Ross_Point_Final_Phase_1_Drawings_033121.pdf
PDF 20 MB Posted
- Attached to
- ROSS POINT RECREATION SITE IMPROVEMENTS PHASE 1
- Solicitation number
- 140L2621R0006
About this file
This document outlines a federal contract opportunity for recreation site improvements. The solicitation number is 140L2621R0006 and seeks proposals for Phase 1 of the Ross Point Recreation Site Improvements project. The Department of the Interior Bureau of Land Management Idaho Region will award a contract to provide recreation site construction services. Phase 1 will involve initial site preparation and infrastructure development at the Ross Point recreation area. Proposals were due by March 31, 2021, and the contract award is expected shortly thereafter. The project aims to upgrade facilities and enhance the visitor experience at the Ross Point site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
ROSS POINT RECREATION SITE IMPROVEMENTS
PHASE 1
INDEX OF DRAWINGS
PROJECT LOCATION SITE ACCESS
DESIGNERS
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE
YOU DIG, GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND MEMBER
UTILITIES
PROJECT VICINITY:
POST FALLS
PROJECT VICINITY
GENERAL
G001 COVER SHEET
CIVIL
C001 CIVIL NOTES AND LEGEND
C101 EXISTING SITE
C102 PHASING PLAN
C103 DEMOLITION PLAN
C104 SITE IMPROVEMENT PLAN
C201 PLAN & PROFILE
C202 PLAN & PROFILE
C203 PLAN & PROFILE
C301 PAVILION SECTION
C501 DETAILS
C502 DETAILS
STRUCTURAL
S001 GENERAL STRUCTURAL NOTES
S101 PAVILLION STRUCTURE
S501 STRUCTURAL DETAILS
ELECTRICAL
E101 ELECTRICAL SITE LAYOUT AND LEGEND
E102 PAVILLION POWER AND LIGHTING PLAN
E501 ELECTRICAL DETAILS
COEUR D'ALENE
HWY 90
PROJECT LOCATION
MAPLEWOOD AVE
SPOKANE RIVER
PROJECT
LOCATION
Bryce Marsh
2021.03.31 09:53:08
-06'00'
GENERAL NOTES
1. ALL CONTRACTORS, AND SUBCONTRACTORS SHALL ATTEND A PRE-CONSTRUCTION
CONFERENCE WITH THE CONTRACTING OFFICER (CO) PRIOR TO START OF WORK.
2. ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR
COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS AND REGULATIONS. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES, AND CONTROL OF TRAFFIC WITHIN
AND AROUND THE CONSTRUCTION AREA.
3. WHEN DISCREPANCIES OCCUR BETWEEN THE PLANS, SPECIFICATIONS, AND/OR FIELD
CONDITIONS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CO.
4. THE LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL
DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK.
CALL DIG-LINE AT 811 A MINIMUM OF 48 HOURS PRIOR TO EXCAVATING TO REQUEST LOCATIONS
OF UNDERGROUND UTILITIES. UTILITY LOCATION AND VERIFICATION SHALL BE AN ONGOING
PROCESS. WHERE CONFLICTING UTILITIES MAY BE PRESENT, THE CONTRACTOR SHALL VERIFY
LOCATION AHEAD OF TRENCHING OPERATIONS, AND IMMEDIATELY NOTIFY THE CO OF ANY
POTENTIAL CONFLICTS.
5. CONTRACTORS SHALL NOTIFY THE CO WHEN MATERIALS ARE ON SITE OR INSPECTION OF THE
WORK IS REQUIRED. NO WORK MAY BEGIN ON ANY PROJECT WITHOUT TWENTY-FOUR (24) HOUR
PRIOR NOTICE.
6. ALL MATERIAL FURNISHED ON OR FOR THE PROJECT MUST MEET THE MINIMUM REQUIREMENTS
OF THE GOVERNMENT. AT THE REQUEST OF THE CO, CONTRACTORS SHALL FURNISH PROOF
THAT ALL MATERIALS INSTALLED ON THIS PROJECT MEET THE SPECIFICATION REQUIREMENTS
SET FORTH.
7. WORK SUBJECT TO APPROVAL BY THE GOVERNMENT MUST BE APPROVED PRIOR TO (A)
BACKFILLING; (B) PLACING OF AGGREGATE BASE; AND (C) PLACING OF CONCRETE.
8. RETAIN AND PROTECT ALL FEATURES NOT DESIGNATED TO BE MODIFIED OR CONSTRUCTED.
9. ALL EXISTING FEATURES WHICH ARE BEING JOINED OR MATCHED IN CONNECTION WITH THIS
PROJECT, SHALL BE JOINED OR MATCHED IN A MANNER SATISFACTORY TO THE GOVERNMENT
INCLUDING NECESSARY SAW CUTTING, REMOVAL, REPLACEMENT, AND CAPPING.
10. SITE SHALL BE CLEANED AND RESTORED TO ORIGINAL OR BETTER CONDITION UPON
COMPLETION OF WORK.
11. THE CONTRACTOR SHALL REPAVE OR RE-GRAVEL TO EXISTING GRADE ANY EXISTING PAVED OR
GRAVELED STREETS DISTURBED DURING CONSTRUCTION.
12. CONTRACTOR SHALL ENSURE THAT ALL SIDEWALKS, RAMPS, ACCESSIBLE PARKING SPACES, AND OTHER PEDESTRIAN ACCESS ITEMS COMPLY WITH THE AMERICANS WITH DISABILITIES ACT
ACCESSIBLE GUIDELINES (ADAAG) REQUIREMENTS.
13. TEMPORARY SHORING, BRACING, FORMING, SCAFFOLDING, ETC. ARE THE SOLE RESPONSIBILITY
OF THE CONTRACTOR OR SUBCONTRACTORS AND HAVE NOT BEEN CONSIDERED BY THE
DESIGNER.
14. NO CHANGES ARE TO BE MADE TO THESE PLANS WITHOUT THE KNOWLEDGE AND CONSENT OF
THE GOVERNMENT AND DESIGNER.
15. PROVIDE 14 DAYS NOTICE PRIOR TO START OF CONSTRUCTION FOR GOVERNMENT STAFF
PLANNING PURPOSES.
EROSION AND SEDIMENT CONTROL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL, STATE, AND FEDERAL
PERMITS REQUIRED FOR STORM WATER MANAGEMENT AS A RESULT OF CONSTRUCTION
ACTIVITIES. THE CONTRACTOR SHALL PREPARE A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP) FOR REVIEW BY THE CONTRACTING OFFICER. THE CONTRACTOR SHALL OBTAIN A COPY
OF THE U.S. ENVIRONMENTAL PROTECTION AGENCY'S (EPA) NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) CONSTRUCTION GENERAL PERMIT (CGP) FOR STORM WATER
DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY AND SUBMIT AND FILE A NOTICE OF
INTENT (NOI) AND NOTICE OF TERMINATION (NOT) AS REQUIRED BY THE EPA OR WITH THE LOCAL
IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY. THE CGP DOES NOT RELIEVE THE
CONTRACTOR FROM COMPLIANCE WITH OTHER REGULATIONS OR CONTRACT REQUIREMENTS
REGARDING STORM WATER POLLUTION PREVENTION INCLUDING BUT NOT LIMITED TO
PROTECTION OF SURFACE WATERS, PREVENTION OF TRACKED SOILS TO ADJACENT STREETS,
FUEL CONTAINMENT, SPILL CONTROL, ETC.
2. THE CONTRACTOR SHALL TAKE ALL NECESSARY ACTION TO MINIMIZE DEPOSITING AND TRACKING
OF MUD, DIRT, SAND, GRAVEL, ROCK, OR DEBRIS ON TO THE PUBLIC RIGHT-OF-WAY. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY CLEAN UP OF THE PUBLIC RIGHTS-OF-WAY OR
ADJACENT PRIVATE PROPERTY FROM ANY TRACKING OR DEPOSITING OF MUD, DIRT, SAND,
GRAVEL, ROCK, OR DEBRIS.
3. NO DEBRIS, DIRT, AGGREGATE, OR EXCAVATED MATERIALS OR CONSTRUCTION SUPPLIES, SHALL
BE PLACED ON THE PUBLIC RIGHT-OF-WAY UNLESS PERMITTED BY THE GOVERNMENT AGENCY,
OR OTHER CONTROLLING ENTITY. IN ADDITION, PUBLIC APPROACHES SHALL NOT BE REMOVED, BLOCKED, OR OTHERWISE RENDERED UNUSABLE BY CONSTRUCTION ACTIVITY, EQUIPMENT OR
MATERIALS, OR PORTABLE TOILETS, UNLESS A SAFE, USABLE ALTERNATE WALKWAY, WHICH
MEETS THE DESIGN STANDARDS, IS PLACED ON THE SAME SIDE OF THE RIGHT-OF-WAY BY THE
CONTRACTOR.
SURVEY NOTES:
1. EXISTING FEATURES: EXISTING ROADWAYS, UTILITIES, STRUCTURES, AND OTHER FEATURES ARE
SHOWN APPROXIMATELY AND THE LOCATION, DEPTH AND ACCURACY OF SURFICIAL
INFORMATION SHALL BE FIELD VERIFIED. ADDITIONAL UNDERGROUND FEATURES MAY EXIST.
2. COORDINATES AND ELEVATIONS FOR THE PROJECT SITE ARE BASED ON A SITE SPECIFIC
CONSTRUCTION SURVEY.
3. THE CONTRACTOR SHALL FIELD VERIFY AND PROTECT ALL BENCHMARKS AND OTHER
DIMENSIONS AND ELEVATIONS PRIOR TO COMMENCEMENT OF WORK. NOTIFY THE CO OF ANY
CONFLICTS.
CIVIL NOTES:
1. ALL EQUIPMENT SHALL BE CLEANED AND INSPECTED PRIOR TO USE ON THE PROJECT SO AS TO
PREVENT THE TRANSPORT AND SPREAD OF NOXIOUS WEEDS AS WELL AS TO PREVENT SPILLS
OR LEAKS OF EQUIPMENT FLUID.
2. SERVICE AND REFUEL EQUIPMENT IN DESIGNATED AREAS ONLY.
3. DISTURBANCES IN STAGING AREAS SHALL BE KEPT TO A MINIMUM, AND SHALL BE RESTORED TO
EXISTING CONDITIONS AFTER CONSTRUCTION ACTIVITIES.
4. STRIP AND STOCKPILE TOPSOIL/GRAVEL FOR REUSE AFTER COMPLETION OF CONSTRUCTION
ACTIVITIES.
5. PROVIDE BEST MANAGEMENT PRACTICES FOR STORMWATER CONTROLS PRIOR TO AND DURING
CONSTRUCTION. THIS PLAN SHALL BE IN ACCORDANCE WITH CITY OF POST FALLS (COPF),
INCLUDING ALL REQUIRED PERMITS AND APPROVALS, PRIOR TO CONSTRUCTION.
6. AT COMPLETION OF PROJECT STOCKPILE AREAS SHALL BE REMOVED AND RESTORED TO
EXISTING CONDITION UNLESS SPECIFIED OTHERWISE BY GOVERNMENT.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL SITE STABILIZATION AND EROSION
CONTROL MEASURES, BETWEEN CONSTRUCTION PHASES, TO PREVENT SEDIMENT FROM
MOVING OFFSITE AND PROTECT IMPROVEMENTS FROM UNDERCUTTING, MOVEMENT OR
SETTLEMENT.
8. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE REHABILITATED TO THE ORIGINAL
CONTOURS AND RESTORED TO THE ORIGINAL CONDITION TO THE GREATEST EXTENT POSSIBLE.
9. ALL CONSTRUCTION SHALL MEET THE COPF AND THE IDAHO STANDARD FOR PUBLIC WORKS
CONSTRUCTION (INSPWC) CURRENT EDITION.
10. WATER MAIN INSTALLATION SHALL COMPLY WITH THE COPF.
11. ASPHALT SURFACE REPAIRS SHALL CONFORM WITH THE COPF PAVEMENT CUT POLICY.
EROSION AND SEDIMENT CONTROL NOTES (CONTINUED)
4. STAGING, PARKING AND SOIL STOCKPILE AREAS SHALL BE SHOWN ON THE SWPPP LISTED IN
EROSION AND SEDIMENT CONTROL NOTE 1. NO SOILS OR AGGREGATE STOCKPILES ARE
PERMITTED ON UNDISTURBED PORTIONS OF THE PROPERTY WITHOUT PRIOR APPROVAL OF THE
GOVERNMENT AND UNLESS EROSION CONTROL MEASURES ARE IN PLACE TO PREVENT
DEPOSITION OF THE OFF-SITE SEDIMENT.
5. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO EXISTING NON-PAVED AREA CAUSED BY
VEHICLES AND EQUIPMENT. ALL DAMAGE TO EXISTING VEGETATION SHALL BE RESTORED TO THE
CONDITION THAT EXISTED PRIOR TO CONSTRUCTION OR BETTER.
6. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT GOVERNMENT, FEDERAL, STATE AND LOCAL
AGENCIES WHICH HAVE JURISDICTION OVER DUST FOR THE CONTROL PROCEDURES AND
ADDITIVES USED IN DUST ABATEMENT. THE CONTRACTOR SHALL PREPARE AND MAINTAIN A DUST
CONTROL PLAN.
7. ALL NAVIGABLE WATERS OF THE U.S. SHALL BE PROTECTED FROM CONSTRUCTION ACTIVITIES.
8. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALL PERMITS NECESSARY TO WORK
IN AND ADJACENT TO THE SPOKANE RIVER.
CONCRETE NOTES:
1. CONCRETE STRENGTH TO BE A MINIMUM F'C=4,000 PSI IN 28 DAYS.
2. SLUMP 4” MAXIMUM, AGGREGATE 3/4” MAXIMUM, AIR CONTENT 6 + 1.5.
3. CONCRETE SHALL BE TO THE STRENGTH AND SLUMP SPECIFIED AND CONSIST OF: ASTM C-150
TYPE I OR II CEMENT, U.N.O. OR AS SPECIFIED BY THE GEOTECHNICAL ENGINEER. AGGREGATE
SHALL CONFORM TO ASTM C-33.
4. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CALCIUM CHLORIDE SHALL NOT BE USED.
5. SLAB-ON-GRADE SHALL BE POURED LEVEL TO WITHIN 1/8” IN 10' U.N.O.
6. CONCRETE CONTRACTOR SHALL DAMPEN SAND UNDERLAYMENT PRIOR TO CONCRETE
PLACEMENT TO ASSIST UNIFORM CONCRETE CURING.
7. THE BOTTOMS OF FOOTING EXCAVATIONS SHALL BE LEVEL, CLEAN AND FREE OF LOOSE
MATERIAL. OVER EXCAVATED FOOTINGS SHALL BE FILLED WITH CONCRETE.
8. REMOVE ALL DEBRIS FROM FORMS BEFORE CASTING ANY CONCRETE.
9. SPECIFICATIONS FOR MIXING, PLACING, AND FINISHING SHALL BE AS PER ACI-302.
10. CONSOLIDATE CONCRETE PLACED IN FORMS BY MECHANICAL VIBRATING EQUIPMENT
SUPPLEMENTED BY HAND-SPADING, RODDING OR TAMPING. USE EQUIPMENT AND PROCEDURES
FOR CONSOLIDATION OF CONCRETE IN ACCORDANCE WITH THE RECOMMENDED PRACTICES OF
ACI 309 TO SUIT THE TYPE OF CONCRETE AND PROJECT CONDITIONS.
11. CONCRETE SHALL NOT BE DROPPED THROUGH REINFORCING STEEL (AS IN WALLS) SO AS TO
CAUSE SEGREGATION OF AGGREGATES. IN SUCH CASES HOPPERS AND CHUTES OF VARIABLE
LENGTHS SHALL BE USED SO THAT THE FREE UNCONFINED FALL OF CONCRETE SHALL NOT
EXCEED 6 FEET.
12. WATER TO CEMENT RATIO SHALL NOT EXCEED 0.45.
13. PROVIDE CONTROL JOINTS A MIN OF EVERY 225 SF OF SLAB CUT THE SAME DAY AS THE SLAB IS
PLACED.
LEGEND
EXISTING ASPHALT
PROPOSED ASPHALT
EXISTING CONCRETE
PROPOSED CONCRETE
EXISTING GRAVEL
EXISTING RIPRAP
PROPOSED RIPRAP
EXISTING SAND
EXISTING MAJOR CONTOURS
EXISTING MINOR CONTOURS
PROPOSED MAJOR CONTOURS
PROPOSED MINOR CONTOURS
EXISTING FENCE
PROPOSED FENCE
EXISTING WATER MAIN
PROPOSED WATER MAIN
EXISTING POWER LINE
EXISTING GAS
EXISTING COMMUNICATION
W
UGP
X
GAS
COM
EOA
EXISTING EDGE OF GRAVEL PATH
EXISTING EDGE OF ASPHALT
PROPOSED EDGE OF ASPHALT
EDGE OF WATER
ORDINARY LOW WATER
ORDINARY HIGH WATER
100 YEAR FLOOD ELEVATION
EXISTING POWER POLE
EXISTING HYDRANT
EXISTING DECIDUOUS TREE
EXISTING EVERGREEN TREE
EXISTING BRUSH
EXISTING GRASS
SURVEY CONTROL POINT
EXISTING PROPERTY BOUNDARY
PROPOSED DRAINAGE SWALE FLOWLINE
X
WM
REINFORCING STEEL NOTES:
1. ALL REINFORCING STEEL SHALL CONFORM TO ASTM A-615 GRADE 60 UNLESS SPECIFICALLY NOTED
OTHERWISE. ASTM A-615 GRADE 40 MAY BE USED FOR #3 BARS AT CONTRACTOR'S OPTION UNLESS THE
GRADE IS SPECIFICALLY NOTED OTHERWISE.
2. CONCRETE CLEAR COVERAGE TO REINFORCING STEEL SHALL CONFORM TO THE FOLLOWING MINIMUMS, U.N.O.
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3”
B. CONCRETE EXPOSED TO EARTH OR WEATHER:
1.1. #5 BARS AND SMALLER 1-1/2”
1.2. #6 BARS AND LARGER 2”
3. SPLICES IN CONTINUOUS REINFORCEMENT SHALL BE LAPPED U.N.O. IN NO CASE SHALL SPLICES BE LESS
THAN 40 BAR DIAMETERS. SPLICES IN ADJACENT BARS SHALL NOT BE LESS THAN 5' APART. SPLICE
CONTINUOUS BARS IN SOIL-BEARING GRADE BEAMS AS FOLLOWS: TOP BARS AT CENTERLINE OF SUPPORT;
BOTTOM BARS AT MID-SPAN. SPLICE CONTINUOUS BARS IN SPANDREL BEAMS, WALL BEAMS, ETC. AS
FOLLOWS: TOP BARS AT MID-SPAN; BOTTOM BARS AT CENTERLINE OF SUPPORT.
4. ALL HOOKS SHALL BE STANDARD HOOKS UNLESS OTHERWISE SHOWN OR NOTED.
5. FIELD BENDING OF REINFORCING BARS SHALL BE REVIEWED BY THE ENGINEER. BENDING MAY BE
UNIFORMLY PREHEATED TO 1400 TO 1600 DEGREES F, AND BENT PER CRSI RECOMMENDATIONS.
EOA
GRADING NOTES:
1. ALL CONCRETE SHALL CONFORM TO ADA GUIDELINES AND THE COPF AND UNLESS OTHERWISE INDICATED.
2. THE FINAL LOCATION OF ALL CONCRETE IMPROVEMENTS INCLUDING ALIGNMENTS, GRADES AND FORMS
SHALL BE APPROVED BY THE CO, PRIOR TO PLACEMENT OF CONCRETE.
3. SIDEWALK CROSS SLOPES SHALL HAVE A MINIMUM CROSS SLOPE OF 1% AND NOT TO EXCEED 2%.
PEDESTRIAN LANDINGS AND MANEUVERING AREAS SHALL MAINTAIN A 60" MINIMUM CLEAR SPACE AND NOT
EXCEED 2% SLOPE IN ANY DIRECTION.
4. LONGITUDINAL SLOPES OF WALKWAY SHALL NOT EXCEED 5% UNLESS OTHERWISE INDICATED.
CLICK HERE FOR CITY OF POST FALL STANDARD DRAWINGS
https://www.postfallsidaho.org/standard-drawings/
Bryce Marsh 2021.03.31
09:57:50 -06'00'
E O
A
E O
A
E O
A
E O
A
E O
A
E O
A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E O
A E O
A E O
A E O
A E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E O
A E O
A E O
A E O
A E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
EG
EGEGEGEGEG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EGEG
EGEGEGEG
EG
EG
EG
EG
EG
E G
E G
E G
EG
EG EG EG
EG
EG EG
EG
EG
EG
EG
EG
EG
EG
EG
E G
E G
E G
E G
E G
EG
EG
EG
EG
EG
EG
EGEG
EG
EGEG
EGEGEG
E G
E G
EG
EG EG
EG
EG
EG EG
EG EG
EG
EG
EG
EG
EG
EG EG
EG
EG
EG
EG
EG
EG
EG
EG
E G
E G
E G
E G
E G
E G
EG
EG EG EG
EG
EG
EG
EG
E G
E G
E G
E G
EG
EG
EG
EGEG
EG
EGEG
EGEGEG
EG
EG
E G
E G
E G
EG EG
EG
EG
EG EG EG
E G
UGPUGPUGPCOM
G A
S
GAS
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
CONSTRUCTION SURVEY
POINT #
CP 1
CP 2
CP 3
CP 4
NORTHING
2202047.65
2201973.36
2201964.82
2201617.52
EASTING
2348121.50
2348271.74
2348231.56
2348361.07
ELEVATION
2149.66
2150.48
2150.50
2150.06
DESCRIPTION
PK NAIL
CORNER
SECTION
PK NAIL
6" NAIL
1. EXISTING FEATURES: EXISTING ROADWAYS, UTILITIES, STRUCTURES, AND OTHER
FEATURES ARE SHOWN USING A COMBINATION OF THE CONSTRUCTION SURVEY AND
FIELD OBSERVATIONS.
2. VERIFICATION: APPROXIMATE SIZE, CONDITION, AND LOCATION OF EXISTING FEATURES
SHALL BE VERIFIED PRIOR TO CONSTRUCTION.
3. BOUNDARY IS SHOWN USING METES-AND-BOUNDS-SURVEY FILED JULY 15, 2015.
4. CONSTRUCTION SURVEY WAS CONDUCTED FOR GENERAL TOPOGRAPHICAL PURPOSES
AND GENERAL SITE CONDITIONS ONLY. CONTROL POINTS SHOWN CANNOT BE RELIED
UPON FOR HORIZONTAL AND VERTICAL CONTROL, BEYOND THIS PROJECT.
5. 100 YEAR FLOOD, ORDINARY HIGH WATER AND LOW WATER ELEVATIONS ARE BASED
UPON IDWR FLOOD HAZARD MAP. VERTICAL ELEVATIONS MAY VARY BASED UPON DATUM
UTILIZED.
SURVEY:
CONCRETE
BARRIERS
(TYP.)
EDGE OF WATER
RESTROOM
M A
P L E
W O
O D
A V
E
100 YEAR FLOOD ELEVATION
ORDINARY HIGH WATER
ELEVATION 2128
ORDINARY LOW WATER
ELEVATION 2121
PICNIC TABLE
STUMP
SIGN
TRASHCAN
TRANSFORMER
UTILIY BOX
GUY WIRE
BLOCK WALL
WOOD RAIL FENCE
EXISTING BEACH
S P
O K
A N
E R
IV
E
R
Bryce Marsh
09:54:16 -06'00'
A
E O
A
E O
A
E O
A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
UGPUGPUGPCOM
G A
S
GAS
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
W M
WM WM WM WM WM WM WM
X X
EOA
E O
A
E O
A
E O
A
E O
A
E O
A
EOG
EOG
EOG
EOG
EOG
EOG
EOG EOG EOG
EOG
EOG
EOG
E O
G
E O G
EO
G
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG EOG
EOG
EOG
EOG
EOG
E O
G
E O
G
EOG
EOG
EOG
EOG
EOG
EOG EOG
EOG
WM WM WM WM WM
W M
W M
W M
W M
W M
W M
W M
W M
W M
E O
A E
O A
EOG EOG EOG
EOGEOGEOGEOG
EOG EOG EOG EOG EOG
EOG EOG EOG EOG EOG EOG EOG EOG EOG EOG
EOG EOG EOG EOG EOG EOG EOG
EOG EOG EOG EOG EOG
E O G
EO
G
EO
G
EO
G
EO
G
EOG
EOG
EOG
EOG
EOG
EOGEOGEOG
EOG
EOG
EOG EOG EOG EOG
EOG EOG EOG EOG EOG EOG EOG EOG
E O
G E O
G E O
G E O
G E O
G
EOG
EOG
EOGEOG
EOGEOGEOG
WMWMWM WMWM
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W
MEO
G
EO
G
W M
W M
W M
W M
EOGEOGEOGEOG EOGEOGEOGEOG EOG EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOG
EOGEOGEOG
EOG
EOGEOGEOGEOGEOG
E O
G E
O G
E O G
E O G
EOG EOG EOG EOG EOG EOG EOG EOG EOG EOG EOG EOG EOG EOG
EOGEOGEOG
EOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOGEOG
E O
G E O
G E O
G W M
W M
W M
W M
W M
W M
W M
EOGEOG
EOGEOG
EOGEOGEOGEOGEOGEOG
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
W M
E O
A E
O A
E O
A E
O A
E O
A
W M
W M
W M
W M
W M
WMWMWMWMWMWM WMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWMWM WMWMWM WMWMWMWMWMWM WMWMWMWMWMWMWMWMWMWM WMWMWMWMWMWM WMWMWMWM
XXX XX
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOA
EOAE
O A
E O
A E
O A
E O
A E
O A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A E O
A
EOG
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
EOG EOGEOGEOGEOGEOGEOGEOG EOG EOG EOG EOG EOG EOG EOG EOG
EOGEOGEOGEOGEOG
EOG EOG EOG EOG EOG EOG EOG
EOGEOGEOGEOGEOGEOG EOG EOG EOG EOG EOG EOG EOG
EOGEOGEOGEOGEOG
M A
P L E
W O
O D
A V
E
PHASING NOTES:
PHASE 1:
· CONCRETE WALKWAYS AS INDICATED
· PIER, GANGWAY AND FLOATING DOCK.
· BANK STABILIZATION.
· PAVILION STRUCTURE, INTERIOR CONCRETE PAD AND ALL SITE ELECTRICAL
S P
O K
A N
E R
IV
E
R
NEW
VAULT
TOILET
PHASE 2
PHASE 2
PHASE 2
PHASE 2
PHASE 2
NEW PAVILION
BANK
STABILIZATION
FLOATING
DOCK
PEDESTRIAN PATH
NON-ADA PATH
TO BEACH
GANGWAY
PIER
PAVILLION
POWER
PHASE 2:
· PARKING LOT, REMAINING SIDEWALK, FENCING, PEDESTRIAN SIGNS, AND CROSSING TO FULL BUILDOUT.
· PICNIC SITES INCLUDING CONCRETE PAD, TABLES, GRILLS, & TRASH CANS.
· KIOSKS AND REMAINING SIGNAGE.
· IRRIGATION SERVICE AND DISTRIBUTION (NOT HIGHLIGHTED).
· FINAL LANDSCAPE (NOT HIGHLIGHTED).
· STORM WATER IMPROVEMENTS.
BANK
STABILIZATION
Bryce Marsh
09:58:16 -06'00'
A
E O
A
E O
A
E O
A
E O
A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
EG
EGEGEGEGEG
EG
EG
EG
EG
EG
EG
EG
EG
EG
EGEG
EGEGEGEG
EG
EG
EG
EG
EG
E G
E G
E G
EG
EG EG EG
EG
EG EG
EG
EG
EG
EG
EG
EG
EG
EG
E G
E G
E G
E G
E G
EG
EG
EG
EG
EG
EG
EGEG
EG
EGEG
EGEGEG
E G
E G
EG
EG EG
EG
EG
EG EG
EG EG
EG
EG
EG
EG
EG
EG EG
EG
EG
EG
EG
EG
EG
EG
EG
E G
E G
E G
E G
E G
E G
EG
EG EG EG
EG
EG
EG
EG
E G
E G
E G
E G
EG
EG
EG
EGEG
EG
EGEG
EGEGEG
EG
EG
E G
E G
E G
EG EG
EG
EG
EG EG EG
E G
UGPUGPUGPCOM
G A
S
GAS
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
CONCRETE BARRIERS
(TYP.)
EDGE OF WATER
RETAIN AND PROTECT
RESTROOM
M A
P L E
W O
O D
A V
E
MOVE TABLE OUTSIDE 100 YEAR
FLOOD ELEVATION; RETAIN AND
PROTECT PICNIC TABLE
STUMP
RETAIN AND PROTECT SIGN
VERTICAL CURB
RETAIN AND PROTECT TRASH CAN
RETAIN AND PROTECT
TRANSFORMER
UTILIY BOX
GUY WIRE
RETAIN AND PROTECT BLOCK WALL
DEMOLITION NOTES:
1. RETAIN AND PROTECT ALL VEGETATION UNLESS OTHERWISE NOTED.
2. RETAIN AND PROTECT ALL EXISTING UTILITIES.
3. RETAIN AND PROTECT ALL EXISTING SURVEY BENCHMARKS.
REMOVE EXISTING
RIPRAP AND DISPOSE
REMOVE NECESSARY CONCRETE
BARRIERS FOR PHASE 1 WORK AND
SALVAGE. REPLACE AT THE END OF
PHASE 1 CONSTRUCTION
RETAIN AND PROTECT
WOOD RAIL FENCE
S P
O K
A N
E R
IV
E
R
CLEAR AND GRUB
RETAIN AND PROTECT
EXISTING PATHWAYS
CLEAR AND GRUB
CLEAR AND GRUB
RETAIN AND PROTECT
EXISTING PATHWAYS
Bryce Marsh
09:58:42 -06'00'
A
E O
A
E O
A
E O
A
E O
A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
UGPUGPUGPCOM
G A
S
GAS
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A E
O A
E O
A
L1
L2
C1
C2
L
L4
L5
L6
C3
C
C
L10
L8
L9
C
L7
C6
C7
C8
N:2201523.01
E:2348357.41
N:2201559.27
E:2348359.03
N:2201558.48
E:2348307.04
N:2201568.31
E:2348241.37 N:2201524.30
E:2348238.91
N:2201485.83
E:2348273.69
N:2201485.83
E:2348211.69
N:2201504.01
E:2348187.94 N:2201474.71
E:2348172.90
N:2201486.43
E:2348139.11
N:2201513.83
E:2348145.86
N:2201529.25
E:2348167.67
POINT TABLE
POINT #
ELEVATION
2134.31
2134.31
2134.31
2134.31
2134.31
2147.57
2147.54
2147.20
2148.00
2147.00
2150.00
2148.03
2148.41
2148.38
2148.09
2143.21
2142.45
2133.12
2142.45
2133.40
2148.18
2148.24
2148.25
2148.25
2148.25
2148.25
NORTHING
2201576.15
2201569.33
2201569.33
2201574.33
2201572.00
2201670.50
2201656.53
2201622.09
2201636.06
2201615.85
2201851.52
2201780.48
2201819.43
2201819.43
2201783.65
2201697.43
2201677.53
2201572.93
2201678.23
2201569.33
2201790.01
2201790.01
2201778.51
2201778.51
2201785.01
2201785.01
EASTING
2348269.48
2348266.69
2348271.69
2348271.69
2348266.69
2348285.73
2348331.65
2348321.17
2348275.25
2348324.50
2348204.50
2348216.11
2348212.51
2348244.81
2348208.61
2348158.80
2348147.23
2348135.98
2348163.08
2348269.19
2348223.62
2348264.35
2348242.73
2348228.07
2348228.07
2348242.73
DESCRIPTION
CONC CORNER
CONC CORNER
CONC CORNER
CONC CORNER
CONC CORNER
FLOWLINE
FLOWLINE
FLOWLINE
FLOWLINE
FLOWLINE
DR1
DR1
DR2
DR2
PT1
PT1
PT2
PT2
PT3
PT3
WALKWAY
WALKWAY
VAULT
VAULT
VAULT
VAULT
xx
LINE TABLE: ALIGNMENTS
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
LENGTH
8.21'
22.01'
32.30'
42.27'
32.52'
0.13'
16.12'
82.57'
12.00'
4.00'
DIRECTION
S01° 42' 47"W
S00° 12' 30"W
N90° 00' 00"E
S52° 57' 30"W
S36° 47' 39"E
S30° 09' 25"W
S30° 09' 25"W
S46° 23' 58"E
S55° 59' 26"E
S00° 00' 00"E
ALIGNMENT NAME
DR1
DR1
DR2
PT1
PT1
PT1
PT2
PT3
PT3
PT3
Lx CURVE TABLE: ALIGNMENT
CURVE #
C1
C2
C3
C4
C5
C6
C7
C8
C9
RADIUS
32.00'
40.00'
10.00'
10.50'
14.50'
109.37'
85.11'
42.79'
315.83'
LENGTH
19.66'
23.52'
15.66'
28.76'
22.77'
42.85'
35.45'
17.41'
55.05'
DELTA ANGLE
035° 12' 01"
033° 41' 46"
089° 45' 10"
156° 55' 51"
089° 58' 46"
022° 26' 50"
023° 51' 44"
023° 19' 08"
009° 59' 13"
ALIGNMENT NAME
DR1
DR1
PT1
PT1
PT1
PT2
PT2
PT2
PT3
Cx
EDGE OF WATER
M A
P L E
W O
O D
A V
E
PICNIC TABLE TO BE
MOVED OUTSIDE OF
100-YR FLOOD PLAIN
STUMP
SIGN
10' OFFSET FROM
EDGE OF PAVILION
CONCRETE PAD
(TYP)
1. PROVIDE 42 CY OF HEAVY DUTY CONCRETE PER DETAIL
2/C501.
2. PROVIDE 5.5 CY OF CONCRETE WALKWAY SURROUNDING
RESTROOMS, REFER TO DETAIL 1/C501.
3. PROVIDE 45 CY OF CONCRETE WALKWAY TO PIER AND
BEACH, REFER TO DETAIL 4/C501.
4. PROVIDE PIER, GANGWAY, AND FLOATING DOCK, REFER
TO DETAIL 7/C502.
5. PROVIDE PAVILION, REFER TO STRUCTURAL DRAWINGS.
6. PROVIDE NEW PRE-MANUFACTURED VAULT TOILET, REFER
TO DETAIL 3/C501.
7. PROVIDE (2) 28 LF OF 6" DIA HDPE CORRUGATED STORM
DRAIN PIPE PER DETAIL 8/C502. CAPS ENDS FOR STORM
WATER IMPROVEMENTS IN PHASE 2.
8. PROVIDE 24 LF OF 12" DIA HDPE CORRUGATED STORM
DRAIN PIPE PER DETAIL 8/C502.
KEY NOTES:
SWIMMING
BUOY'S
5'X5' LANDING
L-SHAPE
FLOATING
DOCK
BEACH
RIPRAP BANK STABILIZATION
REGRADE SLOPE TO 3H:1V
MIN., AS NEEDED
SEE DETAIL 10/C502
EXISTING TRANSFORMER
REFER TO E101 FOR SITE ELECTRICAL
BOUNDARY
PLACE RIPRAP TO STABILIZE BANK.
COORDINATE WITH CO ON FINAL
LOCATION AND QUANTITIES.
REFER TO DETAIL 10/C502.
S P
O K
A N
E R
IV
E
R
1. REFER TO PHASING PLAN FOR PHASE 2 IMPROVEMENTS.
2. FINAL DOCK DESIGN AND LOCATION BY CONTRACTOR PER
GUIDANCE ON DETAIL 7/C502. COORDINATES MAY BE
ADJUSTED AS NEEDED BY DELEGATED DOCK DESIGN.
3. TURF ESTABLISHMENT SHALL BE COMPLETED FOR ANY
DISTURBED GROUND TO CONTROL EROSION AND
RE-ESTABLISH ORIGINAL GROUND CONDITIONS.
SITE IMPROVEMENT NOTES
±1,680 SF STORM RETENTION AND
NATIVE SEED/GRASS
26'X38' PAVILION
CONCRETE PAD
FFE = 2148.5
DRAINAGE DITCH
SEE DETAIL 9/C502
NEW VAULT
CONCRETE PAD
FFE = 2148.25
DRAINAGE DITCH TERMINATION
SEE DETAIL 11/C502
B
C301
A
C301
5'X5' LANDING
5'X5' LANDING
5'X5' LANDING
RAMP
30'@8% MAX
SIDEWALK LONGITUDINAL
SLOPE NOT TO EXCEED 5%
5' TYP.
5' TYP.
10' 15'
15'
30'
10'
PASSING
LANE
RAMP 30'@8% MAX
R15.1738'
INV IN = 2147.65'
INV OUT = 2147.05'
INV IN = 2139.5'
INV OUT = 2137.5'
PROVIDE ENERGY
DISSIPATOR
SEE DETAIL 12/C502
5'
(TYP)
22'
14'
Bryce Marsh
09:59:10 -06'00'
D
R
D
R
D
R
D
R
0+00
E G
.0
F G
.0
0+25
E G
.7
F G
.5
0+50
E G
.3
F G
.5
0+73
E G
.8
F G
.0
0.0% 3.1%
G R
A D
E B
R E
A K
S T
A
E L
E V
.0
G R
A D
E B
R E
A K
S T
A
E L
E
.0
G R
A D
E B
R E
A K
S T
A
E L
E
.0
0+00
E G
.3
F G
.2
0+25
E G
.9
F G
.0
0+32
E G
.0
F G
.0
0.7%
G R
A D
E B
R E
A K
S T
A
E L
E
.2
G R
A D
E B
R E
A K
S T
A
E L
E
.0
D R
D R
D R
SERVICE DRIVE PLAN (DR1)1
C201
SERVICE DRIVE PLAN (DR2)2
C201
6" STORM DRAIN EXISTING
GROUND
FINISH
GRADE
EXISTING
GROUND
FINISH
GRADE
Bryce Marsh
09:59:39 -06'00'
0+00
E G
.9
F G
.0
0+25
E G
.0
F G
.1
0+50
E G
.7
F G
.3
0+75
E G
.2
F G
.4
1+00
E G
.2
F G
.6
1+25
E G
.2
F G
.7
1+42
E G
.3
F G
.2
S T
A
.0
E
L E
.0
S T
A
.1
E
L E
.2
3.4%
0+00 E
G
.4
F G
.4
0+25
E G
.2
F G
.2
0+50
E G
.3
F G
.8
0+75
E G
.7
F G
.3
1+00
E G
.8
F G
.0
1+12
E G
.1
F G
.1
S T
A
.0
E
L E
.4
S T
A
.8
E
L E
.1
L = 17.47'
PVI STA = 0+23.00
PVI EL = 2141.50'
K = 2.98
HIGH POINT STA = 0+14.25
HIGH POINT EL = 2141.86'
P V
C S
T A
.2
P V
C E
L
.8
P V
T S
T A
.7
P V
T E
L
.6
L = 6.40'
PVI STA = 0+63.00
PVI EL = 2137.50'
K = 11.83
LOW POINT STA = 0+66.20
LOW POINT EL = 2137.20'
P V
C S
T A
.8
P V
C E
L
.8
P V
T S
T A
.2
P V
T E
L
.2
L = 5.99'
PVI STA = 1+00.00
PVI EL = 2134.00'
K = 2.97
LOW POINT STA = 1+03.00
LOW POINT EL = 2133.78'
P V
C S
T A
.0
P V
C E
L
.2
P V
T S
T A
.0
P V
T E
L
.7
10.0%
4.1%
9.5%
7.4%
P
T
P
T
0+50 P T1
0+75 PT1
1+00 P T
1+
P T1 1
P
T
P
T
P
T
P
T
P
T
1+00 PT2
1+12 PT2
PIER WALKWAY - 1 (PT1)1
C202
PIER WALKWAY - 2 (PT2)2
C202
12" STORM DRAIN
EXISTING
GROUND
FINISH
GRADE
FINISH
GRADE
EXISTING
GROUNDEXISTING
GROUND
Bryce Marsh
10:00:01 -06'00'
P
T
P
T
P
T
P
T
P
T
P
T
1+
P T3
1+
P T3
0+00
E G
.4
F G
.4
0+25
E G
.6
F G
.4
0+50
E G
.5
F G
.3
0+75
E G
.7
F G
.0
1+00
E G
.2
F G
.5
1+25
E G
.0
F G
.6
1+50
E G
.9
F G
.3
1+54
E G
.3
F G
.3
1.0% 6.9%
1.0%
7.3%
1.0%
7.3%
1.0%
4.0%
4.5%
S T
A
.0
E
L E
.4
S T
A
.6
E
L E
.3
S T
A
.9
E
L E
.3
S T
A
.8
E
L E
.5
S T
A
.8
E
L E
.6
S T
A
.9
E
L E
.8
S T
A
.9
E
L E
.8
S T
A
.9
E
L E
.0
S T
A
.9
E
L E
.0
L = 2.27'
PVI STA = 0+27.96
PVI EL = 2141.35'
K = 4.15
HIGH POINT STA = 0+26.82
HIGH POINT EL = 2141.39'
PVC STA = 0+26.82
PVC EL = 2141.39
PVT STA = 0+29.09
PVT EL = 2141.29
PIER WALKWAY - 3 (PT3)1
C203
EXISTING
GROUND
FINISH
GRADE
Bryce Marsh
10:00:26 -06'00'
FFE PER PLAN
SCALE: NTS
PAVILION SECTIONA
C301
SCALE: NTS
PAVILION SECTIONB
C301
STORM RETENTION
(PHASE 1)
FFE PER PLAN
26'
38'
10'10'
SLOPE TOWARD
EXISTING GRADE
10'
SLOPE TOWARD
EXISTING GRADE
SLOPE TOWARD
EXISTING GRADE
SLOPE TOWARD
EXISTING GRADE
3 MAX
3 MAX
3 MAX
3 MAX
Bryce Marsh
2021.03.31 10:00:51
8" CONCRETE
REINFORCED WITH #4 BAR AT 12" OC
4" CRUSHED AGGREGATE
BASE COURSE
FIRM NATIVE SOILS OR
SATISFACTORY FILL SOILS
PROVIDE THICKENED EDGE
ALONG BOTH SIDES AND
ENDS OF SECTION
12"
AS SHOWN ON PLAN
12"
SLOPE AWAY FROM
FINISH GRADE 2H:1V (TYP)
SCALE: NTS
HEAVY DUTY CONCRETE SLAB2
C104
6"
SCALE: NTS
TYPICAL PRE-MANUFACTURED VAULT TOILET3
C104
SCALE: NTS
CONCRETE WALKWAY1
C104
CXT GUNNISON SINGLE USER
WATERLESS RESTROOM (6'-6"
X 14'-8" 1,000 GALLON VAULT
TOILET) OR APPROVED EQUAL
PREPARED
SUB-GRADE
FIRM NATIVE SOILS OR ENGINEERED
COMPACTED FILL
PRIOR TO PLACEMENT OF BUILDING A PROPERLY PREPARED SUB-BASE
SHALL BE PROVIDED. SUB-BASE SHALL BE A MINIMUM 6" THICK AND
CONSIST OF 3/4" MINUS CRUSHED ROCK COMPACTED TO 95% OF OPTIMUM
DENSITY IN ACCORDANCE WITH ASTM D 1557. FINISHED SURFACE OF
SUB-BASE SHALL BE UNIFORMLY LEVEL, NOT VARYING MORE THAN 1/2"
FROM A TRUE HORIZONTAL PLANE. REFER TO BUILDING HANDLING SHEET
FOR SUB-BASE REQUIREMENTS DURING BUILDING PLACEMENT.
SUB BASE THICKNESS
VARIES, 6" MINIMUM
2'-0"
TYPICAL
5" CONCRETE REINFORCED WITH #4
BAR AT 18" OC, BOTH WAYS
4" CRUSHED AGGREGATE BASE COURSE
FIRM NATIVE SOILS OR
SATISFACTORY FILL SOILS
AS SHOWN ON PLAN
12"
SLOPE AWAY FROM
FINISH GRADE 2H:1V (TYP)
12"
FIRST POUR SECOND POUR
1/2" DIA x 18" DOWEL
@ 18" O.C.
1/8" SAWCUT OR
TOOLED JOINT
EXPANSION JOINT
MATERIAL
1/2" JOINT
3/8" SEALANT
NOTE:
CONSTRUCTION JOINTS & CONTROL JOINT SHALL DIVIDE SLAB INTO AREAS
NOT EXCEEDING 225 SQFT WITHOUT REENTRANT CORNERS AND WITH
LENGTH TO WIDTH RATIOS NOT EXCEEDING 1 1/2 TO 1. CONTRACTOR SHALL
SUBMIT LAYOUT PLAN SHOWING PROPOSED CONTROL AND CONSTRUCTION
JOINT LOCATIONS. JOINT SPACING SHALL NOT EXCEED 20 FEET IN EITHER
DIRECTION. WALKWAYS SHALL HAVE CONTROL JOINTS EVERY 5 FEET AND
EXPANSION JOINTS EVERY 50 FEET MINIMUM.
CONSTRUCTION JOINT
CONTROL JOINTEXPANSION JOINT
SCALE: NTS
TYPICAL SLAB CONTROL JOINTS6
C104
SCALE: NTS
RAMP LANDING PAD5
C104
A
C501
SCALE: NTS
SECTIONA
C501
R
AM
P
THICKENED EDGE
6" THICK 6" MINUS RIP
RAP PLACED AROUND
CONCRETE
#4 BAR 12" O.C.
EACH WAY
5'
6"
6" CRUSHED AGGREGATE BASE COURSE
6"
TERMINATE DRAINAGE DITCH
INTO TYPICAL RIP RAP SECTION
SCALE: NTS
CONCRETE WALKWAY WITH DRAINAGE DITCH4
C104
12" AS SHOWN ON PLAN 12"
5" CONCRETE REINFORCED WITH #4
BAR AT 18" OC, BOTH WAYS
2H:1V
2H:1V
2'
4" CRUSHED AGGREGATE BASE COURSE
FIRM NATIVE SOILS OR
SATISFACTORY FILL SOILS
3' MIN.3' MIN.
SLOPE TO DRAIN, TYP.
NOTE:
PROVIDE WALKWAY CROSS SLOPES
PER GENERAL GRADING NOTES.
FIRM NATIVE SOILS OR
SATISFACTORY FILL SOILS
Bryce Marsh 2021.03.31 10:01:17
3 MIN
3 MIN
PIER WITH COMPOSITE LOW
MAINTENANCE DECKING
48" PIER
PIER WITH ADA
HANDRAILS
STAINLESS STEEL GANG
WAY HINGE AND COVER
4'W x 48'L ASSEMBLY
ALUMINUM GANGWAY WITH ADA
HANDRAILS AND COMPOSITE
LOW MAINTENANCE DECKING
LOW PROFILE ROLLERS ON
FLOATING DOCK WITH 48" X 30"
ALUMINUM TRANSITION PLATE
ADJUSTABLE PILING BRACKET
FOR EACH 10" DIA PIER (TYP)
CORNER GUSSET
SWIM LADDER
POLYETHYLENE FLOATING
DOCK SECTIONS
SWIM LADDER
FLOATING SWIM
BUOY'S
62'
15' TYP.
SCALE: NTS
L DOCK CONCEPT7
C104
.5
COLLAPSIBLE MOORING
CLEAT, TYP OF 12.
6" MIN.
BEDDING COURSE
HDPE CULVERT, SEE PLANS FOR SIZE
INVERT ELEVATION PER PLAN.
GRADE LOCALLY TO ENSURE
POSITIVE DOWNSTREAM
DRAINAGE
INVERT ELEVATION
PER PLAN. GRADE
LOCALLY TO ENSURE
POSITIVE DRAINAGE
TO CULVERT
12" MIN.
DEPTH
VARIES
TOP OF BASE COURSE
PIPE ZONE MATERIAL
COMPACT TO 95% PROCTOR
BACKFILL WITH SATISFACTORY SOIL
COMPACT TO 95% PROCTOR
1/2 DIA.
MIN. TYP.
A
C502
6" MIN.
FIRM NATIVE SOILS OR
ENGINEERED COMPACTED FILL
12" THICK OF 6" MINUS RIP RAP SLOPE
STABILIZE BOTH SIDE OF CULVERT,
2' MIN. EACH SIDE OF CULVERT
12" THICK OF 6" MINUS RIP RAP SLOPE
STABILIZE BOTH SIDE OF CULVERT,
2' MIN. EACH SIDE OF CULVERT
SCALE: NTS
TYPICAL CULVERT8
C104
SCALE: NTS
SECTIONA
C502
SURFACE TREATMENT
PER PLAN
12" MIN
SCALE: NTS
TYPICAL DRAINAGE DITCH9
C104
NONWOVEN GEOTEXTILE FABRIC PER AASHTO
M288.06 FOR FINES GREATER THAN 50%
(CLASS II), LAP GEOTEXTILE A MINIMUM OF 12"
INTO EXISTING GROUND
6" THICK OF 6" MINUS RIP RAP
1' 1' 1'
EXISTING GRADE
SCALE: NTS
TYPICAL RIP RAP SECTION10
C104
ORDINARY LOW WATER
ELEV = 2121'
CLASS 4 RIP RAP IN
TOE, FP-14
21" THICK FHWA CLASS 2
RIP RAP, FP-14
4" THICK CRUSHED
AGGREGATE BEDDING
4'-9"
EXISTING GROUND
LENGTH PER PLAN
NOTE:
GEOTEXTILE SHALL BE CLASS 1 PER AASHTO
M288.06 FOR FINES GREATER THAN 50%.
SCALE: NTS
DRAINAGE DITCH TERMINATION11
C104
9'
10'
MIN
BEGIN HEAVY RIP RAP SECTION
END OF DRAINAGE SECTION
TRANSITION AND EXTEND GEOFABRIC
INTO HEAVY RIP RAP SECTION
6' WIDE
EMBED FABRIC 12"
INTO EXISTING SOIL
SCALE: NTS
TYPICAL ENERGY DISSIPATOR DETAIL12
C104
PROPOSED RETENTION BASIN
10oz NONWOVEN GEOTEXTILE FABRIC
12" MIN SOIL COVER
4' X 4' MIN 12" THICK ENERGY DISSIPATING
RIPRAP D50 = 6" OR APPROVED EQUAL
FINAL PIER AND DOCK DESIGN NOTES:
1. ALL SIZES AND LOADS REPRESENTED IN THIS PIER AND
DOCK CONCEPT WERE ASSUMED. ACTUAL SIZES, LAYOUT,
AND LOADING SHALL BE PROVIDED BY THE DELEGATED PIER
AND DOCK DESIGNER.
2. ALL RELEVANT LOADS AND LOAD COMBINATIONS PER ASCE
7 OR EQUIVALENT SHALL BE CHECKED FOR MOST CRITICAL.
3. THE FINAL PIER AND DOCK DESIGN SHALL BE DELEGATED TO
THE CONTRACTOR PROVIDED ENGINEER WITH THE ACTUAL
SIZES, LAYOUT, AND LOADS PROVIDED BY THE DELEGATED
PIER AND DOCK DESIGNER.
4. PILE SIZING AND DEPTHS AND OTHER ACCESSORIES (I.E.
SWIM BUOY'S) REQUIREMENTS SHALL BE PROVIDED BY THE
DELEGATED PIER AND DOCK DESIGNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING FINAL
PIER AND DOCK DESIGN AND SHALL COORDINATE ALL
APPROVALS WITH THE GOVERNMENT, INCLUDING
MATERIALS AND COLORS.
6. PIER AND DOCK LAYOUT ON SHEET C104 AND C502 ARE NOT
FOR CONSTRUCTION AND FOR REFERENCE ONLY.
DOCK REQUIREMENTS:
1. STEEL FRAME DOCK STRUCTURE.
2. POLYETHYLENE FLOATS.
3. 2' X 2' REINFORCED CONCRETE DECK PANELS .
4. RUBBER BUMPER EDGING SURROUNDING FLOAT
DOCK EDGES.
5. (12) COLLAPSIBLE MOORING CLEATS.
5' Bryce Marsh 2021.03.31 10:02:02
GENERAL NOTES:
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOBSITE CONDITIONS PRIOR TO
COMMENCEMENT OF WORK. ANY DISCREPANCIES BETWEEN THE SITE AND DRAWINGS
SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER (CO) PRIOR TO
CONSTRUCTION. CONDITIONS NOTED AS “EXISTING” ON THE DRAWINGS SHALL BE FIELD
VERIFIED BY THE CONTRACTOR. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CO
OF ANY DISCREPANCIES AND NOT PROCEED WITH CONSTRUCTION UNTIL FURTHER
DIRECTION IS PROVIDED.
2. THE DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE, AND,
UNLESS NOTED OTHERWISE, DO NOT SHOW THE METHOD OF CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR THE METHOD OF CONSTRUCTION, AND SHALL
PROVIDE ALL MEASURES NECESSARY TO PROTECT THE PUBLIC, CONSTRUCTION
WORKERS, AND THE STRUCTURE DURING CONSTRUCTION.
3. TEMPORARY SHORING, BRACING, FORMING, SCAFFOLDING, ETC. ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR OR SUBCONTRACTORS AND HAVE NOT BEEN
CONSIDERED BY THE ENGINEER. THE ENGINEER SHOULD BE CONSULTED FOR INTERIM
DESIGN FOR LOADS APPLIED TO AN UNFINISHED STRUCTURE.
4. NO CHANGES ARE TO BE MADE TO THESE PLANS WITHOUT THE KNOWLEDGE AND
CONSENT OF THE ENGINEER.
5. NO DEVIATIONS FROM STRUCTURAL DETAILS SHALL BE MADE WITHOUT THE WRITTEN
APPROVAL OF THE ENGINEER. APPROVAL FROM THE GOVERNING AGENCY DOES NOT
CONSTITUTE AUTHORITY TO DEVIATE FROM THE PLANS AND SPECIFICATIONS.
6. PROVIDE SPECIAL INSPECTION WHERE REQUIRED BY IBC, SECTION 1704.
7. NO FRAMING OF ANY TYPE SHALL BE CONCEALED PRIOR TO INSPECTION BY THE
GOVERNING AGENCIES.
8. FINISHED GRADE SHALL SLOPE AWAY FROM FOUNDATION AT A MINIMUM OF 2% FOR
IMPERVIOUS SURFACES AND 5% FOR SOIL FOR A MINIMUM OF 10 FEET.
CODES AND DESIGN CRITERIA:
1. ALL WORK SHALL CONFORM TO THE STANDARDS OF THE 2018 INTERNATIONAL BUILDING
CODE (IBC).
FOUNDATION NOTES:
1. THE MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS SHALL BE 4,000 PSI. NOTE
THAT THIS IS THE MINIMUM DESIGN VALUE. HIGHER VALUES MAY BE REQUIRED PER SITE
CONDITIONS, PER THE SOILS ENGINEER OR BUILDING OFFICIAL. FOR SPECIAL
EXPOSURES, REFER TO TABLES FOUND IN IBC SECTION 1904.
2. PROVIDE 3/4” CHAMFERS AT ALL EXPOSED CORNERS, U.N.O. BY ARCHITECTURAL
SPECIFICATIONS.
3. PREPARE ALL SUBGRADE SOILS PER GEOTECHNICAL ENGINEERS RECOMMENDATIONS,
PRIOR TO PLACEMENT OF FILLS SOILS, FOUNDATION REINFORCEMENT, OR CONCRETE.
CONCRETE NOTES:
1. CONCRETE STRENGTH TO BE A MINIMUM F'C=4,000 PSI IN 28 DAYS.
2. SLUMP 4” MAXIMUM, AGGREGATE 3/4” MAXIMUM, AIR CONTENT 6 + 1.5.
3. CONCRETE SHALL BE TO THE STRENGTH AND SLUMP SPECIFIED AND CONSIST OF: ASTM
C-150 TYPE I OR II CEMENT, U.N.O. OR AS SPECIFIED BY THE GEOTECHNICAL ENGINEER.
AGGREGATE SHALL CONFORM TO ASTM C-33.
4. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CALCIUM CHLORIDE SHALL NOT BE
USED.
5. CONCRETE CONTRACTOR SHALL DAMPEN SAND UNDERLAYMENT PRIOR TO CONCRETE
PLACEMENT TO ASSIST UNIFORM CONCRETE CURING.
6. THE BOTTOMS OF FOOTING EXCAVATIONS SHALL BE LEVEL, CLEAN AND FREE OF LOOSE
MATERIAL. OVER EXCAVATED FOOTINGS SHALL BE FILLED WITH CONCRETE.
7. REMOVE ALL DEBRIS FROM FORMS BEFORE CASTING ANY CONCRETE.
8. SPECIFICATIONS FOR MIXING, PLACING, AND FINISHING SHALL BE AS PER ACI-302.
9. CONSOLIDATE CONCRETE PLACED IN FORMS BY MECHANICAL VIBRATING EQUIPMENT
SUPPLEMENTED BY HAND-SPADING, RODDING OR TAMPING. USE EQUIPMENT AND
PROCEDURES FOR CONSOLIDATION OF CONCRETE IN ACCORDANCE WITH THE
RECOMMENDED PRACTICES OF ACI 309 TO SUIT THE TYPE OF CONCRETE AND PROJECT
CONDITIONS.
10.CONCRETE SHALL NOT BE DROPPED THROUGH REINFORCING STEEL (AS IN WALLS) SO AS
TO CAUSE SEGREGATION OF AGGREGATES. IN SUCH CASES HOPPERS AND CHUTES OF
VARIABLE LENGTHS SHALL BE USED SO THAT THE FREE UNCONFINED FALL OF CONCRETE
SHALL NOT EXCEED 6 FEET.
11.WATER TO CEMENT RATIO SHALL NOT EXCEED 0.45.
12.PROVIDE CONTROL JOINTS A MIN OF EVERY 225 SF OF SLAB CUT THE SAME DAY AS THE
SLAB IS PLACED.
REINFORCING STEEL NOTES:
1. ALL REINFORCING STEEL SHALL CONFORM TO ASTM A-615 GRADE 60 UNLESS
SPECIFICALLY NOTED OTHERWISE. ASTM A-615 GRADE 40 MAY BE USED FOR #3 BARS AT
CONTRACTOR'S OPTION UNLESS THE GRADE IS SPECIFICALLY NOTED OTHERWISE.
2. CONCRETE CLEAR COVERAGE TO REINFORCING STEEL SHALL CONFORM TO THE
FOLLOWING MINIMUMS, U.N.O.
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3”
B. CONCRETE EXPOSED TO EARTH OR WEATHER:
I.A. #5 BARS AND SMALLER 1-1/2”
II.B. #6 BARS AND LARGER 2”
3. SPLICES IN CONTINUOUS REINFORCEMENT SHALL BE LAPPED U.N.O. IN NO CASE SHALL
SPLICES BE LESS THAN 40 BAR DIAMETERS. SPLICES IN ADJACENT BARS SHALL NOT BE
LESS THAN 5' APART. SPLICE CONTINUOUS BARS IN SOIL-BEARING GRADE BEAMS AS
FOLLOWS: TOP BARS AT CENTERLINE OF SUPPORT; BOTTOM BARS AT MID-SPAN. SPLICE
CONTINUOUS BARS IN SPANDREL BEAMS, WALL BEAMS, ETC. AS FOLLOWS: TOP BARS AT
MID-SPAN; BOTTOM BARS AT CENTERLINE OF SUPPORT.
4. ALL HOOKS SHALL BE STANDARD HOOKS UNLESS OTHERWISE SHOWN OR NOTED.
5. FIELD BENDING OF REINFORCING BARS SHALL BE REVIEWED BY THE ENGINEER. BENDING
MAY BE UNIFORMLY PREHEATED TO 1400 TO 1600 DEGREES F, AND BENT PER CRSI
RECOMMENDATIONS.
STRUCTURAL STEEL NOTES:
1. ALL STRUCTURAL STEEL FRAMING SHALL BE DETAILED, FABRICATED, AND ERECTED PER
THE THIRTEENTH EDITION AISC SPECIFICATIONS AND CODE OF STANDARD PRACTICE,
EXCEPT AS MODIFIED BY THE IBC.
2. SHOP AND ERECTION DRAWINGS SHALL BE SUBMITTED FOR THE GOVERNMENT'S REVIEW
PRIOR TO FABRICATION. STEEL SHALL NOT BE ERECTED UNTIL THE REVIEWED SHOP
DRAWINGS ARE RECEIVED IN THE FIELD.
3. SHOP AND ERECTION DRAWINGS SHALL NOT CONTAIN ANY REPRODUCTIONS OF THE
STRUCTURAL DRAWINGS. SHOP DRAWINGS SHALL BE COMPLETE AND STAND ALONE,
SUCH THAT THEY DO NOT REFER TO THE STRUCTURAL DRAWINGS.
4. ALL FABRICATION SHALL BE DONE IN A SHOP THAT IS ACCEPTABLE TO THE GOVERNMENT.
CONTINUOUS, FULL-TIME INSPECTION OF SHOP FABRICATION MAY BE WAIVED ONLY TO
THE EXTENT APPROVED BY THE GOVERNMENT.
5. BOLTED CONNECTIONS:
A. HIGH STRENGTH BOLTS: CONTACT FACES AT CONNECTIONS WITH HIGH STRENGTH
BOLTS SHALL NOT BE PAINTED.
B. BEARING BOLTS: UNLESS SPECIFICALLY NOTED, ALL CONNECTIONS SHALL USE
BEARING (N) TYPE BOLTS.
C. SLIP CRITICAL BOLTS: SLIP CRITICAL (SC) CONNECTIONS SHALL USE LOAD INDICATOR
WASHERS PER THE MANUFACTURER'S RECOMMENDATIONS.
D. MOMENT CONNECTIONS: ALL MOMENT CONNECTIONS, SHALL USE SLIP CRITICAL
BOLTS.
6. WELDED CONNECTIONS:
A. ALL WELDING SHALL BE ELECTRIC ARC WELDING, AND SHALL BE PERFORMED ONLY
BY EXPERIENCED, QUALIFIED WELDERS. ELECTRODES SHALL BE E60 XX FOR METAL
DECK AND E70 XX FOR OTHERWISE, UNLESS SPECIFICALLY NOTED OTHERWISE.
WELDING SHALL CONFORM TO IBC SECTION 2204.1.
B. WELDS NOT SPECIFIED SHALL BE CONTINUOUS FILLET WELDS, WELD SIZE SHALL BE
PER AISC SPECIFICATIONS.
C. TESTING:
I. ALL GROOVE WELDS SHALL BE TESTED NON-DESTRUCTIVELY BY EITHER
RADIOGRAPHY OR ULTRASONIC TESTING. TESTING RATE SHALL BE 100%, BUT MAY BE
REDUCED AS ALLOWED BY IBC SECTION 1704.3.1.
II. AT ALL PLATES AND PORTIONS OF ROLLED SHAPES 1-1/2” THICK OR GREATER IN
THICKNESS, ZONES FOR WELDS THAT INDUCE THROUGH-THICKNESS SHRINKAGE
STRAINS SHALL BE 100% ULTRASONICALLY TESTED BEFORE AND AFTER WELDING.
ZONES WITH FLAWS SHALL NOT BE USED AS WELD LOCATIONS.
III. AISC TABLE 2 GROUPS 4 AND 5 SHALL CONFORM TO AISC SPECIFICATIONS SECTIONS
A3.1.C AND M2.2.
D. ALL COMPLETE PENETRATION WELD BACK UP BARS SHALL BE REMOVED. WELD SHALL
BE BACK-GOUGED, FILLED AND GROUND FLUSH, UNLESS NOTED OTHERWISE.
7. FABRICATION:
A. ALL STEEL SHALL BE SHOP PAINTED, UNLESS ENCASED IN CONCRETE, ROUTED
MASONRY, OR SPRAYED FIREPROOFING, UNLESS SPECIFICALLY NOTED ON THE
DRAWINGS AND SPECIFICATIONS.
B. STIFFENER PLATES SHALL EXTEND THE FULL WIDTH OF THE BEAM FLANGES, UNLESS
SPECIFICALLY NOTED OTHERWISE.
C. BASE PLATES AND COLUMN ENDS SHALL BE FINISHED PER AISC SPECIFICATIONS.
D. OPENINGS SHALL NOT BE PLACED IN STEEL MEMBERS UNLESS SPECIFICALLY SHOWN
ON THE STRUCTURAL DRAWINGS.
E. CONTINUITY PLATES SHALL BE CUT WITH CONCAVE QUARTER ROUNDS AT ALL WEB
TO FLANGE LOCATIONS.
8. ALL STEEL SHALL BE DELIVERED TO THE JOB SITE WITHOUT EXCESSIVE RUST, MILL
SCALE, GREASE, ETC.
Bryce Marsh
2021.03.31 10:02:36
S501
6" MIN CONCRETE SLAB WITH
#4 BARS @ 18" O.C. EACH WAY
SLOPE PAD TO DRAIN, 2% MAX
SLOPE IN ALL DIRECTIONS
4" MIN OF 3/4" CRUSHED
AGGREGATE BASE COURSE
24' X 36' GABLE SHELTER RCP
SHELTER MODEL AS-G2436-04
OR APPROVED EQUAL
21'32'
8'
STANDING SEAM METAL
ROOF SHEETING OR
APPROVED EQUAL
36'
24'
A
S101
STRUCTURAL NOTES:
1. RCP GABLE SHELTER STEEL OR APPROVED EQUAL COLOR TO BE APPROVED
BY THE GOVERNMENT.
2. RCP METAL ROOF SHEETING OR APPROVED EQUAL COLOR TO BE APPROVED
BY THE GOVERNMENT.
FINAL BUILD AND FOUNDATION DESIGN NOTES:
1. ALL BUILDING COLUMN SIZES AND LOADS REPRESENTED IN THIS FOUNDATION PLAN
WERE ASSUMED. ACTUAL SIZES, LAYOUT, AND LOADING SHALL BE PROVIDED BY THE
PRE-ENGINEERED METAL BUILDING DESIGNER.
2. ALL RELEVANT BUILDING LOADS AND LOAD COMBINATIONS PER ASCE 7 SHALL BE
CHECKED FOR MOST CRITICAL.
3. THE FINAL FOUNDATION DESIGN SHALL BE DELEGATED TO THE CONTRACTOR PROVIDED
FOUNDATION ENGINEER WITH THE ACTUAL SIZES, LAYOUT, AND LOADS PROVIDED BY
THE PRE-ENGINEERED METAL BUILDING DESIGNER.
4. METAL BUILDING COLUMNS BASE PLATES AND ANCHOR BOLT REQUIREMENTS SHALL BE
PROVIDED BY THE PRE-ENGINEERED METAL BUILDING DESIGNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING FINAL FOUNDATION AND BUILDING
DESIGN AND SHALL COORDINATE ALL APPROVALS WITH THE GOVERNMENT.
6. SHEET S101 AND S501 ARE NOT FOR CONSTRUCTION AND FOR REFERENCE ONLY.
7. ALL STEEL SHALL BE POWDER COAT FINISH WITH A COLOR APPROVED BY THE CO.
8. FINAL PICNIC TABLE LOCATIONS SHALL MEET ADA CLEAR SPACE AND MANEUVERING
REQUIREMENTS.
24" X 24" SQUARE
MASONRY ROCK TO
MATCH NATIVE ROCK
WITH FLAT ROCK CAP
24" X 24" SQUARE
MASONRY ROCK TO
MATCH NATIVE ROCK
WITH FLAT ROCK CAP
PAVILLION STRUCTURE PLAN VIEW1
S101
PAVILLION STRUCTURE SIDE VIEW2
S101
PAVILLION STRUCTURE SECTIONA
S101
60" MIN 36" 36"
60" MIN
26'
38'
60" MIN
Bryce Marsh
10:03:08 -06'00'
STEEL POSTS (TYP)
6" MIN CONCRETE SLAB WITH #4
BARS @ 18" O.C. EACH WAY MIN
REINFORCEMENT PER
FOUNDATION DESIGN
FIRM NATIVE SOIL OR ENGINEERED
COMPACTED FILL
Ø3'-6" CONCRETE FOOTING
#3 REINFORCEMENT HOOPS @ 8" O.C.
(30) #4 VERTICAL REINFORCEMENT
BARS EVENLY SPACED
ANCHOR BOLTS PER
PRE-ENGINEERED METAL BUILDING
MANUFACTURERS SPECIFICATION
MIN
EMBEDMENT PER
FOUNDATION DESIGN
PER FOUNDATION
DESIGN
3" MIN 3" MIN
4" MIN OF 3/4" CRUSHED
AGGREGATE
24" X 24" SQUARE MASONRY ROCK
POST BASE TO MATCH NATIVE
ROCK W/FLAT ROCK CAP
~2'
SCALE: NTS
PAVILION SHELTER FOOTING DETAIL (TYP)1
S101
Bryce Marsh
2021.03.31 10:03:33
UGPUGPUGPCOM
G
AS
GAS
LEGEND
LIGHT FIXTURE, WITH TEXT DENOTING LIGHT
FIXTURE TYPE.
110V DUPLEX RECEPTACLE
OCCUPANCY SENSOR
HOME RUN, WITH CIRCUIT CALLOUT
DISCONNECT SWITCH
GROUND ROD
TRANSFORMER
METER
1. PANEL 'LP1' FEEDERS SHALL BE (3) #8 CU. BURIED
IN (1) 1" CONDUIT. METER SHALL BE CONNECTED
BEFORE DISCONNECT SWITCH.
2. PANEL 'LP1' SHALL BE LOCKABLE AND MOUNTED
WITH UNISTRUT. PANEL ACCESS HANDLE SHALL
BE LOCATED AT 48" ABOVE GRADE.
KEY NOTES:
EDGE OF WATER
SP
O
KA
N
E R
IV
ER
M
AP
LE
W
O O
D A
VE
(1) 1" CONDUIT
PAVILLION
FOOTPRINT
TRANSFORMER
PANEL 'LP1'
DISCONNECT SWITCH
AND METER
OS
GROUND
ROD
PR
OFESS IONAL ENG INEER
D A R R E L L D E A
N
L
I C E N S E D
STA T E OF I DA HO
19543
SHEET NOTES:
1. GROUND AND NEUTRAL SHALL BE BONDED TOGETHER IN PANEL 'LP1'. IN
ADDITION TO CONDUCTOR WIRES, A #12 GND WIRE SHALL BE RAN WITH EACH
RUN. SERVICE SHALL BE SIZED WITH #8 GND WIRE. SIZE ALL OTHERS IN
ACCORDANCE WITH NEC TABLE 250.66.
2. CEILING OR SWITCH MOUNTED OCCUPANCY SENSORS ARE ACCEPTABLE.
3. ELECTRICAL EQUIPMENT ON SUPPLY SIDE OF SERVICE DISCONNECT SHALL
ADHERE TO NEC 230.82 AND NEC 250.25.
4. DSW-1 IS TO BE SERVICE RATED AND LABELED EMERGENCY DISCONNECT.
NOT SERVICE EQUIPMENT PER NEC 230.85.
120/240V
12400V
DSW-1: LABELED "EMERGENCY DISCONNECT, SERVICE DISCONNECT"
RATED 60AMP WITH CLASS 'H' OR 'K', 60AMP FUSE
PANEL
'LP1'
50A MCB
TO UTILITY
GN
PAVILLION POWER AND LIGHTING PLAN1
E102
SCALE: NTS
SINGLE LINE DIAGRAM2
E102
SCALE: NTS
PANEL SCHEDULE3
E102
SCALE: NTS
LIGHT FIXTURE SCHEDULE4
E102
(3) #8 CU W/ #8 GND IN 1" SCH 40 PVC
(3) #8 CU W/ #8 GND IN 1" SCH 40 PVC
PR
OFESS IONAL ENG INEER
D A R R E L L D E A
N
L
I C E N S E D
PANEL AND CIRCUIT
OF DEVICE, TYP
LABEL WITH BROTHER "P-TOUCH" SYSTEM. USE
CLEAR OR WHITE TAPE WITH BLACK LETTERING.
RATED NON-REVERSIBLE OR
EXOTHERMIC WELD CONNECTION
GROUNDING CONDUCTOR
GROUNDING ELECTRODE (ROD)
FINISHED GRADE
SCALE: NTS
DEVICE LABELING DETAIL1
E501 SCALE: NTS
GROUNDING ROD DETAIL2
E501
LEGEND
FINAL BACKFILL
PIPE ZONE
BEDDING
12" MAX.
6" MIN
12" MAX.
6" MIN
4"
" M
IN
" M
AX
IM
U
M
REJECT SAND OR SELECT 3/4" MINUS GRANULAR
EXCAVATED MATERIAL OR IMPORTED AGGREGATE
BACKFILL, COMPACTED TO 90% OF MAXIMUM
DENSITY. 85% FOR FINE GRAINED MATERIAL.
EXISTING GRANULAR MATERIAL
TO 90% OF MAX. DENSITY, 85%
FOR FINE GRAINED MATERIAL
EXISTING GRADE
WARNING TAPE
12" BELOW
GRADE
3" MIN FOR
LIKE CONDUIT6" MIN BETWEEN
POWER AND
COMM LINES
SCALE: NTS
TYPICAL ELECTRICAL TRENCH3
E501
PR
OFESS IONAL ENG INEER
D A R R E L L D E A
N
L
I C E N S E D
File details come from the government source that posted it. Updated .