RR-25-4990 Addendum No. 1_04282025.pdf
PDF 1 MB Posted
- Contract number
- 25-557THA-ENGCO-P-83405
- Issued by
- Illinois
About this file
This document is an Addendum (No. 1) to a contract (RR-25-4990) issued by the Illinois State Toll Highway Authority for drainage improvements on the Tri-State Tollway (I-94/I-294). The project covers segments of I-94 from Townline Road to Half Day Road and I-294 at Walters Avenue, specifically between Mile Post 19.0 to 21.9 and Mile Post 50.7. The addendum includes revised contract requirements, schedule of prices, special provisions, and documentation from an optional pre-bid meeting held on April 9, 2025.
The contract involves drainage-related work including cleaning storm sewers, culverts, and drainage structures; cleaning and regrading ditches; landscaping and erosion control; and maintenance of traffic. The project has specific compliance goals, including a 25% Disadvantaged Business Enterprise (DBE) participation and 3% Veteran-Owned Small Business (VOSB) participation. The contract includes workforce diversity targets of 19.6% minority and 6.9% female representation. The anticipated project timeline includes a Notice-to-Proceed on August 18, 2025, Substantial Completion by August 25, 2026, and final Contract Completion on September 25, 2026. The total contract includes various line items with different quantities and unit prices, with contingency and quality program allowances totaling $384,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. RR-25-4990 Addendum 1 Page 1 of 3 4/28/2025
ADDENDUM NO. 1
TO
CONTRACT REQUIREMENTS
FOR CONTRACT RR-25-4990
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 4/28/2025
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, May 9, 2025
NOTICE OF REVISION TO CONTRACT
NOTES:
1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to pages P-5R and P-7R which have been revised and included as part of the Schedule of Prices.
2. The following revised Special Provision page is included in the Contract with this Addendum: J-83R
3. Revised Contract Drawings 4 and 5 will be issued to the successful Bidder. The revised drawings will reflect the quantity changes shown in the “Summary of Revisions to Pay Item Quantities” table included in this addendum.
4. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on April 9, 2025 are included in this
Addendum.
Addendum 1 Page 2 of 3 4/28/2025
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE SCHEDULE OF PRICES
SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES
SP.
PROV.
PAY ITEM
NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY
CHANGE
NEW
QUANTITY
70600280
IMPACT ATTENUATORS, TEMPORARY (SEVERE
USE,NARROW), TEST LEVEL 3
EACH 6 4 10
70600370
IMPACT ATTENUATORS, RELOCATE (SEVERE USE,
NARROW), TEST LEVEL 3
EACH 4 -4 0
* JI704001
TEMPORARY CONCRETE BARRIER, CROSS-BOLT
CONNECTION
FOOT 2025 1350 3375
* JI704006
RELOCATE TEMPORARY CONCRETE BARRIER,
CROSS-BOLT CONNECTION
FOOT 1350 -1350 0
** Denotes Illinois Tollway Supplemental Specifications.
Change #1 Contract Requirements, Volume I, page P-5 replaced with page P-5R. This replacement contains the following revisions (attached):
1.1. Revised quantity of the pay item for IMPACT ATTENUATORS, TEMPORARY (SEVERE USE,NARROW), TEST
LEVEL 3 (70600280).
1.2. Removed the pay item for IMPACT ATTENUATORS, RELOCATE (SEVERE USE, NARROW), TEST LEVEL 3
(70600370).
Change #2 Contract Requirements, Volume I, page P-7 replaced with page P-7R. This replacement contains the following revisions (attached):
2.1. Revised quantity of the pay item for TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION
(JI704001).
2.2. Removed the pay item for RELOCATE TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION
(JI704006).
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #3 Contract Requirements, Volume II, replace page J-83 with page J-83R. This replacement contains the following revision (attached):
3.1. Removed the pay item, RELOCATE TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION
(JI704006) from the basis of payment for the special provision for TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION (Illinois Tollway).
CHANGES TO THE CONTRACT DRAWINGS
Change #4 Contract Plans, Volume 1, Drawing 4 and 5 Summary of Quantities. These drawings contain the following revisions (issued to successful Bidder):
4.1. Revised quantity of the pay item for IMPACT ATTENUATORS, TEMPORARY (SEVERE USE, NARROW), TEST
LEVEL 3 (70600280).
Addendum 1 Page 3 of 3 4/28/2025
4.2. Removed the pay item for IMPACT ATTENUATORS, RELOCATE (SEVERE USE, NARROW), TEST LEVEL 3
(70600370).
4.3. Revised quantity of the pay item for TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION
(JI704001).
4.4. Removed the pay item for RELOCATE TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION
(JI704006).
END OF ADDENDUM CHANGES
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
20800150 TRENCH BACKFILL CU YD 7
25000400 NITROGEN FERTILIZER NUTRIENT POUND 260
25000600 POTASSIUM FERTILIZER NUTRIENT POUND 780
25000750 MOWING ACRE 8.00
25100630 EROSION CONTROL BLANKET SQ YD 12,047
25100635
HEAVY DUTY EROSION CONTROL
BLANKET
SQ YD 52,315
28000250
TEMPORARY EROSION CONTROL
SEEDING
POUND 515
50104400 CONCRETE HEADWALL REMOVAL EACH 1
50105220 PIPE CULVERT REMOVAL FOOT 23
54213669
PRECAST REINFORCED CONCRETE
FLARED END SECTIONS 24"
EACH 1
542A0229 PIPE CULVERTS, CLASS A, TYPE 1 24" FOOT 17
* 60255410 CATCH BASINS TO BE CLEANED EACH 120
* 66900530 SOIL DISPOSAL ANALYSIS EACH 4
70500625
TEMPORARY TRAFFIC BARRIER
TERMINAL, TYPE 2
EACH 20
70600280
IMPACT ATTENUATORS, TEMPORARY
(SEVERE USE,NARROW), TEST LEVEL 3
EACH 10
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
Contract RR-25-4990 Addendum No. 1 P - 5R April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
* K0029632
WEED CONTROL, NON-SELECTIVE AND
NON-RESIDUAL
GALLON 5
* X0325893 CLEAN EXISTING END SECTION EACH 89
* X2020108 GRADING AND SHAPING (SPECIAL) SQ YD 30,822
* X5537800 STORM SEWERS TO BE CLEANED 12" FOOT 195
* X5537900 STORM SEWERS TO BE CLEANED 15" FOOT 9,833
* X5538000 STORM SEWERS TO BE CLEANED 18" FOOT 367
* X5538200 STORM SEWERS TO BE CLEANED 24" FOOT 2,027
* X5538400 STORM SEWERS TO BE CLEANED 30" FOOT 307
* X5538600 STORM SEWERS TO BE CLEANED 36" FOOT 399
* X5538700 STORM SEWERS TO BE CLEANED 42" FOOT 110
* X5538800 STORM SEWERS TO BE CLEANED 48" FOOT 341
* X7010216
TRAFFIC CONTROL AND PROTECTION,
(SPECIAL)
L SUM 1
* Z0018500
DRAINAGE STRUCTURES TO BE
CLEANED
EACH 49
* JI211126 TOPSOIL FURNISH AND PLACE, 6" SQ YD 28,516
* JI664402
FENCE TO BE REMOVED AND RE-
ERECTED
FOOT 250
* JI669016
REGULATED SUBSTANCES MONITORING
AND FIELD SCREENING
CAL DAY 53
Addendum No. 1 P - 6 April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
* JI680004 HEADWALL TYPE I, 24" EACH 1
* JI704001
TEMPORARY CONCRETE BARRIER,
CROSS-BOLT CONNECTION
FOOT 3,375
** JS107360 DUST CONTROL WATERING UNIT 2,540
** JS120100
TRAILER MOUNTED FULL MATRIX
PORTABLE CHANGEABLE MESSAGE
SIGNS
EACH 6
** JS213004
EXPLORATION TRENCH, UTILITIES (HAND
EXCAVATION)
FOOT 1,969
** JS213006
EXPLORATION TRENCH, UTILITIES
(VACUUM EXCAVATION)
FOOT 239
** JS250314 SEEDING, CLASS 4B ACRE 1.50
** JS250318 SEEDING, CLASS 4F ACRE 2.50
** JS250320 SEEDING, CLASS 5 ACRE 2.50
** JS250324 SEEDING, CLASS 5B ACRE 1.50
** JS251115 MULCH, METHOD 2 ACRE 0.50
** JS280020
MANAGEMENT OF EROSION AND
SEDIMENT CONTROL
CAL MO 13
** JS280050 SILT FENCE FOOT 19,885
** JS280051 RE-ERECT SILT FENCE FOOT 4,971
** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 2,022
Addendum No. 1 P - 7R April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
** JS280100 SUPER SILT FENCE FOOT 8,319
** JS280150
TEMPORARY STABILIZATION WITH
STRAW MULCH
ACRE 2.25
** JS280151 SAME-DAY STABILIZATION SQ YD 3,750
** JS280210
FILTER FABRIC INLET PROTECTION,
BASKET TYPE
EACH 1
** JS280305 TEMPORARY DITCH CHECKS FOOT 2,290
** JS633032
REMOVE AND RE-ERECT STEEL PLATE
BEAM GUARDRAIL, TYPE A, 6 FOOT
POSTS
FOOT 500
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
** JS782022 BARRIER WALL REFLECTORS, TYPE C EACH 270
* JT201940 SELECTIVE CLEARING (BRUSH REMOVAL) ACRE 6.50
* JT202009 NON-SPECIAL WASTE DISPOSAL, TYPE 1 CU YD 4,178
* JT546000 TELEVISION INSPECTION OF SEWER FOOT 3,000
* JT546200 SLOTTED DRAINS TO BE CLEANED FOOT 892
* JT599044
NOISE ABATEMENT WALL PANEL
REMOVAL, STORAGE AND RE-ERECTION
EACH 1
* JT669030 EARTHWORK CONSTRUCTION PLAN L SUM 1
* JT669040
EARTHWORK FINAL CONSTRUCTION
REPORT
L SUM 1
Addendum No. 1 P - 8 April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
* JT901041
WEED CONTROL NON-SELECTIVE AND
NON-RESIDUAL (WETLAND)
ACRE 0.25
* JT901042
WEED CONTROL SELECTIVE (WOODY
PLANTS AND BROADLEAF)
ACRE 5.75
* JT154008
UNFORESEEN ADDITIONAL
MAINTENANCE OF TRAFFIC
UNIT 60,000 $ 1.00 $60,000.00
* JT154015
ALLOWANCE FOR UNFORESEEN
DRAINAGE WORK
UNIT 80,000 $ 1.00 $80,000.00
* JT154016
ALLOWANCE FOR UNFORESEEN
EROSION CONTROL MEASURES
UNIT 20,000 $ 1.00 $20,000.00
* JT154051
CONTRACT ALLOWANCE FOR
UNSUITABLE SOIL
UNIT 10,000 $ 1.00 $10,000.00
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
UNIT 100,000 $ 1.00 $100,000.00
* JT154167
ALLOWANCE FOR GRADING AND
SHAPING
UNIT 30,000 $ 1.00 $30,000.00
* JT154185
ALLOWANCE FOR DEBRIS REMOVAL AND
DISPOSAL
UNIT 30,000 $ 1.00 $30,000.00
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $ 54,000.00 $54,000.00
** 999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER
TOLLWAY SUPPL. SPEC. 701.08(a)
INC/DAY (2,500.00)$
** 999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR (2,500.00)$
** 999NEG06
FAILURE TO REPAIR IMPACT
ATTENUATORS, TEMPORARY PER
TOLLWAY SUPPL. SPEC. 701.08(c)
OCCUR (2,500.00)$
** 999NEG07
LOSS OR DAMAGE TO TOLLWAY OWNED
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(d)
SQ FT (100.00)$
TOTAL AMOUNT OF CORE WORK
NEGATIVE
Addendum No. 1 P - 9 April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
** 999NEG08
FAILURE TO OPEN TRAFFIC LANES TO
TRAFFIC PER TOLLWAY SUPPL. SPEC.
701.08(e)(a)
15 MINUTES (3,000.00)$
** 999NEG09
FAILURE TO OPEN TRAFFIC LANES TO
TRAFFIC PER TOLLWAY SUPPL. SPEC.
701.08(e)(b)
15 MINUTES (5,000.00)$
** 999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
TRI STATE
OCCUR (10,000.00)$
** 999NEG30
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
ALL ROADWAYS OFF-PEAK
OCCUR (2,000.00)$
** 999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30(b)
INC/DAY (1,000.00)$
** 999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE
PER TOLLWAY SUPPL. SPEC. 108.02(e)
DAY (300.00)$
** 999NEG33
NON-COMPLIANCE WITH EROSION AND
SEDIMENT CONTROL PER TOLLWAY
SUPPL. SPEC 280.02 (2) (1)
INC/DAY See Note 1
** 999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY
FOR CONSTRUCTION HAULING
EQUIPMENT PER TOLLWAY SUPPL. SPEC.
105.15
DAY (1,000.00)$
** 999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY
SUPPL. SPEC. 280.02 (2) (2)
OCCUR (25,000.00)$
** 999NEG36
FAILURE TO COMPLY WITH OCCUPANCY
DATE OR PROVIDE COMPLETE
FACILITIES. FIELD OFFICE OR LAB PER
TOLLWAY SUPPL. SPEC. 670.01 (b)
DAY (500.00)$
** 999NEG44
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.1
CAL DAY (7,500.00)$
** 999NEG45
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.2
CAL DAY (7,500.00)$
** 999NEG49
DAMAGE TO FIBER OPTIC UTILITIES, PER
S.P. 115.3
OCCUR (10,000.00)$
* 999NEG53
NON-COMPLIANCE WITH CONTRACTOR
QUALITY PROGRAM SPECIAL PROVISION
OCCUR (50,000.00)$
** 999NEG54
DAMAGE TO TOLLWAY MULTI-MODE
CABLE, DMS SIGNS,
CAMERAS,TELECOMMUNICATION,CABLE,
ELECTRICAL,WATER and SEWER PER S.P.
115.4
OCCUR (1,000.00)$
* 999ADJ45
CONSTRUCTIONWORKS APPRENCTICES
WAGE RATE PAYMENT
HOUR 15.00$
ADJUSTMENTS
Addendum No. 1 P - 10 April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
* 999ADJ46 ARROW BOARD EACH 13.32$
* 999ADJ47 ARROW BOARD (WINTER RATE) EACH 19.98$
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH 1.00$
* 999ADJ49
TYPE I OR TYPE II BARRICADE (WINTER
RATE)
EACH 1.50$
* 999ADJ50 TYPE III BARRICADE EACH 2.35$
* 999ADJ51 TYPE III BARRICADE (WINTER RATE) EACH 3.53$
* 999ADJ52 PLASTIC DRUM EACH 1.25$
* 999ADJ53 PLASTIC DRUM (WINTER RATE) EACH 2.34$
* 999ADJ54 FLASHER LIGHT EACH 0.20$
* 999ADJ55 FLASHER LIGHT (WINTER RATE) EACH 0.30$
* 999ADJ56 STEADY BURN LIGHT EACH 0.30$
* 999ADJ57 STEADY BURN LIGHT (WINTER RATE) EACH 0.45$
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH 1.70$
* 999ADJ59
HI-INTENSITY LIGHT, SIGN MOUNTED
(WINTER RATE)
EACH 2.55$
* 999ADJ60 CMS, SOLAR POWERED EACH 45.70$
* 999ADJ61 CMS, SOLAR POWERED (WINTER RATE) EACH 68.55$
Addendum No. 1 P - 11 April 28, 2025
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT RR-25-4990
DRAINAGE IMPROVEMENTS
TRI-STATE TOLLWAY (I-94/I-294)
I-94 MILEPOST 19.0 TO MILEPOST 21.9
I-94 FROM TOWNLINE ROAD TO HALF DAY ROAD
AND I-294 AT WALTERS AVENUE
AND I-294 MILEPOST 50.7
* 999ADJ62 SIGNS, WORK ZONE EACH 2.00$
* 999ADJ63 SIGNS, WORK ZONE (WINTER RATE) EACH 3.00$
* 999ADJ64
TEMPORARY MODULAR GLARE SCREEN
(12.5 FT. SECTION)
UNIT 0.60$
* 999ADJ65
TEMPORARY CONCRETE BARRIER (12.5
FT. SECTION)
UNIT 0.83$
* 999ADJ66
TEMPORARY CONCRETE BARRIER (10.0
FT. SECTION)
UNIT 0.50$
* 999ADJ67
TEMPORARY CONCRETE BARRIER,
CROSS BOLT CONNECTION (12.5 FT.
SECTION)
UNIT 1.47$
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY
(SEVERE USE, NARROW), TEST LEVEL 3
EACH 18.33$
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY
(SEVERE USE, WIDE), TEST LEVEL 3
EACH 18.33$
* 999ADJ71
TEMPORARY INFORMATION SIGNING-
GROUND MOUNTED, 24 SQ FT IN AREA
OR LESS
SQ FT 0.25$
* 999ADJ72
TEMPORARY INFORMATION SIGNING-
GROUND MOUNTED, GREATER THAN 24
SQ FT IN AREA
SQ FT 0.25$
* 999ADJ73
TEMPORARY INFORMATION SIGNING-
OVERHEAD, 24 SQ FT IN AREA OR LESS
SQ FT 0.25$
* 999ADJ74
TEMPORARY INFORMATION SIGNING-
OVERHEAD, GREATER THAN 24 SQ FT IN
AREA
SQ FT 0.25$
$384,000.00
S.P. COLUMN LEGEND
* INDICATES SPECIAL PROVISION
** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS
AMOUNT OF CONTRACTOR'S QUALITY PROGRAM (CQP) + TOTAL AMOUNT OF CONTINGENCY WORK
TOTAL AMOUNT OF CORE WORK + AMOUNT OF CONTRACTOR'S QUALITY PROGRAM (CQP)
+ TOTAL AMOUNT OF CONTINGENCY WORK = TOTAL AMOUNT OF BASE BID
BID CREDIT
AWARD CRITERIA
Note 1: The deduction will be according to Article 280.02(2)(1) Table A, The Contractor should leave the unit price value blank.
Addendum No. 1 P - 12 April 28, 2025
Addendum No.1 J-83R April 28, 2025
Concrete Barrier wall to Temporary Concrete Barrier wall as specified in the plans will not be paid for separately but included in the cost of the type of wall specified.
Furnishing and installing anchor pins will not be paid for separately but will be included in the unit price for TEMPORARY CONCRETE BARRIER, CROSS-BOLT CONNECTION or RELOCATE
TEMPORARY CONCRETE BARRIER CROSS-BOLT CONNECTION.
Impact attenuators will be paid for separately.
Pay Item Number
Designation Unit of Measure
JI704001 TEMPORARY CONCRETE BARRIER, CROSS-
BOLT CONNECTION
FOOT
Capital Program
PRE-BID MEETING MINUTES
MEETING PURPOSE: Optional Pre-Bid Meeting - Contract RR-25-4990
Tri-State Tollway (I-94/I-294) Drainage Improvements
Townline Road To Half Day Road
I-94 M.P 19.0 TO M.P. 21.9
And I-294 M.P. 50.7
MEETING DATE: 4/9/2025
MEETING TIME: 1:30 PM
CHAIRPERSON: Jim Mondel
LOCATION: Illinois Tollway Microsoft Teams
TO:
Names Initials Organization / Title
Eric Occomy EO Procurement / Chief of Contract Services Maria Campuzano MC Procurement / Deputy Chief of Procurement Sainey Jobe SJ Procurement / Deputy Chief of Contract Compliance Danna Hall DH Procurement/Contract Services Manager Jim Mondel JM Procurement / Senior Contract Negotiator Mo Faraj MJ Engineering / Project Manager Muthayab Mohammed MM Design Section Engineer
Meeting Minutes:
1.0 Welcome message was provided.
2.0 Self-Introduction of Attendees
2.1 Tollway Procurement – Contract Services
2.2 Tollway Procurement – Contract Compliance
2.3 Tollway- Diversity
2.4 Tollway- Engineering Project Manager
2.5 Design Section Engineer
3.0 Brief Project Description (by Procurement Representative)
The improvements under this contract shall be performed for the Tri-State Tollway (I-94) between Mile Post 15.0 and Mile Post 19.0 in Lake County, Illinois.
The work under this contract includes cleaning storm sewers, culverts, and drainage structures; cleaning and regrading ditches; landscaping and erosion control;
maintenance of traffic; and other miscellaneous work.
Addendum 1
Page 1 of 6 04/28/2025
Capital Program
PRE-BID MEETING MINUTES
4.0 Advertisement Schedules (by Procurement Representative)
4.1 Plan Holder questions should be provided to 4801D.4990_Questions@docs.e-builder.net as identified on Page A-1
4.2 Final Date for Plan Holder Questions – April 18, 2025 at 2:00 p.m.
4.3 Bid Opening Date – May 9, 2025, 10:30 AM
5.0 Compliance Goals (by Procurement Compliance)
5.1 Disadvantaged Business Enterprise Program (DBE) – 25%
5.2 Veteran-Owned Small Business Program (VOSB) - 3%
5.3 Workforce
5.3.1 Equal Employment Opportunity (EEO)
• Minority: 19.6%
• Female: 6.9%
6.0 Diversity Programs – Overview of Available Programs (by Diversity Representative)
6.1 Earned Credit Program (ECP) Bid Credit Cap
6.2 Technical Assistance Program
6.3 Partnering for Growth (P4G)
6.4 Small Business Initiative (if applicable)
6.5 Construction Works
7.0 Project Schedule (by Engineering Project Manager)
7.1 Anticipated Notice-to-Proceed – August 18, 2025
7.2 Substantial Completion Date – August 25, 2026
7.3 Contract Completion Date – September 25, 2026
8.0 Special Items to Note (by Design Section Engineer)
8.1 For construction on or adjacent to any City/Village roadways, the contractor will be required to contact the Village of Lake Forest and Village of Lincolnshire, Village of Bannockburn, Village of Mettawa, Village of Northbrook, and Lake County Division of Transportation, to notify them one week prior to construction of any work on or adjacent to their right of way.
8.2 For cleaning and regrading ditches along I-94, the Contractor is permitted to remove short segments of existing guardrail to gain construction access. Guardrail that is removed must be replaced prior to the winter season. Refer to details included in the Contract Drawings.
9.0 Responses to Plan Holder Questions (by Design Section Engineer)
9.1 Last day for questions is April 18, 2025. Responses to questions will be provided in an Addendum.
9.2 Meeting Minutes and Sign-In Sheet for Optional Pre-Bid Meeting are attached as part of this addendum. Addendum is anticipated to be issued and dated April 28, 2025.
End of Meeting
Contract No. RR-25-4990
Page 2 of 6 04/28/2025
Page 3 of 6 04/28/2025
Page 4 of 6 04/28/2025
Attendance:
Name First Join Last Leave Email Role Mondel, Jim 4/09/25, 1:21:50 PM 4/09/25, 1:41:19 PM JMondel@getipass.com Organizer Hacking, Kathi 4/09/25, 1:26:26 PM 4/09/25, 1:41:13 PM KHacking@getipass.com Organizer Liu, Meiyu 4/09/25, 1:28:54 PM 4/09/25, 1:41:10 PM mliu@getipass.com Organizer Faraj, Mohamad 4/09/25, 1:22:01 PM 4/09/25, 1:41:06 PM mfaraj@getipass.com Presenter Coleman, Timothy 4/09/25, 1:22:05 PM 4/09/25, 1:41:21 PM TJColeman@getipass.com Presenter Seagrave, Ann 4/09/25, 1:25:56 PM 4/09/25, 3:25:04 PM ASeagrave@getipass.com Attendee Andre Hammel (External) 4/09/25, 1:26:27 PM 4/09/25, 1:42:25 PM AHammel@ICUTechAssist.net Attendee Benjamin Cuthbert (External) 4/09/25, 1:27:00 PM 4/09/25, 1:41:10 PM bcuthbert@gsg-consultants.com Attendee Howe, Ruth 4/09/25, 1:27:04 PM 4/09/25, 1:45:35 PM RAHowe@getipass.com Attendee Kelly, Sherita 4/09/25, 1:27:31 PM 4/09/25, 1:41:08 PM skelly@getipass.com Attendee Muthayab Mohammed (External) 4/09/25, 1:28:15 PM 4/09/25, 1:41:08 PM mmohammed@osehinc.com External Presenter Myers, Lindia 4/09/25, 1:30:32 PM 4/09/25, 1:41:17 PM LMyers@getipass.com Attendee Bamonti, Elaine 4/09/25, 1:30:56 PM 4/09/25, 1:41:10 PM EBamonti@getipass.com Presenter 16302047866 (Unverified) 4/09/25, 1:30:59 PM 4/09/25, 1:41:30 PM Attendee Prohammer, Valerie 4/09/25, 1:31:29 PM 4/09/25, 1:41:08 PM VProhammer@getipass.com Attendee Drozd, Laura 4/09/25, 1:31:55 PM 4/09/25, 1:41:14 PM LDrozd@getipass.com Attendee
Optional Pre-Bid Meeting for Contract RR-25-4990 Tri-State Tollway (I-94/I-294) Drainage Improvements I-94 from Townline Road to Half Day Road and I-294 at Walters Ave I-94 Mile Post 19.0 to Mile Post 21.9 and I-294 Mile Post 50.7
Illinois State Toll Highway Authority Contract No. RR-25-4990
Page 5 of 6 04/28/2025
Registered:
Registration First Registration Last Registration Email Registration Time Registration Job title Organization Phone Number Ann Seagrave aseagrave@getipass.com 4/07/25, 1:38:14 PM Registered Contract Analyst Illinois Tollway 630-743-8214 Andre Hammel ahammel@icutechassist.net 4/03/25, 2:37:35 PM Registered TA Inner-city 3122853204 Benjamin Cuthbert bcuthbert@gsg-consultants.com 4/09/25, 8:17:30 AM Registered Civil Engineer 1 Illinois Tollway GEC 2242504270 Ruth Howe rahowe@getipass.com 4/09/25, 1:26:50 PM Registered Contract Analyst Illinois Tollway 6303794726 Sherita Kelly skelly@getipass.com 4/09/25, 1:19:03 PM Registered Senior Contract Negotiator Illinois Tollway 16302416800 Lindia Myers lmyers@getipass.com 4/09/25, 7:51:19 AM Registered Contract Analyst TOLLWAY 6302416800 Valerie Prohammer vprohammer@getipass.com 4/09/25, 1:27:19 PM Registered Contract Specialist Illinois Tollway 630.241.6800 x 4633 Laura Drozd ldrozd@getipass.com 4/09/25, 1:28:20 PM Registered Contract analyst Tollway 6307968658 Lilly hashim lhashim@getipass.com 4/09/25, 1:28:35 PM Registered na IL Tollway- Diversity Dept 3127999790 Isaac Cuenca icuenca@getipass.com 4/09/25, 1:32:54 PM Registered Contract specialist Procurement 13313993486
Optional Pre-Bid Meeting for Contract RR-25-4990 Tri-State Tollway (I-94/I-294) Drainage Improvements I-94 from Townline Road to Half Day Road and I-294 at Walters Ave I-94 Mile Post 19.0 to Mile Post 21.9 and I-294 Mile Post 50.7
Illinois State Toll Highway Authority Contract No. RR-25-4990
Page 6 of 6 04/28/2025
File details come from the government source that posted it. Updated .