.21.pdf | ||
| 36C25221B0017_2.docx | DOCX document | |
| S02 - Att2 Specifications 585-20-111.pdf | ||
| S02 - Att5 VHA Directive Seasonal Flu Shot.pdf | ||
| S02 - Att3 REV1 Drawings 585-20-111.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
5/17/2021
Project Data
Title: Upgrade Low Pressure Steam Risers
Location: Oscar G. Johnson VA Medical Center, Iron Mountain, MI
Project No: 585-20-111
COR: Donald Demeuse
Contractor: TBD
Scope of Work
Contractor shall provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, licenses, certificates, insurance, temporary protection, and other items designated under the provisions of this contract Upgrade Low Pressure Steam Risers, Project# 585-20-111, at the Oscar G. Johnson VA Medical Center Located in Iron Mountain, Michigan as outlined in the contract specifications and as shown on the contract drawings. The work involves demolition of some of the existing architectural, mechanical and electrical and the furnishing and installation of the new architectural, mechanical, and electrical located on the Sub-Basement, Basement, 1st Floor 2nd Floor, 3rd floor, 4th floor, 5th floor and 6th floor as outlined in the contract specifications and as shown on the drawings.
Attachments Drawings and Specifications provided by Berners-Schober Associates, INC.
Period of Performance will be 240 calendar days from the Notice to Proceed (NTP)