S02 - 6. New Confined Spaces Not Previously Recorded.pdf
PDF 146 KB Posted
- Solicitation number
- 36C25225Q0170
About this file
This is an architectural/engineering diagram showing a steam block upgrade plan for what appears to be a VA facility campus. The diagram depicts the steam distribution system connecting multiple buildings including Building 200, Building 1, Building 2, Building 221, Building 215 (Steam System), Building 37, and Building 20, along with a Loyola Campus and Loyola Boiler Plant. The diagram includes various vault connections (labeled Vault 1 through Vault 12) and shows both existing steam connections and new upgrades to the system. Multiple reference notes (e.g., "REFER TO M5101", "REFER TO M5403") are included throughout the drawing, indicating connections to other technical documentation. The drawing was prepared by consultants including Heapy and HGA, and issued for construction by the VA Office of Construction and Facilities Management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sewer Ejector Pit Entry.doc | DOC document | |
| Sewer Manhole Entry.doc | DOC document | |
| Pits49H24CSprocedures.docx | DOCX document | |
| 36C25225Q0170 0001.docx | DOCX document | |
| S02 - WD 2015-5017 - Rev 28 - 12.23.24.pdf | ||
| S02 - 5. Existing Confined Space Survey Report.pdf | ||
| S02 - 3. SOP 578-21-21-677 Confined Space Program.pdf | ||
| S02 - 2. Hines Underground Utility Plan.pdf | ||
| S02 - 1. Hines VA Campus Site Plan.pdf | ||
| S02 - 4. Existing Confined Space Inventory.pdf | ||
| 36C25225Q0170.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .