S-40 Erosion Repair - Bid Plans Summary
This is a bid plans document for the S-40 Erosion Repair project prepared by GAI Consultants, Inc. for the Central Florida Tourism Oversight District (CFTOD). The project addresses undermining occurring along the downstream apron of the S-40 water control structure, an automatic AMIL gate structure that maintains upstream water elevation. The repair work consists of installing steel sheet pile cutoff walls along the downstream and perimeter edge of the existing outfall apron, filling existing undermined voids beneath the apron with excavatable flowable fill, and installing riprap for bank and shore protection. The design includes sheet pile installation to minimum tip elevation of 18.0 feet with section modulus requirements varying by wall location, filter fabric installation, and slope stabilization with sod restoration. The project site is accessible via a gated access off U.S. Route 192 through an unpaved access levee, requiring approximately 30 minutes travel time from the gate. Work must be completed during the dry season from November through May, and all construction activities require coordination with CFTOD compliance personnel regarding erosion and sediment control measures.
The bid plans specify material requirements including non-calcareous riprap meeting FDOT Specification 530 (composed of granite, gneiss, or quartzite with no limestone or crushed concrete), Type D-2 filter fabric per FDOT Specifications Section 985, and flowable fill meeting FDOT Section 971 requirements. The contractor must provide a project-specific safety plan, erosion control plan, and as-built plans upon completion. Design parameters indicate steel sheet pile sections with yield strength of either 39 ksi (A-328) or 50 ksi (A-572), with a maximum allowable wall deflection of 1.5 inches under construction loads. The site presents significant environmental constraints as an environmentally sensitive area within wetlands, requiring Licensed Trapper assistance during certain seasons and prohibiting equipment storage in adjacent wetland areas. The contractor must obtain FDOT MOT permits for large equipment deliveries, coordinate utility locates through Sunshine 811 at least 72 hours prior to construction, and maintain continuous monitoring of apron movement during filling operations to prevent uplift or cracking.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/30/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\KeySheet01.dgn7:12:14 AM
SHEET
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S E
R O
S I O
N R
E P
A I R
SHEET DESCRIPTION
K E
Y S
H E
E T
S-40
EROSION CONTROL DETAILS
WALL DATA TABLE
STEEL SHEET PILE WALL DETAILS
REPORT OF CORE BORINGS
BORING LOCATION PLAN
PLAN AND ELEVATION
GENERAL NOTES 2 OF 2
GENERAL NOTES 1 OF 2
SIGNATURE SHEET
KEY SHEET
ORLANDO, FL 32801
618 E. SOUTH STREET - SUITE 700
GAI CONSULTANTS, INC.
P.E. NO.: 68534
CHRISTOPHER P. BRADEN, P.E.
BID PLANS
CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT
CONTRACT PLANS
S-40 EROSION REPAIR
SHEET NO.
MANDEE BRANDT
CFTOD PROJECT MANAGER:
ORLANDO, FL 32801
618 E. SOUTH STREET - SUITE 700
GAI CONSULTANTS, INC.
P.E. NO.: 67350
CHRISTOPHER J. KNOX, P.E.
ORLANDO, FL 32814
919 LAKE BALDWIN LANE
CONSULTANTS, INC.
GEOTECHNICAL AND ENVIRONMENTAL
P.E. NO.: 71571
CRAIG G. BALLOCK, P.E.
INDEX OF PLANS
ENGINEER OF RECORD:
STRUCTURE PLANS
ENGINEER OF RECORD:
DRAINAGE PLANS
ENGINEER OF RECORD:
GEOTECHNICAL PLANS
STATE OF
No 71571
R E
E
NI
GNE LANOIS
SE
F O
R P
ESNECIL
ADIROL
F
E.
P
,K
COLLAB .G GI
A R
C
4/30/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\SignSt01.dgn7:13:23 AM
SHEET
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N C
M M
A P
P R
O V
E D
C
P B
D A
T E
/3
/2
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S -4
E
R O
S
IO
N R
E P
A
IR
STATE OF
No 67350
ESNECIL X
ONK J
REHPOTSIR
H C
R E
E
NIGNE LANOIS
SEF
O R
P
ADIROL
F
STATE OF
No 68534
ESNECIL
N E
DARB .P
REHPOTSI
R H
C
R E
E
NIGNE LANOIS
SEF
O R
P
ADIROL
F
S
IG
N A
T U
R E
S H
E E
T
SHEET NO. SHEET DESCRIPTION
ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
BE RESPONSIBLE FOR THE FOLLOWING SHEETS IN
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL
CHRISTOPHER P. BRADEN, P.E. NO. 68534
ORLANDO, FL 32801
618 E. SOUTH STREET - SUITE 700
GAI CONSULTANTS, INC.
ON ANY ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
SHEET NO. SHEET DESCRIPTION
ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
BE RESPONSIBLE FOR THE FOLLOWING SHEETS IN
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL
CHRISTOPHER J. KNOX, P.E. NO. 67350
ORLANDO, FL 32801
618 E. SOUTH STREET - SUITE 700
GAI CONSULTANTS, INC.
ON ANY ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
BE RESPONSIBLE FOR THE FOLLOWING SHEETS IN
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL
CRAIG G. BALLOCK, P.E. NO. 71571
ORLANDO, FL 32814
919 LAKE BALDWIN LANE
CONSULTANTS, INC.
GEOTECHNICAL AND ENVIRONMENTAL
ON ANY ELECTRONIC COPIES.
SIGNATURE MUST BE VERIFIED
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
SHEET NO. SHEET DESCRIPTION
WALL DATA TABLE
STEEL SHEET PILE WALL DETAILS
PLAN AND ELEVATION
GENERAL NOTES 2 OF 2
GENERAL NOTES 1 OF 2
SIGNATURE SHEET
KEY SHEET
EROSION CONTROL DETAILS
SIGNATURE SHEET
REPORT OF CORE BORINGS
BORING LOCATION PLAN
SIGNATURE SHEET
4/30/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\GeneralNotes01.dgn7:15:39 AM
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S E
R O
S I O
N R
E P
A I R
G E
N E
R A
L N
O T
E S
O
F
1. ELEVATIONS ARE MEASURED RELATIVE TO THE NGVD 29 DISNEY GRID.
DATUM:
REFERENCED TO WALT DISNEY WORLD COORDINATE SYSTEM.
1. HORIZONTAL COORDINATES ARE SHOWN IN DECIMAL FEET AND ARE
COORDINATE SYSTEM:
WITH P&E PRIOR TO INSTALLATION TO MINIMIZE BLOCKING OF FLOW.
IN ANY WAY. A SHEET PILE INSTALLATION PLAN SHALL BE COORDINATED
9. CONTRACTOR IS NOT ALLOWED TO BLOCK, LOAD OR RESTRICT GATE FUNCTION
CONTRACTOR TO TAKE CARE NOT TO DAMAGE EQUIPMENT.
8. USGS EQUIPMENT IS LOCATED WITHIN THE VICINITY OF THE PROJECT.
THE PROJECT ARE IMMEDIATELY AVAILABLE AND/OR ARE ON SITE.
7. CONTRACTOR WILL NOT COMMENCE WORK UNTIL ALL MATERIALS NEEDED FOR
WILDLIFE HAVE BEEN KNOWN TO DAMAGE EXPOSED ITEMS.
END OF EACH DAY. IT IS ALSO RECOMMENDED TO COVER EQUIPMENT AS
6. CONTRACTOR SHALL SECURE AND SAFE UP EQUIPMENT AND MATERIAL AT THE
DISPOSAL.
ALL CONSTRUCTION DEBRIS SHALL BE HAULED OFFSITE FOR PROPER
DAMAGE TO THE SITE AND EMBANKMENTS AND RE-SOD WITH BAHIA GRASS.
ON THE SITE AND RESTORE TO ITS ORIGINAL CONDITION. RESTORE ANY
5. UPON COMPLETION OF THE PROJECT, CLEAN UP ANY CONSTRUCTION DEBRIS
LAKE BUENA VISTA, FL 32803
1920 EAST BUENA VISTA DR, SUITE A
CFTOD PLANNING AND ENGINEERING
UTILITY CONTACTS:4.
PROCESSED THROUGH THE RCES CONTROL ROOM AT 407-824-4185.
E. AFTER 4:00 PM AND ON WEEKENDS, EMERGENCY LOCATES WILL STILL BE
CENTER.
PERSON AT THE EPCOT CENTRAL ENERGY PLANT LOCATED AT EPCOT
WDW.RCES.UTILITY.LOCATES@DISNEY.COM, VIA FAX TO 407-560-5640, OR IN
THE SUBMITTAL MAY BE MADE VIA EMAIL TO
SUBMITTED BY THE CONTRACTOR TO REEDY CREEK ENERGY SERVICES.
D. THE MAP ALONG WITH THE SUNSHINE TICKET NUMBER MUST BE
MAP.
PROPOSED PROJECT AND WRITE THE SUNSHINE TICKET NUMBER ON THE
C. THE CONTRACTOR SHALL PREPARE A MAP SHOWING THE LIMITS OF THE
GIVEN A TICKET NUMBER THAT MUST BE RETAINED.
B. AFTER COMPLETING THE SUBMISSION PROCESS, THE CONTRACTOR WILL BE
TICKET.
(800-432-4770) OR VISITING HTTP://WWW.SUNSHINE811.COM. TO SUBMIT A
A. THE CONTRACTOR SHALL CONTACT SUNSHINE 811 BY CALLING 811
LOCATES AT LEAST 72 HOURS PRIOR TO CONSTRUCTION:
3. THE CONTRACTOR SHALL UTILIZE THE FOLLOWING STEPS TO SECURE UTILITY
UTILITIES.
FULLY WITH UTILITY COMPANIES ON EXACT LOCATION OF UNDERGROUND
THE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR IS TO COORDINATE
ARE APPROXIMATE ONLY; THE EXACT LOCATION SHALL BE DETERMINED BY
PERMITS AS APPLICABLE. THE LOCATION OF UTILITIES SHOWN IN THE PLANS
CONSTRUCTION ACTIVITIES FOR DIG PERMIT, ELECTRICAL PERMIT, OR OTHER
2. CONTRACTOR TO COORDINATE WITH UTILITY COMPANIES PRIOR TO ANY
CONSTRUCTION SHALL BE PROTECTED AT ALL TIMES.
1. ALL SURVEY AND PUBLIC LAND CORNERS WITHIN THE LIMITS OF
GENERAL NOTES:
I. JOB HAZARD ANALYSIS (JHA).
H. EQUIPMENT TO BE UTILIZED IN PERFORMANCE OF THE WORK.
G. PERSONNEL NAMES TO BE WORKING ONSITE.
F. DIVE PLAN.
E. SEVERE WEATHER PLAN.
D. JOB HAZARDS PRESENT AND HOW TO MITIGATE.
C. SUMMARY OF WORK TO BE PERFORMED.
B. CONTRACT AND TWO NUMBERS AND PROJECT NAME.
A. CONTRACTOR COMPANY NAME AND CONTACT INFORMATION.
PLAN SHALL INCLUDE THE FOLLOWING:
OWNER FOR REVIEW AND APPROVAL PRIOR TO THE START OF ANY WORK.
1. CONTRACTOR TO PROVIDE PROJECT SPECIFIC SAFETY PLAN (PSSP) TO
PROJECT SPECIFIC SAFETY PLAN:
STRUCTURE.
ALL TIMES ARE BELOW WEIGHT RESTRICTION TO AVOID DAMAGING
LOAD. CONTRACTOR SHALL ENSURE EQUIPMENT, MATERIALS, AND LOADS AT
RESTRICTIONS OF 16,000 LBS PER WHEEL LOAD AND 32,000 LBS PER AXLE
9. THE BRIDGE AT S-40 IS RATED AS AN HS-20 AND HAS WEIGHT
BRIDGE. CONTRACTOR TO USE CAUTION WITH GUY WIRES FOR POLE.
8. CONTRACTOR TO BE AWARE OF A MONOPOLE TOWER LOCATED ON THE S-40
AT ALL TIMES WHEN NOT NEAR GATES.
THAT THE GATES AT US 192 AND THE S-40 STRUCTURE REMAIN LOCKED
7. CONTRACTOR WILL NEED TO PROVIDE COMBINATION LOCKS AND ENSURE
ANY WAY. FISHING IS PROHIBITED ON DISTRICT PROPERTY.
6. CONTRACTOR SHALL NOT FISH, FEED, CAPTURE OR HARASS WILDLIFE IN
TO ENSURE THAT A LICENSED TRAPPER IS ON-SITE.
JUNE). ANY “IN-WATER” ACTIVITIES SUCH AS DIVING, ETC., CONTRACTOR IS
TRAPPER MAY BE REQUIRED, ESPECIALLY DURING MATING SEASON (APRIL-
CONTRACTOR TO USE EXTREME CAUTION. ASSISTANCE FROM A LICENSED
5. DUE TO THE WILDLIFE PRESENT WITHIN THE PROJECT’S VICINITY,
STORED WITHIN THE ADJACENT WETLANDS.
AREAS AS DIRECTED BY CFTOD. NO MATERIALS OR EQUIPMENT SHALL BE
THE SURROUNDING AREA. LAYDOWN AND PARKING AREA ARE LIMITED TO
BEST MANAGEMENT PRACTICES SHALL BE USED TO MINIMIZE IMPACTS TO
4. THE SITE IS LOCATED WITHIN AN ENVIRONMENTALLY SENSITIVE AREA.
AND MATERIAL.
CONTRACTOR TO COORDINATE WITH CFTOD COMPLIANCE FOR LOCATIONS
TO ACCESSING SITE, DURING CONSTRUCTION, AND FINAL CLOSE-OUT.
3. CONTRACTOR MAY NEED TO FILL ANY POTHOLES OR ERODED AREAS PRIOR
POTHOLES.
ROADWAY THAT IS NOT LEVEL, HAS SHARP BENDS, AND MAY CONTAIN
2. ALL EQUIPMENT MUST BE ABLE TO TRANSVERSE AN UNPAVED ACCESS
PROJECT SITE VIA AN UNPAVED ACCESS LEVEE.
192. IT TAKES APPROXIMATELY 30 MINUTES FROM GATE TO REACH
1. THE S-40 STRUCTURE IS ACCESSIBLE THRU A GATED ACCESS OFF OF U.S.
SITE CONSTRAINTS:
FABRIC. REMOVE AND REPLACE IF FABRIC IS DAMAGED OR TORN.
4. USE CAUTION WHEN PLACING THE BANK AND SHORE TO AVOID TEARING THE
3. SPLICE LENGTH SHALL BE 2'-0" MINIMUM.
2. RIPRAP INSTALLATION WILL REQUIRE AN INSPECTION BY CFTOD COMPLIANCE.
RIPRAP/BEDDING STONE.
204, GROUP 2. ALL GRADATION WILL NEED TO MEET FDOT SPEC 530 FOR THE
QUARTZITE (NO LIMESTONE OR CRUSHED CONCRETE), THE MEET FDOT SPEC
COMPOSED OF NON-CALCEROUS MATERIALS INCLUDING GRANITE, GNEISS, OR
1. THE RIPRAP (BANK AND SHORE PROTECTION) AND BEDDING STONE SHALL BE
RIPRAP:
DEPARTMENT OF TRANSPORTATION STANDARD PLANS.
EDITION OF UNIFORM TRAFFIC CONTROL DEVICES AND THE FLORIDA
TRAFFIC CONTROL AND SAFETY DEVICES IN ACCORDANCE WITH THE LATEST
2. THE CONTRACTOR SHALL FURNISH, ERECT, AND MAINTAIN ALL NECESSARY
GATE DIRECTLY BY CROSSING INTERSECTION.
1. ALL LARGE VEHICLES ARE TO ARRIVE VIA INTERNATIONAL DRIVE AND ENTER
MOT/TTC:
COMPLIANCE.
2. CONTRACTOR TO OBTAIN EROSION CONTROL APPROVAL THROUGH P&E
LARGE EQUIPMENT DELIVERIES.
1. CONTRACTOR WILL BE REQUIRED TO OBTAIN A FDOT MOT PERMIT FOR ANY
PERMITS/APPROVALS:
WITH CFTOD P&E.
NGVD DISNEY GRID AND NAVD 88 DATUMS. LOCATION TO BE COORDINATED
2. CONTRACTOR TO INSTALL PERMANENT BENCH MARK TO STRUCTURE FOR 1929
RIPRAP IN THEIR FINAL CONDITION ONCE CONSTRUCTION IS COMPLETED.
1. CONTRACTOR TO SUPPLY AS-BUILT PLANS FOR PERMANENT SHEET PILE AND
CONTRACTOR NOTES:
4/10/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\GeneralNotes02.dgn2:26:02 PM
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S E
R O
S I O
N R
E P
A I R
G E
N E
R A
L N
O T
E S
O
F
INTERFACE TO PREVENT PIPING.
PROVIDE TIGHT INTERLOCKS. SEAL ANY OPEN JOINTS/GAPS AT THE APRON 3.
SHOWN.
SHEET PILE SHALL BE DRIVEN/PLUMBED TO THE MINIMUM TIP ELEVATION 2.
ACT AS A CUTOFF WALL AND PREVENT FURTHER UNDERMINING.
SHEET PILE SHALL BE INSTALLED TO THE LINE AND LENGTH SHOWN TO 1.
SHEET PILE NOTES:
4. CFTOD LAND DEVELOPMENT REGULATIONS (LDR) APPLY TO THIS PROJECT.
DESIGN STANDARDS DATED 2026-27.
3. FOR STANDARDS AND DETAILS NOT SHOWN IN THE PLANS, SEE FDOT
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
2. ALL MATERIALS, CONSTRUCTION METHODS, AND TESTING SHALL BE IN
SECTION 971 – EXCAVATABLE FLOWABLE FILL
SECTION 570 – EROSION CONTROL
SECTION 400 – CONCRETE STRUCTURES
SECTION 455 – SHEET PILING
SECTION 120 – EXCAVATION AND EMBANKMENT
TO:
SPECIFICATIONS AND APPLICABLE SECTIONS, INCLUDING BUT NOT LIMITED
PERFORM WORK IN ACCORDANCE WITH THE LATEST FDOT STANDARD 1.
APPLICABLE SPECIFICATIONS AND CRITERIA:
DIRECTION BEFORE PROCEEDING.
DISTRESS IS OBSERVED, STOP WORK AND NOTIFY THE ENGINEER FOR
EXTENT. IF VOIDS EXTEND BEYOND PLAN LIMITS OR IF ADDITIONAL
THE VOID HEIGHT IS ESTIMATED TO BE ~2 FT WITH UNKNOWN LATERAL 2.
APPROVED METHODS.
EXPLORATORY EXCAVATIONS WHERE FEASIBLE, AND/OR OTHER ENGINEER-
FULL EXTENT OF UNDERMINING BY PROBING/RODDING, SMALL
PRIOR TO ANY FILLING, CONTRACTOR SHALL LOCATE AND DELINEATE THE 1.
FIELD VERIFICATION/LIMITS OF UNDERMINING:
SEASON, NOVEMBER THROUGH MAY.
DURING OPERATIONS. ALL WORK TO BE COMPLETED DURING THE DRY
4. WORK IS TO BE COMPLETED IN THE WET, FLOW CANNOT BE BLOCKED
APRON FROM UPLIFT/CRACKING DURING FILLING OPERATIONS.
EXISTING APRON THICKNESS VARIES. CONTRACTOR SHALL PROTECT THE 3.
UNDERMINING.
INSTALLED ALONG THE WINGWALLS TO FURTHER MITIGATE ANY POTENTIAL
SUPPORT AND PREVENT FURTHER SOIL LOSS. RIP RAP WILL ALSO BE
FILLING EXISTING UNDERMINED VOIDS BENEATH THE APRON TO RESTORE
DOWNSTREAM/PERIMETER EDGE OF THE EXISTING OUTFALL APRON AND
REPAIR CONSISTS OF INSTALLING STEEL SHEET PILE CUTOFF ALONG THE 2.
70.50-FT NGVD DISNEY GRID.
THE UPSTREAM ELEVATION AT 69.50-FT NGVD AND THE WESTERN GATE AT
IT IS A DUAL GATE STRUCTURE WHERE THE EASTERN GATE CONTROLS
ELEVATION OF THE WATER LEVEL UPSTREAM AT A CONSTANT ELEVATION.
AN AUTOMATIC WATER CONTROL STRUCTURE THAT MAINTAINS THE
40 WATER CONTROL STRUCTURE. THE S-40 STRUCTURE IS AN AMIL GATE,
1. UNDERMINING IS OCCURRING ALONG THE DOWNSTREAM APRON OF THE S-
WORK DESCRIPTION:
THE CANAL.
DOCUMENTS AND PERMITS. PREVENT DISCHARGE OF UNCURED MATERIAL INTO
PROVIDE TURBIDITY/SEDIMENT CONTROLS AS REQUIRED BY THE CONTRACT 2.
LOW-FLOW CONDITIONS.
WITH WEATHER AND MAINTAIN BEST EFFORT TO PERFORM FILLING DURING
CANAL FLOW IS RAINFALL-DRIVEN; CONTRACTOR SHALL COORDINATE WORK 1.
FLOW/WATER CONTROL AND ENVIRONMENTAL PROTECTION:
IN ACCORDANCE WITH PROJECT EROSION CONTROL REQUIREMENTS.
PROVIDE SURFACE STABILIZATION/EROSION CONTROL AFTER CONSTRUCTION 2.
REQUIREMENTS.
RESTORED WITH SUITABLE MATERIAL AND COMPACTED PER FDOT
ANY DISTURBED AREAS ADJACENT TO THE APRON AND SHEET PILE SHALL BE 1.
SUBGRADE/BACKFILL STABILIZATION:
THE ENGINEER.
IF CRACKING/SPALLING OCCURS, STOP PUMPING IMMEDIATELY AND NOTIFY 3.
AND NOTIFY THE ENGINEER.
IF VERTICAL MOVEMENT EXCEEDS 1/4 INCH, STOP PUMPING IMMEDIATELY 2.
APRON MOVEMENT.
DURING FILLING OPERATIONS, CONTRACTOR SHALL CONTINUOUSLY MONITOR 1.
UPLIFT / SLAB PROTECTION MONITORING:
IS TO BE REPAIRED, AND PORT TO BE RELOCATED.
CONTRACTOR CORE INTO REBAR, CORING IS TO STOP IMMEDIATELY, THE HOLE
THAT THEY DO NOT DAMAGE THE REBAR PRESENT IN THE APRON. SHOULD
8. CONTRACTOR TO USE MINIMAL PORT SIZES AND IS TO LOCATE PORTS SUCH
SHALL HAUL OFF WITH LINED DUMP TRUCKS.
SITE OFF SITE. IF SOIL IS UNABLE TO BE DRIED OUT ON SITE, CONTRACTOR
7. IF DEBRIS IS REMOVED, TRANSPORT ANY SEDIMENT/DEBRIS TO A DISPOSAL
ITEM.
FILL. THIS WILL BE INCLUDED UNDER THE CLEANING AND GRUBBING PAY
WITHIN THE VOID UNDERNEATH THE APRON PRIOR TO PLACING FLOWABLE
6. CONTRACTOR TO BE AWARE OF THE POTENTIAL NEED TO REMOVE DEBRIS
PRESSURE CONTROL, AND MONITORING) TO THE ENGINEER PRIOR TO WORK.
CONTRACTOR SHALL PROVIDE A PLACEMENT PLAN (PORTS, SEQUENCING, 5.
AT ADJACENT PORTS/EDGES INDICATING FULL ENCAPSULATION.
PROGRESS UPWARD/OUTWARD UNTIL REFUSAL OR UNTIL MATERIAL RETURNS
PLACE FLOWABLE FILL STARTING AT THE LOWEST ACCESSIBLE POINT AND 4.
THE APRON.
SHALL BE CONTROLLED TO PREVENT UPLIFT, DISPLACEMENT, OR CRACKING OF
DO NOT USE HIGH-PRESSURE INJECTION. PUMPING RATE AND PRESSURE 3.
SEGREGATION, WASHOUT, AND DISPLACEMENT OF THE EXISTING APRON.
AND SHALL BE PLACED BY PUMPING (TREMIE OR INJECTION) TO PREVENT
FLOWABLE FILL SHALL BE SUITABLE FOR PLACEMENT IN WET CONDITIONS 2.
VOID UNDERNEATH APRON.
MEETING FDOT REQUIREMENTS. FOR BIDDING PURPOSES, ASSUME A 70'x16'x3'
FILL ALL VOIDS BENEATH THE APRON WITH EXCAVATABLE FLOWABLE FILL 1.
VOID FILL MATERIAL AND PLACEMENT:
COMPLIANCE.
ANY AND ALL DEWATERING AND/OR PUMPING IS TO BE PERMITTED WITH CFTOD
CFTOD COMPLIANCE.
ADDITIONAL EROSION CONTROLS MAY BE REQUIRED AT THE DISCRETION OF
THESE RESTRICTIONS.
RESPONSIBILITY OF THE LANDOWNER OR ITS DESIGNEE TO INQUIRE ABOUT
DEVICE(S) MAY INCREASE ENVIRONMENTAL DEGRADATION. IT IS THE
MANAGEMENT PRACTICES DUE TO POOR PERFORMANCE OR BECAUSE THE
CFTOD MAY ELECT TO RESTRICT OR PROHIBIT CERTAIN EROSION CONTROL BEST
WORKING CONDITION AT THE END OF EACH WORKDAY.
ALL SEDIMENT, EROSION, AND TURBIDITY CONTROL MEASURES SHALL BE IN
EFFORTS. ANY NECESSARY REMEDIES SHALL BE PERFORMED WITHOUT DELAY.
DETERMINE THE EFFECTIVENESS OF SEDIMENT AND EROSION CONTROL
DAILY INSPECTIONS SHALL BE MADE BY THE GENERAL CONTRACTOR TO
CENTRAL FLORIDA TOURISM OVERSIGHT DISTRICT.
HAY BALES ARE NOT ALLOWED AS AN EROSION CONTROL DEVICE WITHIN THE
COMPARABLE DEVICES.
PILES, PORTABLE COFFERDAMS, INFLATABLE WATER STRUCTURES, AND OTHER
ERODIBLE MATERIALS. MATERIALS COMMONLY APPROVED BY CFTOD ARE SHEET
WATER BODIES. DITCH BLOCKS OR DAMS MUST BE COMPOSED OF NON-
ERODIBLE MATERIAL TO BE PLACED IN LIVE STREAMS, CANALS, OR ACTIVE
CFTOD DOES NOT ALLOW EARTHEN DITCH BLOCKS OR DAMS OR OTHER
WORK STOPPAGE.
FROM THIS PROCEDURE MAY RESULT IN AN IMMEDIATE REQUIREMENT FOR
OBTAINED FROM CFTOD DESIGNATED COMPLIANCE PERSONNEL. ANY DEVIATION
PREVENTION MEASURES MAY BE DONE ONLY AFTER AUTHORIZATION IS
CONSTRUCTION ACTIVITIES. REMOVAL OF THESE SAME EROSION CONTROLS AND
APPROVED BY CFTOD DESIGNATED COMPLIANCE PERSONNEL PRIOR TO ANY
ALL EROSION PREVENTION AND CONTROL MEASURES MUST BE INSPECTED AND
PLACEMENT.
AND APPROVED BY CFTOD DESIGNATED COMPLIANCE PERSONNEL PRIOR TO
ALTERNATE EROSION PREVENTION AND CONTROL DEVICES MUST BE REVIEWED
DISCHARGE FROM THE CONSTRUCTION SITE WILL BE REQUIRED. ALL
METHODS FOR MAINTAINING STATE WATER QUALITY STANDARDS FOR
THE EROSION CONTROL PLAN PROVE NOT TO BE EFFECTIVE, ALTERNATE
IN THE EVENT THAT EROSION PREVENTION AND CONTROL DEVICES SHOWN IN
STORMWATER, EROSION, AND SEDIMENTATION CONTROL INSPECTORS HANDBOOK.
WITH THE CFTOD LAND DEVELOPMENT REGULATIONS AND THE FLORIDA
ALL EROSION AND SEDIMENT CONTROL PRACTICES MUST BE IN ACCORDANCE
AND FEDERAL LAW, SHALL BE IMPLEMENTED.
SPECIFIED IN THE PLAN, THAT IS REQUIRED TO COMPLY WITH LOCAL, STATE,
THE MINIMUM STANDARDS. ANY EROSION CONTROL MEASURE BEYOND THAT
THE MEASURES SET FORTH IN THE EROSION CONTROL PLAN ARE INTENDED AS
PRE-CONSTRUCTION MEETING PRIOR TO COMMENCEMENT OF CONSTRUCTION.
CONTRACTOR SHALL NOTIFY CFTOD COMPLIANCE PERSONNEL OF THE PROJECT
FROM MEETING ALL LOCAL, STATE, AND FEDERAL DISCHARGE STANDARDS.
PROPOSED PLAN BY CFTOD DOES NOT RELIEVE THE GENERAL CONTRACTOR
BEFORE PROCEEDING WITH PROJECT CONSTRUCTION. APPROVAL OF THE
SWPPP MUST BE RECEIVED FROM CFTOD PRIOR TO SUBMITTING TO FDEP AND
WRITTEN APPROVAL OF THE EROSION CONTROL PLAN, NOI AND NARRATIVE
EROSION CONTROL:
4/30/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\PlanElev01.dgn4:56:20 PM
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S E
R O
S I O
N R
E P
A I R
P L
A N
A N
D E
L E
V A
T
IO
N
AREA
LAYDOWN
CONSTRUCTION
EDGE OF WATER
TOP OF BANK
EXISTING CONCRETE APRON
EDGE OF WATER
TOP OF BANK
WALL (TO BE REMOVED)
EXISTING SHEET PILE
REMOVED)
PILE WALL (TO BE
EXISTING SHEET
PILE WALL
STEEL SHEET
FENCE (TYP.)
EXISTING
EXISTING GUARDRAIL (TYP.)
MUD LINE
EXISTING WINGWALL
EXISTING WINGWALL
EXISTING CONCRETE APRON
EXISTING CONCRETE APRON
EXISTING GUARDRAIL (TYP.)
MIN TIP EL. 18.000
(RIPRAP NOT SHOWN FOR CLARITY)
STRUCTURE
DRAINAGE
EXISTING
STEEL SHEET PILE WALL
STRUCTURE S-40
EXISTING DRAINAGE
EL. 67.000
WALL BEND
EL. 67.000
WALL BEND
GROUND (TYP.)
EXISTING
"21
'-9
"2
55'-10
"2
18'-9
E 24627.964
N 11446.142
WALL BEND
E 24680.355
N 11465.590
WALL BEND
E 24699.137
N 11465.962
WALL BEND
E 24680.213
N 11466.337
WALL BEND
E 24614.188
N 11440.893
BEGIN WALL
E 24694.336
N 11470.491
END WALL
EL. 71.000
BEGIN WALL
EL. 60.000
WALL BEND
EXISTING CONCRETE APRON
EL. 60.000
WALL BEND
EL. 71.000
END WALL
(T Y
P
PLAN
A
A
NOTES
CONTROL DETAILS" SHEET.
2. FOR SLOPE PROTECTION, SEE "EROSION
"STEEL SHEET PILE WALL - DETAILS" SHEET.
1. FOR SECTION A-A AND SECTION B-B, SEE
ELEVATION
FLOW
B
O
R
IN
G L
O C
A T
IO
N
P L
A N
4/10/2026mmiller T:\J5921G Water Control Structure Rehab (S-40)_GAI\7 CADD Files\CFTOD.dgn4:26:10 PM
SHEET
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
M F
M
A P
P R
O V
E D
C
G B
D A
T E
License No. 71571
Professional Engineer
State of Florida
CRAIG G. BALLOCK, P.E.
S E
R O
S I O
N R
E P
A I R
W A
T E
R C
O N
T R
O L
S T
R U
C T
U R
E S
R
L A
N D
O
F L
L
A K
E B
A L
D W
IN
L
A N
E
C O
N S
U L
T A
N T
S
IN
C
G E
O T
E C
H N
IC
A
L A
N D
E N
V
IR
O N
M E
N T
A L
Feet
0 50 200
Feet
0 50
FIGURE 2
50/2" NUMBER OF BLOWS FOR 2 INCHES OF PENETRATION
GENERAL NOTES
SPLIT SPOON SAMPLER:
INSIDE DIAMETER: 1.375 IN.
OUTSIDE DIAMETER: 2.0 IN.
AVERAGE HAMMER DROP: 30 IN.
HAMMER WEIGHT: 140 LBS.
ENVIRONMENTAL CLASSIFICATION:
SUBSTRUCTURE:
SUPERSTRUCTURE: SLIGHTLY AGGRESSIVE
TOWNSHIP: 25 SOUTH
RANGE: 28 EAST
LEGEND
BT
TOP OF DRILL RIG DECK INDICATED
BORING TERMINATED AT DEPTH BELOW
N STANDARD PENETRATION RESISTANCE, BLOWS PER FOOT
-200=
MC=
LL=
PERCENT PASSING NO. 200 U.S. STANDARD SIEVE
PERCENT NATURAL MOISTURE CONTENT
LIQUID LIMIT
SAND
SAND AND SILT
SAND AND CLAY
PI= PLASTICITY INDEX
SECTION: 30
STEEL: SLIGHTLY AGGRESSIVE
CONCRETE: SLIGHTLY AGGRESSIVE
OVER 40
24-40
8-24
3-8
0-3
GRANULAR SOILS: SANDS
VERY DENSE
DENSE
MEDIUM DENSE
LOOSE
VERY LOOSE
HARD
VERY STIFF
STIFF
FIRM
SOFT
VERY SOFT
DENSITY
RELATIVE
CONSISTENCY
OVER 24
12-24
6-12
3-6
1-3
0-1
(BLOWS/FT)
N VALUE
(BLOWS/FT)
N VALUE
AUTOMATIC HAMMER
SILTS, CLAYS, MUCK
NON-GRANULAR SOILS:
DAMAGE/DEFORMATION DURING INSTALLATION THROUGH HARD LAYERS.
USE SPECIALIZED EQUIPMENT AND/OR PROCEDURES AS NECESSARY TO FACILITATE INSTALLATION TO PREVENT
INSTALLATION. EXPECT TO ENCOUNTER THESE TYPES OF MATERIAL AT ALL SHEET PILE WALL LOCATIONS AND
LAYERS OF DENSE MATERIAL WERE ENCOUNTERED AT THIS SITE. SUCH MATERIALS CAN CAUSE DIFFICULT
BE PREPARED TO HANDLE ARTESIAN HEAD LEVELS UP TO +33 FEET NAVD88.
SURFACE OF THE FLORIDAN AQUIFER IN THE PROJECT VICINITY IS APPROXIMATELY +30 TO +33 FEET NAVD88.
ACCORDING TO THE FDEP SEPTEMBER 2021 POTENTIOMETRIC CONTOURS MAP, THE POTENTIOMETRIC
A SUB-METER ACCURACY TRIMBLE GPS UNIT.
THE BORING LOCATIONS WERE NOT SURVEYED. BORING LOCATIONS WERE ESTABLISHED IN THE FIELD USING
UNLESS OTHERWISE NOTED.
PENETRATION RESISTANCES ARE SHOWN ON THE BORINGS AT THE TEST DEPTHS IN BLOWS PER FOOT
STANDARD PENETRATION TEST BORINGS WERE PERFORMED IN ACCORDANCE WITH ASTM D-1586. STANDARD
TESTING SHOWN.
SOIL CLASSIFICATIONS SHOWN ON THE BORINGS ARE BASED ON VISUAL EXAMINATION AND THE LABORATORY
BORING LOCATIONS. ACTUAL CONDITIONS BETWEEN THE BORINGS MAY VARY FROM THOSE SHOWN. UNIFIED
SUBSURFACE CONDITIONS SHOWN ON THE BORINGS REPRESENT THE CONDITIONS ENCOUNTERED AT THE
N
NOT TO SCALE
N
AIR
W/H/18"
W/H
RIG DECK
TOP OF DRILL
GROUTED
15' OF 3" CASING
BT AT 67'
DATE DRILLED: 1-29-26
DRILLER: M. STEPHENS
RIG TYPE: BARGE CME 45
HAMMER TYPE: AUTOMATIC
LONG: W81.54494°
LAT: N28.27535°
B-1
WATER
D E
P T
H
F T
N
50/3"
50/2"
W/H/18"
RIG DECK
TOP OF DRILL
GROUTED
20' OF 3" CASING
BT AT 62'
DATE DRILLED: 1-30-26
DRILLER: M. STEPHENS
RIG TYPE: BARGE CME 45
HAMMER TYPE: AUTOMATIC
LONG: W81.54504°
LAT: N28.27531°
B-2
D E
P T
H (F
T
-200=5
-200=22
PI=19
LL=33
MC=28
-200=38
PI=42
LL=39
MC=73
-200=79
PERCENT LOSS OF DRILLING FLUID CIRCULATION
100%
SILT, FEW ROCK (SP-SM)
REDDISH BROWN FINE SAND WITH
GRAY SILTY FINE SAND (SM)
GRAY CLAYEY FINE SAND (SC)
GRAY SILTY FINE SAND (SM)
GRAY FAT CLAY WITH SAND (CH)
GRAY SILTY FINE SAND (SM)
LIGHT BROWN FINE SAND (SP)
WATER
AIR
-200=10
PI=5
LL=24
MC=27
-200=23
GRAY FINE SAND WITH SILT (SP-SM)
GRAY SILTY FINE SAND (SM)
GRAY FINE SAND WITH SILT (SP-SM)
GRAY SILTY CLAYEY FINE SAND (SC-SM)
CEMENTED SAND (SM)
GRAY SILTY FINE SAND, MOSTLY
W/H/18" WEIGHT OF HAMMER FOR 18 INCHES OF PENETRATION
AND CLAY
SAND, SILT
100%
CEMENTED SAND (SM)
GRAY SILTY FINE SAND, SOME
CEMENTED SAND
SAND, SILT AND
CLAY
R E
P O
R T
O F
C O
R E
B O
R I N
G S
4/10/2026mmiller T:\J5921G Water Control Structure Rehab (S-40)_GAI\7 CADD Files\b1boring01.dgn2:04:41 PM
SHEET
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
M F
M
A P
P R
O V
E D
C
G B
D A
T E
License No. 71571
Professional Engineer
State of Florida
CRAIG G. BALLOCK, P.E.
S
E
R O
S I O
N R
E P
A I R
W A
T E
R C
O N
T R
O L
S T
R U
C T
U R
E
R
L A
N D
O F
L
L
A K
E B
A L
D W
IN
L
A N
E
C O
N S
U L
T A
N T
S
IN
C
G E
O T
E C
H N
IC
A
L A
N D
E N
V
IR
O N
M E
N T
A L
FIGURE 3
T
E E
L S
H E
E T
P I L
E W
A L
L D
E T
A I L
S
4/10/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\MiscStr02.dgn7:31:09 AM
SHEET
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S E
R O
S I O
N R
E P
A I R
NOTES
"STEEL SHEET PILE WALL - PLAN AND ELEVATION" SHEET.
1. FOR LOCATIONS OF SECTION A-A AND SECTION B-B, SEE
MUDLINE MUDLINE
PILE WALL
STEEL SHEET
PILE WALL
STEEL SHEET
GROUT FILLED VOID
EXISTING CONCRETE APRON
FORMWORK
TEMPORARY
GROUT FILLED VOID
EXISTING CONCRETE APRON
(MAX.)
10" GAP
(MAX.)
10" GAP
SECTION A-A SECTION B-B
4/10/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\DataTable01.dgn7:32:18 AM
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 68534
Professional Engineer
State of Florida
CHRISTOPHER P. BRADEN
S E
R O
S I O
N R
E P
A I R
W A
L L
D A
T A
T A
B L
E
ELEVATION
WATER
ELEVATION
SOIL
STEEL SHEET PILE WALL, CANTILEVER DATA TABLE
DESIGN PARAMETERSCONSTRUCTION INFORMATION
fy=39 ksi
(ksi)
A-328 fy=50 ksi
(ksi)
A-572
NOTES
** MINIMUM OF DESIGN GROUND SURFACE OF DESIGN SCOUR DEPTH.
SECTIONS, INCREASE MINIMUM SECTION MODULUS BY 20%.
* MINIMUM SECTION MODULUS IS BASED ON HOT ROLLED SECTIONS. FOR COLD ROLLED
(in�/ft)
SECTION MODULUS
MINIMUM *
SECTION 560.
SOIL ELEVATION (**), WITH COAL TAR-EPOXY IN ACCORDANCE WITH SPECIFICATION
COAT EXPOSED SURFACE OF STEEL SHEET PILES TO 5 FEET BELOW THE FRONT OF WALL 3.
ENVIRONMENTAL CLASSIFICATION IS EXTREMELY AGGRESSIVE.2.
THE WALL TO RESIST CONSTRUCTION LOADS AT A MAXIMUM DEFLECTION OF 1.5 INCHES.
PARAMETERS SHOWN ABOVE, THE CONTRACTOR'S SPECIALTY ENGINEER WILL REDESIGN
WALL ANALYSIS. IF THE CONTRACTOR PLANS OPERATIONS, WHICH EXCEED THE DESIGN
THE DESIGN PARAMETERS INDICATED IN THIS TABLE WERE USED IN THE SHEET PILE 1.
(ft)
WALL
OF
FRONT
(ft)
ELEVATION
WALL TIP
MINIMUM
(ft)
ELEV.
TOP
WALL
(ft)
WALL
OF
FRONT
(ft)
WALL
OF
BACK
(in⁴/ft)
INERTIA
OF
MOMENT
REQUIRED
MINIMUM
(ft)
WALL
OF
BACK
7.8 6.0 84.38 18.0 60.0 55 55 70 70
FILTER FABRIC
OR WINGWALL
SHEET PILE WALL
CONCRETE APRON
7778 78
4/30/2026MaranCM c:\bms\gai-prod\c.marangiello\dms44483\SlopeProtection01.dgn4:53:50 PM
SHEET
R E
V
IS
IO
N
S
N O
B
Y D
A T
E R
E A
S O
N
P R
O J E
C T
D R
A W
N
C M
M
A P
P R
O V
E D
C
P B
D A
T E
License No. 67350
Professional Engineer
State of Florida
CHRISTOPHER J. KNOX
S E
R O
S I O
N R
E P
A I R
E R
O S
I O
N C
O N
T R
O L
D E
T A
I L
S
0 10 30
FILTER FABRIC
RUBBLE RIPRAP (BANK & SHORE)
T (THICKNESS
1'-0" MIN.
2T
5'-0" (MIN.)
SLOPE
TOE OFFILTER FABRIC
VARIES 2'-6" MIN.)
T (THICKNESS
TO ¡ SPLICE
6'-0" MIN.
MIN.
5'-0"
SOD
5'-0"
10'-0"
FILTER FABRIC SPLICE
RE-ESTABLISH SLOPE
FILL AS NEEDED TO
CLEARING & GRUBBING LIMITS
MATCH EXIST.
MATCH EXIST.
CONC. APRON
EXISTING
EDGE OF WATER
PILE WALL
STEEL SHEET
FENCE (TYP.)
EXISTING
EXISTING BRIDGEEXISTING GUARDRAIL (TYP.)
EDGE OF WATER
TYPICAL RIPRAP SECTION
NOTES
BE COORDINATED WITH CFTOD P&E.
APRON. LIMITS OF RIPRAP AND SLOPE STABILIZATION WILL NEED TO
3. CONTRACTOR TO TAKE CARE NOT TO DISTURB THE EXISTING SANDBAG
ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 530.
2. RUBBLE (BANK AND SHORE PROTECTION) TO BE INSTALLED IN
ACCORDANCE WITH FDOT SPECIFICATIONS SECTION 514.
SPECIFICATIONS SECTION 985. SPLICE LENGTH SHALL BE IN
1. FILTER FABRIC SHALL BE TYPE D-2, IN ACCORDANCE WITH FDOT
EL. 69.5
EL. 69.0
EL. 67.5
MATCH EXIST.
EL. 74.0
EL. 73.0
EL. 74.5
EL. 73.0
EL. 70.0
EL. 66.0
MATCH EXIST.
EL. 69.0
EL. 72.0
EL. 71.0
EL. 72.0
EL. 71.0
EL. 75.0
MATCH EXIST.
EXIST.
MATCH
EL. 60.0 EL. 60.0
SODSOD 1
10'
22'
EDGE OF WATEREDGE OF WATER
EL. 72.0
EL. 71.0
MATCH SLOPE
* ADD FILL TO
N 11551.136, E 24704.038
N 11551.350, E 24543.129
N 11378.898, E 24703.809
N 11379.113, E 24542.900
TYPICAL WALL AND FILTER FABRIC INTERACTION
* EMBANKMENT AREAS TO BE COMPACTED PER FDOT SPECIFICATION SECTION 120.
PROP. FENCE (TYP.)
FENCE (TYP.)
REMOVE EXIST.
EL. 72.5
EL. 70.5
CONSTRUCTION (TYP.)
LIMITS OF
(SEE NOTE 3)
SANDBAG APRON
EXISTING
' 1
VARIES 2'-6"
MIN.)
BEDDING
STONE*
EROSION CONTROL - PLAN
LEGEND
ORANGE SNOW FENCING
FLOATING TURBIDITY BARRIER
SCALE: 1" = 30'
1 2
LIMITS OF CONSTRUCTION COORDINATES
LIMITS OF CONSTRUCTION
DISTURB)
(DO NOT
AREA
SENSITIVE
| 2026-05-01T11:02:59-0400 | |
| Craig G Ballock |
| 2026-05-01T22:11:02-0400 | |
| Christopher P Braden |
| 2026-05-01T14:34:42-0400 | |
| Christopher J Knox |
File details come from the government source that posted it. Updated .