RPF No. PWG126-ADMIN-6438 -Addendum No.2.pdf

PDF 11 MB Posted

Attached to
Cable Creek Basin (Upper) RFP
Solicitation number
PWG126-ADMIN-6438
Issued by
San Bernardino County, San Bernardino City, California

About this file

This Addendum No. 2 modifies the RFP for Proposal No. PWG126-ADMIN-6438 issued by the San Bernardino County Flood Control District for design services of the Cable Creek Basin Area. The addendum revises the proposal deadline from August 6, 2026 to September 3, 2026 at 4:00 PM, with a final deadline of September 17, 2026 also at 4:00 PM, and adds an oral presentation component to the evaluation process. The project involves hydrology, hydraulic analysis, geotechnical investigation, environmental permitting, utility coordination, surveying, and engineering design services for a flood control basin designed to reduce peak flow rates from 10,830 cubic feet per second to approximately 8,600 cfs. Proposers must submit proposals electronically via the ePro System or by paper submission with three hard copies and one USB drive. The oral presentations will be held at 825 3rd Street, San Bernardino, CA 92415 on a date to be determined, with a typical schedule including 5-10 minute introductions, 20-25 minute presentations, 20 minute question-and-answer sessions, and 5 minute closing remarks. Evaluators will score physical oral presentations (with content weighted at 15%, questions and answers at 70%, and presentation delivery at 15%) and the highest-ranking firm's fee proposal will be opened and subject to fee negotiations.

The addendum clarifies that no preliminary geotechnical report exists but a 1994 drainage study will be provided; confirms that minimum experience requirements for DSOD and DWR approvals are not mandatory but proposers should describe their approach to working with both agencies; confirms the proposal deadline extension to August 17th for proposers to review district responses and incorporate clarifications; specifies that no maximum page limit applies to proposals; clarifies that NEPA compliance documentation is not required as FEMA will handle all NEPA-related tasks, though proposers must prepare a CEQA Initial Study and related technical reports to facilitate FEMA's review; identifies that an existing non-engineered levee within the project footprint is owned but not maintained by the District and coordination will be required if the basin qualifies as a DSOD jurisdictional basin; confirms that right-of-way acquisition costs must be included in proposals with the County Real Estate Services Department handling appraisals and acquisitions; and clarifies that items marked as "RESERVED" (such as Attachments H and K) do not need to be included in submitted proposals. All proposals must be accompanied by a signed Bidder's Certification acknowledging receipt of Addendum No. 2, with proposals lacking this certification subject to rejection.

View the file

Other files

File Type Posted
Blue Pages Index 2026-1.pdf PDF
2025-08-14 RB TOPO.pdf PDF
BG2025_0821_Cable Creek @ Cable Canyon Rd.pdf PDF
RFP-PWG126-ADMIN-6438-Cable Creek Basin.pdf PDF
Sitework.Planting.Grass.Short.jpg JPG image
Sitework.Planting.Gravel.Crushed.jpg JPG image
AM 0261-13.pdf PDF
AM 0261-11.pdf PDF
RS0121P0028-0028.pdf PDF
RS0138P0086-0087.pdf PDF
PP_152.1.pdf PDF
RS0113P0028-0028.pdf PDF
RS0006P0079-0079.pdf PDF
CS 6654.pdf PDF
MB300PG67-72.pdf PDF
PP_1992.123090.pdf PDF
Invoice 932504447-1.pdf PDF
PRELIM-LINKED.PDF PDF
1991-474266 street.pdf PDF
Invoice 932504435-1.pdf PDF
3087-98 REC ALL.pdf PDF
4294-139 REC ALL .pdf PDF
2-32 of Maps.pdf PDF
m - APN Map.pdf PDF
2053-198 REC ALL .pdf PDF
932504440 Plotted Easements.pdf PDF
EAS 1988-122325.pdf PDF
Invoice 932504427-1.pdf PDF
Invoice 932504437-1.pdf PDF
932504437 Plotted Easements.pdf PDF
3335-262 REC ALL.pdf PDF
2053-198 REC ALL.pdf PDF
2820-341 REC ALL.pdf PDF
Invoice 932504443-1.pdf PDF
1992-123090 Vac.pdf PDF
57603-01.jpg JPG image
56803-02 (1).jpg JPG image
78701-03.pdf PDF
PM0037P0072-0072.pdf PDF
BG2025_0813_Cable Creek.pdf PDF
Sitework.Planting.Soil.jpg JPG image
FB4049P0886-0912.pdf PDF
RS0077P0094-0094.pdf PDF
RS0043P0017-0018.pdf PDF
PP_106.81.pdf PDF
PP_163.7.pdf PDF
RS0046P0071-0071.pdf PDF
RS0146P0077-0079.pdf PDF
RS0001P0032-0032.pdf PDF
PP_78.61.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2 Page 1 of 4 RFP for Proposal No. PWG126-ADMIN-6438 August 31, 2026

ADDENDUM NO. 2

DESIGN OF CABLE CREEK BASIN

AREA: SAN BERNARDINO

DEADLINE FOR PROPOSAL: 3:00 PM, THURSDAY, AUGUST 06, 2026

DEADLINE FOR PROPOSAL: 4:00 PM, THURSDAY, SEPTEMBER 03, 2026

DEADLINE FOR PROPOSAL: 4:00 PM, SEPTEMBER 17, 2026

By Email via ePro System

Add Section E. ORAL PRESENTATION to VII. EVALUATION on page 17 of 53:

E. ORAL PRESENTATION

1. Physical Oral Presentation Evaluation

The following categories may include additional specific criteria in the oral presentation evaluation.

Likewise, the listed considerations are possible considerations and may not be the only factors involved in the evaluation.

A. CONTENT OF PRESENTATION

Weight: 15% Consideration: Presentation made clearly, concise and timely manner.

B. QUESTIONS AND ANSWER SESSION

Weight: 70% Consideration: The proposed staff for the project are able to provide most appropriate responses to questions presented by evaluation panel.

C. PRESENTATION DELIVERY

Weight: 15% Consideration: Demonstration of proficiency/performance in the presentation.

D. PRESENTATION DETAIL

Date & Time: TBD

Location: 825 3rd Street, San Bernardino, CA 92415

Typical Schedule:

• Introductions: 5-10 minutes

• Presentation: 20-25 minutes

• Questions & Answers: 20 minutes

• Closing Remarks: 5 minutes

Following the physical oral presentations, the evaluators will score and rank the shortlisted Proposers based on the physical oral presentation only. The Facilitator will open the fee proposal of the highest overall ranking firm and commence the fee negotiations.

ADDENDUM NO. 2 Page 2 of 4

Questions on EPRO:

1. Question:

Will the District provide the existing preliminary/draft geotechnical report referenced in Section B.4, along with any other available background studies, reports, models, design files, or preliminary data for proposers to review and use in developing their proposals? If so, please identify when and where these materials will be made available.

Response: The District does not have a preliminary/draft geotechnical report. A drainage study from 1994 will be provided as part of this addendum.

2. Question:

Please confirm that the minimum experience requirement may be satisfied by two detention basin projects for which each project received the required approvals from both DSOD and DWR, rather than four separate projects consisting of two DSOD projects and two DWR projects.

Response: There is no minimum experience required; we would like to know your familiarity with working with the agencies. If you do not have experience, that is okay too. Please let us know your approach to working with both agencies.

3. Question:

Two (2) weeks to provide proposers sufficient time to review the District’s responses to questions and incorporate any resulting clarifications or scope changes into their technical ana fee proposals?

Response: The proposal has been extended to August 17th.

4. Question:

Please confirm whether there is a maximum page limit for the proposal, either overall or for individual sections. If a page limit applies, please identify which forms, attachments, resumes, organizational charts, schedules, and other required materials are excluded from the page count.

Response: There is no maximum page limit, so please include anything you believe will strengthen your proposal. For the resumes, only provide those of individuals who will actually be involved in the project, along with their alternatives. We want to know who we will be working with.

5. Question:

The scope requires preparation of NEPA compliance documentation but does not identify the anticipated NEPA class of action or associated deliverables. Please confirm the anticipated NEPA pathway (e.g., Categorical Exclusion, Environmental Assessment/FONSI, or other documentation), identify the federal lead agency, and clarify the NEPA deliverables that should be included in the proposal scope and fee.

Response: NEPA is not required for this project. FEMA will perform all NEPA related tasks and ensure compliance prior to awarding construction funds, however, environmental documents and technical studies should be prepared to facilitate this review process by FEMA. The consultant shall prepare a CEQA Initial Study, related technical reports per Section V.C.8.b. in the RFP, and other required documentation our environmental team may require.

ADDENDUM NO. 2 Page 3 of 4

6. Question:

Please identify the ownership and operational responsibility for the existing facilities and infrastructure that may be affected by the project, including the Cable Creek utility or water infrastructure within the project limits. Please also clarify which third-party agencies or owners the Consultant will be responsible for coordinating with during design.

Response: There is an existing non-engineered levee within the project footprint which is owned but not maintained by the San Bernardino County Flood Control District (District). The basin should be designed within the District’s right-of-way which can be viewed under the “Interactive Maps” section on the San Bernardino County Public Works website’s homepage (https://dpw.sbcounty.gov). If the basin is a DSOD jurisdictional basin, there will be coordination and approval from DWR DSOD.

7. Question:

Does the District anticipate that any new right-of-way acquisition, permanent easements, or temporary construction easements will be required to complete the proposed project? If so, please clarify the anticipated acquisition needs and whether right-of-way engineering, acquisition support, legal descriptions, plats, appraisal coordination, or related services are expected to be included in the Consultant’s scope of work.

Response: The District anticipates needing right-of-way acquisition based on the design. Please include this cost in your proposal. Before awarding the project, we will hold a meeting to address any questions, clarifications, or revisions. The County Real Estate Services Department will handle all appraisals and acquisitions for the project.

8. Question:

The RFP identifies Attachment H and Attachment K as “RESERVED,” and we did not identify any additional instructions regarding completion of these attachments. Please confirm that proposers should leave Attachments H and K blank, retain the pages marked “RESERVED,” and include them in the submitted proposal package in their respective locations.

Response: Any item marked as RESERVED does not need to be included in the proposal. If you prefer, you can add a page that states, for example, "ATTACHMENT H-RESERVED."

ATTACHMENT:

ATTACHMENT 1: DRAINAGE STUDY

The addition of these requirements shall be considered in concert with existing documents in preparation of bids.

THE BIDDER’S CERTIFICATION FOR THIS ADDENDUM NO. 2 SHALL BE SIGNED BY THE SAME PERSON WHO SIGNS THE PROPOSAL AND SHALL BE SUBMITTED WITH THE PROPOSAL. ANY proposal not accompanied by a signed BIDDER’S CERTIFICATION (below) acknowledging receipt of this Addendum No. 2 will NOT be accepted.

Noel Castillo, Chief Flood Control Engineer San Bernardino County Flood Control District

By:

Lawrence G. White, P.E., Chief

Flood Design Division

LW:MR

https://dpw.sbcounty.gov/

ADDENDUM NO. 2 Page 4 of 4

BIDDER'S CERTIFICATION:

By my signature hereunder, I acknowledge receipt of Addendum No. 2 and I fully understand the intent and detail of Addendum No. 2, which I have considered in my preparation of the attached proposal.

Bidder's Signature Date

Note: The page containing the executed BIDDER’S CERTIFICATION (just this page), must be included with the proposal.

ATTACHMENT 1: DRAINAGE STUDY

CABLECREEK

DRAINAGE STUDY

Pre~ared for:

SAN BERNARDINO COUNTY

FLOOD CONTROL DISTRICT

825 East Third Street

San Bernardino, California 92415

Prevared bv:

BSI Consultants, Inc.

2001 East First Street

Santa Ana, California 92705

(7 14) 568-7300

Under the supervision of:

E P ~ Mohammed N.K. Rowther Date

TABLE OF CONTENTS

Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I

Plans and Profiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I1

Cost Estimates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I11

HYDRAULICS

HEC-2 - Water Surface Profile, Upstream of DetentionIDebris Basin . . . . . . . . . . . . . . . . . . . IV

DetentionIDebris Basin Rating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V

WSPG - Water Surface Profiles, . . . . . . . . . . . . . . . . . Downstream of DetentionIDebris Basin VI

HYDROLOGY

Watershed Information Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VII

Watershed Point Rainfall Isohyetal Maps . . . . . . . . . . . . . . . . . . . . . . . . . VIII

Intensity Duration Curves - Mass Rainfall Plotting Sheets . . . . . . . . . . . . . . . . IX

Rational Method Calculations For Fm and Tc . . . . . . . . . . . . . . . . . . . . . . . X Y Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Runoff Hydrographs XI1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Hydrology Map Pocket

DISCUSSION

PURPOSE

The purpose of this study was to analyze existing conditions of Cable Creek watershed using current San Bernardino County Flood Control District (SBCFCD) approved criteria and to make recommendations for improvements to the Cable Creek mainstream system from the mouth of Cable Creek Canyon to its confluence with Devil Creek Diversion Channel. This report summarizes the criteria, assumptions, findings and recommendations of the study.

The scope of this study included the following:

+ define the basin and subarea boundaries of watershed contributing storm runoff to the Cable Creek upstream of its confluence with Devil Creek Diversion Channel;

+ develop a hydrological model of the Cable Creek watershed, calculate peak 100-year runoff at flow concentration nodes along Cable Creek and prepare a Hydrology Map;

evaluate alternatives and develop preliminary sizes for the recommended facilities along Cable Creek Channel, including. a debrisldetention basin and channel improvements;

+ establish preliminary requirements for right-of-way;

+ prepare preliminary cost estimates for the recommended improvements.

BACKGROUND

Cable Creek is a partially improved facility, located in the foothills of the San Bernardino Mountains in the northerly portion of the City of San Bernardino. It initiates as an unimproved watercourse at the mouth of Cable Canyon, east of Interstate 15 and Route 215 Interchange, and flows south to the Cable Creek Spreading Grounds; thence flows south-east for approximately three (3) miles to the Devil Creek Diversion Channel.

Existing improvements include structural crossings at Cypress Avenue, Palm Avenue, Kendall Drive, and Route 215; and rail and wire revetment channel with bottom controls from Cypress Avenue to + 12,200 feet upstream from the confluence with Devil Creek Diversion Channel.

- The confluence of Cable Creek with Devil Creek Diversion Channel is currently improved with a reinforced concrete lining. The existing improvements to Devil Creek Diversion Channel were designed to accept a peak discharge of 8,600 cfs from Cable Creek.

EVALUATION AND RECOMMENDATIONS

The watershed tributary to the Cable Creek Channel consists of approximately 10.7 square miles lying to the east of Cajon Canyon Wash, and includes Cable Canyon, Ames Canyon, Hopper Canyon, Meyers Canyon and Meecham Canyon. Ground elevation in the watershed varies from approximately 5600 feet at the Monument Peak to approximately 1550 feet at the confluence of Cable Creek and Devil Creek Diversion Channel. The ground slopes in a southerly direction with very steep grades (60% to 30%) in the north-east areas, and mild grades (6% to 2%) in the south-west areas.

Based on surface flow patterns, the watershed was divided into two basins as follows:

Drainage Basin-I consists of an approximately 6.5 square mile area in the northerly portion of the watershed. This basin includes the Cable Creek Canyon, Ames Canyon and Hopper Canyon areas, and is upstream of the Cable Canyon Spreading Grounds, as shown on the Hydrology Map.

Drainage Basin-I1 consists of an approximately 4.2 square mile area in the southerly portion of the watershed. This basin includes the Meyers Canyon and Meecham Canyon areas and drains directly to the Cable Canyon Spreading Grounds or to the Cable Creek Channel downstream from the Cable Canyon Spreading Grounds.

Based on initial evaluation of the watershed, basin topography, site conditions and discussions with the County and City staff, following are the conclusions on which this study was finalized:

+ In order to reduce the peak 100-year frequency storm flows discharging from Cable Creek into Devil's Creek Diversion Channel to equal approximately 8,600 cfs, a detention basin has been proposed to be constructed within the area of the existing Cable Creek Spreading Grounds. The detention basin is to be constructed within the existing SBCFCD's right-of-way. The basin will be located at the downstream end of Drainage Basin-I and has been sized to reduce the tributary 100-year peak inflow of 10,830 cfs to an outflow of 5,675 cfs into the Cable Creek Channel downstream from the basin.

+ Due to extremely steep topography of the watershed upstream from the detention basin (Drainage Basin-I) alternatives to locate debris basins at the mouth of the canyons (Cable Creek Canyon, Ames Canyon and Hopper Canyon) and channelization of flows from the debris basins to the detention basin were found to be undesirable. Channelized clear-water velocities in this reach would be very high (in excess of 60 feet per second), causing severe erosion potential. It was, therefore, concluded that the debris basin would be combined with the detention basin and the watercourses upstream from the detentionldebris basin will be maintained in its existing stable and natural state. Recommended improvements for this reach includes extension of the existing levee, and a new levee to be constructed southwesterly of the existing levee running parallel to the 1-215 corridor.

These levee improvements are to contain and deflect peak runoff, keeping flows within the Cable Creek System. Containment of the flows by the levees will also provide protection to the 1-215 freeway embankment. Limit lines .representing the 100-year floodplain boundaries along Cable Creek from the proposed debrisldetention basin upstream to the mouth of Cable Creek Canyon have been delineated on the preliminary plan and profile sheets (Section II).

Downstream from the proposed detentionldebris basin to the confluence of Cable Creek and Devil Creek Diversion Channel, the County has the required right-of-way to improve the existing channel to adequate capacity. Three channel improvement alternatives were evaluated, including (1) trapezoidal channel section with grouted riprap lining, (2) trapezoidal channel section with concrete lining, and (3) rectangular reinforced concrete lined channel section. Based on the cost estimates (Section 111) for the three alternate sections, the grouted riprap trapezoidal channel section is the least costly and the recommended alternative. Other factors leading to this recommendation include:

0 Flow velocity: grouted riprap channel will have lower velocities (i.e. 25 fps as compared to 40 fps for concrete channel) creating less disturbance at Devil's Creek confluence.

0 Aesthetics: the grouted riprap lining would blend better with the natural appearance of the terrain, versus a concrete lined channel.

HYDROLOGY

The hydrologic procedures used for this study are based on the San Bernardino County Hydrology Manual, dated August 1986. For a thorough discussion of the methodology, please refer to the Manual.

Rational Method calculations for times of concentration values as calculated by Sierra Engineering in a study titled "Master Hydrology Study, Verdemont Area", dated June 19, 1989, were used in this study for Drainage Basin I.

The unit hydrograph method has been used to calculate peak 100-year frequency storm runoffs along Cable Creek with AMC I1 conditions. The proposed detention basin volume requirements are based on AMC 111 conditions for areas upstream from the basin (Drainage Basin-I).

p Land use was assumed to be at built-out conditions based on the City of San Bernardino's Land Use Plan dated June 2, 1989. Steep mountain terrains with grades greater than 30% were assumed to be undevelopable with natural grass cover.

HYDRAULICS

The criteria used for the preliminary hydraulic design of the proposed improvements is in conformance with the San Bernardino County Hydrology Manual and the Hydraulic Design Manual - Los Angeles County Flood Control District.

+ Reach upstream of detentionldebris basin:

The hydraulic methodology entails water surface calculations using the "Standard Step Method" implemented with HEC 11 software. Since this reach is upstream from the debris basin, the 100-year peak flows were bulked by a factor of 2 for the hydraulic analysis.

+ Detentionldebris basin:

The proposed debrisldetention basin, located at existing Cable Creek Spreading Grounds, will serve as a sedimentation basin and also as a flood storageldetention basin. The basin will reduce the 100-year peak discharge from Cable Creek to 8,600 cfs at its confluence with Devil Creek Diversion Channel. The maximum allowable discharge at the confluence is 8,600 cfs. The basin volume of 993 acre-feet was established in two parts as follows:

0 The flow detention volume requirement of 415 acre-feet was calculated using the Modified Puls methodology outlined in San Bernardino County's Hydrology Manual.

0 The basin is designed to be over-excavated to provide an additional volume of 578 acre-feet to allow for deposition of the debris produced from the upstream areas, i.e.

Drainage Basin-I. The is in accordance with debris volume requirements furnished by SBCFCD.

+ Reach downstream from the detentionldebris basin:

The proposed channel improvements from Devil Creek Diversion Channel to the debrisldetention basin was evaluated using Los Angeles County WSPG program for three different alternative sections as follows:

0 Alternative #1: Grouted riprap lined trapezoidal section having llh:,l side slopes, 40 foot bottom width, and an overall depth of 12 feet.

0 Alternative #2: Concrete lined trapezoidal section having 1 lh: 1 side slopes, 40 foot bottom width, and an overall depth of 12 feet, lined to a depth of 9 feet.

0 Alternative #3: Concrete lined rectangular section having a 40 foot bottom width and an overall depth of 9 feet.

Following this discussion section, this report includes plan and profile of the concept design of the proposed improvements, preliminary cost estimates for the alternatives evaluated, hydraulic and hydrology calculations, and the Hydrology Map of the Cable Creek Watershed.

PLANS AND PROFILES

SAN BERlclhRDCNO COUNTY FLOOD CONTROL DIS"I"ET

COST ESTIMATES

PROJECT COST ESTIMATE

AGENCY: SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT

PROJECT: CABLE CREEK CHANNEL IMPROVEMENTS

CHANNEL TYPE: GROUTED RIPRAP TRAPEZOIDAL

SUB-TOTAL =

CONTINGENCY (1 5%) =

TOTAL CONSTRUCTION COST =

ENGINEERING, INSPECTION & ADMINISTRATION (12%) =

TOTAL PROJECT COAT =

B A S I N EXCAVATION U N I T P R I C E ASSUMES

30% S O L I D ROCK REMOVAL.

C H L D A T E

SHEET OF

2001 East 1 st Street. Santa Ana. CA 92705 (714) 568-7300 . FAX (714) 836-5906 FAX

PROJECT COST ES-I-IMATE

PROJECT: CABLE CREEK CHANNEL IMPROVEMENTS

CHANNEL TYPE: REINFORCED CONCRETE TRAPEZOIDAL

ITEM

NO.

I 14 CELL 13'WXl O'H (60' LONG) I I I I I

1 9 136" DIA RCP BASIN LOW FLOW OUTLET I LF I 1,900 1 100.00 1 190.000 1

DESCRIPTION

SUB-TOTAL =

CONTINGENCY (1 5%) =

TOTAL CONSTRUCTION COST =

ENGINEERING, INSPECTION & ADM INlSTRATlON (1 2%) =

TOTAL PROJECT COST =

TRAPEZOIDAL CHANNEL (CONCRETE)

BASIN OUTLET STRUCT.

MAGNOLIA AVE RCB

4 CELL 13'WXlO'H 160' LONG)

* B A S I N EXCAVAATION U N I T P R I C E ASSUMES

30% S O L I D ROCK REMOVAL.

UNITS

CY

LS

CY

QUANTITY

43,306

UNIT

PRICE

TOTAL

COST

200.00

1,189,435.56

450.00

8,661,200

1,189,436

180,000

BY DATE

C H L D A T E

SHEET OF

2001 East 1 st Street. Santa Ana. CA 92705 (714) 568-7300 FAX (714) 836-5906 FAX

TASK JOB NO.

. ..-A . . . * r

0' ' .

. - . A

-1. .

I4 . -.. .

0 '-..

I,?\<

I . .

Con

. . E x v . ~ , FI \I

B& f / / I ou

~ O ? L

&/YL

t \ / . -/---r (46-*/

. . 4-L,% r

9 % k

//< f-

((302 . . XI

. . / 2 7

.. 3 l * x / z / 7 - 7

+ . . . . /d,l

. / t , 7 %

/ 2 7

X . / Z ~ J -

6%

~ e / r , C ~ r c r p / / ~ o ~ r ~

~ 1 ) / 2 7 x

. . . /&/I--

& / 6 / J - Q

. . . . + ' l / . 6 > l ) ~ 3 ~ + f / i 9 ~ : / +

/i

/ 6 l r O

; 6 % ~ ) ~ ; 0 ~ )

7ra#~?~a/d~ /

PROJECT COST ESTIMATE

PROJECT: CABLE CREEK CHANNEL IMPROVEMENTS

CHANNEL TYPE: REINFORCED CONCRETE RECTANGULAR

SUB-TOTAL =

CONTINGENCY (1 5%) =

TOTAL CONSTRUCTION COST =

ENGINEERING, INSPECTION & ADMINISTRATION (12%) =

TOTAL PROJECT COST =

B A S I N EXCAVATION U N I T P R I C E ASSUMES

30% S O L I D ROCK REMOVAL.

COP~SULTANTS TO GOVERNM'ENTZ, AGENCIES

:3">-- . . -m ~ = d . . -&-TT:- zs@a

C H L D A T L

SHEET 0 F

2W1 East 1 st Slreet. Santa Ana. CA 92705 (714) 568-7300 . FAX (714) 836-5906 FAX

WATER SURFACE PROFILE,

UPSTREAM OF DETENTIONIDEBRIS BASIN

Date: 01-12-1994

P ro jec t : CABLE CREEK

Descr ip t ion: LEVEE HEIGHT DETERMINATION FOR LEVEE ALONG

FREEWAY U/S OF BASIN

** Open Channel Flow - I r r e g u l a r Cross Sect ion **

Discharge Average M a x i m Area Top Froude E levat ion

( c f s ) VeLoci ty Depth ( sq f t ) Width Number ( f t )

( f t / s ) ( f t ) ( f t )

3089. 11.96 4.65 258.19 82.55 1.19 1950.65

** Cross Sect ion Desc r ip t i on **

STA ELEV n STA ELEV n STA €LEV n

Channel s lope ( f t / f t ) = .01600

Discharge Along Freeway: 3,089 cfs Normal Depth = 4.5' Levee Height = D, + 3.5' Freeboard = 4.65 + 3.5 = 8 . 1 5 ' Use 8.5' High Levee 2 : l Side Slope

T H I S RUN EXECUTED 20OEC93 1 5 : 0 9 : 3 0

HEC-2 WATER SURFACE PROFILES

V e r s i o n 4.6.2; May 1991

T 1 CABLE CREEK

T 2 SAN BERNARDINO COUNTY

T 3 CABLE CREEK U / S OF D E B R I S B A S I N

7 4 1 0 0 YR. DISCHARGE INCREASED BY 1 0 0 PERCENT DUE TO BULKING / NODE 5 9 8

T 5 B S I / L.JOHNSON / INPUT F I L E : CABLE.SUP

J 1 ICHECK I N Q N I NV [ D I R STRT METRIC HV lNS Q WSEL FQ

J 2 NPROF I P L O T PRFVS XSECV XSECH FN ALLDC I B U CHNIM I TRACE

J 3 VARIABLE CODES FOR SUMMARY PRlNTOUT i--

SECNO DEPTH CWSEL CRIWS WSELK EG HV H L OLOSS L-BANK ELEV

Q QLOB QCH QROB ALOE ACH' AROB VOL TWA R-BANK ELEV

T IME VLOB VCH VROB XNL XNCH XNR UTN E L M I N SSTA

SLOPE XLOBL XLCH XLOBR I T R I A L I D C ICONT CORAR TOPUlD ENDST

C R I T I C A L DEPTH TO BE CALCULATED AT A L L CROSS SECTIONS

*SECNO 2 3 2 . 8 0 0

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 2 3 2 . 8 0 , 2 1 . 7 5 0 FT AND MULTIPLYING BY 2 . 0 3 5

3 2 6 5 D I V I D E D FLOW -

3 3 0 1 HV CHANGED MORE THAN H V I N S

3 3 0 2 WARNING: CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE. KRATIO = 5.02

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 1.01, - 7 . 2 5 0 FT AND M U L T I P L Y I N G BY - 8 3 0

3301 HV CHANGED MORE THAN H V I N S

3 3 0 2 WARNING: CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE, K R A T I O = - 3 9

L..

SECNO DEPTH CUSEL CRIUS USELK EG H V HL OLOSS L-BANK ELEV

Q QLOB QCH QROB ALOE ACH AROB VOL TUA R-BANK ELEV

T I M E VLOB VCH VROB XNL XNCH XNR WTN E L M l N SSTA

SLOPE XLOBL XLCH XLOBR I T R l A L I D C ICONT CORAR TOPUID ENDST

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 1 .02 , - 7 . 2 5 0 FT AND M U L T I P L Y I N G BY - 7 9 6

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 1 . 0 3 , - 7 . 2 5 0 FT AND M U L T I P L Y I N G BY . 7 4 4

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 2 2 2 . 8 0 , 3 1 . 3 3 3 FT AND M U L T I P L Y I N G BY 6 . 0 1 3

3 3 0 2 WARNING: CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE, KRATIO = 1 . 7 4

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 1 .01 , - 1 5 . 6 6 7 FT AND M U L T I P L Y I N G BY . 5 8 3

3 3 0 1 HV CHANGED MORE THAN H V l N S

3 3 0 2 WARNING: CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE, K R A T l O = . 5 7

SECNO DEPTH CWSEL CRIUS USELK EG H V HL OLOSS L-BANK ELEV

Q PLOB QCH QROB ALOE ACH AROB VOL T UA R-BANK ELEV

T IME VLOB VCH VROB XNL XNCH XNR WTN E L M I N SSTA

SLOPE XLOBL XLCH XLOBR I T R I A L I D C ICONT CORAR TOPWID ENDST

1 6 4 5 I N 1 SEC ADDED BY R A I S I N G SEC 1.02, - 1 5 . 6 6 7 FT AND M U L T I P L Y I N G BY - 2 8 5

3 2 6 5 D I V I D E D FLOU

3 3 0 1 HV CHANGED MORE THAN HVINS

3 2 6 5 D I V I D E D FLOW

3 2 8 0 CROSS SECTION 211 - 0 0 EXTENDED . 8 0 FEET

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 1 8 9 . 0 0 , 2 3 . 0 0 0 F T AND M U L T I P L Y I N G BY . 6 5 5

3 3 0 1 HV CHANGED MORE THAN H V I N S

1 6 4 5 I N T SEC ADDED BY R A I S I N G SEC 1.01, - 2 3 . 0 0 0 F T AND M U L T I P L Y I N G BY 1 . 5 2 6 rP-

SECNO DEPTH CWSEL CRIWS WSELK EG H V HL OLOSS L-BANK ELEV

Q QLOB QCH QROB ALOB ACH AROB VOL T UA R-BANK ELEV

T I M E VLOB VCH VROB XNL XNCH XNR WTN E L M I N SSTA

SLOPE XLOBL XLCH XLOBR I T R I A L I D C ICONT CORAR TOPWID ENDST

3 2 6 5 D I V I D E D FLOW

T H I S RUN EXECUTED 20DEC93 1 5 : 0 9 : 3 4

HEC-2 WATER SURFACE P R O F I L E S

Version 4.6.2; M a y 1991

NOTE- ASTERISK (*) AT LEFT OF CROSS-SECTION NUMBER I N D I C A T E S MESSAGE I N SUMMARY OF ERRORS L I S T

CREEK U/S OF D E B R I S BAS

SUMMARY PRINTOUT

SECNO TOPWID DEPTH CWSEL ELTRD ELLC XLBEL RBEL QCH

SUMMARY OF ERRORS AND SPECIAL NOTES

CAUTION SECNO= 232.800 PROFILE. 1 INTERPOLATED X-SECTIONS USED

CAUTION SECNO= 222.800 PROFILE= 1 INTERPOLATED X-SECTIONS USED

CAUTION SECNO= 1 8 9 . 0 0 0 PROFILE= 1 INTERPOLATED X-SECTIONS USED

DETENTION/DEBRIS BASIN RATING

BY DATE

CONSULTANTS. INC.

CHK DATE

CHK DATE

TASK JOB NO.

I i - * . . - - - -

.L . .

I

7nn1 Fact 1ct Street Santa Ann C A 4770.5 . 1714) 56R-7?nn . F A X 17141 R?6-54nfi FAX w

(7

.f /ow a so00 , v c r r P /a ~780

I / /& y C XI) . -

STORM DRAIN ANALYSIS PLUS

Ori-1 vers ion by Los Angeles County Publ ic Works

Po 3 Copyrighted by CIVILSOFT, 1986, 1987, 1989

Version 1.20

Ser ia l Number 07010257

Dec 14, 1993 14:34: 1

Input f i l e : C:\TEMP\CABLE-C.DAT

Output f i l e : C:\TEMP\CABLE-C.081

INPUT FILE LISTING

T I CABLE CREEK CHANNEL/ BSI / L.JOHNSON

T2 COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

T3 BSI CONSULTANTS / L-JOHNSON

SO 14700.0 1820.00 1 .014

R 15300.0 1828.00 1 .014

R 16300.0 1846.00 1 .OIL

TS 16700.0 1852.00 10 .014

TS 16900.0 1859.50 11 -014

TS 17100.0 1859.70 12 -014

TS 17420.0 1860.02 13 .OIL

SH 13

SP

WATER SURFACE P R O F I L E - CHANNEL D E F I N I T I O N L I S T I N G PAGE 1

CAP-SECT CHN NO OF AVE P I E R HEIGHT 1 BASE ZL ZR I N V Y(1) Y(2) Y(3) Y(4) ~ ( 5 ) ' Y(6) Y(7) Y(8) Y(9) ~ ( 1 0 )

C NO TYPE P I E R S WIDTH DIAMETER WIDTH DROP

PAGE NO 1

WATER SURFACE PROFILE - T I T L E CARD L I S T I N G

/h

HE. L I N E NO 1 I S -

CABLE CREEK CHANNEL/ B S I / L-JOHNSON

HEADING L I N E NO 2 I S -

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

HEADING L I N E NO 3 I S -

B S I CONSULTANTS / L.JOHNSON

PAGE NO 2

WATER SURFACE PROFILE - ELEMENT CARD L I S T I N G

E, i NO 1 I S A SYSTEM OUTLET * *

U/S DATA STATION INVERT SECT

14700.00 1820.00 1

ELEMENT NO 2 I S A REACH * * *

U/S DATA STATION INVERT SECT

15300.00 1828.00 1

ELEMENT NO 3 I S A REACH

U/S DATA STATION INVERT SECT

16300.00 1846.00 1

ELEMENT NO 4 I S A TRANSIT ION * *

U/S DATA STATION INVERT SECT

16700.00 1852.00 10

ELEMENT NO 5 I S A TRANSIT ION * *

U/S DATA STATION INVERT SECT

16900.00 1859.50 11

ELEMENT NO 6 I S A TRANSIT ION t *

U/S DATA STATION INVERT SECT

17100.00 1859.70 12

ELEMENT NO 7 I S A TRANSIT ION * * *

U/S DATA STATION INVERT SECT

17420.00 1860.02 13

ELEMENT NO 8 I S A SYSTEM HEADUORKS *

U/S DATA STATION INVERT SECT

17420.00 1860.02 13

NO E D I T ERRORS ENCOUNTERED-COMPUTATION I S NOW BEGINNING

W S ELEV

-00

W S ELEV

1870.00

RADIUS ANGLE ANG PT MAN H

-00 .oo -00 0

RADIUS ANGLE ANG PT MAN H

-00 -00 .oo 0

WATER SURFACE PROFILE L I S T I N G

CABLE CREEK CHANNEL/ B S I / L.JOHNSON

C W N T Y OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ ZL NO AVBPR

€LEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH D I A I D NO. P IER

L/ELEM SO S F A V E HF NORM DEPTH ' ZR

CABLE CREEK CHANNEL/ B S I / L-JOHNSON

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH U.S. 9 VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF FLOU ELEV HEAD GRD.EL. ELEV DEPTH D I A I D NO. P I E R

L/ELEM SO SF AVE HF NORM DEPTH ZR

TRANS STR -03750 -03317 6.63 1 .50

TRANS STR -00100 .00202 .40 .oo

TRANS STR -00100 .00003 .01 1.50

CWNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L.JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF FLOU €LEV HEAD GRD.EL. ELEV DEPTH D I A I 0 NO. P I E R

L/ELEM SO S F A V E HF NORM DEPTH ZR

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L.JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH D I A I D NO. P I E R

L/ELEM SO S F A V E HF NORM DEPTH ZR

TRANS STR -01500 1.50

TRANS STR -03750 -02608 5.22 1.50

TRANS STR .00100 .00148 .30 -00

TRANS STR .00100 .00003 -01 1.50

UATER SURFACE PROFILE L I S T I N G

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ ZL NO AVBPR

ELEV OF FLOW ELEV HEAD GRD.EL. ELEV DEPTH D I A I D NO. P I E R

L/ELEM SO S F A V E HF NORM DEPTH ZR

C W N T Y OF SAN BERNAROINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L.JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

€LEV OF FLOW ELEV HEAD GRO.EL. ELEV DEPTH D I A I D NO. P I E R

L/ELEM SO S F A V E HF NORM DEPTH ZR

TRANS STR . 0 1 5 0 0 1.50

TRANS STR . 0 3 7 5 0 . 0 2 0 6 6 4.13 1.50

TRANS STR . 0 0 1 0 0

. 0 0 1 3 0 .26 .OO

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L.JOHNSON

STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ ZL NO AVBPR

ELEV OF FLOW ELEV HEAD GRD-EL. ELEV DEPTH D I A I D NO. P I E R

L/ELEM SO S F A V E HF NORM DEPTH ZR

************************t*****t*****************************************************************************n***************n*********

TRANS STR .00100 .00003 -01 1.50

WATER SURFACE PROFILE LISTING

CABLE CREEK CHANNEL/ BSI / L.JOHNSON

COUNTY OF SAN BERNAROINO TRAPEZOIDAL CHANNEL

BSI CONSULTANTS / L.JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER CRITICAL HGT/ BASE/ ZL NO AVBPR

ELEV OF FLOW ELEV HEAD GRD-EL. ELEV DEPTH DIA ID NO. PIER

L/ELEM SO SFAVE HF NORM DEPTH ZR

TRANS STR -01500 .01837 7.35 1.50

16700.00 1852.00 1.47 1853.47 1650.0 21.50 7.18 1860.65 .OO 3.13 15.00 50.00 1.50 0 -00

TRANS STR .03750 -01438 2.88 1.50

16900.00 1859.50 3.07 1862.57 1650.0 9.95 1.54 1864.11 .OO 3.07 15.00 54.00 .OO 0 .OO -

TRA R .00100 .00115 .23 .OO

C W N T Y OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF F L W ELEV HEAD GRD.EL. ELEV DEPTH D I A I D NO. P IER

L/ELEM SO SF AVE HF NORM DEPTH ZR

TRANS STR .00100 .OD002 -01 1.50

UATER SURFACE PROFILE L I S T I N G

CWNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF FLOW ELEV HEAD GRD-EL. ELEV DEPTH D I A I D NO. P IER

L/ELEM SO S F A V E HF NORM DEPTH ZR

TRANS STR .01500 .01624 6 .49 1.50

TRANS STR .03750 .01112 2.22 1.50

TRANS STR .00100 .00108 .22 .00

TRANS STR .00100 .00002 .01 1.50

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH W.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF FLOW E L E V HEAD GRD-EL. ELEV DEPTH D I A I D NO. P I E R

L/ELEM SO S F A V E HF NORM DEPTH ZR

TRANS STR -01500 -01374 5.50 1.50

TRANS STR -03750 -00860 1.72 1.50

TRANS STR .00100 .00104 .21 .OO

TRANS STR .00100 .00002 .01 1.50

COUNTY OF SAN BERNARDINO TRAPEZOIDAL CHANNEL

B S I CONSULTANTS / L-JOHNSON

STATION INVERT DEPTH U.S. Q VEL VEL ENERGY SUPER C R I T I C A L HGT/ BASE/ Z L NO AVBPR

ELEV OF FLOW E L E V HEAD GRD-EL. E L E V DEPTH D I A I D NO. P I E R

L/ELEM SO SF AVE HF NORM DEPTH ZR

TRANS STR .01500 .01119 4.48 1 .50

TRANS STR .03750 .00680 1.36 1 .50

TRANS STR .00100 .00102 -20 .oo

TRANS STR .00100 .00001 .00 1 .50

HYDROLOGY MAP

File details come from the government source that posted it. Updated .