Sewer Ejector Pit Entry.doc

DOC document 25 KB Posted

Attached to
Z1DA--Confined Space Assessment on the Hines Campus
Solicitation number
36C25225Q0170
Issued by

About this file

This file is a Confined Space Entry Procedure document detailing the required safety protocols for entering a sewer ejector pit. The document outlines a comprehensive step-by-step process that includes hazard identification (inhalation, entrapment, engulfment), pre-entry requirements (ventilation, permits, lockout procedures), and safety measures during entry operations.

The procedure mandates specific roles including an Entry Supervisor, Entry Attendant, and Authorized Entrant, with explicit prohibition of the same person serving as both supervisor and attendant. Key safety requirements include: one-hour ventilation period, gas monitoring before and during entry, use of safety harness, extrication tripod setup, continuous monitoring by the Entry Attendant, and emergency procedures. The document includes an annual review section to ensure procedures remain adequate and are properly followed. This appears to be related to a Department of Veterans Affairs solicitation for confined space assessment at the Hines Campus.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONFINED SPACE ENTRY PROCEDURE

1. Area of Confined Space Entry: SEWER EJECTOR PIT

2. Hazard associated with Confined Space Entry: Inhalation, Entrapment, Engulfment

3. Procedure for Confined Space Entry:

a. Reviewed the procedure entirely.

Yes_____ No_____

b. Entry Permit required:

c. Entry Permit completed:

4. Procedure for Confined Space Entry:

a. Open lid of sewer ejector pit

b. Close and lockout sewer pipe valve

c. Ventilate sewer ejector pit for 1 hour

d. Notify M&O Foreman of proposed confined space entry

e. Assign Entry Supervisor and Entry Attendant – they may NOT be the same person.

f. M&O Foreman will initiate a Confined Space Permit

g. M&O Foreman will get the gas monitor from the Boiler Plant and take gas readings of the confined space and determine if the entry is safe.

h. If the readings indicate the entry is safe, the entry permit will be completed, reviewed with all personnel and completed.

i. If the readings indicate the entry is NOT safe, the confined safe will be ventilated for an additional 1 hour and the readings will be repeated.

j. Entry Supervisor will review the permit and sign approval before the Authorized Entrant enters the confined space.

k. Authorized Entrant will wear the safety harness, while in the sewer ejector pit

l. M&O Foreman will set-up the extrication tripod over the pit opening

m. The confined space permit will be placed near the confined space entry point.

n. Entry Attendant will remain outside the confined space entry and monitor the Authorized Entrant at all times both by visual and voice.

o. Authorized Entrant will have the gas monitor on at all times inside the confined space. If the alarm activates the Authorized Entrant will STOP IMMEDIATELY and exit the confined space.

p. Entry Attendant will call 9-911 for all emergencies.

q. Entry Attendant will NOT attempt any rescue if the Authorized Entrant is unable to leave the confined space.

r. After maintenance is completed the confined space entry permit will be completed. The original will be given to the IH/S&OHS for the Engineering Service files.

ANNUAL REVIEW

1. Date of Inspection:

2. Employee Conducting Review:

3. Were All Procedures Followed? Yes_____ No_____

If no, why?

4. Are Existing Procedures Adequate? Yes_____ No_____

5. If Not, Has Corrective Action Been Taken? Yes_____ No_____

If yes, what action has been taken?