RR-25-2026_AddendumNo.1_11182025.pdf

PDF 3 MB Posted

Attached to
Open Market Competitive Sealed Bidding IL|26-557THA-ENGCO-P-94776
Contract number
26-557THA-ENGCO-P-94776
Issued by
Illinois

About this file

Contract Summary

This is Addendum No. 1 to Contract RR-25-2026, issued by the Illinois State Toll Highway Authority (ISTHA) on November 18, 2025. The addendum modifies the original contract requirements for bridge rehabilitation work on the Reagan Memorial Tollway (I-88) between Howland Creek and Illinois Route 26 Ramp, spanning Mile Post 44.5 to Mile Post 54.4 in Lee and Whiteside Counties, Illinois. The contract was advertised on October 17, 2025, with proposals to be received through electronic bidding via BidBuy until 10:30 a.m. local time on December 5, 2025.

The contract involves bridge reconstruction of one mainline bridge and bridge rehabilitation and minor repairs of five mainline bridges, bridge reconstruction for two overhead bridges and rehabilitation and minor repairs of five overhead bridges, construction of new pavement, milling and overlaying of existing pavement, guardrail removal and installation, grading work, erosion and sediment control, pavement markings installation, maintenance of traffic, and miscellaneous work. The project includes compliance goals of 22.0% Disadvantaged Business Enterprise Program participation, 2.0% Veteran-Owned Small Business Program participation, 4.3% minority workforce participation, and 6.9% female workforce participation. The anticipated Notice-to-Proceed is March 23, 2026, with a Substantial Completion Date of September 28, 2027, and Contract Completion Date of October 28, 2027. Addendum No. 1 revises Special Provision J-65 to include Phase II Environmental Site Assessment requirements and updates maintenance of traffic drawings (Drawings 33, 34, 49, and 50) to revise advance signing details and change standard references from STD 701402 to STD 701401.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois State Toll Highway Authority

Contract No. RR-25-2026 Addendum 1 Page 1 of 2 November 18, 2025

ADDENDUM NO. 1

TO

CONTRACT REQUIREMENTS

FOR CONTRACT RR-25-2026

ILLINOIS STATE TOLL HIGHWAY AUTHORITY

Date: 11/18/2025

For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, 12/5/2025

NOTICE OF REVISION TO CONTRACT

NOTES:

1. The following revised Special Provision pages are included in the Contract with this Addendum: J-65R.

2. The following revised Contract Drawings are included in this Addendum:

Volume 1– Drawings 33-34, 49-50

3. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on 10/30/2025 are included in this Addendum.

Addendum 1 Page 2 of 2 November 18, 2025

CHANGES TO THE CONTRACT REQUIREMENTS

CHANGES TO THE CONTRACT SPECIAL PROVISIONS

Change #1 Contract Requirements, Volume II, replace page J-65 with page J-65R. This replacement contains the following revisions (attached):

4.1. S.P. 120 revised to include Phase II Environmental Site Assessment

CHANGES TO THE CONTRACT DRAWINGS

Change #2 Contract Plans, Volume 1, Drawing 33. Maintenance of Traffic. This drawing contains the following revisions (attached):

7.1. Advance signing detail revised.

7.2. References to STD 701402 revised to refer to STD 701401.

Change #3 Contract Plans, Volume 1, Drawing 34. Maintenance of Traffic. This drawing contains the following revisions (attached):

8.1. References to STD 701402 revised to refer to STD 701401.

Change #4 Contract Plans, Volume 1, Drawing 49. Maintenance of Traffic. This drawing contains the following revisions (attached):

9.1. Advance signing detail revised.

9.2. References to STD 701402 revised to refer to STD 701401.

Change #5 Contract Plans, Volume 1, Drawing 50. Maintenance of Traffic. This drawing contains the following revisions (attached):

10.1. References to STD 701402 revised to refer to STD 701401.

END OF ADDENDUM CHANGES

Contract RR-25-2026 J-65R October 17, 2025

RR-15-5712_V2.pdf Bridges 1258, 1257, 1256, 1255, 1253, 1251, 1247, 1245, 1244, 1243, 1241 Reconstruction, 2017 (Bridge plans only)

ENV_A3E_CS_2026C-

EnvironmentalSoilClassification_ 10202025.pdf

Phase II Environmental Site Assessment

S.P. 121 ELECTRONIC DATA FILES AVAILABLE

Computer Aided Design & Drafting (CADD), Digital Terrain Model (DTM) and Triangulated Irregular Network (TIN) files developed for this project are available on the Illinois Tollway’s online plan room. The Illinois Tollway does not guarantee the accuracy of the below listed files, and the Contractor is responsible to perform all work according to the Plans, Special Provisions and the Standard Specifications. Upon downloading any of listed the electronic files from the online plan room the Contractor agrees the data is not a portion of the contract documents and are for information only, thus the Illinois Tollway shall not be liable for the completeness or accuracy of that data, and any discrepancies between these files and the contract documents are not grounds for claims for compensation or delays.

The Contractor agrees to defend, hold harmless and indemnify the Illinois Tollway, its officers, directors, employees, agents, and consultants from any and all claims resulting from, or in any way related to the use or modification of electronic data and files provided hereunder, by the Contractor, or by any third party obtaining the listed files.

File Name Description

2026-rdyAlign_I88.dgn 2D DGN with 3D Model – I-88 existing alignment, existing profiles

2026-utlPln_I88.dgn 2D DGN – I-88 utility plan

2026-motS01_I88at3MileBranch.dgn

2D DGN – Stage 1 MOT linework at 3 Mile Branch

2026-motS01_I88atHowlandCreek.dgn

2D DGN – Stage 1 MOT linework at Howland Creek

2026-motS01_I88atUPRR.dgn

2D DGN – Stage 1 MOT linework at

UPRR

2026-motS02_I88at3MileBranch.dgn

2D DGN – Stage 2 MOT linework at 3 Mile Branch

2026-motS02_I88atHowlandCreek.dgn

2D DGN – Stage 2 MOT linework at Howland Creek

2026-motS02_I88atUPRR.dgn

2D DGN – Stage 2 MOT linework at

UPRR

S.P. 122 COMMITMENTS

NOT USED

S.P. 123 CONTRACT BOND

NOT USED

November 24, 2025

ABenz Text Box November 18, 2025

SUPPLEMENTAL

RT

SUPPLEMENTAL

RT & LT W20-5F(O)-L-4848

RT & LT

W20-5E(O)-L-4848

RT & LT

W20-I103(O)-4848

W16-3A(O)-3612

RT & LT

W4-2L(O)-4848

RT & LT

BEGINNING OF LANE

CLOSURE TAPER

FLASHING ARROW

LT

M A

T C

H B

E L

O W

L E

F T

M A

T C

H A

B O

V E

R

IG

H T

A

MILE

CLOSED

LEFT LANE

1 MILE

CLOSED

LEFT LANE SPEED

LIMIT

W3-5(O)-4848

RT & LT

SIGN

INFORMATION

TOLLWAY PROJECT

MESSAGE SIGN

CHANGEABLE

PORTABLE

AHEAD

CONSTRUCTION

ROAD

2 MILES

500' 100' 500' 600' 1500' 300'

FLASHING ARROW

LT

DIRECTION OF

TRAFFIC FLOW

I-88 EB STAGE 1 ADVANCE SIGNING DETAIL PER IDOT STD 701400

500'4000'500'2000'

W21-I115(O)-3618

R2-1-3648

R10-I108P-3618

R2-I106P-3618

RT & LT

SUPPLEMENTAL

RT

DISPLAY UNIT

RADAR SPEED

1500'

$XXX FINE

MINIMUM

SPEED

LIMIT

W O R K

Z O N E

ENFORCED

PHOTO

2330+00 2335+00 2340+00 2345+002331 2332 2333 2334 2336 2337 2338 2339 2341 2342 2343 2344

N

SHEET LOCATION

KEY MAPHOWLAND CREEK

UPRR

NELSON RD

BOLLMAN RD

HARMON RD

ATKINSON RD

HOYLE RD

3 MILE BRANCH

PUMP FACTORY RD

IL 26 RAMP AB

LEGEND

TRUCK MOUNTED ATTENUATOR (SEE NOTE 3)

EXISTING PAVEMENT MARKING TO REMAIN

OR PAVEMENT MARKING PLACED IN

PREVIOUS STAGE

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID YELLOW) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (25' SKIP - 25' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (9' SKIP - 3' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 8" -

TYPE IV TAPE (SOLID WHITE) (70307140)

TEMPORARY PAVEMENT MARKING - LINE 8" - TYPE IV

TAPE (CHEVRONS AT 20' CENTERS WHITE) (70307140)

DIRECTION INDICATOR BARRICADES,

TYPE II BARRICADES, DRUMS, OR VERTICAL

BARRICADES W LIGHTS IF REQUIRED AT

- 100' CENTERS ON TANGENT

- 50' CENTERS IN TAPERS AND SHIFTS

- 25' CENTERS IN RAMPS

WORK AREA

TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704001) OR

RELOCATE TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704006)

IMPACT ATTENUATORS, TEMPORARY (SEVERE

USE, NARROW), TEST LEVEL 3 (70600280) OR

IMPACT ATTENUATORS, RELOCATE (SEVERE

USE, NARROW), TEST LEVEL 3 (70600370)

CONSTRUCTION SIGN

DIRECTION OF TRAFFIC FLOW

A

SHOULDER RESURFACING BETWEEN EXISTING

CONDITION AND TEMPORARY CONDITION:

- HMA SURFACE REMOVAL, 2" (44000157)

- WMA SURFACE COURSE, MIX "D", N70, (JI406510)

SHOULDER RUMBLE STRIP REMOVAL (JI440022)

NOTES

1. BARRICADES IN LANE CLOSURE TAPERS SHALL BE DIRECTION INDICATOR BARRICADES.

2. EXISTING GUARDRAIL AND CONCRETE BARRIER REFLECTORS SHALL BE BROUGHT INTO CONFORMANCE WITH STANDARD D4

PRIOR TO STAGING TRAFFIC. USE OF SUPPLEMENTAL AND REPLACEMENT REFLECTORS TO BE DETERMINED BY THE ENGINEER.

3. TRUCK MOUNTED ATTENUATOR REQUIRED WHEN WORKERS ARE PRESENT.

SHOULDER RESURFACING BETWEEN TEMPORARY

CONDITION AND PROPOSED CONDITION:

- HMA REMOVAL, VARIABLE DEPTH (JI440015)

- WMA SURFACE COURSE, MIX "D", N70 (JI406510)

.0

M

A T

C H

L

IN

E S

T A

¡ I-88

N

0 50 100 150

SCALE IN FEET

12.50'

12.50'

12.50'

12.50'

(TYP)

I-88 WB12.50'

US 3

0 R

AMP A

US 30 RAMP D

STA 2339+26.13 TO STA 2349+26.13

1000' LANE CLOSURE TAPER PER IDOT STD 701401

A

A

EX ROW

EX ROW

EX ROW

E X R

O W

A

EXIT SIGN

UTILIZE EXISTING

A

12.50'

12.50'

12.50'

100'

I-88 EB

SPEED

LIMIT

W3-5(O)-4848

I L L I N O I S 6 0 5 1 5

D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E

DRAWING NO.

OF

DESCRIPTIONDATENO.

SHEET NO.DESIGNED BY: DATE:

DATE:

CHECKED BY: DATE:

DRAWN BY:

MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY1

/1

/2 s k ie rp ie c

P L

O T

D A

T E

P L

O T

T E

D B

Y

F

IL

E N

A M

E

M O

D E

L N

A M

E

-m o tS

I8

-0

.s h t-

P L

O T

D R

IV

E

R

P E

N T

A B

L E

P L

O T

T

IM

E

:0

:0

P

M

PAGE SIZE:PLOT SCALE: 0.16666633 ' / in. 17x11 (in.)

REVISIONS

SK

SK

JB

11/12/2025

11/12/2025

11/12/2025

CONTRACT NO. RR-25-2026

MAINTENANCE OF TRAFFIC

STAGE 1 - I-88 AT HOWLAND CREEK

MOT-06

33 330

ADDENDUM NO 111/24/2025 1

INTERSTATE

ILLINOIS

26 52

INTERSTATE

2345+00 2350+00 2355+00 2360+002346 2347 2348 2349 2351 2352 2353 2354 2356 2357 2358 2359

N

SHEET LOCATION

KEY MAPHOWLAND CREEK

UPRR

NELSON RD

BOLLMAN RD

HARMON RD

ATKINSON RD

HOYLE RD

3 MILE BRANCH

PUMP FACTORY RD

IL 26 RAMP AB

LEGEND

TRUCK MOUNTED ATTENUATOR (SEE NOTE 3)

EXISTING PAVEMENT MARKING TO REMAIN

OR PAVEMENT MARKING PLACED IN

PREVIOUS STAGE

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID YELLOW) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (25' SKIP - 25' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (9' SKIP - 3' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 8" -

TYPE IV TAPE (SOLID WHITE) (70307140)

TEMPORARY PAVEMENT MARKING - LINE 8" - TYPE IV

TAPE (CHEVRONS AT 20' CENTERS WHITE) (70307140)

DIRECTION INDICATOR BARRICADES,

TYPE II BARRICADES, DRUMS, OR VERTICAL

BARRICADES W LIGHTS IF REQUIRED AT

- 100' CENTERS ON TANGENT

- 50' CENTERS IN TAPERS AND SHIFTS

- 25' CENTERS IN RAMPS

WORK AREA

TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704001) OR

RELOCATE TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704006)

IMPACT ATTENUATORS, TEMPORARY (SEVERE

USE, NARROW), TEST LEVEL 3 (70600280) OR

IMPACT ATTENUATORS, RELOCATE (SEVERE

USE, NARROW), TEST LEVEL 3 (70600370)

CONSTRUCTION SIGN

DIRECTION OF TRAFFIC FLOW

A

SHOULDER RESURFACING BETWEEN EXISTING

CONDITION AND TEMPORARY CONDITION:

- HMA SURFACE REMOVAL, 2" (44000157)

- WMA SURFACE COURSE, MIX "D", N70, (JI406510)

SHOULDER RUMBLE STRIP REMOVAL (JI440022)

NOTES

1. BARRICADES IN LANE CLOSURE TAPERS SHALL BE DIRECTION INDICATOR BARRICADES.

2. EXISTING GUARDRAIL AND CONCRETE BARRIER REFLECTORS SHALL BE BROUGHT INTO CONFORMANCE WITH STANDARD D4

PRIOR TO STAGING TRAFFIC. USE OF SUPPLEMENTAL AND REPLACEMENT REFLECTORS TO BE DETERMINED BY THE ENGINEER.

3. TRUCK MOUNTED ATTENUATOR REQUIRED WHEN WORKERS ARE PRESENT.

SHOULDER RESURFACING BETWEEN TEMPORARY

CONDITION AND PROPOSED CONDITION:

- HMA REMOVAL, VARIABLE DEPTH (JI440015)

- WMA SURFACE COURSE, MIX "D", N70 (JI406510)

.0

M

A T

C H

L

IN

E S

T A

.0

M

A T

C H

L

IN

E S

T A

N

0 50 100 150

SCALE IN FEET

11.33'

11.33'

12.50'

12.50'

11.33'

I-88�

I-88 EB

I-88 WB 12.50'

11.33'

US 30 RAMP B

US 3

0 R

AMP C

100'

STA 2351+59.43 TO STA 2358+14.85

655' LANE SHIFT TAPER (10.08' @ 65:1)

STA 2354+26.13 TO STA 2362+06.13

780' LANE SHIFT TAPER (12.00' @ 65:1)

100'

STA 2349+26.13 TO STA 2354+26.13

IDOT STD 701401500' BUFFER PER

STA 2359+14.85 TO STA 2362+13.17

298' EXIT TAPER PER TOLLWAY STD E5

1 5 6 4

2A

A

A

A

EX ROW

EX ROW

EX ROW

US 30

14.92'

(TYP)

SPEED LIMIT

WORK ZONE

END

G20-I103-6036

EXIT

E5-1(O)-7260

STA 2339+26.13 TO STA 2349+26.13

1000' LANE CLOSURE TAPER PER IDOT STD 701401

W24-1R(O)-4848

' TA

PER

(4.0 0' @ :1)

15.

33'

2352+40.68

60.00' LT.

2356+40.73

82.28' LT.

2356+40.07

60.00' LT.

2359+32.21

157.70' RT.

2355+07.29

60.00' RT.

$XXX FINE

MINIMUM

SPEED

LIMIT

ENFORCED

PHOTO

W O R K

Z O N E

W21-I115(O)-3618

R2-1-3648

R10-I108P-3618

R2-I106P-3618

1 1

2 7 0 0 O G D E N A V E N U E

DRAWING NO.

OF

DESCRIPTIONDATENO.

SHEET NO.DESIGNED BY: DATE:

DATE:

CHECKED BY: DATE:

DRAWN BY:

MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY1

/1

/2 s k ie rp ie c P

L O

T D

A T

E

P L O

T T

E D

B Y

F

IL

E N

A M

E

M O

D E

L N

A M

E

-m o tS

I8

-0

.s h t-

P L

O T

D R

IV

E

R

P E

N T

A B

L E

P

L O

T T

IM

E

:2

:0

P

M

PAGE SIZE:PLOT SCALE: 0.16666633 ' / in. 17x11 (in.)

REVISIONS

SK

SK

JB

11/12/2025

11/12/2025

11/12/2025

CONTRACT NO. RR-25-2026

MAINTENANCE OF TRAFFIC

STAGE 1 - I-88 AT HOWLAND CREEK

MOT-07

34 330

11/24/2025 1 ADDENDUM NO 1

MILE

INTERSTATE

ILLINOIS

26 52

INTERSTATE

I-88 EB STAGE 2 ADVANCE SIGNING DETAIL PER IDOT STD 701400

W4-2R(O)-4848

RT & LT

FLASHING ARROW

RT

W20-5E(O)-R-4848

RT & LT

MILE

CLOSED

RIGHT LANE

W20-5F(O)-R-4848

RT & LT

1 MILE

CLOSED

RIGHT LANE

FLASHING ARROW

RT

SUPPLEMENTAL

RT

SUPPLEMENTAL

RT & LT

W20-I103(O)-4848

W16-3A(O)-3612

RT & LT

BEGINNING OF LANE

CLOSURE TAPER

M A

T C

H B

E L

O W

L E

F T

M A

T C

H A

B O

V E

R

IG

H T

A

SPEED

LIMIT

W3-5(O)-4848

RT & LT

SIGN

INFORMATION

TOLLWAY PROJECT

MESSAGE SIGN

CHANGEABLE

PORTABLE

AHEAD

CONSTRUCTION

ROAD

2 MILES

500' 100' 500' 600' 1500' 300'

DIRECTION OF

TRAFFIC FLOW

500'4000'500'2000'

W21-I115(O)-3618

R2-1-3648

R10-I108P-3618

R2-I106P-3618

RT & LT

SUPPLEMENTAL

RT

DISPLAY UNIT

RADAR SPEED

1500'

$XXX FINE

MINIMUM

SPEED

LIMIT

W O R K

Z O N E

ENFORCED

PHOTO

2330+00 2335+00 2340+00 2345+002331 2332 2333 2334 2336 2337 2338 2339 2341 2342 2343 2344

N

SHEET LOCATION

KEY MAPHOWLAND CREEK

UPRR

NELSON RD

BOLLMAN RD

HARMON RD

ATKINSON RD

HOYLE RD

3 MILE BRANCH

PUMP FACTORY RD

IL 26 RAMP AB

LEGEND

TRUCK MOUNTED ATTENUATOR (SEE NOTE 3)

EXISTING PAVEMENT MARKING TO REMAIN

OR PAVEMENT MARKING PLACED IN

PREVIOUS STAGE

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID YELLOW) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (25' SKIP - 25' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (9' SKIP - 3' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 8" -

TYPE IV TAPE (SOLID WHITE) (70307140)

TEMPORARY PAVEMENT MARKING - LINE 8" - TYPE IV

TAPE (CHEVRONS AT 20' CENTERS WHITE) (70307140)

DIRECTION INDICATOR BARRICADES,

TYPE II BARRICADES, DRUMS, OR VERTICAL

BARRICADES W LIGHTS IF REQUIRED AT

- 100' CENTERS ON TANGENT

- 50' CENTERS IN TAPERS AND SHIFTS

- 25' CENTERS IN RAMPS

WORK AREA

TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704001) OR

RELOCATE TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704006)

IMPACT ATTENUATORS, TEMPORARY (SEVERE

USE, NARROW), TEST LEVEL 3 (70600280) OR

IMPACT ATTENUATORS, RELOCATE (SEVERE

USE, NARROW), TEST LEVEL 3 (70600370)

CONSTRUCTION SIGN

DIRECTION OF TRAFFIC FLOW

A

SHOULDER RESURFACING BETWEEN EXISTING

CONDITION AND TEMPORARY CONDITION:

- HMA SURFACE REMOVAL, 2" (44000157)

- WMA SURFACE COURSE, MIX "D", N70, (JI406510)

SHOULDER RUMBLE STRIP REMOVAL (JI440022)

NOTES

1. BARRICADES IN LANE CLOSURE TAPERS SHALL BE DIRECTION INDICATOR BARRICADES.

2. EXISTING GUARDRAIL AND CONCRETE BARRIER REFLECTORS SHALL BE BROUGHT INTO CONFORMANCE WITH STANDARD D4

PRIOR TO STAGING TRAFFIC. USE OF SUPPLEMENTAL AND REPLACEMENT REFLECTORS TO BE DETERMINED BY THE ENGINEER.

3. TRUCK MOUNTED ATTENUATOR REQUIRED WHEN WORKERS ARE PRESENT.

SHOULDER RESURFACING BETWEEN TEMPORARY

CONDITION AND PROPOSED CONDITION:

- HMA REMOVAL, VARIABLE DEPTH (JI440015)

- WMA SURFACE COURSE, MIX "D", N70 (JI406510)

.0

M

A T

C H

L

IN

E S

T A

N

0 50 100 150

SCALE IN FEET

12.50'

12.50'

12.50'

12.50' I-88 EB

I-88 WB12.50'

US 3

0 R

AMP A

US 30 RAM

P D

STA 2343+09.00 TO STA 2353+09.00

1000' LANE CLOSURE TAPER PER IDOT STD 701401

A

A

EX ROW

EX ROW

EX ROW

E X R

O W

12.50'

12.50'

12.50'

A

A

(TYP)

100'

I-88�

SPEED

LIMIT

W3-5(O)-4848

2 7 0 0 O G D E N A V E N U E

DRAWING NO.

OF

DESCRIPTIONDATENO.

SHEET NO.DESIGNED BY: DATE:

DATE:

CHECKED BY: DATE:

DRAWN BY:

MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY1

/1

/2 s k ie rp ie c P

L O

T D

A T

E

P L O

T T

E D

B Y

F

IL

E N

A M

E

M O

D E

L N

A M

E

-m o tS

I8

-0

.s h t-

P L

O T

D R

IV

E

R

P E

N T

A B

L E

P

L O

T T

IM

E

:1

:4

P

M

PAGE SIZE:PLOT SCALE: 0.16666633 ' / in. 17x11 (in.)

REVISIONS

SK

SK

JB

11/12/2025

11/12/2025

11/12/2025

CONTRACT NO. RR-25-2026

MAINTENANCE OF TRAFFIC

STAGE 2 - I-88 AT HOWLAND CREEK

MOT-22

49 330

1 11/24/2025 ADDENDUM NO 1

INTERSTATE

ILLINOIS

26 52

INTERSTATE

2345+00 2350+00 2355+00 2360+002346 2347 2348 2349 2351 2352 2353 2354 2356 2357 2358 2359

N

SHEET LOCATION

KEY MAPHOWLAND CREEK

UPRR

NELSON RD

BOLLMAN RD

HARMON RD

ATKINSON RD

HOYLE RD

3 MILE BRANCH

PUMP FACTORY RD

IL 26 RAMP AB

LEGEND

TRUCK MOUNTED ATTENUATOR (SEE NOTE 3)

EXISTING PAVEMENT MARKING TO REMAIN

OR PAVEMENT MARKING PLACED IN

PREVIOUS STAGE

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID YELLOW) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (SOLID WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (25' SKIP - 25' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 4" -

TYPE IV TAPE (9' SKIP - 3' DASH WHITE) (70307120)

TEMPORARY PAVEMENT MARKING - LINE 8" -

TYPE IV TAPE (SOLID WHITE) (70307140)

TEMPORARY PAVEMENT MARKING - LINE 8" - TYPE IV

TAPE (CHEVRONS AT 20' CENTERS WHITE) (70307140)

DIRECTION INDICATOR BARRICADES,

TYPE II BARRICADES, DRUMS, OR VERTICAL

BARRICADES W LIGHTS IF REQUIRED AT

- 100' CENTERS ON TANGENT

- 50' CENTERS IN TAPERS AND SHIFTS

- 25' CENTERS IN RAMPS

WORK AREA

TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704001) OR

RELOCATE TEMPORARY CONCRETE BARRIER,

CROSS-BOLT CONNECTION (JI704006)

IMPACT ATTENUATORS, TEMPORARY (SEVERE

USE, NARROW), TEST LEVEL 3 (70600280) OR

IMPACT ATTENUATORS, RELOCATE (SEVERE

USE, NARROW), TEST LEVEL 3 (70600370)

CONSTRUCTION SIGN

DIRECTION OF TRAFFIC FLOW

A

SHOULDER RESURFACING BETWEEN EXISTING

CONDITION AND TEMPORARY CONDITION:

- HMA SURFACE REMOVAL, 2" (44000157)

- WMA SURFACE COURSE, MIX "D", N70, (JI406510)

SHOULDER RUMBLE STRIP REMOVAL (JI440022)

NOTES

1. BARRICADES IN LANE CLOSURE TAPERS SHALL BE DIRECTION INDICATOR BARRICADES.

2. EXISTING GUARDRAIL AND CONCRETE BARRIER REFLECTORS SHALL BE BROUGHT INTO CONFORMANCE WITH STANDARD D4

PRIOR TO STAGING TRAFFIC. USE OF SUPPLEMENTAL AND REPLACEMENT REFLECTORS TO BE DETERMINED BY THE ENGINEER.

3. TRUCK MOUNTED ATTENUATOR REQUIRED WHEN WORKERS ARE PRESENT.

SHOULDER RESURFACING BETWEEN TEMPORARY

CONDITION AND PROPOSED CONDITION:

- HMA REMOVAL, VARIABLE DEPTH (JI440015)

- WMA SURFACE COURSE, MIX "D", N70 (JI406510)

.0

M

A T

C H

L

IN

E S

T A

.0

M

A T

C H

L

IN

E S

T A

N

0 50 100 150

SCALE IN FEET

15.33'

12.50'

12.50'

12.50'

I-88 EB

I-88 WB

US 30 RAMP B

US 3

0 R

AMP C

STA 2353+09.00 TO STA 2364+09.00

1100' BUFFER PER TOLLWAY STD E2

161'

6A

A

A

EX R

OW

EX R

O

W

EX ROW

U S

11.33'12.50'

12.50'

12.50'

EXIT

E5-1(O)-7260

SPEED LIMIT

WORK ZONE

END

G20-I103-6036

SEE DETOUR PLANS.

US 30 RAMP C CLOSED IN STAGE 2.

157' LANE SHIFT TAPER (2.42' @ 65:1)

STA 2357+39.57 TO STA 2358+96.65

(TYP)

2356+40.73

82.28' LT.

2357+67.15

32.00' LT.

A

2351+40.68

44.08' LT. 100' I-88�

$XXX FINE

MINIMUM

SPEED

LIMIT

ENFORCED

PHOTO

W O R K

Z O N E

W21-I115(O)-3618

R2-1-3648

R10-I108P-3618

R2-I106P-3618

2 7 0 0 O G D E N A V E N U E

DRAWING NO.

OF

DESCRIPTIONDATENO.

SHEET NO.DESIGNED BY: DATE:

DATE:

CHECKED BY: DATE:

DRAWN BY:

MILESTONE: THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY1

/1

/2 s k ie rp ie c P

L O

T D

A T

E

P L O

T T

E D

B Y

F

IL

E N

A M

E

M O

D E

L N

A M

E

-m o tS

I8

-0

.s h t-

P L

O T

D R

IV

E

R

P E

N T

A B

L E

P

L O

T T

IM

E

:5

:1

P

M

PAGE SIZE:PLOT SCALE: 0.16666633 ' / in. 17x11 (in.)

REVISIONS

SK

SK

JB

11/12/2025

11/12/2025

11/12/2025

CONTRACT NO. RR-25-2026

MAINTENANCE OF TRAFFIC

STAGE 2 - I-88 AT HOWLAND CREEK

MOT-23

50 330

ADDENDUM NO 111/24/2025 1

MILE

INTERSTATE

ILLINOIS

26 52

INTERSTATE

Addendum 1 November 18, 2025

Capital Program

PRE-BID MEETING MINUTES

MEETING PURPOSE: Optional Pre-Bid Meeting - Contract RR-25-2026

Regan Memorial Tollway (I-88) Bridge Rehabilitation Howland Creek to IL Route 26 Ramp Mile Post 44.5 to Mile Post 54.4

MEETING DATE: October 30, 2025

MEETING TIME: 1:00 p.m.

CHAIRPERSON: Tiffany Merrill – Senior Contract Negotiator

LOCATION: Illinois Tollway WebEx

TO:

Names Initials Organization / Title

Eric Occomy EO Procurement / Chief of Contract Services Maria Campuzano MC Procurement / Deputy Chief of Procurement Sainey Jobe SJ Procurement / Deputy Chief of Contract Compliance Danna Hall DH Procurement / Contract Services Manager Tiffany Merrill TM Procurement / Senior Contract Negotiator Laura Drozd LD Procurement / Contract Analyst Jorge Galvan JG Procurement / Contract Analyst Michael Brink MB Engineering / Project Manager Mo Faraj MF Engineering / Deputy Program Manager

Alex Benz AB Design Section Engineer

MEETING MINUTES

Item Description Responsibility Due Date

1.0 Open and Welcome N/A N/A

2.0 Introduction:

2.1 Tollway Procurement – Contract Services

2.2 Tollway Procurement – Contract Compliance

2.3 Tollway – Diversity

2.4 Tollway – Engineering Project Manager

2.5 Design Section Engineer

N/A N/A

3.0 Project Description:

The location of the services to be performed for this contract is the Reagan Memorial Tollway (I-88) between Mile Post 44.5 and Mile Post 54.4 in Lee and Whiteside Counties, Illinois.

The work under this contract includes bridge reconstruction of one mainline bridge and bridge rehabilitation and minor repairs of five mainline bridge, bridge reconstruction for two overhead bridges and

N/A N/A

PRE-BID MEETING MINUTES

bridge rehabilitation and minor repairs of five overhead bridges, construction of new pavement and milling and overlaying existing pavement, guardrail removal and installation, grading work, erosion and sediment control, pavement markings installation, maintenance of traffic and other miscellaneous work.

4.0 Advertisement Schedule:

4.1 Plan Holder questions should be provided to

4948D.2026_Questions@doc.e-builder.net as identified on Page A-1

4.2 Final Date for Plan Holder Questions – November 14, 2025

at 2:00 p.m.

4.3 Bid Opening DatE – December 5, 2025

N/A N/A

5.0 Compliance Goals

5.1 Disadvantaged Business Enterprise Program (DBE) – 22.0%

5.2 Veteran - Owned Small Business Program (VOSB) – 2.0%

5.3 Workforce

5.3.1 Equal Employment Opportunity (EEO)

• Minority: 4.3%

• Female: 6.9%

N/A N/A

6.0 Diversity Programs:

6.1 Earned Credit Program (ECP) Bid Credit Cap - $325,000.00

6.2 Technical Assistance Program

6.3 Partnering for Growth (P4G)

6.4 Construction Works

N/A N/A

7.0 Project Schedule:

7.1 Anticipated Notice-to-Proceed – March 23, 2026

7.2 Interim Completion dates as noted in S.P. 103.3 thru S.P.

103.5 related to closure of ramps along I-88 at US 30 and IL 26 interchanges.

7.3 Interim Completion Date as noted in S.P. 103.6 related to lane closures during the winter period.

7.4 Substantial Completion Date – September 28, 2027

7.5 Contract Completion Date – October 28, 2027

N/A N/A

8.0 Special Items to Note:

8.1 See S.P. 104.1 – Work Restrictions

8.2 See S.P. 106.1 for Coordination with IDOT

8.3 See S.P. 106.2 through 106.5 and S.P. 106.8 for

Coordination with Adjacent Municipalities.

8.4 See S.P. 106.6 for Coordination with Union Pacific Railroad

8.5 See S.P. 106.7 for Coordination with Other Contractors

8.6 Ultra High-Performance Concrete Overlay

8.6.1 Mockup Testing is required.

mailto:4948D.2026_Questions@doc.e-builder.net

PRE-BID MEETING MINUTES

9.0 Responses to Plan Holder Questions:

9.1 Questioned received to date – 2 regarding DBE goal. Will be addressed in addendum.

9.2 Future question responses.

9.3 Responses will be provided in an Addendum which is

expected to be released the week of November 24th.

10.0 Open Discussion / Questions N/A N/A

Illinois State Toll Highway Authority Contract No.

RR-25-2026 Addendum 1 4 of 6November 24, 20254 of 6

ABenz Rectangle

ABenz

Illinois State Toll Highway Authority Contract No.

RR-25-2026 Addendum 1 5 of 6November 24, 20255 of 6

ABenz

Optional Pre-Bid Meeting: Contract #RR-25-2026 Reagan Memorial Tollway (I-88) Bridge Rehabilitation, Howland Creek to IL Rte 26 Ramp M.P. 44.5 to M.P. 54.4

Name Email Role Registration Email Job Title Organization Phone Number Merrill, Tiffany TMerrill@getipass.com Organizer Drozd, Laura LDrozd@getipass.com Organizer Galvan, Jorge JGalvan@getipass.com Organizer Jim Kowalewski (External) jkowalewski@fhpaschen.com Attendee jkowalewski@fhpaschen.com Senior Estimator FH Paschen 13122885926 Ramirez, Yolanda YRamirez@getipass.com Presenter Coleman, Timothy TJColeman@getipass.com Presenter Seagrave, Ann ASeagrave@getipass.com Attendee aseagrave@getipass.com Contract Analyst Illinois Tollway 6307438214 Mondel, Jim JMondel@getipass.com Attendee jmondel@getipass.com Senior Contract Negotiator Illinois Tollway CA 3316310562 Alex Benz abenz@efkmoen.com External Presenter Myers, Lindia LMyers@getipass.com Attendee lmyers@getipass.com Contract Analyst Illinois Tollway 6303051945 Benjamin Cuthbert (External) bcuthbert@gsg-consultants.com Attendee bcuthbert@gsg-consultants.com Civil Engineer 1 Illinois Tollway GEC 2242504270 Prohammer, Valerie VProhammer@getipass.com Attendee vprohammer@getipass.com Contract Specialist ISHTA 331.399.3498 James Berggren jberggren@efkmoen.com External Presenter Ahmed, Muaz Muahmed@getipass.com Attendee muahmed@getipass.com Senior Project Manager IL Tollway 3128350878 Darin Baughman (Unverified) Attendee dbaughman@helmgroup.com Estimator Helm Civil 8152978540 Brink, Michael mbrink@getipass.com Presenter Howe, Ruth RAHowe@getipass.com Attendee rahowe@getipass.com Contract Analyst Illinois Tollway 6303794726

Illinois State Toll Highway Authority Contract No.

RR-25-2026 Addendum 1 6 of 6November 24, 20256 of 6

ABenz

File details come from the government source that posted it. Updated .